HomeMy WebLinkAboutRESPONSE - BID - 5670 MULBERRY BRIDGE EXTENSION (2)SECTION 00300
BID FORM
PROJECT: MULBERRY BRIDGE EXTENSION; BID NO. 5670
Place Fort Collins, CO
Date February 15, 2002
1. In compliance with your Invitation to Bid dated January 17, 2002
and subject to all conditions thereof, the undersigned
G.L. Hoff Company a **(Corporation, bimited----hiatri3Zty-
Fr�}r-Parip,�-3eiat-e±�+�++-c,--or-Swig F�rogrtetmzy** authorized to do
business in the State of Colorado hereby proposes to furnish and do
everything required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid bond
in the sum of 5% bid bond ($
in accordance with the Invitation To Bid and
Instructions to Bidders.
9. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows: Employers Mutual Casualty Company, PO Box 441098
Aurora, CO 80044
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No. 1
through 2
7/96 Section 00300 Page 1
G.L. Hoff Company
2001 Projects
Elkhorn Retail Shops
Construction of a new, two stor-;, 16,000 square foot retail buildin, in Estes
Park. The scope of work included contaminated soil remediation,
foundation, utility lines, building construction, rough in for twelve retail
units, exterior finishes, elevator, mechanical and electrical.
Owner: Ed Grueff, 970-586-5421
3225 Devils Gulch Road
Estes Park, CO 80517
Contact: owner
Contract: $1,248,085.00
Completion: September, 2001
Edora Skate Park
Construction of a new concrete, in ground, skate board park with flat and
vertical curved concrete work. Scope of work included excavation,
structural steel, and shotcrete work.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Jason Stutzman, 970-221-6366
Park Planning and Development
Contract: $347,846.00
Completion: August, 2001
East Drive to Center Street Steam Loop
Construction of concrete trench and installation of steam piping for
Colorado State University. Scope of work included excavation, structural
concrete, and mechanical work.
Owner: Colorado State University
365 Aylesworth Hall Southeast
Fort Collins, CO 80523
Contact: Cass Beitler, Project Manager, 970-491-0158
Contract: $667,652.00
Completion: August, 2001
Pella Crossin, Irrigation System Improvements
Installation of a nCv subinersibie pump and guide rail systern and
construction of a new set well and piping. Scope of work included remoral
or existing lake pump, wet well, catwalk and discharge piping, and
installation of meter pit, discharge line, suction line, intake screen, slide `,ate,
and sitework.
Owner: Boulder County
2040 loth Street
Boulder, CO 80302
Contact: Kenneth V. Sjodin, 720-622-0109
Boulder County Parks and Open Space
Contract: $92,305.85
Completion: May, 2001
George Rist Dam Rehabilitation Project
Construction of new outlet structure, repair of damaged section of dam and
replacement of riprap. Scope of work included excavation, sitework,
structural concrete and pipeline installation.
Owner: City of Loveland
500 East Third Street
Loveland, CO 80537
Contact: Rod Chapman, Project Manager, 970-962-2454
Contract: $157,918.00
Completion: July, 2001
Geist Reservoir Dam Rehabilitation Project
Repair of dam and outlet. Scope of work included construction of coffer
dam and excavation for new outlet, installation of outlet, upstream and
downstream headwalls, sluice gate, staff gage and trash rack, removal and
replacement of existing spillway culvert, raise top of dam, and set riprap.
Owner: Frank Walsh
PO Box 30
Sterling, CO 80751
Contact: David Marsh, Project Engineer, 970-490-2620
Smith Geotechnical Engineering Consultants
Contract: $37,895.2�
Completion: February, 2001
G.L. Hoff Company
2000 Completed Projects
Arkius Pump Station
Construction of cast in place buried pump building including interior
piping, pump equipment, installation of manual hoist and sectionalizing
valve, earthwork, and reclamation of construction site.
Owner: Little Thompson Water District
Mike Cook PE, (970) 532-2096
835 East Highway 56
Berthoud, CO 80513
Contact: The Engineering Company
Warren Mesloh, (970) 484-7477
Contract: $86,538.00
Completion: February, 2000
Centennial Village Pump Station
Construction of non -potable water pump station including well drilling,
pump system, building construction, electrical, and landscaping.
Owner: City of Greeley
Phil Carter, (970) 350-9826
1000 loth Street
Greeley, CO 80631
Contact: Amy Johnson, Aqua Engineering, (970)229-9668
Contract: $119,511.00
Completion: February, 2000
Associated Thermoforming, Inc
Pre-engineered metal building addition and remodel of manufacturing
facility. Scope of work included sitework, landscaping, structural and site
concrete, metal building construction, mechanical, electrical.
