HomeMy WebLinkAboutRESPONSE - BID - 5695 MISCELLANEOUS EARTHWORK ANNUALBID SCHEDULE Please enter your costs in the following bid schedule: Name of Contractor: Temple & Petty Construction Company, LLC JBID SCHEDULE MISCELLANEOUS EARTHWORK BUCKET lDI11l/Lxi1i 22.00 5.00 28.001 20.00 1 21.00 r5.00 n of other equipment not listed 50.00 N/A 21 .00 N/A to non -delivered rental equipment 5 Material Costs. Cost plus 5 % for materials costing less than $500.00. Maximum allowed is 10% Cost pl Name of Contractor 5 % for materials costing $500.00 or more. Maximum allowed is 8% Temple & Petty Construction Company, LLC 0 Apr 15 02 01:24p T -31e & Petty [f 1482-7412 p.2 TEMPLE & PETTY CONSTRUCTION CO., LLC 1404 DUFF DRIVE • FORT COLLINS, COLORADO 80524 • (970) 224-1991 • FAX (970) 482-7412 ADDITIONAL EQUIPMENT RATES Pick Up & Tools $ 16.50 Hour 1 Ton Flat Bed $ 16.50 Hour 2 Ton Flat Bed $ 18.50 Hour Welding Rig & Cutting Torches & Expendables $ 40.00 Hour S/A Dunip Truck $ 22.00 Hour Concrete Vibrator $ 50.00 Day 2 Ton Water Tank Truck $ 35.00 Hour Transit or Laser Level $ 100.00 Day Jumping Jack Compactor $ 100.00 Day Carpenter Concrete Tools & Saws $ 20.00 Day 3000 Watt Generator $ 50.00 Day Core Drill Machine $ 200.00 Day Pothole Unit $ 900.00 Day Small Trench Box $ 100.00 Day Chain Trencher $ 200.00 Day Sheep's Foot Bucket Attached Compactor $ 100.00 Day Jack Hamner Electric or Air $ 50.00 Day Directional Drill (24 — 40) $1,500.00 Day Chop or Demo Saw $ 100.00 Day Chain Saw $ 75.00 Day Pipe Threaders $ 25.00 Day Hole Hog $ 175.00 Day PE Fusion Hand Tools $ 100.00 Day Butt Fusion Machine to 12" $ 300.00 Day 30' Pull Behind Trailer $ 75.00 Day 16" Pull Behind Trailer $ 16.00 Hour CONTRACT AWARD Award will be based upon (1) The most favorable total cost for the labor, material and mark-up requirements stated below and (2) the Service Provider meeting the requirements of the Service Agreement. Following is a sample project, similar in scope to a typical job to be expected under this contract. Please fill-in the standard hourly rate using your standard hourly rates from the bid schedule. Sample Project Worksheet. A) Labor Amount: Category Hours Std Hourly Sub Total Rate Laborer 16 12.00 192.00 Truck Driver 8 21.00 168.00 Operator -Loader 6 22.00 132.00 Operator- Excavator/Dozer 8 22.00 176.00 Foreman 16 Operator 24.00 384.00 Superintendent 1 w/Pick-up truck 60.00 60.00 Sub -Total $ 1,112.00 B) Equipment Amount: Category Hours Std Hourly Rate Sub Total Excavator 85 hp 8 60.00 480.00 Backhoe 50 hp 8 24.00 192.00 Tractor loader 100 hp 6 60.00 360.00 Tractor 6 bulldozer Skid steer 8 loader 14,00 112.00 Truck Dump/tandem 8 28.00 224.00 Tractor -semi w/ 4 low boy trailer 50.00 200.00 Sub -Total $ 1,868.001 Sample Materials Mark-up Totals: $450.00 x 1.-aL2% = $_4Z2.5D Maximum 10% $2500.00 x 1.-Q-210 = $_.625 • oblaximum 8% C) Total Materials Mark-up: Equipment Totals $ 1,868.00 Labor Totals $ 1,112.00 Mark-up Totals $ 3,097.50 Sample Project Award Total: $ 6,077.50 (Grand Total of: A) Labor amount, B) Equipment amount and C) Total Materials mark-up) Firm Name Temple & Petty Construction Company, LLC ou a corporation, DBA, Partnership, LLC, PC) Signat re PRINTED NAME Jim Temple Title a ging Membe Addres 404 Duff Dr i e Fort Collins CO 80524 Phone/Fax 224- 191 482-741