HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 2207049 5727 UTILITIY SERVICES CENTERSent By: MARK YOUNG CONSTRUCTION; 970+454+2790; Jan-13-03 8:10AM; Page 1
January 10, 2003
Mr. John Renhowe
Vaught Frye Architects
401 West Mountain Avenue; Suite 200
Fort Collins, CO 8o521
Project Title:
Sent via facsimile to:
Owner, Architoct, &
Engr.Fax*.970-482-6368
City of Fort Collins Utility Service Center Warehouse Storage improvements
700 Wood Street
Fort Collins, CO 80521
Project No.: 02312
Subject: Change HEP CP & slotted CSP
RE: Change Order Request (CC 1t}'N6, 24
John:
This proposal is written in response to Brotvri'Gtuttp's revised drawing CS303 dsted.8/29/02.
Please find enclosed our cost surnm8ry,1aelifi0eti0n% and limit up to change part of the FIERCP to 361, .
RCP & she loved CSP. The total coat iv incorperdte`this change is a scope decrease to the
Contract o $(38,981).
Your approval of COR No. 24 fbr inclusion ink, the:next change order is appreciated. 1f you should Lave
any questions and/or concerns related to this rmxte r,.please contact the undersigned at your earliest
convenience.
Sincerely,
Ted Willis
Superintendent/Project Engineer
Attachments
file: 02312-F-1.2: CORNo. 24
Acknowledged and approved to proceed with work and for inclusion into the next change order:
John Renhowe; Vaught Frye Architects Date Fax #: 970-224-1662
Jack Gianole; City Operations Services Dept. Date Fax d: 970-221-6534
155 North College Avenue, Suite 220 + Fort: C611fi s,'Colorad6W52+4 • (970) 484-1648 • Fax (970) 224�0392
4150 Jason Street • Due. e4 Colorado 80211 • (3M) 477--9073 • Fax (303) 477-9085
Sent By: MARK YOUNG CONSTRUCTION; 970+4B4+2790; Jan-7-03 12:13PM;
Page 1la
January 7, 2003
W. John Renhowe
Vaught Frye Architects
401 West Mountain Avenue; Suite 200
Fort Coffins, CO 80521
Sent via facsimile to:
Owner, Azchitect, &
Engr. Fax#: 970-492-6369
Project Title: Cityof Dort CollinsUtiliry Service Center Warehouse Storage Improvements
700 Wood Street
Fort Collins, CO 80521
Project No.: 02312
Subject: Change southeast fencing: to r &. delete V Site
RE: Change Order Request(CC)R):..22
John:
This proposal is Written in response to Sear . n vo:l Croup's revised:drawing 0 dated 8/29/02.
Please find enclosed our cost summary gmjificxtims; and bticit-up tv change the southeast fencing:tu.8',.
& delete the 8, gala. The total cost to cncorpoiift this change to a scope inumase to the contract of
$2,426.
Your approval of COR No. 22 for mclmlmi.itrt , titr next chimp. order is appreciated. ifyou should have
any questions and/or concerns related to this m dur, please romacrthe undersigned at your earliest
convenience.
Sincerely, Ci1.u.;.=..�. :'t.yV J,,i�. p�it"7 ..,�-L.. 1�+, 'v� 1 r:. "•.�
Ted Willis
SupertntendentlProject Engineer
Attachmems
file: 02312-F-1.2: COR No. 22
Acknowledg
ed and approved to proceed w:th arork ami'foi' ittoluston into the next change order.
John Renhowc; Vaught Frye Architects I ate. Fax #: 970-224-1662
Jack Gianola; City operations Services peg; L. ihi#o Fax #: 970221-6534
155 North College Avenue, Suite 220+: Fortt ColEt3§ Colorado 80524' • (970) 484-16C • Fax (920) 224.0392
4150 Jason Street • 1?ertvter Col otado 80211 • ..M 477--9073 • Fax (303) 477-9085
Sent By: MARK. YOUNG CONSTRUCTION; 970+434+2790; Jan-7-03 12:14PM; Page 2/4
MARK YOUNG CONSTRUC`fl0pit, :1l .
PROJECT NAME: CITY OF FORT..COLLINS ti WY SERVICE CENTER STORAGE
PROJECT NUMBER: 802312
CHANGE ORDER REQUEST SUM MARV
COST CODES i ACTI%W . ;
C1E.iCftiPT10N 1 AMOUNT TOTALS
Sen- By: MARK. YOUNG CONSTRUCTION; 970+494+2790•
Jan-7-03 12:14PM; Page 3!4
MARK YOUNG CONSTfRUtMONf, VIC. -
PROJECT NAME: CITY OF FORT COLLW9 ti. nLJTY WRVICE CENTER STORAGE
PROJECT NUMBER: 002312
CHANGE ORDER REQUEST SUTAM: ANY
COST CODES I ACTIMiTY'DESCRIPTION AMOUNT TOTALS
Metro Fend Co.-1/2103
$2,275
CACT %C►Ti4L .. $2,275 $�
_I SU�AL SUgwNTRACT6WwCWK—
SU13't'o7AL
ucw�n s.,naurvuavr�v:rs�74:
NIYC SdND D.$t1�6;
SUBCONTRACTOR BOND; DNA
PERMIT FEES: NIA
SALES TAX WA
CONTRACTORCON'1'IN4m!CYA 0%
$18
$19
$0
$0
gp
$0
PROPOSED CHANGE TIOTAL.
