Loading...
HomeMy WebLinkAboutRFP - P841Administiadve Services Purchasing Division ADDENDUM No. 3 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Proposal: #P841, Contractor for Digital Orthophotography and Planimetric Data OPENING DATE: 5:00 p.m. (our clock) June 18, 2002 Five (5) hard copies of the Proposal must be submitted to the Purchasing Department by 5:00 p.m. (our clock) June 18, 2002. Please do not submit electronic or fax copies.. Additional questions and answers: Q. What version of AutoCAD are you using? A. We are servicing several departments where they will be using anywhere from 14 to current version. Q. Is the 1999 footprint data at ground or rooftop level? Is your requirement to capture data at ground level a continuation of what was done before? What is your intended purpose of this requirement? A. The footprints were collected at ground level. We would like to collect the data as closely to the original collection as possible. Q. Do you have an existing database design that we can see? A There are directions on how to download the sample data on one of the addendums to the RFP. Q. Do you want the new data constructed to the same database design or will it change in any way? A. Whatever we had before was good enough. There were numbered codes for some of the attributes insted of them being spelled out. We'd rather have the attributes spelled out. Q. Does the City have the ability to support airborne GPS base stations (i.e.; do receivers have enough memory to log GPS data at 0.5 sec)? A. We have survey grade GPS receivers that we can use as base stations. We have three Trimble 4800 receivers with oh -board memory capable of 8 hours at 5-second epocs. Two hand-held receivers with extended memory. Q. In the RFP under "Planimetric Data" you specify that vendors are to collect all pavement cover including parking lots. Does this mean that you want all impervious services to be mapped? A. Yes. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE PROPOSAL STATING THAT THIS ADDENDUM HAS BEEN RECEIVED 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 a seven (7) day period. Unacceptable photography, as determined by the City, shall be re -flown when conditions are suitable. Individual exposures shall be shot with the proper amount of overlap to collect 3-D points, breaklines, and other planimetric data. Each exposure shall be labeled with flight -line, exposure number, and scale. b. Orthophotography Delivery of the orthophotography shall be in MrSid, and GeoTiff digital formats. Or a file format that is usable in current ESRI product versions that is optimized for system performance. And also a format that performs in AutoDesk (AutoCAD) products. The photos shall be scanned and rectified with 3-D points and breaklines collected from the same photography. Image quality shall be 0.5-foot pixel resolution. A price should be listed for a ground horizontal/vertical accuracy of +/- 2 feet, as well as alternative pricing for between 3, and 5 feet accuracy should be given. Edge -matching of the orthophotography should be consistent and as clean as possible. The end -use should appear seamless. See software specifications below. 2) Digital Elevation Model and Digital Terrain Model Mass points and breaklines shall be collected to a spacing interval and accuracy that would be sufficient to orthorectify the imagery appropriate to National Map Accuracy Standards (NMAS) for V = 100' or whichever WAS scale is appropriate for the horizontal/vertical accuracy of the photography. The WAS should be noted in the quote. Mass points shall only be collected on the ground surface and breaklines shall be collected that define major drainage ways or drainage detention. A digital terrain model shall be generated from these mass points and breaklines. Elevations shall be coded in the DEM. If available, mass points, and breakline files shall be delivered in ESRI ascii format. 3) Planimetric Data Optionally, the City may request that the following planimetric data shall be collected from this photography. It is to be listed and priced separately: 1. Building footprints 2. Hydrology 3. Edge of pavement 4. Driveways and sidewalks. This shall consist of collecting the outline of the building at ground level and all pavement cover including parking lots. Hydrology shall consist of visible water on the ground. The horizontal accuracy of these data sets shall be the same as the aerial photography. Any existing data from the 1999 collection shall be used to build onto if it defrays the cost and does not compromise data integrity or the time involved to collect it. These three data sets shall be delivered in separate Arc/INFO coverages. 