HomeMy WebLinkAboutRESPONSE - BID - 5695 MISCELLANEOUS EARTHWORK ANNUAL (4)BID SCHEDULE
Please enter your costs in the following bid schedule:
Name of Contractor: lion Kehn Construction, Inc.
JBID SCHEDULE MISCELLANEOUS EARTHWORK — �
�--
18'-22' MAX. DIGGING
DEPTH
2.5 C.Y. 1f
19'-26' MAX. DIGGING
0.751C.Y.1 50 H.
14'-16' MAX. DIGGING
DEPTH
1.25 C.Y. 75 H.
15'-20' MAX. DIGGING
ININEWtwo
®�M
FiL�1:t�
'•kjj a x
..RJ.LY'�i�
mobilization of other equipment not listed
applicable to non -delivered rental equipment
H.P.
.00 42.00 1 36.00
.00 75.00 136.00 7
36.00 1210 1
30.00 1 30.00 172
N/A I in _ nn I N/A i
j
per hour
45.00
Material Costs.
Cost plus 10 % for materials costing less than $500.00. Maximum allowed is 10%
Cost plus 8 % for materials costing $500.00 or more. Maximum allowed is 8%
Name of Contractor Don Kehn Construction, Inc.
6
CONTRACT AWARD
Award will be based upon (1) The most favorable total cost for the labor, material and mark-up
requirements stated below and (2) the Service Provider meeting the requirements of the Service
Agreement. Following is a sample project, similar in scope to a typical job to be expected under
this contract. Please fill-in the standard hourly rate using your standard hourly rates from the
bid schedule.
Sample Project Worksheet.
A) Labor Amount:
Category
Hours
Std Hourly
Sub Total
Rate
Laborer
16
26.00
416.00
Truck Driver
8
Operator -Loader
6
36.00
216.00
Operator-
Excavator/Dozer
8
36.00
288.00
Foreman
16
Operator
45.00
720.00
Superintendent
1
w/Pick-up truck
65.00
65.00
Sub -Total
$1 945.00 '
B) Equipment Amount:
Category
Hours
Std Hourly
Rate
Sub Total
Excavator85 hp
8
162.00
1,296.00
Backhoe 50 hp
8
Tractor loader
100 hp
6
185.00
1,110.00
Tractor
6
bulldozer
1
Skid steer
8
loader
92.00
736.00
Truck
Dump/tandem
8
72.00
576.00
Tractor -semi w/
4
low boy trailer
165.00 660.00
Sub -Total
$ 6,236.00
Sample Materials Mark-up Totals: $450.00 x 1.10 % _ $ 495 Maximum 10%
$2500.00 x 1. 8 % = $2700 Maxi '80/0
axim8%
C) Total Materials Mark-up: $ 3195.00 V
Equipment Totals $ 6,236.00
Labor Totals $ 1,945.00
Mark-up Totals $ 30195.00
Sample Project Award Total: $ 11, 376.00
(Grand Total of: A) Labor amount, B) Equipment amount and C) Total Materials mark-up)
Firm Name Don Kehn Construction, Inc. ( A Colorado Corporation)
(Are you a corporation, DBA, Partnership, LLC, PC)
SignaturePRINTED NAME Dan Kehn
Title Vice —President
Address 6550 South County Road 5
Ft. Collins, CO 80528
Phone/Fax (970) 226-4111