Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 2207049 5727 CHANGE ORDER 6 UTILITY SERVICE CENTECHANGE ORDER NO. 6 PROJECT TITLE: Utility Services Center Warehouse Storage Improvements — BID #5727 CONTRACTOR: Mark Young Construction, Inc. i PROJECT NUMBER: 5727 DESCRIPTION: In preparing change orders show in order as separate numbered paragraphs the following: Reason for change: Changes to the east retaining wall; removal of existing storm -sewer system in Elm Street; changes to the cutoff walls for the box culvert; shorten existing storm -sewer system; install trash rack on box culvert; add emergency discharge pipe to oil/water separator area; re -grade water quality pond; remove City's concrete blocks; and raise north retaining wall. 1. Description of change: See attached summary sheets. 2. Change in contract cost: Nineteen Thousand Three Hundred Ten Dollars ($19,310.00) 3. Change in contract time: No change in contract time. (Attach additional sheets as required) ORIGINAL CONTRACT COST $2,273,200 TOTAL APPROVED CHANGE ORDERS �gpF�t7 TOTAL PENDING CHANGE ORDERS -- TOTAL THIS CHANGE ORDER $%310 ADJUSTED CONTRACT COST $2,483,497 (Assumino all change orders approved) ACCEPTED BY: J ' " 2-1 Mark Young Construction, Inc. Date ACCEPTED BY: REVIEWED BY: APPROVED BY: Manager Architects Utilities General cc: City Clerk Project File Contractor Purchasing Engineer z -2. Date 220D bat 2 ks o Date