Loading...
HomeMy WebLinkAboutPrebid - BID - 5670 MULBERRY BRIDGE EXTENSIONATTENDANCE RECORD PREBID CONFERENCE Project: Mulberry Bridge Extension Time: 10:00 a.m. Date: January 30, 2002 Location: 215 N. Mason St., 2nd floor, Conference Room 2A NAME FIRM NAME ADDRESS TELEPHONE FAX # E-MAIL ADDRESS AA ) / 3/ 3 (?I e 51�« `�-B Co//"s.f Q$2< ys'i"---3 .+ors 37TPAV e7- l* Go 9633 420 3V6-8343 9+ti Sic- 93 ael {�r1.+.,.�„ � `y/p - /S 970 - 3171 lC Z"r '- rec.� �," . C. liege ZZI —4GoS J ( r �To S l c Pq IfC/1w 22 -6 >�7 R l- 6707 Pre -Bid Meeting Agenda City of Fort Collins Mulberry Bridge Extension - Bid No. 5670 Purchasing - Conference Room 2A 215 N. Mason Street Wednesday, January 30, 2002 10:00 a.m. 1) INTRODUCTIONS John Lang — Project Manager 221-6605 Kyle Lambrecht — Project Engineer 221-6605 Lance Newlin — Inspection Representative 221-6605 John Stephen - Purchasing 221-6777 2) PARTICIPANT INTRODUCTIONS 3) BID OPENING February 13, 2002, 3:00 p.m. (our clock) Purchasing Division - 215 North Mason Street, 2ntl Floor, Fort Collins 4) GENERAL CONDITIONS AND GENERAL REQUIREMENTS 1) Bonds — Bid, Payment and Performance 2) $300.00 per calendar day liquidated damages 5) SCHEDULE Substantial Completion, April 22, 2002 Final Completion — April 29, 2002 6) PROJECT DESCRIPTION Mulberry Bridge Extension: • Schedule All work to be done in the ditch bed (including backfill of wingwalls) must be completed before April 1, 2002. Work not affecting the ditch bed may be performed up until the completion dates. • Concrete Gutter Pan Is a modified version of the gutter pan called out in CDOT's M&S Standards. • Relocation of Utilities Temporary relocation of utilities to be coordinated with the City of Fort Collins. Final relocation of the utilities to be located as specified in the plans (PVC pipe within the decorative rail will house utilities currently attached to the outside of the structure). • Structural Excavation shall include all dewatering necessary to perform the construction of the extension (as outlined on page 177 of the 1999 CDOT Standard Specifications for Road and Bridge Construction). • Asphalt sawcutting shall be included in the Removals line item. • Class B Concrete shall be used for the wingwalls and footers while Class D concrete shall be used for the deck and above ground concrete work. Pre -Bid Meeting Agenda City of Fort Collins Mulberry Bridge Extension - Bid No. 5670 Purchasing - Conference Room 2A 215 N. Mason Street Wednesday, January 30, 2002 10:00 a.m. 6) PROJECT DESCRIPTION (cont.) Laporte Bridge Rail: • All work will be performed on the existing concrete structure. • Reinforcement will be epoxied into the existing structure with a minimum embeddment of 9". • Facing to be a natural river rock stone facing approved by the City Engineering Department. 7) SURVEYING — Responsibility of the Contractor 8) TRAFFIC CONTROL — Responsibility of the Contractor 9) QUESTIONS 10) SITE VISIT