HomeMy WebLinkAboutRESPONSE - BID - 5763 GATEWAY PIERWALL PROJECTBID SCHEDULE
Awarded Contractor must provide all materials, labor and installation required for construction of
a retaining wall per the specifications and drawings attached:
Project: Gateway Park Pierwall Project
Spec/Item n Estimated
Number Description n r �'f & Unit Cost Quantity Item Cost
timat
1 I
626-01 Mobilization ( G 1% Y1 LS 1
503-02 Drilled Caisson n►yp7}f(g�Il di ele�l (/ l LF 242
601-03 C.I.P. Pier Head�,vall (, V �j'(Qh LF
fl 42
602-04 Reinforcing Steel (Epoxy Coated)/ lbs. 800
5 Remove and Reset Guardrail LF 40
6 Traffic Control LS 1
Remove and Replace Asphalt Pavement w/ Asphalt
7 Curb SF 135
TOTAL
Dollars
Cents
Walsh Construction, Inc.
5828 N. St. Louis Ave.
FIRM NAME: Loveland, CO 80538
(Are you a corporation, DBA, Partnership, LLC, or PC)
ADDRESS:
TELEPHONE FAX
BY: l Mu19�No✓ iv h/
Sign Printed
Bid #5763
Addendum #2 Bid Schedule
Project:
Gateway Park Pierwall Project
Spec/Item
Number
Description
Unit
Unit Cost
Estimated
Quantity
Item Cost
626-01
503-02
601-03
Mobilization
Drilled Caisson 18 inch diameter
C.I.P. Pier Headwall
LS
LF
LF
j�4WtP
00
1
242
42
3 YO4 oa
602-04
Reinforcing Steel (Epoxy Coated
lbs.
ii
�`
800
O�v
O(�(,1•
5
Remove and Reset Guardrail
LF
�
40
00
6
Traffic Control
LS
wf
1
50 ee
7
Remove and Replace Asphalt Pavement w/ Asphalt Curb
SF
135
/ w' CP
8
Rock Drilling Equipment - 'carbide tipped'
HR
d
20
�190Q•
TOTAL
OLlad
C
Q—S
Dollars
Cents
struction, Inc.
:. Louis Ave.
rk; 0 80538
"vwT Wk he.