HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 2201622 P812 SECOND SHEET ICESECTION 00950 CHANGE ORDER NO. 11 PROJECT TITLE: Second Sheet of Ice at EPIC CONTRACTOR: The Neenan Company BID NUMBER: P-812 DESCRIPTION: The design and construction of an addition to the Edora Pool Ice Center (EPIC) to house a full size ice arena and associated facilities and equipment. In preparing change orders show in order as separate numbered paragraphs the following: Reason for change: To incorporate miscellaneous changes into the contract. 2. Description of change: Provide all materials, labor and equipment necessary to: delete asphalt patching, wall in room 118, keying of locksets, bathroom accessories and lockers in coaches room; prep nine (9) hollow metal doors and frames for dead bolt locks; provide equipment shelf in storage room; enlarge two overhead doors to 12'X12'; install three (3) etched glass units; move wall between rooms 136 & 137 and add a closet; add drop ceiling in corridor 127; add subfloor to conditioning room; ventilate the Zamboni room; relocate RTU-3 and duct work to conditioning room; run CO & CO2 sensors to DDC panels; change light fixtures in locker rooms; add reflectors in conditioning room. 3. Change in Contract Cost: $22,810.00 4. Change in Contract Time: 2 Days (Attach additional sheets as required) ORIGINAL CONTRACT COST $3,360,896.00 TOTAL APPROVED CHANGE ORDERS 268.226.62 TOTAL PENDING CHANGE ORDERS 0.00 TOTAL THIS CHANGE ORDER 22,810.00 ADJUSTED CONTRACT COST $3,651,932.62 (Assuming all change orders approved) ACCEPTED BY- l� Contractors Representative REVIEWED BY: �� CA -I,-,_ Facilities Project Mai cc: City Clerk Project File D/B Contractor Purchasing 7 O� Date Z 7 03 Date