Please enter your costs in the following bid schedule:
Name of Contractor: Temple & Petty Construction Company, LLC
JBID SCHEDULE MISCELLANEOUS EARTHWORK
BUCKET
lDI11l/Lxi1i
22.00
5.00
28.001 20.00 1 21.00 r5.00
n of other equipment not listed 50.00 N/A 21 .00 N/A
to non -delivered rental equipment
5
Material Costs.
Cost plus 5 % for materials costing less than $500.00. Maximum allowed is 10%
Cost pl
Name of Contractor
5 % for materials costing $500.00 or more. Maximum allowed is 8%
Temple & Petty Construction Company, LLC
0
Apr 15 02 01:24p T -31e & Petty
[f 1482-7412 p.2
TEMPLE & PETTY
CONSTRUCTION CO., LLC
1404 DUFF DRIVE • FORT COLLINS, COLORADO 80524 • (970) 224-1991 • FAX (970) 482-7412
ADDITIONAL EQUIPMENT RATES
Pick Up & Tools
$
16.50 Hour
1 Ton Flat Bed
$
16.50 Hour
2 Ton Flat Bed
$
18.50 Hour
Welding Rig & Cutting Torches & Expendables
$
40.00 Hour
S/A Dunip Truck
$
22.00 Hour
Concrete Vibrator
$
50.00 Day
2 Ton Water Tank Truck
$
35.00 Hour
Transit or Laser Level
$
100.00 Day
Jumping Jack Compactor
$
100.00 Day
Carpenter Concrete Tools & Saws
$
20.00 Day
3000 Watt Generator
$
50.00 Day
Core Drill Machine
$
200.00 Day
Pothole Unit
$
900.00 Day
Small Trench Box
$
100.00 Day
Chain Trencher
$
200.00 Day
Sheep's Foot Bucket Attached Compactor
$
100.00 Day
Jack Hamner Electric or Air
$
50.00 Day
Directional Drill (24 — 40)
$1,500.00
Day
Chop or Demo Saw
$
100.00 Day
Chain Saw
$
75.00 Day
Pipe Threaders
$
25.00 Day
Hole Hog
$
175.00 Day
PE Fusion Hand Tools
$
100.00 Day
Butt Fusion Machine to 12"
$
300.00 Day
30' Pull Behind Trailer
$
75.00 Day
16" Pull Behind Trailer
$
16.00 Hour
CONTRACT AWARD
Award will be based upon (1) The most favorable total cost for the labor, material and mark-up
requirements stated below and (2) the Service Provider meeting the requirements of the Service
Agreement. Following is a sample project, similar in scope to a typical job to be expected under
this contract. Please fill-in the standard hourly rate using your standard hourly rates from the
bid schedule.
Sample Project Worksheet.
A) Labor Amount:
Category
Hours
Std Hourly
Sub Total
Rate
Laborer
16
12.00
192.00
Truck Driver
8
21.00
168.00
Operator -Loader
6
22.00
132.00
Operator-
Excavator/Dozer
8
22.00
176.00
Foreman
16
Operator
24.00
384.00
Superintendent
1
w/Pick-up truck
60.00
60.00
Sub -Total
$ 1,112.00
B) Equipment Amount:
Category
Hours
Std Hourly
Rate
Sub Total
Excavator 85 hp
8
60.00
480.00
Backhoe 50 hp
8
24.00
192.00
Tractor loader
100 hp
6
60.00
360.00
Tractor
6
bulldozer
Skid steer
8
loader
14,00
112.00
Truck
Dump/tandem
8
28.00
224.00
Tractor -semi w/
4
low boy trailer
50.00
200.00
Sub -Total
$ 1,868.001
Sample Materials Mark-up Totals: $450.00 x 1.-aL2% = $_4Z2.5D Maximum 10%
$2500.00 x 1.-Q-210 = $_.625 • oblaximum 8%
C) Total Materials Mark-up:
Equipment Totals $ 1,868.00
Labor Totals $ 1,112.00
Mark-up Totals $ 3,097.50
Sample Project Award Total: $ 6,077.50
(Grand Total of: A) Labor amount, B) Equipment amount and C) Total Materials mark-up)
Firm Name Temple & Petty Construction Company, LLC
ou a corporation, DBA, Partnership, LLC, PC)
Signat re PRINTED NAME Jim Temple
Title a ging Membe
Addres 404 Duff Dr i e
Fort Collins CO 80524
Phone/Fax 224- 191 482-741