HomeMy WebLinkAboutRESPONSE - BID - 5695 MISCELLANEOUS EARTHWORK ANNUAL (2)BID SCHEDULE
Please enter your costs in the following bid schedule:
Name of Contractor:
Material Costs.
Cost plus .5 L % for materials costing less than $500.00
Cost plus s % for materials costing $500.00 or more.
Name of Contractor `7 ro i/ P-le,5 Z,
Maximum allowed is 10%
Maximum allowed is 8%
CONTRACT AWARD
Award will be based upon (1) The most favorable total cost for the labor, material and mark-up
requirements stated below and (2) the Service Provider meeting the requirements of the Service
Agreement. Following is a sample project, similar in scope to a typical job to be expected under
this contract. Please fill-in the standard hourly rate using your standard hourly rates from the
bid schedule.
Sample Project Worksheet.
A) Labor Amount:
Category
Hours
Std Hourly
Sub Total
Rate
Laborer
16
Truck Driver
8
Operator -Loader
6
AQ
oy�
Operator-
Excavator/Dozer
8
�o
S
�ydoo
Foreman
16
Operator
q
Superintendent
1
w/Pick-up truck
Sub -Total
$ SAD
B) Equipment Amount:
Category
Hours
Std Hourly
Rate
Sub Total
Excavator 85 hp
8
Backhoe 50 hp
8
._ram
5
G o0
Tractor loader
100 h
6
ao
Tractor
6
bulldozer
Skid steer
8
loader
0=
O
Truck
Dump/tandem
8
'-
02 v'
Tractor -semi w/
4
low boytrailer
b'�
Sub -Total
$ O-'Q
Sample Materials Mark-up Totals: $450.00 x 1.Z?s % _ $% aximum 10%
$2500.00 x 1.cY % _3 : Maximum 8%
C) Total Materials Mark-up:
Equipment Totals
Labor Totals
Mark-up Totals
Sample Project Award Total:
(Grand Total of: A) Labor amount, B) Equipment amount and C) Total Materials mark-up)