Owner: Associated Thermoforming, Inc.
765 Second Street
Berthoud, CO 80513
Contact: John Nis, President (970) 532-2000
Contract: $806,679,00
Completion: August, 2000
Colorado State University Condensate Replacement Phase 16 GiH
Remove aristiM4 under round condensate lines Crum campus main lines :u
building entrances for CSU heating system. Scope Of wWrk included
excavation, landscaping, concrete tunnels, piping and insulation
Owner: Colorado State University
Facilities Services
Fort Collins, CO 50523
Contact: Jim Stoddard, Project Manager, 491-0135
Contract: $319,552.00
Completion: October, 2000
Colorado State University Steam and Condensate Insulation Repair
Insulation repair to existing underground steam and condensate lines at
CSU. The scope of work included excavation, landscaping, concrete,
mechanical and piping insulation, and tunnel lid replacement.
Owner: Colorado State University
Facilities Services
Fort Collins, CO 50523
Contact: Jim Stoddard, Project Manager, 491-0135
Contract: $263,306.00
Completion: October, 2000
Colorado State University: University Avenue Plaza
Three projects combined for the removal of an road through campus and
construction of a landscaped plaza. The scope of work included demolition,
structural and flatwork concrete, paving stones, masonry, landscaping,
asphalt, drain line, fencing and bike parking.
Owner: Colorado State University
Facilities Services
Fort Collins, CO 30523
Contact: Bill Conn, Project Manager, 491-0145
Contract: $302,796.00
Completion: October, 2000
Colorado State University Master Storm Drainage Phase II
Construction of a storm water drain system including excavation, installation
of storm sewer and manifold pipe, precast vaults, manholes, asphalt paving,,.
cast in place concrete, masonry and landscaping.
Owner: Colorado State University
Facilities Services
Fort Collins, CO 50523
Contact: Jim Stoddard, Project Manager, 491-013S
Contract: S219,773.00
Completion: December 2000
flarmmny Substation
Construction of containment $tciIity For the City of Fort Collins suh�t,ltion.
The scope of work included excavation_ concrete catch basin, draina�_e
channel, and concrete box, sand interceptor/imbiber bead vault, installation
of precast containment tank, and concrete flow till.
Owner: City of Fort Collins
700 Wood Street
Fort Collins, CO 80521
Contact: Anthony Barsoom, Project Manager, 482-5922
Sear -Brown Group, Engineering
Contract: S85,739.68
Completion: August, 2000
Emerald Glen Pump Station
Installation of a new non -potable water pump station and transfer pump
station for neighborhood irrigation system. Scope of work included
sitework, irrigation, and abandonment of potable water sprinkler taps.
Owner: Glen Properties
2707 West Eisenhower Blvd.
Loveland, CO 80538
Contact: Richard Aust, Engineer, 970,229-9668
Aqua Engineering, Inc.
Contract: $321,668.50
Completion: August, 2000
Home State Bank Interior Remodel
Interior remodel of the first and second floor of the main bank building.
Scope of work included construction of new walls, interior finishes, and
electrical.
Owner: Home State Bank
Contact:
Contract:
Completion:
935 North Cleveland
Loveland, CO 80537
Mary McCambridge. Bank Officer, 669-4040
$97,824.00
October, 2000
G.L. Hoff Company
1999 Completed Projects
Equalizer Dam Project
Construction of new structural concrete dam outlet structure at the
Equalizer Reservoir. Work included removal of existing structure,
excavation, concrete foundation and walls, gate system, and sitework.
Owner: Greeley & Loveland Irrigation Company
Ron Brinkman, (970) 352-0495
808 23rd Avenue, Greeley, CO 80631
Contact: Boyle Engineering, Lee Queen (303)987-3443
165 South Union Blvd., Suite 200
Lakewood, CO 80228
Contract: $308.752.00
Completion: 2-99
Ridgeview Park Construction
Construction of a new city park for the Fort Collins including demolition,
layout, earthwork and drainage, utilities rough -in, irrigation, site paving and
surfacing, fine grading and seeding, playground, picnic shelter and
furnishings, lighting, and landscaping.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Craig Foreman, 221-6366
Parks and Recreation Department
Contract: $2K900.00
Completion: 3-99
Mosier Hill Non -Potable System
Construction of a non -potable water irrigation system including precast
concrete building, aeration system, pump system intake, irrigation pond
lining, cast in place concrete. irrigation pump system, and electrical.