32,426
Sen` By: MARL: YOUNG CONSTRUCTION; 970+434+2790; Jan-22-02 11:11AM; page 1/3
FACSIMILE TRANSMITTAL
Date: January 22, 2003
Comoany Nome > tL Fax No,
Sear Brown Group Cinde Wien 970482-5922 970-482-6369
From; Ted Willis
Phone Number: 970-4842201 (C611: 303-7104:196) ..
Facsimile Number: 970494-2790
Total Pages: 3 (Including this page)',
Project: City ofFortlUi'm3Utility:ServicesCenter 'Warehouse Storage
Enclosod is yow firm's response to COR #22 acid Metro Fence's -associated breakdown for your
reference. Most of the =75 cost was ronacitiag tk salvaging lk tainstaliation of the 6fence material;
Please recommend this COR #22 far apprmai'to Jack Gianola.. Thank you.
Please contact this office should you.haw any* or ooneems related to this maacr-ll `
Ted Willis
Superintendent/Project Engineer
File: 02312-F-3.3
W. Vaught Frye Architects John Fier horve 0(-224-1191
City Operations Services A.*C-'dawta 970-221-6272
Original Will Not Follow
970-224-166Z
970-221-6534,
155 North College Avenue, Suite 220 • Fort CoM,%i, Colorado'80324 • (970) 484-1648 • Fax (970) 2244392
4150 Jason Street • Denver, Colorado 80211 • (303) 477-9073 • Fax (303) 477-9085
Son- Bv: MARK YOUNG CONSTRUCTION; 970+4B4+2790; Jan-22-02 11:11AM; page 213
.. FENCE; 3(134F9733t3; Jan•3-03 9:40AM; 0e9 a 3/2
Mm
���ffft •• ' • :n� t�il tip'
P121)P()SAL
January 2,2003
Mark Young Cbnatnu ticm, Inc.
155 North College Ave., Suite 220
Purt Collins, CO 80524
Attn: Ted Willis
P.samare No.: 10373-la
Ref: COR #22
We propose to replace approxinjawly 225'linear feet of G' with 8' chain link r
WV propose to delete vac 8' wide x IF higi0A%lk gate. •f S..
We propose to uP"dc one I5' wide.x.6'.ltigh walk gate to an 8' height.
We propose to upgrade one 4' wick x 5' high walk gateto'an 8' height
Initially a credit was rcn=wd in the umtrt'et Amotutt fOr-MMOVing end reusing aver 1000 linear
feet of 6' chain .link Lancing since these"awities have c4pfo
ged an add price is in order r that
initial credit. (No material will be able to 1-ye reused) j it{ 0 a
Add Price: S 2,275.1M
12171
1. Permits: arc: excluded.
2. Price based on no obsirwtiorra in Rmcc line. t
3. Pace bash on access, to bamper+ for cqu4m=t,
4. Ronde not included (tote .0165).
5. Insurance is based on 3 tnilliim•dullar policy.
Mclm P o • any, Inc M�FBenjamin Shir ey
EVE]
No Text
No Text
Sen- By: MARK YOUNG CONSTRUCTION; 970+434+2790; J2n-7-03 12:OBPM; Page 3/6
_.I... ......_. T ._..,.T._
COST CODES] acTrv#1 v [DES 1P1 !DK} j AMOUNT TOTALt
- S
�:.:
....
�-
--:
..
9LICf2,a
,.
SD
ssr-tea .:
$o
—cYcea�wr�
_ ;
_..
...
.......
Sent By: MARK YOUNG CONSTRUCTION; 970+494+2790:.Ian-7-nq i�-napu.
Project:
To:
RE:
Requested Sy:
Respond By:
DAfE 12/23/02 J09 NAME FTC.01ft Service Center
d CONTRACTOR: LOCATION: FG. Collins
MYC CONTACT.Ted Wills
Demo 1601f of east Retaining W�l CQR#21
&A - mll LABOR I IEW.4EQUIP1 - : MMTERIAL MA1
-
WORK DESCRIPTION
'-- HQVM
RAT€ :
TOTAL
rKxis#
wife
MIA_ ' :
ur r'
unri b
IL&MI
MAF tKAFL
Marx UP.
lUl,%L
-
rn
vatur
:$ 45-00
.. 225
S
190
: " . :050
0
Q
or
-. 5
- f 45:0D
; 22SIq
5
$ 89.00
$ 400.00
D
f
-
O
0
$ 825.00
mpacbr
..5
$ 35.00
$ 775.00
5
$ 50.D0
f250.013
0
$
-
0
0
$ 425.011
o
necking -Hard Of Material
.8
f 35.00
$ 210:00
8
S 35.00
$ 210.00
0
f
--
:0
0
$ 42DW
D4mpFees
-0
$ r :.
f
0
b.-
$.
.38a
-E
375.00
:1125
i7f8.7.
$ Y203.T5
L
m
als
..
$
o
t
o:
:0
IF
It
iNfd
It
:
It
Z
Of
$
oIt
It -
fl
f
u.
