HomeMy WebLinkAboutRESPONSE - BID - 5763 GATEWAY PIERWALL PROJECT (3)Bid #5763
Addendum #2 Bid Schedule
Project:
Gateway Park Pierwall Project
Spechtem
Number
Description
Unit
Unit Cost
Estimated
Quantity
Item Cost
626-01
503-02
Mobilization
Drilled Caisson18 inch diameterLF601-03
LS*60,7d/242
C.I.P. Pier Headwall
LF602-04
5
6
7
Reinforcin Steel E ox Coated
Remove and Reset Guardrail
Traffic Control
Remove and Replace Asphalt Pavement w/ Asphalt Curb
lbs.
LF
LS
SF
fk%
OO
40
1—
135
e:wado
��//�r,
Do
Op
8
Rock Drilling Equipment -'carbide Upped'
HR
20
TOTAL
co
3 7.-
O
Cents
Dollars
�C/t'�IOwL£JGF /Q�A¢wAeu t I�%• f/K�� /YA�J �rlAtls.� We. 2�
Page 2 of 1
BID SCHEDULE
Awarded Contractor must provide all materials, labor and installation required for construction of
a retaining wall per the specifications and drawings attached:
Project: Gateway Park Pierwall Project
S umber Description Estimated
Number P Unit Unit Cost quantity Item Cost
626-01
Mobilization
LS
1
503-02
Drilled Caisson (18 Inch diameter)
LF
242
601-03
C.I.P. Pier Headwall
LF
42
602-04
Reinforcing Steel (Epoxy Coated)
lbs.
800
5
Remove and Reset Guardrail
LF
40
6
Traffic Control
LS
1
Remove and Replace Asphalt Pavement w/ Asphalt
7
Curb
SF
135
TOTAL
Dollars
Cents
FIRM NAME: TLM CONSTRUCTORS, INC.
(Are you a corporation, DBA, Partnership, LLC, or PC)
ADDRESS: P.O. sox 336638
Greeley, CO 80633-0611
323 FAX #970-346-8324
Aaron L. Mi I I s
41— Printed
y
4