HomeMy WebLinkAboutRESPONSE - BID - 5695 MISCELLANEOUS EARTHWORK ANNUAL (3)BID SCHEDULE
Please enter your costs in the following bid schedule:
Name of Contractor: a �,
Material Costs
Cost plus q % for materials costing less than $500,00. Maximum allowed is 10%
Cost plus 7 % for materials costing $500.00 or more. Maximum allowed is 8%
Name of Contractor Rrv.,D ,y�� �
CONTRACT AWARD
Award will be based upon (1) The most favorable total cost for the labor, material and mark-up
requirements stated below and (2) the Service Provider meeting the requirements of the Service
Agreement. Following is a sample project, similar in scope to a typical job to be expected under
this contract. Please fill-in the standard hourly rate using your standard hourly rates from the
bid schedule.
Sample Project Worksheet.
A) Labor Amount:
Category
Hours
Std Hourly
Rate
Sub Total
Laborer
16
/Oj>
s000
Truck Driver
8
35,DD
Operator -Loader
6
Operator-
Excavator/Dozer
8
Y/vo
0/ 00
6
Foreman
Operator
16
S -Co
% 0, 6v
Superintendent
w/Pick-u truck
1
/s/Ov
FJ
8� /O0
Sub -Total
$��
B) Equipment Amount:
Category
Hours
Std Hourly
Rate
Sub Total
Excavator 85 hp
8
C o' pp
, co
Backhoe 50 h
8
%
/S,O-D co,00
Tractor loader
100 h
6
q6) cc
�yg, cc
- 0 S5'v
Tractor
bulldozer
6
`7 � j/ /
/ So
81'14�
Skid steer
8
SR/S
L
loader
b U
Truck
Dump/tandem /tandem
8
� S0
5-001-co
Tractor -semi
4
l 1-75 -'
c
7S � co
low bo trailer
r
Sub -Total
$
Sample Materials Mark-up Totals: $450.00 x 1. q % _ �M um 10%
$2500.00 x 1�- % = aximum 8%
C) Total Materials Mark-up:y�' 31(055�
Equipment Totals
Labor Totals
Mark-up Totals
Sample Project Award Total:
$_ 6/0N. 6v
$ 3-60- co ?
$
$ 67 i �.
(Grand Total of: A) Labor amount, B) Equipment amount and C) Total Materials mark-up)
Firm Name J
Are you a
Signature
Title
Address
Partnership, LLC, PC)
NTED NAME �.1(ASJU
-
.o AT�—
Phone/Fax y� a99S- �-�Q�i