0It...
of
s
0$
d.-.
o
$
o
of
'0
f
It
tl
f
It
f
o
o
f
T
Grand Totals Pane t
$ 3s3e.75
Y
Q
g
a0
i
Sent By: MARK. YOUNG CONSTRUCTION; 970+484+2790; Jan-13-02 8:10AM;
Page 2
`M>e►RK YOy14G comSjWMjCT . , am.
PROJECT NAME: CITY OF FORT COLI..iNS'UIILITY SERVICE CENTER STORAGE
PROJECT NUMBER: 002312
CHANGE ORDER REQUEST SUMMAf2Y
COST CODES ACTIVITY DESO IPTION T— ....
AMOUNT TOTALS
i
--- .._
� CHANGE ORDER REOUE3T# 24
Change HERO & W, slot id C$P
MARK YOLK CO1{,;
I01YC MATEXIAL TMAL....__._
MYC EQUIPNIEN7`:'1`)TAL � gp -
SUBTOTAL
SINALL COOLS.d�'SIJPPL1E13 � 6spOF
PAYROLL TAXES%,& MUR tk.S 43% 015 LABOR
GENERAL CLEA UP: WA..
DELIVERY: WA
DRAMIINGS d SPECS: BYAA014twT
SUBTOTAL
$0
Sent By: MARK YOUNG CONSTRUCTION;
8ent-8y:,M5TR0 FENCE;
970+494+2790; J2n-7-03 12:10PM; Page 616
"3034EKII413a; - Jan-3.03 9:40AN; Page 213
*"Xw,
blarade Am
January 2.2003
Mark Young Construction, Inc.
155 North College Ave., Suite 220 -
Fort Collins, CO $0524
Ann: 'fad Willis
Estimate No-: 10373-1
Wfl. COR 1921
We propose to fumisb and install approamart-ly 160linewf6et: ,f additional 6' chain link
fencing.
AddPrioe: 52,730.00
YAW
1. Patmits an excluded, ...
2. Price based on an obstructiocm iu fmce life; .
3. Prse cc bad on eer ess:'tn bts gpen,lnr cquipti.sent
4. Hands not included (mite .iil6$);
5. Tnsurancc is based vn 3'milliawdnllar policy,
Metro I:ence mt7a Tile .
Bcmjami
970+4B4+2790; J2n-B-03 3:48PM; Page ,/B
Sen' By: MARK YOUNG CONSTRUCTION;
.�if.�.5�1.Y•IVAYY.�Yls ...
January 8, 2003
Sent via facsimile to:
Sent By: MARI, YOUNG CONSTRUCTION; 970+434+2790; Jan-8-03 3:48PM; Page 2/6
TOTALS
$0
$0
$0
$0
$0
$0
Sen' By: MARK YOUNG CONSTRUCTION; 970+434+2790; Jan-8-03 3:49PM; Page 3/6
MARK YOUNG COMMUCTMIAM. . ,
PROJECT NAME: CITY OF FORT COLUNIS V71,11TSERWCE CENTER STORAGE
PROJECT NUMBER. #02342
CHANGE ORDER REQUEST$UNWARY
COST CODES I ACTIVITY MESCRIP'110N I AMOUNT TOTALS
i
-S
F3
Rig wFxcavalion 11ZJOS
$39q
New River Corat* g-1fBifi3 '
$144
SUBC0KTRA0T TCTTAL. ^.
$538
SUBTOTAL
NYC FEE & 6 d4L'
SURZERS "K I Fi MER
LIABILIT71N ANI=t11:T�4'e .
AM BOND *:&oft
SWBCONTftACTOIC16mb.1V/l5 -
PERMIT FEES! WA
SALES TAX. WA
CONTRACTOR'CONTFNCEiIICY
PROPOSED CHANGE TtlS` ki,
$574
8en- By: MARK YOUNC CONSTRUCTION; 970+434+2780; Jan'8 03 3:48PN: Page 4/8
'..=-
FT. COLLINS, 00 SW4
asi
Requested By:
Respond By. 011OW2003
Scope of Work.
Material Labor Mach'
75
Original Contricla:
Net Change by Previous Change 0
Contract Sum Prior to this Change 0 rde
4394.00
Total Proposed Amount,
The Contract time Will be extended 11 days
se
Please indicate your approval by itti]i A.&4 ordoiloi�ft. wo* swdw.
Distribution. Ted Willis rely,
Sent By: MARK YOUNG CONSTRUCTION; 970+494+2790; J2n-8-03 3:49PM; JPage 5/6
Jan Ua Uy U3:25p M*w `titVbri - flDDDDUD
P �'2
New River
Juum y 8, 2003
Ted Wil is
mark. Y.ouog C mstnmtion, im.
155 North College Avemie
Suite 220
Fort Coffins, CO 80211
RE: COR #20
Ted,
At your raquestI�Teov Rtster ilttltge pfadzo.awbaai toybn our dust
estusm for the additwoil
g tit the 6' iwvc per Fn>po,si16cra #03 Pixed:tol us
on 12AW02. The scopeafNew.11%wt Teskti helY ibb"Ahe following:
Stalnog of xitntttely *15 3'
6" PVC
.: iOtiil iX�f: f�t+rrtite ttaa�i eervitx: S�!f3�.
If you have =y ihrdw impttnes
or oois pA e%oontad. usar 720-565-2413.
sitttarefy,
Ralf %obaa, PE.
