Loading...
HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - RATESTERRACON PROFESSIONAL SERVICE FEE SCHEDULE FIELD INVESTIGATION Drilling services, backhoe, bulldozer, and other heavy equipment rental...............................................................................................Cost+ 15 percent Drill bits and/or media, special sampling and/or monitoring equipment, air compressor, and water truck, Equipment for site access, special safety equipment, or other auxiliary equipment provided...............................................................Cost+ 15 percent Equipment rental including slope inclinometer, pressuremeter, seismometer, resistivity meter, etc .............................................. Quotation on Request PROFESSIONAL SERVICES PrincipalEngineer.......................................................................................... Senior Project Engineer/Geologist................................................................. Project Engineer/Geologist... .......................................................................... Assistant Project Engineer/Geologist............................................................. Staff or Field Engineer/Geologist.................................................................... Technician...................................................................................................... CADD OperatorlDraftsperson........................................................................ Clerical............................................................................................................ Special Consultation, Expert Testimony, & Court Appearance ...................... LABORATORY TESTING OF SOIL AND ROCK Unit Price Sieve Analysis (ASTM D422 and D1140) a. Standard Sieves 3-inch through No. 200..... ................. $95.00 b. Standard Sieve 3-inch-No. 200 (SPT Sample)...............65.00 c. No. 200 to .005 mm, add to a or b..................................90.00 d. Percent passing No. 200 mesh sieve only......................40.00 Liquid -Plastic Limit (ASTM D4318)............................................85.00 Specific Gravity (ASTM D854)...................................................85.00 Moisture Content (ASTM D2216)................................................7.50 Moisture -Density Determination Standard (ASTM D698)......................................................120.00 Modified (ASTM D1557).....................................................130.00 OnePoint Test.....................................................................55.00 Density & Moisture Content (ASTM D2937)..............................30.00 CBR Test (ASTM D1883)........................................................325.00 Permeability (ASTM D2434)....................................................325.00 R Value (ASTM D2844)...........................................................325.00 SulfateContent..........................................................................35.00 pH and Resistivity ......................................................................55.00 pH, sulfide, redox, resistivity....................................................110.00 Direct Shear per point................................................................85.00 ResidualShear...................................................................175.00 Rush laboratory service available at 30 percent surcharge DIRECT CHARGES Hourly Rate ................................... $110.00-$130.00 ..................................... $90.00-$120.00 ............. I......................... $75.00-$95.00 ....................................... $60.00-$80.00 ....................................... $55.00-$75.00 ....................................... $40.00-$60.00 ....................................... $35.00-$47.50 ....................................... $35.00-$45.00 .................................. $130.00-$160.00 Unit Price One -Dimensional Consolidation or Swell: (ASTM D2434 and D4213) a. 4 ksf load ...................................... ............................... $105.00 b. 8 ksf load.......................................................................115.00 c. 16 ksf load.....................................................................135.00 d. 32 ksf load.....................................................................155.00 e. Add to a-d, above for time rate readings (1) 2 loads.................................................................70.00 (2) 4 loads...............................................................105.00 Unconfined Compression, (ASTM 02166 and D2938)............105.00 Triaxial Shear, per point a. Unconsolidated-Undrained, Saturated..........................225.00 b. Consolidated-Undrained...............................................475.00 c. Consolidated-Drained...................................................650.00 Permeability Using Triaxial Cell d. Undisturbed or Remolded.............................................325.00 Special Tests .................................................. Quotation on Request Laboratory Technician for sample preparation ................. 48.00/hour PerDiem and Lodging........................................................................................................................................................... $33.00/day + cost of lodging Automobileor Pick-up............................................................................................................................................ $0.45/mile or $140.00/week minimum 4-Wheel Drive Vehicle............................................................................................................................................ $0.70/mile or $210.00tweek minimum All other direct project expenses, i.e. special equipment rental, Commercial travel, bulk reproduction, protective clothing, etc........................................................................................................................ Cost+ 15% Provide on -site field laboratory facilities and test equipment........................................................................................................... Quotation on Request ENVIRONMENTAL AND CONSTRUCTION MATERIALS ENGINEERING SERVICES .....................................Fee Schedule Available on Request FORT COLLINS OFFICE Revised January 2002 Irerraco ERO Resources Corporation Schedule of Fees 2002 tAb H i tl t Craig Sommers Scientist/Economist $130.00 Richard Trenholme Environmental Scientist $115.00 Steve Dougherty Senior Ecologist $105.00 Mark DeHaven Senior Natural Resource Specialist $95.00 Dave Shaw Engineer $98.00 Mike Galloway Senior Hydrogeologist $110.00 Sheri Chapman Senior Hydrogeologist $95.00 Barbara Galloway Senior Hydrologist $95.00 Ron Beane Wildlife Biologist $85.00 Steve Hannula Hydrologist $75.00 Craig Sovka Geologist $68.00 Jack Denman Environmental Scientist $68.00 Denise Larson Biologist $75.00 Liz Payson Ecologist $75.00 Leigh Rouse Ecologist $68.00 Mary Powell Natural Resource Specialist $75.00 Steve Butler Natural Resource Specialist $68.00 Aleta Powers Natural Resource Specialist $65.00 Bill Mangle Natural Resource Specialist $65.00 Justin Spring Natural Resource Specialist $60.00 Clint Henke Natural Resource Specialist $57.00 Andy Cole Natural Resource Planner $68.00 Scott Babcock Natural Resource Planner $63.00 Janelle Luppen GIS Specialist $60.00 Sadie Russo GIS Specialist $60.00 Denise Ernst GIS Specialist $60.00 Mark Bina Graphic Designer $57.00 Clerical I $50.00 Clerical II $35.00 ry 3 Yf�a 3T d d A 4 Sv dk G � w�l 4 '..ri� ��... �j 3a .� W"� l �i a sk �1 a'�C��� C��t '$` •9 `��N'f S Y 3 A"O.YY M % .'i`�• d� `..$"''V-F' � ' i 4 1 i�"a � d. n :: 3� ^4 F `4 � -�" _�_` i ,—. Y 5 .. of 4 > tl Officer -in -Charge $ 160 Quality Assurance/Quality Control $ 160 Project Manager $ 140 Senior Technical Advisor $ 140 Technical Manager $ 135 Senior Geotechnical Engineer $ 125 Senior Structural Engineer $ 125 Structural Engineer $ 100 Project Engineer $ 100 Geotechnical Engineer $ 80 Electrical or Mechanical En ineer $ 135 Senior Engineer $ 125 Senior Hydrology and Hydraulics Engineer $ 125 Design Engineer $ 75 Hydroloa and Hydraulics Engineer $ 100 CADSpecialist/Designer $ 70 Construction/Cost Engineer $ 100 CAD Drafter $ 55 Project Administrator $ 55 Technician $ 50 MM. y C ry Mileage $ 0.365/mile Travel, Meals, Lodging Cost Plus 10 Percent