Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5763 GATEWAY PIERWALL PROJECT (2)Bid #5763 Addendum #2 Bid Schedule Project: Gateway Park Pierwall Project Specntsm Number Description Unit Unit Cost Estimated Quantity Item Cost 626-01 Mobilization LS 832.00 1 $ 832.00. 503-02 601-03 602-04 Drilled Caisson 18 inch diameter C.I.P. Pier Headwall Reinforcing Steel E Coated LF LF lbs. 51.00 62.00 0.65 242 42 800 12, 342.00 2,604.00 520.00 5 6 7 Remove and Reset Guardrail Traffic Control Remove and Replace Asphalt Pavement w/ Asphalt Curb LF LS SF 48.75 1575.00 18.00 40 1 135 1,950.00 1,575.00 2.430.00 8 Rock Drilling Equipment -'carbide tied' HR 448.00 20 8,960.00 TOTAL $31,213.00 Thirty one thousand two hundred thirte n Dollars 00/10 --- Cents Page 2 of 1 BID SCHEDULE Awarded Contractor must provide all materials, labor and installation required for construction of a retaining wall per the specifications and drawings attached: Project: Gateway Park Pierwall Project Spec/item Number Description Unit Unit Cost Estimated Quantity Item Cost 626-01 Mobilization LS 1 503-02 Drilled Caisson (18 inch diameter) LF 242 601-03 C. I.P. Pier Headwall LF 42 602-04 Reinforcing Steel (Epoxy Coated) lbs. 800 5 Remove and Reset Guardrail LF 40 6 Traffic Control LS 1 Remove and Replace Asphalt Pavement w/ Asphalt 7 Curb SF 135 TOTAL **See revised Addendum #2 Bid Schedule Dollars Cents FIRM NAME: G.L. Hoff Company (Are you a corporation, DB#;fartnershifr,t-tee =-PeJ ADDRESS: 1815 West 12th Street Loveland, CO 80537 TELEPHON # 970-669-3255 FAX # 970-663-1566 BY: / Gregory L. Hoff, President Si na re Printed 4