0 4) Hard / Soft Copy Deliverables The DTM, DEM, contours, building footprints, hydrology, edge of pavement, and annotation shall be delivered on CDROM in Arc/INFO format. The orthophotography shall be delivered in a TIF/TIFW and SID format. Any data collected and film shall be available to the City of Fort Collins for future use, and shall remain property of the City of Fort Collins unless it is more cost effective to have the copyright remain with the vendor. The proposal shall be itemized and have prices for each individual product (photography, orthorecification, DTM, DEM, buildings, edge of pavement and hydrology plus any other costs). 5) Timeline a. Flight portion must be completed prior to: leaf -of, no snow 2002 b. Final products, as outlined in the Scope of Work, shall be delivered no later than nine (9) months after completion of the aerial flights. Section 4.0: QUALITY CONTROL 1) Completeness of Attributes and Data Collection The City will conduct quality control checks on the delivered data regarding positional accuracy and completeness of features. The city will choose 20% of the delivered dataset area to check for positional accuracy, attribute accuracy, and completeness of features. All deliverables will only be accepted when less than 2% of the checked features show errors. 2) Post Flight Horizontal/Vertical Control Survey Check The City surveyor will perform field spot checks of the completed work to verify accuracy. 3) Payment Requirements It is the City's intent to pay a portion of the contracted fee at the time of contract execution and to pay for the balance of services as they are completed and deliverables received. 4) Contacts for Questions G/S Related questions, data quality, positional accuracy: Katy Carpenter, GIS Programmer/Analyst, City of Fort Collins, 970-416-2048 5 Land Survey Questions: Wally Muscott, Surveyor, City of Fort Collins, 970-221-6605 Questions regarding submission of proposals: James O'Neill II, CPPO, FNIGP, Director of Purchasing and Risk Management, 970-221-6779 Section 4.0: Pricing In your written response to this proposal provide pricing as set forth below. Pricing for the following services: a. Digital terrain model b. Digital orthophotos (see Orhtophotography Specifications below) c. Edge of pavement d. Hydrology e. Building footprints f. Sidewalks and Driveways g. Any other services, as needed, for clarification of proposal pricing h. Unit prices, where appropriate, to aid in contract change orders Orthophotography Specifications: Several criteria are to be handled differently for each orthophotography option to assess cost and accuracy. First would be to weigh color and black and white photography. Traditionally black and white film and processing has cost less than color film and processing. The quote should reflect a price for each option. The next option would be horizontal and vertical accuracy. Generally higher accuracy means higher cost. A price should be listed for a ground horizontal/vertical accuracy of +/- 2 feet, as well as alternative pricing for between 3, and 5 feet accuracy should be given. Planimetric Specifications: The city would like to investigate if it is cost effective to collect a smaller area, or by performing a change detection process. For example, the city could specify areas that have changed since the original 1999 collection and only those areas would be collected. Or another method would be to collect the listed planimetric features only inside of the developed areas of the whole 125 sq. mi. area. Any similar method offered by the consultant would be considered that would reflect a cost savings. The purpose for listing different prices for othophotography is to get an accurate representation of price vs. accuracy comparison to all the options. If there are options that can be considered other than these to show a similar comparison, those can be submitted as well. Although it is still important to follow the previous outline for a quote initially so that a comparison can be made between quotes from other vendors. 2 Section 5.0: Evaluation 1) Evaluation and Assessment of Proposal An evaluation committee shall rank the interested firms based on their written proposals using the ranking system set forth below. Firms shall be evaluated on the following criteria. The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 an average rating, and 5 an outstanding rating. Recommended weighing factors for the criteria are listed adjacent to the qualification. Weighting Qualification Standard Factor 1.0 Scope of Proposal Does the proposal show an understanding of the project objective, methodology to be used, and results that are desired from the project? 2.0 Assigned Personnel Do the persons who will work on the contract have the necessary skills? Are sufficient people of the requisite skills assigned to the contract? 2.0 Availability Can the work be completed in the time frame required? Can targeted start- and completion -dates be met? Are other qualified personnel available, if required, to assist in meeting the project schedule? Is the project team available to attend meetings as required by the Scope of Work? 1.0 Motivation Is the firm interested and are they capable of doing the work in the required time frame? 