Sen- BY: MARK, YOUNG CONSTRUCTION;
970+494+2790; Jan-3-03 12:53PM; Page 1/'
January 3, 2003
Mr. John RenhDwe
V
Sent via facsimile to:
Owner, Architect, &
Engr. Fax#: 970-482-6368
aught Frye Architects
401 West Mountain Avenue; Suite 200 .
Fort Collins, CO 80521
Project Title:
Project No.:
Subject:
RE:
John:
C014911111CttON .
INCORPORATED
City of Fort Collins Utility Fivice Center Warehouse Storage improvements
700 Wood Street
Fort Collins, CO $0521 _
02312
Revise water quality 4 ! ( 3 ,
4 b P�Autiet.sttuchue 11,— . jvy
Change Order Request (COR) N46:19
T
This proposal is written in response to Sea Bmivn Grow's revised water quality pond outlet structure
fax dated 12/06102. Please find enclosed ottr cotR'summary qualifications, and back up to complete this
work. The total cost to incorporate this cl=V is a scope increase to the contract of S1.187.
Your approval of COR No. 19 for inclusiow into ibi neltt chaaige:arder is appreciated. if you should have
any questions and/or concerns related to this rmattw, plow contact the undersigned at your earliest
convenience.
Sincerely,
Ted Willis
Superintendent/ProjectEngineer
Attachments
file: 02312-F-1.2; CORNo. 19
Acknowledged and approved to proceed wi[h wotkand for inchlsion into the next change order.
John Renhowe; Vaught Frye Accbiteets Dde Fax #: 970-224-1662
Jack Gianola; City Operations Services.Dept. ate Fax#: 970-221-6534
155 North College Avenue, Suite 220 - Fort {.okras, Colorado 60524"0 (970) 484-1648 • Fax (970) 274-0392
41W Jason Street • i eAm Colorado 8?21.1 • (303) 4l-'9073 • Fax (303) 477-9085
Sent By: MARK YOUNG CONSTRUCTION; 970+494r2790; Jen-3-03 12:53PM; Page 217
MARK YOUNG CONSTRUCTION, NC.
PROJECT NAME: CITY OF FORT COLLINS LMLITY SERVICE CENTER STORAGE
PROJECT NUMBER: #102312
CHANGE ORDER REQUEST SUMMARY
:.r
COST CODES e•
�- ACTIVITY CJEuCRIP ri.ON AMOUNT i TOTALS
CHANGE ORDER REQUESTP 19
Revised quality pond owtlit atmotdne
MARK YOUNG CONamu,CI I
Lo
Ie� Ytxrat
NYC EQUIPiI X.W TOM
$0
$0
$0
$0
SUBTOTAL T— - _
SMALL TOOLS 3 SUPPLIES OWN, OF LABOR
PAYROLL TAXES & INSUFt W=' - M 43% OF LABOR
GENERAL CLEANUP: NIA
$0
$0
DELIVERY. NIA ::
DRAWINGS S SPECS: BY ARCHIITEC7
$0
$p
$0
SUBTOTAL __-.- - --
Sent By: MARK YOUNG CONSTRUCTION; 970+494+279C; Jan-3-0-- 12:53PM; Page 3/7
MARK YOUNG CONSTiMT10M.. NC,
PROJECT NAME: CITY OF FORT COLLM S UTILITY SERVICE CENTER STORAGE
PROJECT NUMBER:OM12
CHANGE ORDER REQUEST SUMS Y
COST CODES ! ACTIVITY DMFilF"FION AMOUNT TOTALS
II SUB ONT�RACTS
Big Sky Excavation -112M
BUBCON1RiCT ti>7<Al'
SUBTOTAL
NIYC FEE S:i1T6'
SUBTOTAL W oiK
SUBTOTAL UWEECT_--
RUI LD E RISK Lq SU F U W 185 COY Eli'
LIABILITY INSURANCE 010.75%
MYC WMD M 0.8t %
SUBCONTRACTOR BOW WA
PERMIT FEES: NIA
SALES TAX: NIA
CONTRACTOR CONTtNEiENC'i*i 0%
PROPOSED CHANGE'TDZU.
1131 $1,113
$9
$9
$0
$0
$0
$1,187
I
Sent By: MARK YOUNG CONSTRUCTION; 970+494+2790; Jar-3-03 12:53PM; Page 4/7
Page 1 of I
I MW NO. AVAWNGT-ON ST.
Emc 13RCOKIFIELD, CO soo2o
(303) 450-7855
Chang I WOrder
Tfiumdley, Anuary 02, 2003
Project- Utlity Services Center Contract Number: 436-MYC
To: Ted Willis
Chimp Order Number: 13
MARK YOUNG CONSTRUTION Owner CP Number: COR1 9
155 NORTH COLLEGE EGE Reference Number: COR # 19
SUITE 220
FT. COLLINS, CO 9052,91
RE: Rev Rack At Existing Inlet
Requested By:
Respond By: 01/0a/2003
Scope of Work:
Revised Wash racks at already installed:iniet
Marerial
678
Labor Equipment
370 65
Section:
Original Contract:
Net Change by Previous Change Orders., -$98.026.00
Contract Sum Prior to this Change Order*.. $917,319.00
Total Proposed Amount. .$1'113.00
............::.a. ___
Revised Contract:. $91 i,2_, 66
The Contract time Will be extended by.. 5 days
Please indicate your approval by returninga change,orderfor the work specified.
