Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5695 MISCELLANEOUS EARTHWORK ANNUAL (2)BID SCHEDULE Please enter your costs in the following bid schedule: Name of Contractor: Material Costs. Cost plus .5 L % for materials costing less than $500.00 Cost plus s % for materials costing $500.00 or more. Name of Contractor `7 ro i/ P-le,5 Z, Maximum allowed is 10% Maximum allowed is 8% CONTRACT AWARD Award will be based upon (1) The most favorable total cost for the labor, material and mark-up requirements stated below and (2) the Service Provider meeting the requirements of the Service Agreement. Following is a sample project, similar in scope to a typical job to be expected under this contract. Please fill-in the standard hourly rate using your standard hourly rates from the bid schedule. Sample Project Worksheet. A) Labor Amount: Category Hours Std Hourly Sub Total Rate Laborer 16 Truck Driver 8 Operator -Loader 6 AQ oy� Operator- Excavator/Dozer 8 �o S �ydoo Foreman 16 Operator q Superintendent 1 w/Pick-up truck Sub -Total $ SAD B) Equipment Amount: Category Hours Std Hourly Rate Sub Total Excavator 85 hp 8 Backhoe 50 hp 8 ._ram 5 G o0 Tractor loader 100 h 6 ao Tractor 6 bulldozer Skid steer 8 loader 0= O Truck Dump/tandem 8 '- 02 v' Tractor -semi w/ 4 low boytrailer b'� Sub -Total $ O-'Q Sample Materials Mark-up Totals: $450.00 x 1.Z?s % _ $% aximum 10% $2500.00 x 1.cY % _3 : Maximum 8% C) Total Materials Mark-up: Equipment Totals Labor Totals Mark-up Totals Sample Project Award Total: (Grand Total of: A) Labor amount, B) Equipment amount and C) Total Materials mark-up) Firm Name Signature Title Address a e- I Iy c>Y 4 _�� (C v S!), Phone/Fax qt? 8 -`tg ? 7 .WoF