2.0 Cost and Work Hours Do the proposed cost and work hours compare favorably with the Project Manager0s estimate? Are the work hours presented reasonable for the effort required in each project task or phase? 2.0 Firm Capability Does the firm have the support capabilities the assigned personnel require? Has the firm done previous projects of this type and scope? 2) Reference Evaluation (Top -ranked firms) The Project Managers will check references using the following criteria. The evaluation rankings will be labeled Satisfactory / Unsatisfactory. 3) Qualification and Standard a. Overall Performance - Would you hire this company again? b. Timetable - Was the original Scope of Work completed within the specified time? Were interim deadlines met in a timely manner? c. Completeness - Was the company responsive to client needs; did the company anticipate problems? Were problems solved quickly and effectively? d. Budget - Was the original Scope of Work completed within the project budget? e. Job Knowledge - Did company personnel exhibit the knowledge and skills necessary for R the efficient completion of the Scope of Work? Section 6.0: Proposal Acceptance All proposals shall remain subject to initial acceptance 90 days after the day of submittal. SA 7/93 Exhibit A City of Fort Collins, Larimer County Colorado Fall 2002 Proposed Flight Area Legentl �oem caiecaon aea N crs oe�e exrem ..... streets n cry umus N 0 4,000 8,000 16,000 24,000 32,000 Feet t� X `3 \ i-t 5 z 1 a t` tl�i t i t.t..,m RIM �x� x �� I V, s x Mb 1 r. SA 7/93 10 Exhibit B Sample SERVICES AGREEMENT THIS AGREEMENT made and entered into the day and year set forth below by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and , hereinafter referred to as "Service Provider". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Services The Service Provider agrees to provide Orthophotography and Planimetric Data services in accordance with the scope of services attached hereto as Exhibit "A", consisting of page[s], and incorporated herein by this reference. 2. The Work Schedule The services to be performed pursuant to this Agreement shall be performed in accordance with the Work Schedule attached hereto as Exhibit "B", consisting of _ (_) page[s], and incorporated herein by this reference. 3. Time of Commencement and Completion of Services The services to be performed pursuant to this Agreement shall be initiated within five (5) days following execution of this Agreement. Services shall be completed no later than nine (9) months after the initial flight takes place.. Time is of the essence. Any extensions of the time limit set forth above must be agreed upon in a writing signed by the parties. 4. Contract Period This Agreement shall commence upon the date of execution shown on the signature page of this Agreement and shall continue in full force and effect for one (1) year, unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for an additional period of one (1) year at the rates provided with written notice to the Professional mailed no later than ninety (90) days prior to contract end. 5. Delay If either party is prevented in whole or in part from performing its obligations by unforeseeable causes beyond its reasonable control and without its fault or negligence, then the party so prevented shall be excused from whatever performance is prevented by such cause. To the extent that the performance is actually prevented, the Service Provider must provide written notice to the City of such condition within fifteen (15) days from the onset of such condition. [Early Termination clause here as an option. 6. Early Termination by City/Notice Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Service Provider. Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice SA 7/93 11 unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following addresses: City: Service Provider: City of Fort Collins Purchasing PO Box 580 Fort Collins, CO 80521 In the event of early termination by the City, the Service Provider shall be paid for services rendered to the date of termination, subject only to the satisfactory performance of the Service Provider's obligations under this Agreement. Such payment shall be the Service Provider's sole right and remedy for such termination. 7. Contract Sum The City shall pay the Service provider for the performance of this Contract, subject to additions and deletions provided herein, the sum of Dollars 8. City Representative The City will designate, prior to commencement of the work, its representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the services provided under this agreement. All requests concerning this agreement shall be directed to the City Representative. 9. Independent Service provider The services to be performed by Service Provider are those of an independent service provider and not of an employee of the City of Fort Collins. The City shall not be responsible for withholding any portion of Service Provider's compensation hereunder for the payment of FICA, Workmen's Compensation or other taxes or benefits or for any other purpose. 