Distribution: Ted Willis Sincerely,
ANDY DENNIS
Sen- By: MARK YOUNG CONSTRUCTION; 970+434+2790; Jan-13-03 8:10AM;
page 3
IMRK YOUNG -C "tRUrCT110K wNC,
PROJECT NAME: CITY OF FORT coLL "S. uT1WTY SERVICE CENTER STORAGE
PROJECT NUS; SOM2
CHANGE ORDER REQUEST SUMM1kRY
COST CODES ACTIVITY DElSOR PT'ION
AMOUNT i TOTALS
Big Sky Excevadon-1110103 ($36,B99
New Rim Conwwnq -1omt. $143
SllBCOM17Z An'r'y'.7Y1"6t
l
• v rpc YA o.V7TMJ@
1� ---T--
SUBTOTAL! 1. u}
1 629
1
3IH
8U11.6ER$
L *MVJP W%40t.7s'w
ts�ss
myc sow
a$3°g
wA
$0
PERIW,FEEg:; M/A
SALESTAX NiA,.
$0
CoN'i'FiACTOR t:Uht"opwAi O
—$0
PROPOSED CHASE TOTAL. I
t&3:981.
San` By: MARK YOUNG CONSTRUCTION;
970+484+2790; Jan-8-03 2:45PM; Page 1/9
January 8, 2003
Mr. John Renhowe -
Sent via facsimile to:
Owner, Architect, &
Engr. Fax#: 970-492-6368
Vaught Frye Architects
401 West Mountain Avenue; Suite 200
Fort Collins, CO 30521
Project Title: City of Fort Collins Utility' Serviot;' Center Warehouse'Storage Improvements
700 Wood Street
Fort Collins, CO 80521 tw
Project No.: 02312 j�
Subject: Add water discharge pipe to wtdx+da pond 061 bpi N _ $ 20 .
RE: Change Order Request (COR) No,11 CITY OF+aclurt
John:
This proposal is written in response to Sear, h3mmm GroWa revised drawing CS306 received on 1215102'
Please find enclosed our cost summatry;'qushf mmiaus; and back up:to.add a water discharge ph "e':
wetlands pond. The total cost to ineorporeu this change is a scope'increase to the coutract of 8,912
�
Your approval of COR No. 17 for inclusion tntt 4 e:m ft ohatigie order is appreciated. If you -should have
any questions and/or concerns related to tiih43 matter; pleasacodtaot the undersigned at your earliest
convenience.
Sincerely,
ell W�,
Ted Willis
Superintendent/Project Engineer
Attachments
file: 02312-F-1.2: COR No. 17
Acknowledged and approved to proceed with wodr and far inclusion into the next change order:
John Renhowe; Vaught Frye Architects ` :.yam.. Fax #: 970-224-1662
Jack Gianola; City Operations Services Detu. rhi* Fax #: 970-221-6534
155 North College Avenue, Suite 220 'Fort Collms;.Cokuado 13i M.4 (970) 484-1648 • Fax (970) 224-0392
4150 Jason Street • Denvec Colbrado-I§ t 1 '.(303) 03 9073 • Fax (303) 477-9085
Sen- By: MARE; YOUNG CONSTRUCTION; 970+434+2790; Jan-8-03 2:46PM,; Page 219
MARK YOUNG CONSTRUCTION NC.
PROJECT NAME: CITY OF FORT COLLIN5 't MUTY `SERWCE CENTER STORAGE
PROJECT NUMBER: 002312
CHANGE ORDER REQUEST SUMMARN'
COST CODES ACTIVITY DESCRIPTION AMOUNT TOTALS
CHANGE ORDER kgCU. 2ST# i7 I
1 Add Wetland Pond Dlsch"a Pioig
MARK YOUNG CONSTRUCTIONI,MIQ9: 32tl1hr
NYC LAVIOR.TOTAL.
MYC EQUiPI1N tW 11*AL
SUBTOTAL _..::.......
SMALL TOOLS & SUPPLtEI:r:LA$08
PAYROLL TAXES & INStWiNCE"�6 43%'OF LASOR
GENERAL CLEANUP: NA
DELIVERY: WA
DRAWINGS 3 SPECS: 8Y ARe,igrECT
SUBTOTAL
uvr_ ccF wi 4; iwt
laill
110
$0
$0'
Sent By: MARK YOUNG CONSTRUCTION; 970+4B4+2790; Jan-6-03 2:46PM; Page 3/9
MARK YOUNG CONSTRUCfif - 1,11NC.
PROJECT NAME: CITY OF FORT COLLINS:IMLiTY SEA .ICE CENTER STORAGE
PROJECT NUMBER: 002312
CHANGE ORDER REQUEST SUMMARY
COST CODES ACTIVITY DESCRIPTION i AMOUNT TOTALS
�S�jBCON�i �'iS
Bin Sky Excavation-1217/02 57,2WI
SW By: MARK YOUNG CONSTRUCTION; 970+494+2790; Jan-6-03 2:46PM; Page 4/B
DATE:12/07l02
JOB NAME: F7 w1iis.SWAM Cemer
CONTRACTOR:
LOCATION: FT. Colf+ns
MYC
CONTACT:Ted Wills
PAGE 1
Excavator
S 45.00-
386
130
- . rm
0
- 0
$ 1,140.00
lanrlfr
.8
$ 45.o0
S moo
6
$ 60.06
$ 480.UU
0
$
0
0
$ 840.00
PWe Crew
o
$
$
❑
$
$
❑
$
0
o
E
Ipe layer
8$
40.00
$ 320.00
0
S
t0
$
Q
0
S 320.00
pipe Layer
.6
S 4OX0.
