HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 15957Jan-22-03 16:17 From-URS 3037402650
L I CHA • V E UFLUtlK 'Nu-' 1
T-924 P-002/002 FIN
IROJECT TITLE: Selected Plan and 50-Year Analysis for the Dry Creek Basin.
.ONTRACTOR: URS Greiner
'.0. NUMBER: 2207874
TENDOR NUMBER: 101409
;BARGE NUMBER: 50452807.528180.3
3ESCRUMON
n preparing change orders show inorder as separate numbered paragraphs the
following:
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time
1. Additional work requested by the City.
2. Revised format for the selected plan of improvements.
3. $4,087.00 (Four Thousand Eighty -Seven Dollars)
4. Not Applicable.
Attach additional sheets as nixed)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
ADJUSTED CONTRACT C, O�%
ACCEPTED BY:
REVIEWED BY:
912
APPROVED BY:
DATE: Z
-*15957
s�G a/2-0 Joa
�2-2�-VJ
$38,008.50
$0.00
$0.00
$4,087.00
$42,095.50
DATE: -ZZ-O
✓l' "&` DATE: 1 L Y
(Purchasing Agent Over $ 15,000)
CC: City Clerk Purchasing
Contractor Project File
dryurschwft
DATE:
NOTE: Signature of Contractor matcames
agreement herewithin, including any adjustment
in contract sum or contract time.
January 22, 2003
Sue Paquette
City of Fort Collins, Utilities
700 Wood St.
Fort Collins, CO 80522-0580
RE: Revised format for the Selected Plan of Improvements - Dry Creek Basin Master Plan
The following discussion includes a cost estimate (attached) and schedule for the work related to the
reorganization of the Selected Plan of Improvements Appendix for the Dry Creek Master Plan.
For the cost estimate we have assumed that the tasks to be completed include the following:
Reorganization the Selected Plan of Improvements Appendix as necessary as outlined in the Selected Plan
Outline.doc received on December 10, 2002.
Add a section to each project reach description that addresses potential and existing locations for gaging
stations for possible flood emergency response and monitoring purposes.
Add a figure to the Selected Plan Appendix indicating the locations of the potential and existing gage
locations.
The total estimated cost to complete the work is $4, 087 and are requesting a change order for the Dry Creek
Selected Plan of Improvements budget for that amount.
We assume that these tasks can be completed with the final revisions to the draft Selected Plan of Improvements
Appendix and Attachments.
Please let us know at your earliest convenience is this cost estimate will meet your needs and is acceptable.
Sincerely,
Monica 8ortolini, P.E.
Project Manager
A - Cost Estimate
Creek/Greenbriar-Evergreen Master Plan
a
z
3 Z
F
[`
il
Z
Ci
F
y D:
U
Z
�"
Z
c�
G
F-
v
LtJ Z
¢
7..
Total Houle
Rate
Unit
Total
URS Professional _ _
Title
Steve Rogers, P.E.
B/C Task Mma er
0
107.50
$/hr
$ _
Tim Volz, P.E.
Princi al -in -Char e/ A&
0
135.75
$/hr
$ -_ -
Monica Bortolini, E.I.T.
Project Mane
20
92.00
S/hr
20.00
-
$ 1,840.00
Frank Lao, Ph.D., C.F.M.
Modeling Task Mena
0
99.50
S/hr
$ _
Michael Phillips, E.I.T., C.F.M.
- _--
Hydrologic Modeling
20
- -
73.75
$/Iv
20.00
--- ---
$ 1,475.00
Chris Williams, P.G.
Habitat/Stream Stability
0
92.00
$/Iv
- -
Tom Joseph, E.LT.
Technical Assistance _
0
62.50
$/br
$ _
Richard Chamberlain
GIS
0
92.00 _ _
S/hr
$ _
Ice Ri I
GIS/Modeling Interface
0
73.75
S/lv
g_.--
Drafter _
CADD/Draftin
4
65.50
SAv
4.00
$ 262.00
Jennifer Swender
Administration Assistance
_
10
51.00
$/hr _
10.00
- _
S 510.00
Christine Aldridge
Administration Assistance
0
51.00
$/Iv
--
-
--
$ _
Labor SubTotal
S 3,825.00
S -
S 262.00
S -
S -
S _
S 4.087.00
Expenses
Maps/Outside Relmoduction
1.00
1.00
cost+
$ -
Mileage(non-4WD)
._
-- 1.00
1.00
cost+
-
$ -�
Postal Services...
-_ _.
1.00
1.00 -
- cost+
_..
$ _
Field Expenses
-'n
1.00
1.00
1.00
1.00
-
wst+
cost+
-
--
g-
Sury Ex Moses
_.. _.---
Ancillary
1.00
1.00
wst+
Expenses SubTotal
S -
S
S
$
$
$
$
Total
S 3,82700 1
S -
S 262.00 1
S
$ I
$ I
S 4,087.00