Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5763 GATEWAY PIERWALL PROJECTBID SCHEDULE Awarded Contractor must provide all materials, labor and installation required for construction of a retaining wall per the specifications and drawings attached: Project: Gateway Park Pierwall Project Spec/Item n Estimated Number Description n r �'f & Unit Cost Quantity Item Cost timat 1 I 626-01 Mobilization ( G 1% Y1 LS 1 503-02 Drilled Caisson n►yp7}f(g�Il di ele�l (/ l LF 242 601-03 C.I.P. Pier Head�,vall (, V �j'(Qh LF fl 42 602-04 Reinforcing Steel (Epoxy Coated)/ lbs. 800 5 Remove and Reset Guardrail LF 40 6 Traffic Control LS 1 Remove and Replace Asphalt Pavement w/ Asphalt 7 Curb SF 135 TOTAL Dollars Cents Walsh Construction, Inc. 5828 N. St. Louis Ave. FIRM NAME: Loveland, CO 80538 (Are you a corporation, DBA, Partnership, LLC, or PC) ADDRESS: TELEPHONE FAX BY: l Mu19�No✓ iv h/ Sign Printed Bid #5763 Addendum #2 Bid Schedule Project: Gateway Park Pierwall Project Spec/Item Number Description Unit Unit Cost Estimated Quantity Item Cost 626-01 503-02 601-03 Mobilization Drilled Caisson 18 inch diameter C.I.P. Pier Headwall LS LF LF j�4WtP 00 1 242 42 3 YO4 oa 602-04 Reinforcing Steel (Epoxy Coated lbs. ii �` 800 O�v O(�(,1• 5 Remove and Reset Guardrail LF � 40 00 6 Traffic Control LS wf 1 50 ee 7 Remove and Replace Asphalt Pavement w/ Asphalt Curb SF 135 / w' CP 8 Rock Drilling Equipment - 'carbide tipped' HR d 20 �190Q• TOTAL OLlad C Q—S Dollars Cents struction, Inc. :. Louis Ave. rk; 0 80538 "vwT Wk he. Page 2 of 1