S 320.00
0$
-
t
0
$
b
0
S 0x0.OQ
-.240.00
`.8.$
. 3f1:00'
$ .240.00
- ..0
S =.'.
S.. -.
:b
5 . .` '
.�0
.' 0
S
:: 3500
$ "::tA0.00....
.4.
S 35.➢9;
$ 14QQq::
0
4ti
T148
S. goo
- . Rio
: B21
3..c T8810.
SBWCtis .
:$ :� • ..
-t : i
'. .. ij
$ -i !
'$
,Y
!!if : �
$ .?.°.QUO.
2S0
: 37.5
$-:-; 287;31
.....
A$p11a8 bBniti Sid flafi
... R.5
S : ':. 3:i DO
�..`_ -:::
t.: 8730
$ :��
2.5
- �.: ❑
S 38-Ob
$ .- ;:
3 87,90'
$ r..
4.:
1.'
.
$ - `.
S lA1R:0A0.
D
i 1U20
. ❑
153
$ :: it5b0
.S. 1173.E10
-
75 jN[3pE 9 $agta
t5'80dd83iorr4.
..Oa
.::
070
.::;21
$ 00:
$ 91;66
•
1 .1ne
-
r: r -
s2w%
e a+n
.n ...k
S &60
I im5
eve
112
12.$T15
an a
$ ,mom
i tie Ali
172:50
�rasbGra� -
-0
$ r :
$ -
o',S
:. �..--
$
::1
ea :'.
$.:25DAt1
-o$
$
0$
$
Q
$
0
0
a:$
S
o$
$
❑
$
o
Q$
b$
_
a
o
$
o
o
s
of
$
oS.•-
$
❑
$.
❑
o.$
0$
$
oS
$
o
$
0
flS
$
$
OS
S
0
$
❑
0$
O
Grand Totals Page 1
"
$ 7,xlsoe
Sen< By: MARK YOUNG CONSTRUCTION; 970+4B4+2790; Jan-B-03 2:47PM; Page 619
Jan 08 03 12:59p "Nrw Ri4lr DDIID000 p,.,2
No Text
Sen- By: MARK YOUNG CONSTRUCTION; 970+434+2790;
Dec-16-02 3:33PM; Page 1/7
December 16, 2002 CON'S'liRUCTION Sent via facsimile to:
INCORPORATED
Owner, Architect
Mr. John Renhowe
Vaught Frye Architects
401 West Mountain Avenue; Suite 200
Fort Collins, CO Son
Project Title: City of Fort Collins Utility Semite Center Warehouse Storage Improvements
700 wood Street
Fort Collins, CO 80521
Project No.: 02312
Subject: Extra landscaping per Piroposallzequest42
RE: Change Order Request (Colt) No. 16
John:
This proposal is written in response toVaugltt Frye's'Proposal Request #2 received on 12/3/02. Please
rind enclosed our cost summary, qualifieailons add 'back up to extra landscaping to the noMh_west comer.
of the site. The total cost to incorporate this change is a scope increase to the contract of 2�23^8�
Your ai of COR No. 16 for inclusion into th-,next ch
ange hangs order is appreciated. If you should have
any questions and/or concerns related to this matt -. , please conraet the undersigned at your earliest
convenience.
Sincerely,
Ted Willis
Superintendent/Project Engineer
Attachments
file: 02312-F-1.2: CORNo. 16
Acknowledged and approved to proceed wuh work:and for inclusion into the next change order:
John Renhowe; Vaught Frye Architects Date Fax #: 970-224-1662
Jack Gianola; City Operations Services Dept. Date Fax #: 970-221-6534
155 North College Avenue, Suite 2M ► Fun# Crllimr Colorado IW524 • (970) 484-1648 • Fax (970) 224-0392
415o jason Streit • Dens) Colorado WMI • (303) 477-9W3 0 Fax (303) 477-9085
Sent By: MARK YOUNG CONSTRUCTION; 970+434f2790; Dec-16-02 3: 33PM; Page 2/7
MARK YOUNG CONSTRUC6014, INC.
PROJECT NAME* CITY OF FORT COLLIKIS-UTIUTY SERVICE CENTER STORAGE
PROJECT NUM13ER: AM12
CHANGE ORDER REQUEST SUMAPY
......... ..
COST CODES : ACTIVITY DESCRIFMON
. ....... . ............ ..
CHANGE ORDER
Extro Land"aping In nordmeatcomw
NWW YOUNG CONSTRUC IOIL
MYC LABOR TOTAL
MYC MATERIAL
wc My nNiAL TOTAL
wo twip,
myc Equipmewr tom
SMALL TOOLS & SUPPLIES 4! 8%�WLAEPR-
PAYROLL TAXES & INSLKM-.E G 434A OF LA13OR
GENERAL CLEANUP: NIA
DELIVERY: Wk'
DRAWINGS & SPECS: BY ARCHITECT
--7-
AMOUNT I TOTALS
a
$Dj $0
Sent By: MARK YOUNG CONSTRUCTION; 970+434+2790; Dec-16-02 3:34PM; Page 317
MARK YOUNG CONSTRUCTION, :INC.
