HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - RATESTERRACON
PROFESSIONAL SERVICE FEE SCHEDULE
FIELD INVESTIGATION
Drilling services, backhoe, bulldozer, and other heavy equipment rental...............................................................................................Cost+ 15 percent
Drill bits and/or media, special sampling and/or monitoring equipment, air compressor, and water truck,
Equipment for site access, special safety equipment, or other auxiliary equipment provided...............................................................Cost+ 15 percent
Equipment rental including slope inclinometer, pressuremeter, seismometer, resistivity meter, etc .............................................. Quotation on Request
PROFESSIONAL SERVICES
PrincipalEngineer..........................................................................................
Senior Project Engineer/Geologist.................................................................
Project Engineer/Geologist... ..........................................................................
Assistant Project Engineer/Geologist.............................................................
Staff or Field Engineer/Geologist....................................................................
Technician......................................................................................................
CADD OperatorlDraftsperson........................................................................
Clerical............................................................................................................
Special Consultation, Expert Testimony, & Court Appearance ......................
LABORATORY TESTING OF SOIL AND ROCK
Unit Price
Sieve Analysis (ASTM D422 and D1140)
a. Standard Sieves 3-inch through No. 200..... .................
$95.00
b. Standard Sieve 3-inch-No. 200 (SPT Sample)...............65.00
c. No. 200 to .005 mm, add to a or b..................................90.00
d. Percent passing No. 200 mesh sieve only......................40.00
Liquid -Plastic Limit (ASTM D4318)............................................85.00
Specific Gravity (ASTM D854)...................................................85.00
Moisture Content (ASTM D2216)................................................7.50
Moisture -Density Determination
Standard (ASTM D698)......................................................120.00
Modified (ASTM D1557).....................................................130.00
OnePoint Test.....................................................................55.00
Density & Moisture Content (ASTM D2937)..............................30.00
CBR Test (ASTM D1883)........................................................325.00
Permeability (ASTM D2434)....................................................325.00
R Value (ASTM D2844)...........................................................325.00
SulfateContent..........................................................................35.00
pH and Resistivity ......................................................................55.00
pH, sulfide, redox, resistivity....................................................110.00
Direct Shear per point................................................................85.00
ResidualShear...................................................................175.00
Rush laboratory service available at 30 percent surcharge
DIRECT CHARGES
Hourly Rate
................................... $110.00-$130.00
..................................... $90.00-$120.00
............. I......................... $75.00-$95.00
....................................... $60.00-$80.00
....................................... $55.00-$75.00
....................................... $40.00-$60.00
....................................... $35.00-$47.50
....................................... $35.00-$45.00
.................................. $130.00-$160.00
Unit Price
One -Dimensional Consolidation or Swell:
(ASTM D2434 and D4213)
a. 4 ksf load ...................................... ...............................
$105.00
b. 8 ksf load.......................................................................115.00
c. 16 ksf load.....................................................................135.00
d. 32 ksf load.....................................................................155.00
e. Add to a-d, above for time rate readings
(1) 2 loads.................................................................70.00
(2) 4 loads...............................................................105.00
Unconfined Compression, (ASTM 02166 and D2938)............105.00
Triaxial Shear, per point
a. Unconsolidated-Undrained, Saturated..........................225.00
b. Consolidated-Undrained...............................................475.00
c. Consolidated-Drained...................................................650.00
Permeability Using Triaxial Cell
d. Undisturbed or Remolded.............................................325.00
Special Tests .................................................. Quotation on Request
Laboratory Technician for sample preparation .................
48.00/hour
PerDiem and Lodging...........................................................................................................................................................
$33.00/day + cost of lodging
Automobileor Pick-up............................................................................................................................................
$0.45/mile or $140.00/week minimum
4-Wheel Drive Vehicle............................................................................................................................................
$0.70/mile or $210.00tweek minimum
All other direct project expenses, i.e. special equipment rental,
Commercial travel, bulk reproduction, protective clothing, etc........................................................................................................................
Cost+ 15%
Provide on -site field laboratory facilities and test equipment...........................................................................................................
Quotation on Request
ENVIRONMENTAL AND CONSTRUCTION MATERIALS ENGINEERING SERVICES .....................................Fee Schedule Available on Request
FORT COLLINS OFFICE Revised January 2002
Irerraco
ERO Resources Corporation
Schedule of Fees
2002
tAb
H i tl t
Craig Sommers
Scientist/Economist
$130.00
Richard Trenholme
Environmental Scientist
$115.00
Steve Dougherty
Senior Ecologist
$105.00
Mark DeHaven
Senior Natural Resource Specialist
$95.00
Dave Shaw
Engineer
$98.00
Mike Galloway
Senior Hydrogeologist
$110.00
Sheri Chapman
Senior Hydrogeologist
$95.00
Barbara Galloway
Senior Hydrologist
$95.00
Ron Beane
Wildlife Biologist
$85.00
Steve Hannula
Hydrologist
$75.00
Craig Sovka
Geologist
$68.00
Jack Denman
Environmental Scientist
$68.00
Denise Larson
Biologist
$75.00
Liz Payson
Ecologist
$75.00
Leigh Rouse
Ecologist
$68.00
Mary Powell
Natural Resource Specialist
$75.00
Steve Butler
Natural Resource Specialist
$68.00
Aleta Powers
Natural Resource Specialist
$65.00
Bill Mangle
Natural Resource Specialist
$65.00
Justin Spring
Natural Resource Specialist
$60.00
Clint Henke
Natural Resource Specialist
$57.00
Andy Cole
Natural Resource Planner
$68.00
Scott Babcock
Natural Resource Planner
$63.00
Janelle Luppen
GIS Specialist
$60.00
Sadie Russo
GIS Specialist
$60.00
Denise Ernst
GIS Specialist
$60.00
Mark Bina
Graphic Designer
$57.00
Clerical I
$50.00
Clerical II
$35.00
ry 3 Yf�a
3T d d
A 4
Sv dk G � w�l 4 '..ri� ��... �j 3a .� W"�
l
�i a sk �1 a'�C��� C��t '$`
•9 `��N'f
S Y 3
A"O.YY
M
% .'i`�• d�
`..$"''V-F' � ' i
4 1
i�"a �
d. n :: 3� ^4 F `4 � -�" _�_` i ,—.
Y 5 .. of
4
>
tl
Officer -in -Charge
$ 160
Quality Assurance/Quality Control
$ 160
Project Manager
$ 140
Senior Technical Advisor
$ 140
Technical Manager
$ 135
Senior Geotechnical Engineer
$ 125
Senior Structural Engineer
$ 125
Structural Engineer
$ 100
Project Engineer
$ 100
Geotechnical Engineer
$ 80
Electrical or Mechanical En ineer
$ 135
Senior Engineer
$ 125
Senior Hydrology and Hydraulics Engineer
$ 125
Design Engineer
$ 75
Hydroloa and Hydraulics Engineer
$ 100
CADSpecialist/Designer
$ 70
Construction/Cost Engineer
$ 100
CAD Drafter
$ 55
Project Administrator
$ 55
Technician
$ 50
MM. y
C
ry
Mileage
$ 0.365/mile
Travel, Meals, Lodging
Cost Plus 10 Percent