HomeMy WebLinkAboutRESPONSE - BID - 5767 LEMAY AVENUE WIDENING PROJECT (11)Project: Lemay Avenue Widening Project Lawson Construction Company Date: 0210512003 Sp uer Numbmber Description Estimated Quantity Unit Unit Cost Item Cost Lemav Avenue Widening Quantities: 202-01 Remove Pipe (RCP, CMP, PVC) 180 LF ra'(n� 202-02 Remove Existing Wingwalls at Stone Creek Box Culvert 2 EA 5� � RS 202-03 Remove Existing Parapet Railing at Stone Creek Box Culvert 2 EA /6215-/ — 202-04 Remove Vertical Curb And Gutter 3,056 LF el — 202-05 Remove Concrete Sidewalk 7,898 SF 202-06 Remove Crosspan and Aprons 8,386 SF 202-07 Remove Asphalt Sidewalk (4" Thick) 15,280 SF 2 5rO ,3"d0 202-08 Asphalt Taper Mill (0"-2" Depth) 420 BY `/ 202-09 Rolomill Asphalt Pavement (0"-2" Depth) 7,715 SY �--*— //g .7-;7 —'- 202-10 Rolomill Asphalt Pavement (5"-10" Depth) 14,600 SY 202-11 Remove Existing Rip -Rap 2,941 SF 202-12 Remove Trash Pile at South Ridge Greens Golf Course 1 LS /tea �G$9ty 202-13 Remove Existing Barricade (Type III) 1 EAii 202-14 Remove Existing Willow Tree at Stone Creek Box Culvert 1 EA 202-15 Remove Fence (Various Types) 1,135 LF 202-16 Remove Existing Silt Fence 486 LF 1;2 97� 202-17 Remove Power Pole Anchors 6 EA /„7Gor--� 202-18 Cap Irrigation Sprinklers 6 EA cJ ' ,e J 202-19 Remove Manhole Cone Section - Abandon Sewer 3 EA 9 202-20 Remove and Dispose of 2" to 4" Sprinkler Pipe 1 LSG%=— 203-01 Unclassified Excavation 11,535 CY5'-- 203-02 Embankment -(CIP) 3,266 CY 203-03 Haul & Dispose 8,269 CY 203-04 Golf Course Grading 1 LS 203-05 Borrow ABC (Class 5 or 6) - (CIP) 300 TON o;7_6-- 203-06 Muck Excavation - (CIP) 500 CY /3 203-07 Topsoil - (Stripping, Stockpiling, Placing) - 6" Depth 5,210 CY / O 203-08 Topsoil - (Stripping, Haul Off -Site) 1,735 CY 'W'9 e 203-09 Temporary Access Road (Golf Course Maintenance Building) 1 LS -'o' 9b r- 203-10 Median Splashblock/ Hardscape Shaping - (CIP) 13,350 SF 203-11 Grade Stone Creek Channel Flowline and Slopes 1 LS ,;? eLe°y 203-12 Graded Flow Channel (Park Property) 340 LFGd- 203-13 Potholing 1 LS 203-14 Median Specialty Work (Excavation above Light and Power Duct Bank) 1,750 CY 203-15 Flowfill Section Over Shallow Utilities 1,800 LF .5,5j�' 206-01 Structure Excavation 4,863 CY 206-02 Borrow Structural Backfill Material (R-Value > 25) 3,800 CY ,� 6- ` %/-4 dryp 206-03 Structural Backfill Flow Fill 250 CY O —' ?y, �- 206-04 Filter Material (1 112" Washed Rock) 372 TON _5�e _ %011 /-?6 206-05 Dewatering 1 LS 0021eto 206-06 Structure Haul and Dispose 4,863 CY 206-07 Structure Muck Excavation 225 CY 207-01 Wetland Topsoil 100 CY 207-02 Import Topsoil Screened 3" Depth (BOC) - (CIP) 1,200 CY ✓� y ar e C _ 208-01 Erosion Control 1 LS 210-01 Adjust Manhole Ring/Cover 11 EA 210-02 Modify Manhole 5 EA ?