PROJECT NAME: CITY OF FORT COLLINS UTILITY SERVICE CENTER STORAGE
PROJECT NUMBER: 0=12
CHANGE ORDER REQUEST SUMMARY
COST CODES I ACTIVITY DESCFRIFrnON I AMOUNT TOTALS
Belmire Landscape - 12112102
_ MYC FEE t� 5.0%
SUBTOTAL 9UW4hP 4UCT$.VO A _
SUILDORS RISK
�UBTd fAL..�1�tE�`f, COS��_
LIA9ILITY INSURANCE 4. D:70)6
MYC BOND a &90%
SUBCONTRACTOR -BOND, WX
PERMIT FEES: WA
SALES TAX: NIA
CONTRACTOR CONTINGENCY 910
PROPOSED CHANGE T'OTAI-
$2,099
Sent By: MARK. YOUNG CONSTRUCTION; 970+494+2790; Jan-13-03 8:10AM;
liku t'XO4vi7:i0f)
303 450 6921
I
S 16280'ND, WASHiNGTONST.
BROOMFIELD, CD'mwo
Page 4/9
Page 1 Of 2
4303j 46D-7855
hder
- F�ida:Y, aanuary 10, 2Dt}3
Project Utldy Sentes Center Contract Number, 43&MYC
TO: Ted Willis Change Order -Number: 16-
MARK YOUNG Ci3NS1'RU1"IDN. Owner CP Number. 24
155 NORTH COLLEGE: SUITE 220 !%eferettce Number: CDR #24 .
FT. COLLINS, 00 60624
RE: W CSP & 36" RCP .
Requested By:
Respond By: 01/1612003
Section:
Scope of Waric
Change 43x68" HERCP to 36
RCP sfi6rten.36' Slotted OSP by 190 feet
Item
43x68" HERCP 220'
Material
-
s
Lkbor,
E LO
q Dent
Total
36" slotted CSP
60"
.'7
1Bi:.0(1
. 16:8S
16.60
22 03
t4,.15
(29405.2)
(36128:5)
manhole 8' die
38" CSP ca P�
2578itN9
1347.90
: 7M.00
3929:9
36"P
RCP 2fgM,# ...
128 00 ...:
$9;83
40.-00
14 86
27:00
tt3.92:'
195.0
MH
MH#BreRiadBs61d..fi4withi
Plus costta 61 36' invert a-
807
45s00
.
ti5.0t?
22781.0
120.75
18` ...:
1 B" CMP w/cap 12
7 1. +F1.-
4.36
4;2x^ ._
(192,24).
The Contt i time Wiff .m elft uiodbar vs
8 ,
Pteas9 i CatB Y4uraptatapv by ratuerWO. a ctu bIde.,I* #ice Work SPecfftecl
r-y..u,
%6CL a0
r-
i
FE -�, 4�1'," a E-
caapittg, t1G. KETGOLUMSt/TLrryEEmegCENTER
CHMGE PROPOSAL. for SGWO bm mm Y MW CONAL
WT. UPIT HAIMAL LIIR $OF LAMIOR i.AMIOR OCUR. MICA". RQUIP.
ilQf1: C1Y. cw am HU MEN PATE CMT HOURS RATE COST
PROJEGT(fm"vm #, avow COIumms 4 ! - � t � 40 It M 1 $6,00 4 ! - f
2'XYX1-
1 1MI•X
I.W _t
IaeG AI?4MmL *AW8W
- � 111i14a�?
.. - 1A"pA1ME
BPRAY7Alif �:
6PAAY xoHE
60L PREP, 9"
{i"1
600 AREA 6PREAU WMPW aG'T/iAJ9
(C1)
FM GRAM U
On
BLMGRA$B OO W TM PEOOUE BOC
W)
e0A PHEO a 600 SUMMAL
i
:TSB 4
I-W
a-
x
--as
•-- s
1 4
idW i
: 10.48
1
Y !
f/
J
fam
.1 F
0! 1
45
.4
.ab Lvl
.:1y
i-a_
61 t
Um II -
: -AM
O
A S
-.
J
-
-J 1
i
"
-4a-
175 -J
- ;
-
:lit
9 t-
41
:
UJI
s-4 P
a J
IM44
iM J
- 4
"tP0
1 i
/6
f
m.m
P t
#
11% i
- {
4A
1 i
1/
1
WJ63
B t
- {
I70 J
{
-
'1A
1 i
u
i
MW
Im 1
4f f
67M
1
3.71
a.7f i
lao0 1
9/.M
W
I t
if
9
232
! {
44- !
44.00
1.737 0
- 1
oa
1 1
I4
I
7.W
1.10 4
4J $
67.00
1= J
t
-
1J
1. {
t6
i
40.00
1 7
4J f
46M
IAT J
0.40 !