10. Personal Services It is understood that the City enters into the Agreement based on the special abilities of the Service Provider and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Service Provider shall neither assign any responsibilities nor delegate any duties arising under the Agreement without the prior written consent of the City. 11. Acceptance Not Waiver The City's approval or acceptance of, or payment for any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement or cause of action arising out of performance of this Agreement. 12. Warranty a. Service Provider warrants that all work performed hereunder shall be performed with the highest degree of competence and care in accordance with accepted standards for work of a similar nature. SA 7/93 12 b. Unless otherwise provided in the Agreement, all materials and equipment incorporated into any work shall be new and, where not specified, of the most suitable grade of their respective kinds for their intended use, and all workmanship shall be acceptable to City. C. Service Provider warrants all equipment, materials, labor and other work, provided under this Agreement, except City -furnished materials, equipment and labor, against defects and nonconformances in design, materials and workmanship/workwomanship for a period beginning with the start of the work and ending twelve (12) months from and after final acceptance under the Agreement, regardless whether the same were furnished or performed by Service Provider or by any of its subcontractors of any tier. Upon receipt of written notice from City of any such defect or nonconformances, the affected item or part thereof shall be redesigned, repaired or replaced by Service Provider in a manner and at a time acceptable to City. 13. Default Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this agreement, such party may be declared in default thereof. 14. Remedies In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to: a. Terminate the Agreement and seek damages; b. Treat the Agreement as continuing and require specific performance; or C. Avail himself of any other remedy at law or equity. If the non -defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney fees and costs incurred because of the default. 15. Binding Effect This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 16. Indemnity/Insurance a. The Service Provider agrees to indemnify and save harmless the City, its officers, agents and employees against and from any and all actions, suits, claims, demands or liability of any character whatsoever brought or asserted for injuries to or death of any person or persons, or damages to property arising out of, result from or occurring in connection with the performance of any service hereunder. SA 7/93 13 Adminish..dve Services Purchasing Division REQUEST FOR PROPOSAL P-841 CONTRACTOR for DIGITAL ORTHOPHOTOGRAPHY and PLANIMETRIC DATA The City of Fort Collins is requesting proposals from a contractor to provide digital orthophotos. The City may also elect to contract for a digital terrain model, topographic data, and selected planimetric data and is seeking proposals that include these items as well. The City currently has these previously listed features from a1999 flight project. Individual City departments will decide the type of data collection and the types of additional data features to be collected after an itemized quote as been submitted. The City of Fort Collins is piloting an e-procurement system for the next 30 days. As a result all of the City's solicitations will be available at www.slcomm.net, This service will be free to you during this pilot program. To receive this solicitation please sign up at the website www.sicomm.net, or call 1-800-575-9955, select option #2, and tell the Sicomm representative you are a vendor and would like to sign up with the City of Fort Collins. Please make sure you sign up for commodity number 905-04. Written proposals, five (5) in number, will be received at the City of Fort Collins' Purchasing Division, 215 N. Mason, 2nd , Fort Collins, Colorado 80524. Proposals will be received before June 4, 2002, Proposal No. P-841 Contractor for Digital Orthophotography and Planimetric Data. Proposal Timeline: a. Flight portion must be completed: leaf -off, no snow 2002 c. Final products, as outlined in the Scope of Work, shall be delivered no later than nine (9) months after completion of the aerial flights. If you have Purchasing questions please contact James O'Neill II, CPPO, FNIGP, Director of Purchasing and Risk Management, at 970-221-6779. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision - making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or sham proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Sincerely, 4a s B. O'Neill II, CPPO, FNIGP ctor of Purchasing & Risk Management 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 b. The Service Provider shall take all necessary precautions in performing the work hereunder to prevent injury to persons and property. C. Without limiting any of the Service Provider's obligations hereunder, the Service Provider shall provide and maintain insurance coverage naming the City as an additional insured under this Agreement of the type and with the limits specified within Exhibit C, consisting of one (1) page, attached hereto and incorporated herein by this reference. The Service Provider before commencing services hereunder, shall deliver to the City's Director of Purchasing and Risk Management, P. O Box 580, Fort Collins, Colorado, 80522, one copy of a certificate evidencing the insurance coverage required from an insurance company acceptable to the City. 17. Entire Agreement This Agreement, along with all Exhibits and other documents incorporated herein, shall constitute the entire Agreement of the parties. Covenants or representations not contained in this Agreement shall not be binding on the parties. 18. Law/Severability The laws of the State of Colorado shall govern the construction interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 19. Special Provisions Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit _, consisting of (_) page[s], attached hereto and incorporated herein by this reference. 14 Exhibit C INSURANCE REQUIREMENTS The Service Provider will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Service Provider shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement" "The insurance evidenced by this Certificate will not be cancelled or materially altered, except after ten (10) days written notice has been received by the City of Fort Collins." In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Service Provider, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Service Provider under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Service Provider's general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Service Provider shall maintain during the life of this Agreement for all of the Service Provider's employees engaged in work performed under this agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Service Provider shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $500,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Service Provider shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. 15 Citv of Fort Collins Administi...ive Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 2 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Proposal: #P841, Contractor for Digital Orthophotography and Planimetric Data OPENING DATE: 5:00 p.m. (our clock) June 18, 2002 F.A.Q.'s for City of Fort Collins Fall 2002 Flight By: Katy Carpenter kcarpenter aafcaov.com 970-416-2048 The purpose of this list is to answer some of the more common questions. I will be out of the office the week after Memorial Day and will return the following Monday. I can answer any other questions you may have then. Q: What is the scale of the original 1999 aerial photography? A: 1" = 600' scale Q: Does the City currently have driveways and sidewalks collected? A: No. Q: Will the City do the paneling and have base stations for the ABGPS ground control? A: Probably, but we don't know for sure yet. Q: What format of digital orthophotography do you need? A: We currently have SID and TIF/TFW format. We need something that works in AutoCad and something that works in ESRI products. If there were a better format that stores smaller file sizes than TIF/TFW and works in AutoCad, we would want that. The SID format currently works really well in ESRI products. Q: Do you need a TIN re -generated for the whole city and new contours? A: No. Primarily we need the orthophotography, secondarily we need our planimetric data updated in changed areas, and thirdly we may want to update changed areas with TIN's and topo, but that is least important at this time. Q: Were the original 1999 aerials flown in color? A: Yes. Q: Why is the City asking for several scales or ground accuracy of photography? A: The point of this is to be able to see the cost difference between each option. Our original collection was accurate for V = 100' mapping and it is +/- 2 feet on the ground. Since this is an update project, we are considering doing a less precise collection on this turn to fill in some of the gaps. In a few more years it will become necessary to do this higher level of collection 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 again, but in the mean time we are investigating the possibility that we might be able to save some money by doing a less precise collection. Q: Do you have files you can send us that will show areas of change? A: We have a sample set of data you can download off of our FTP site. Included in this are a series of files that make up all of the building permits issued between 1999 and now. This is only one indicator of change. There are other files that can be incorporated to create a better indicator for change. For now, this is good enough. Q: Do you have a sample of what was collected in 1999? A: Yes. These are part of the files you will download off of our FTP site. Q: How do I get to your FTP site? A: There are directions for logging in on the first addendum to this RFP. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE PROPOSAL STATING THAT THIS ADDENDUM HAS BEEN RECEIVED CITY OF FORT COLLINS ADDENDUM No. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Proposal: #P841, Contractor for Digital Orthophotography and Planimetric Data OPENING DATE: 2:00 p.m. (our clock) June 4, 2002 NEW OPENING DATE: 5:00 p.m. (our clock) JUNE 18, 2002 To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made: 1. Opening date is changed to June 18, 2002 at 5:00 p.m. 2. Under Section 4.0: QUALITY CONTROL - Page 5, delete paragraph 3), "Payment Requirements" 3. A sample of the'99 Data including a sample photo may be found on the City of Fort Collins GIS FTP site. Also included will be recent building permits to show a level of change detection and the quarter -section index file with control points. Instructions to access this data follow: Logging into City of Fort Collins GIS FTP Site Using Internet Explorer 1. Type the following into the Address box on the browser: ftp://ftcgls@ns2.fcgov.com 2. In the USERNAME box type in: ftcgis 3. In the PASSWORD box type in: rev91 iew 4. You should be able to see directories at this point. The data is located in the "sampledata" directory. Copy or remove data. 4. The weighing factors for the criteria has been amended as follows: Recommended weighing factors for the criteria are listed adjacent to the qualification. Weighting Qualification Standard Factor 2.0 Scope of Proposal Does the proposal show an understanding of the project objective, methodology to be used, and results that are desired from the project? 2.0 Assigned Personnel Do the persons who will work on the contract have the necessary skills? Are sufficient people of the requisite skills assigned to the contract? 1.0 Availability Can the work be completed in the time frame required? Can targeted start- and completion -dates be met? Are other qualified personnel available, if required, to assist in meeting the project schedule? Is the project team available to attend meetings as required by the Scope of Work? 1.0 Motivation Is the firm interested and are they capable of doing the work in the required time frame? 2.0 Cost and Work Hours Do the proposed cost and work hours compare favorably with the Project Manager's estimate? Are the work hours presented reasonable for the effort required in each project task or phase? 2.0 Firm Capability Does the firm have the support capabilities the assigned personnel require? Has the firm done previous projects of this type and scope? RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE PROPOSAL STATING THAT THIS ADDENDUM HAS BEEN RECEIVED Adminish-wive Services Purchasing Division REQUEST FOR PROPOSAL P-841 for DIGITAL ORTHOPHOTOGRAPHY and PLANIMETRIC DATA The City of Fort Collins is requesting proposals from a contractor to provide digital orthophotos. The City may also elect to contract for a digital terrain model, topographic data, and selected planimetric data and is seeking proposals that include these items as well. The City currently has these previously listed features from a1999 flight project. Individual City departments will decide the type of data collection and the types of additional data features to be collected after an itemized quote as been submitted. The City of Fort Collins is piloting an e-procurement system for the next 30 days. As a result all of the City's solicitations will be available at www.sicomm.net. This service will be free to you during this pilot program. To receive this solicitation please sign up at the website www.sicomm.net, or call 1-800-575-9955, select option #2, and tell the Sicomm representative you are a vendor and would like to sign up with the City of Fort Collins. Please make sure you sign up for commodity number 905-04. Written proposals, five (5) in number, will be received at the City of Fort Collins' Purchasing Division, 215 N. Mason, 2nd Fort Collins, Colorado 80524. Proposals will be received before June 4, 2002, Proposal No. P-841 Contractor for Digital Orthophotography and Planimetric Data. Proposal Timeline: a. Flight portion must be completed: leaf -off, no snow 2002 C. Final products, as outlined in the Scope of Work, shall be delivered no later than nine (9) months after completion of the aerial flights. If you have Purchasing questions please contact James O'Neill II, CPPO, FNIGP, Director of Purchasing and Risk Management, at 970-221-6779. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision -making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or sham proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Sincerely, Ja s B. O'Neill II, CPPO, FNIGP ector of Purchasing & Risk Management 215 North Mason Street - 2nd Floor - P.O. Box 580 - Fort Collins, CO 80522-0580 - (970) 221-6775 - FAX (970) 221-6707 Request for Proposal Contractor for Digital Orthophotography and Planimetric Data Proposal No. P-841 Opening: JUNE 4, 2002 GENERAL Section 1.0: Proposal Requirements 1) General Description The City of Fort Collins is soliciting proposals to find a qualified contractor to provide the city with the following data outlined below in the Scope of Work. 2) Proposal Submittal The City of Fort Collins shall not reimburse any firm for costs incurred in the preparation and presentation of their proposal. Proposals must contain the following information: a. Company history and experience in the activities described in the scope of work. b. The name of the company representative responsible for coordinating with the City. c. References from five or more organizations which have used your company for similar services within the last two years. d. A written description of the proposed services as required below. e. Pricing, as requested. The proposal must be signed by a duly authorized representative of the firm submitting the proposal. The signature shall include the title of the individual signing the proposal. 3) Exhibits Exhibit A, Map attached to show area of data collection Exhibit B, Sample Service Agreement Exhibit C, Insurance Requirements, as set forth in Exhibit B Section 2.0: BACKGROUND 1) General Information In 1999 the City of Fort Collins conducted an aerial photography collection that resulted in digital orthophotog ra phy and plan imetric data collection. This consists of a DTM, SID format imagery of the flight area, edge of pavement, hydrology, and building footprints. Two -foot contours were created in house from the DTM. It is now time to update the orthophotography at a minimum. 2 2) Data to be Provided to the Consultant: Any digital or hard copy information that the City has, which is needed to obtain the desired products, will be provided. Any additional support functions by City staff, or other resources, will be determined as part of the contract negotiations. Any of the data from the previous data collection can be used by the vendor for this project in the interest of reducing cost or to increase or maintain the current data accuracy or completeness. The quote should indicate instances where the original data collection could be utilized for this project and the cost savings or accuracy improvements that would incur. 3) Existing City Survey Control Network The City has approximately 16 HARN (High Accuracy Reference Network) control monuments scattered throughout the proposed area to be mapped. The published values for these points is in NAD83/92 Latitude and Longitude, with Orthometric and Ellipsoidal heights published in NGVD88 Vertical Datum (meters). The City's vertical network is on NGVD29 Datum. The City has vertical control approximately every one half mile throughout the existing city limits. The vertical control network has no horizontal values. NGVD29 datum (feet) will be given for each HARN station. The aerial mapping shall be delivered in NAD83 State Plane Coordinates and NGVD29 vertical datum. In addition, the City has three Trimble 4800 GPS receivers, and two survey crews to assist (if needed) in the collection of aerial data. Proposals must specify whether or not these receivers and crews will be used during the project and, if used, must clearly indicate when and where such use will occur. Section 3.0: SCOPE OF WORK 1) Digital Orthophotography a. Aerial Photography The City Of Fort Collins would ideally like to obtain 1" = 100' minimum output scale color digital orthophotography with .5ft. pixel resolution. Other minimum scale options will be considered based on price. Also the photos shall be scanned and rectified with 3-D points and breaklines collected from the same photography. The 3-D points and breaklines from the original 1999 collection can be used if it reduces the cost without compromising the data integrity. The area of data collection is outlined in the map (Exhibit A, attached) titled City Of Fort Collins. Larimer County, Colorado Aerial Photographv Flight Fall 2002. This area encompasses approximately 125 sq. miles. The flight should take place in the fall of 2002. More specifically, this would be a time when the trees have no leaves, there is no snow on the ground, minimum cloud cover and sufficient sunlight to collect good contrast photography, when there is not an excessive amount of wind. The aircraft used in the flight should be equipped with and use Airborne Global Positioning System (AGPS). Ground control procedures shall conform to this method and will be negotiated with the contract. The flight lines should be started and finished within 3