[ge 210-03 Adjust Valve Box (FCLW D) 19 EA 9A_4 —'- 210-04 Relocate Blow Off (FCLWD) 2 EA ,Z�1 304-01 Aggregate Base Course - (Class 5 or 6) - 6" Depth - (CIP) 10,794 TON 304-02 Aggregate Base Course Patch Placement - (Class 5 or 6) - 6" Depth - (CIP) 377 TON Lawson Construction Company 306-01 Reconditioning (8") 19,015 SY ,�,?d _ L7 ' � ,3_0 307-01 Flyash Subgrade Stabilization - (12%) 33,649 SY 403-01 Hot Bituminous Pavement - Grading S (3" Depth) - (PG 64-28) 7,079 TON 403-02 Hot Bituminous Pavement -Grading SG (4" Depth) - (PG 64-22) 7,807 TON Jr. -3. , 7d 403-03 Asphalt Paver Patching - Grading S (3" Depth) - (PG 64-28) 215 TON 403-04 Asphalt Paver Patching - Grading SG (4" Depth) - (PG 64-22) 495 TON 403-05 Asphalt Patching - Grading SG (4" Depth) - (PG 64.22) 69 TON 214 403-06 80' x 4' Beaver Slide at Fossil Creek Bridge - Grading S (4" Depth) 32 TON 420-01 Geotextile Paving Membrane 9,000 SY r-4,� 420-02 Geogrid Stabilization Fabric 1,188 SY 506-01 45'x80' Type L Rip -Rap, 6" Topsoil (CIP Per Detail) Sta. 22+50 It 1 LS > /�' %GSA 506-02 22'x50' Type L Rip -Rap, 6" Topsoil (CIP Per Detail) Sta. 22+50 rt 1 LS � (%b0 506-03 10'x10' Type L Rip -Rap, 6" Topsoil (CIP Per Detail) Sta. 37+00 Lt 1 LS 506-04 10'x25' Type L Rip Rap, 6" Top Soil (CIP Per Detail) Sta. 54+30 Lt 1 LS /er� / Qf4O 601-01 10' x 12' Pedestrian Underpass with Skylights 125 LF -.,j$;7 601-02 4' x 12' Pre Cast Box Culvert- Wiinggw$aallss Paa/raphet Walls and Toe Walls 180 LF %/Oy ' T -2-6- 603-01 15" ADS N-12 25 LF (p/ _- /✓�� 603-02 15" ADS N-12 FES with Grate 1 EA 603-03 15" RCP Class III - 300 LF 603-04 18" RCP Class 111 25 LF _7!j 603-05 24" RCP Class III 18 LF jP -- 603-06 24" RCP Class III FES with Grate 1 EA 603-07 Remove and Reset Existing 30" ADS FES 1 EA��- 603-08 Concrete Joint Encasements 4 EA 603-09 Median Underdrain Pipe System - (4" Perforated Pipe) 870 LF S't3es r 603-10 Median Underdrain Pipe System - (4" Solid Pipe) 315 LF .�%✓l� /�`7,.Sc'l 603-11 Connect 4" PVC Solid Median Underdrain to a new 4' Manhole 1 EA 603-12 90 Degree PVC Bend (4") 1 EA -2f'-- �! -- 603-13 18" PVC SDR-35 (or District equal) 30 LF 604-01 10' Type R Inlet 1 EA Sd�b 604-02 Single Type 16 Combination Inlet 1 EA � �, 65dp 604-03 Double Type 16 Combination Inlet 1 EA 7�py.p- 604-04 Inlet in Retaining Wall with Trash Rack 1 EA 604-05 4' Diameter Manhole 1 EA 607-01 3 Rail Dowel Rail Fence with No Climb Fabric 467 LF 607-02 Orange Safety Fence at Gotf Course 1,739 LF 607-03 Portable Chain Link Fence (6' High) 800 LF Z' -5-0 608-01 Concrete Sidewalk (6") 35,448 SF 6) �+'1`��--f— ,® 608-02 Concrete Sidewalk (5" Thick with Fibermesh) - Yosemite Brown (Saw Cut Joints) 5,272 SF _S, 150 9 f'j _ 608-03 Concrete Flatwork at Underpass (6" Thick) - (Grey) 4,672 SF _91 - Rg - 608-04 Concrete Access Ramps with Truncated Dome (8") 6,293 SF 608-05 Concrete Drive Approach (6") 800 SF 608-06 Concrete Crosspan with Aprons (8") 7,621 SF 608-07 Hi -Early Concrete (24 Hour) 222 CY�- 608-08 Flowable Fill Concrete 600 CY ��p ,IfCZ �tQY 608-09 Exposed Aggerate Median Splashblock (4") 14,017 SF- 608-10 Pedestrian Refuge Island 300 SF 608-11 Patterned and Decorative Asphalt Crosswalks 2,650 SF /' •�V ( �'Y,O" 5 n 609-01 Vertical Curb & Gutter (30") 7,177 LF 609-02 Oulfall Curb & Gutter (18") 5,689 LF Lawson Construction Company 609-03 Driveway Curb Cuts (25' Width) 3 EA C /36 , 609-04 R & R Vertical Curb and Gutter 150 LF'- 609-05 R & R Drive -Over Curb and Gutter 100 LF 618-01 Pressure Grouting 75 CY _jib _540 619-01 20" DIP Class 51 with Field Lock Gaskets 600 LF 619-02 20" Butterfly Valve with Valve Box 2 EA"- 619-03 20" 45 Degree Bend with Thrust Block & Mega -Lug 7 EA 619-04 20" 22.5 Degree Bend with Thrust Block & Mega -Lug 2 EA"- 619-05 2" Air Release Valve with Manhole and Vent (Per FCLWD) 1 EA,- 619-06 Connect to Existing 20" DIP Main 2 EA lZYo 619-07 Fire Hydrant Assembly 3 EA'- 619-08 Blow -Off Assembly 1 EA 619-09 Remove Existing 20" Valve (Deliver to FCLWD) 1 EA Z7,7 619-10 Steel Encase 20" DIP Live Water Main 36" x 3/8" Coated Casing (FCLWD) 18 LF 3. 25_ 619-11 3/4" Irrigation Tap and Meter Pit 2 EA Z>�,V 619-12 6" PVC - C900 60 LF Al — 960 619-13 1 1/2" Water Service and Meter Pit 1 EA _ ?--/-*5-- 619-14 Wet Tap 6".x 20" Tapping Saddle, Valve and Box 1 EA 619-15 Cut 20" Valves In 2 EA / -O Subtotal Lemay Avenue Quantities: Landscaping Quantities: 2810-01 Irrigation System (This work does not include median irrigation) 1 LS A ~ T S�� -te) - Topsoil - Mix for Medians 1,420 CY - MSE Block Retaining Wall (Approx. 4' High) 365 LF - Concrete Retaining Wall (8' High) 602 LF /9oJ . �5;;P , - Restore Rock Areas For Private Owners 1 LS G "— G5Fegnpn `— Subtotal Landscaping Quantities: Miscellaneous Quantities: - Contract Bond 1.00 LS //a6100- 625-01 Construction Surveying 1.00 LS 626-01 Mobilization 1.00 LS 9(i eef> 630-01 Type III Barricades (7 boards for 20 days) 2.00 SECTION 630-02 Message Boards - 1.00 LS 630-03 Traffic Control 1.00 LS /.*V I 'Oft' Subtotal Misc. Quantities: Lawson Construction Company The sum of these two amounts will be used to determine the lowest successful bidder according to the following formula: A + B X (the daily cost) = Contractor's bid for evaluation for the lowest successful bidder Where: A = Contractor's total bid for the work items B = Number of Calendar Days required to substantially complete the Work Daily Cost for this Project = $4,109.00 A = Total Construction Cost (Lemay Avenue, Landscaping and Misc. Quantities) $ �� 3J9' (JS`j—� Z B = Total number of calendar days bid Total number of calendar days bid ( j�Jp ) X $4,109.00 = $ TOTAL PROJECT COST = A + B X (the daily cost) _ $ 3i Bzz �--i� 03' DATE TITLE FIRM NAME ieav ADDRESS /Qed?oK / 3Ie PHONE/FAX 903— ys/y-(#6gV /=fix