464.0
OA
4 /
-
t
-
0 e
i
vlwlclfl FI l lillA
TOTALMI i /MSI U.9 MI41M1Re I M-W tt/ HIMEAPMr 1 41L44 t 174.M f- S74H I xS/B]L
i 1 4i.N !OR is% 10%,
11
No Text
Sent By: MARK YOUNG CONSTRUCTION;
970+484+2790;
Jan-IS-03 8:OBAM;
Page 1
January 10, 2003
Mr. John Renhowc
Vaught Frye Architects
401 West Mountain Avenue; Suite 200
Fort Collins, CO 80521
Sent via facsimile to:
Owner, Architect, &
E,ngr. Fax#: 970-482-6368
Project Title: City of Fort Collins Uiilhy Swvice Center'Warehouse Storage Improvements
700 Wood Street
Fort Collins, CO 80521 r-
1 IS Ur Is U P/
Project No.: 02312
Subject: Change inlet *I trash rack _ JAN 1 3 2W3
RE: Change Order Request (CO1t) No. 23 i CITY OF FORT COWN
FACILITIES
John:
This proposal is written in response to Ssarlkown Gro*. 's revised.drawing CS604 dated 8I29/02.
Please find enclosed our cost summary, quatifrcetitars, and back up to add an hatch a inlet##
trash rack. The total cost to incorporate' this ohatipo is a scope increase to the contract of 1,408.
Your approval of COR No. 23 for inclusion,.inki th, nw ohangt: order is appreciated. If you should have
any questions and/or concerns rcb tedto this maltbr'$ Please contact the undersigned at your earliest
convenience.
Sincerely,
Ted Willis
Superintendent/Project Engineer
Attachments
file: 02312-F-1.2: CORNo. 23
Acknowledged and approved to proceed with ivrmk and for inclusion into the next change order.
John Renhowe; vaught Frye Architects Dub Fax #: 970-224-1662
Jack Gianola; City Operations Services Dept: But Fax #: 970-221-6534
155 North CoAege Avenue, Suite 220 • Fort Collins: Cobmdo-BOM4 * (970) 4844648 • Fax (970) ="392
4150 Jason Street • Denvet; Colorado 8=1 • (303) 477.9073 • Fax (303) 477-9085
Sen. By: MARE: YOUNG CONSTRUCTION; 970+494+2790; Jan-13-03 8:08AM; Page 2
MARK YOUNG CON �r Uenol ty..WC.
PROJECT NAME: CITY OF FORT COLLINS tMLjT'Y'SERVICE CENTER STORAGE
PROJECT NUMBER: 002312
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIMTY DESCRIMON
CHANGE ORDER REQUESTN 23
Change Inlet It trash'ack
MARK YOUNG CONST'RUC y .'
MYC LABOR TOTAL
MYC EQUIPMENTTOTAL
OTAL
PAYROLL TAXft a MURiWCE O 43% OF LABOR
GENERAL CLEANUP: WA
DELIVERY: HIA `
DRAWINf3S 8 $PECS:'BY ARCI I "ECT
AMOUNT TOTALS
S�
$0
$0
$0
$0
$0
$0
$0
Sent By: MARK YOUNG CONSTRUCTION; 970+434+2790; Jan-13-03 8:09AM; Page 314
MARK YOUNG CONSMU W1, WC.
PROJECT NAME: CITY OF FORT COLLINS ttnuirY SERVICE CENTER STORAGE
PROJECT NUMBER: 002312
CHANGE ORDER R )WMT SUMKARy
i COST CODES ACTIVITY DE3CF:W noN ! AMOUNT I TOTALS
j
' Big Sky Excavation - Illo 3 $1,3201
3UBCONTRA.CTTOTAL
.............._..:... ....... ... ..... .... ........ ....___:_................. .,
LlML"y JNS F1ifi,4NCE * 0.Z6!4
un Bom o-a eox ..:: .
suscoNTRAOTOFt8M* ,:N7A
PERMIT FiMe. MIA
SALE8 TAX #UA
CON'T�IACTOR CONT IC*jj 9%
PROPOSED CHANGE TDTAL.
$1408
I
San' By: MARK YOUNG CONSTRUCTION; 970+4B4+2790; Jan-13-03 8:09AM;
US ke:,$bf, B1,C Sky�Excav,&%�ion 303 450 .6921 page 4/4
^P- S
ELSE,:WC. page i of i
t6200 NO. WASMNGT+ON ST.
E" 8ftOC)1VFIELD,CO 80020
(313) 450-7855
Change Ordw
Project: WRY Services Center
Contract Number. 4Wmyc
To. Ted Willis Change Order Number,- 16
MARK YOUNG. C0NS7r-RLr.r)ON Owner CP Number. 23
155 NORTH COLLEGE." Reference Number: COR #23
SUITE 220
Fr. COLLINS, CO 805,!4
RE: Hinged Grate At Box inlet Section:
Requested By:
Respond Ely- 01/16/2003
Scope of Work:
Reconstruct inl9t.trash grate at the start of btu culvert...
Build separate places then dip eaeh:P** than hinge and finish assembly
Material Labor Equipment TOTAL
46- $1,320:00
Original Contract W61293-00
Not Change by Previous Change Orders: $98 omoo
Contract Sum Prior to this Change Order $917,319.00
Total Proposed Amount,- 41,320.00
Revised Contract. s91amq.66—
The Contract time Will be extended by: 5
Please indicate your approval by retuft'g a diange ostler for the work specified,
Distribution; Ted Willis Sincerely,