Owner: City of Greeley
1300 A Street
Greeley, CO 80631
Contact Phil Carter, (970)350-9826
City of Greeley
Contract: $193,963.00
Completion: 3-99
Fusil ('reek yN est
Constniction oC a concrete bike and pedestrian trail section west oC' Hll
Road for the City of Fort Collins trail system Scope of work included
sitework, grading, concrete, bridge installation, fencin„ and seeding.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Craig Foreman, 221,6366
Park Planning and Development
Contract: $168,642.00
Completion: 11-99
Nielson Greenway
Construction of a concrete and crusher fines pedestrian trail for the Town of
Berthoud. Scope of work included extensive site grading, storm sewer, soil
preparation, concrete sidewalk and curb ramp and stone trail.
Owner: Town of Berthoud
P.O. Box 1229
Berthoud, CO 80513
Contact: Marty Lafontaine, 532-2643
Parks Department
Contract: $123,548.60
Completion: 11-99
L&INI Parking Lot
Construction of the L & M Parking Lot at the University of Northern
Colorado. The scope of work includes sitework, grading, concrete curb,
gutter, walk, and drive pans, asphalt paving, and lighting.
Owner: University of Northern Colorado
Carter Hall 1002
Greeley, CO 80639
Contact: Scott McLean, (970) 351-1982
University of Northern Colorado
Contract: $223,377.00
Completion: 12-99
( ath Fronune Prairie Parking Area
Construction of a parkin, area at Tad Hill Road ar(, Harmom in Fort
Collins. Project includes demolition of existing roadway. concrete curb
gutter and asphalt paving.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Craig Foreman, 221-6618
Parks and Recreation Department
Contract: $101.412.00
Completion: 1 1-99
Fossil Creek Trail West of Taft Hill
Construction of a section of the Fort Collins bike trail system. Work
includes sitework, concrete sidewalk and bridge abutments, pedestrian
bridge and seeding.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Craig Foreman, 221-6618
Parks and Recreation Department
Contract: $156,247
Completion: 10-99
Loveland Office Max
Construction of all concrete work for the new Office Max facility. Work
includes excavation for foundation, and sitework, concrete building
foundation, floors and all site concrete such as curb and gutter, sidewalks,
dock and pads.
Owner: TCC-BTS Loveland OM. Inc.
7535 E. Hampden Avenue, Suite 650
Denver, CO 80231
Contact: Tap Pritchard, (303) 843-1947
Contract: $191,845.00
Completion: 10-99
G.L. Hoff Company
1998 Completed Projects
Cathy Fromme Prairie Parking Lot
Construction of new parking lot including earthwork, asphalt paving, paving
blocks, seeding, and fencing.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Craig Foreman, 221-6366
Parks and Recreation Department
Contract: $78,431.00
Completion: 3-98
Loveland Rental Center
Construction of new rental center facility including sitework, concrete
paving and flatwork, masonry buildings and finishes.
Owner: Bill and Debbie Mortellaro
211 Barberry Place
Loveland, CO 80537
Contact: Bill Mortellaro, 669-6060
Contract: $495,705.00
Completion: 4-98
Ivy and Rockwell Street Bridges
Bridge repairs including
sitework, grouting, and new concrete and masonry
railings.
Owner:
Town of Estes Park
170 MacGregor Avenue
Estes Park, CO 80517
Contact:
Greg Sievers, 586-5331
Town of Estes Park
Contract:
$171,574.00
Completion:
4-98
1� ussil ('reel. Trail
Constriction of concrete bike and pedestrian trail section east of Taft Hill
Road ror City of Fort Collins trail system.
Owner City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Craig Foreman, 221-6366
Parks & Recreation Department
Contract: $111,569.00
Completion: 3-98
Golden Ponds Fishing Pier
Construction of a handicap accessible fishing pier with caisson foundation,
concrete and steel pier structure, wood decking, shoreline grading, riprap
and concrete walk construction.
Owner: City of Longmont
1100 South Sherman Street
Longmont, CO 80501
Contact: Paula Fitzgerald, (303) 651-8448
Contract: $38,046.00
Completion: 4-98
LDS Church Remodel
Restroom remodel for the Church of Jesus Christ of Latter Day Saints for
ADA requirements including electrical modification and interior finishes.
Owner: LDS Church
1400 Lynwood
Fort Collins, CO 80521
Contact: Douglas Coates, (307)635-4922
Douglas Coates, Architect
Contract: $70,539.00
Completion: 4-98
G.L. Hoff Company
CONTRACTO
BY:
G r e o Hof , P .sident
ADDRESS: 1815 West 12th Street
Loveland, CO 80537
970-669-3255
8. BID SCHEDULE (Base Bid)
Please use the attached Bid Schedule when submitting your bid.
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (25%) of the total Agreement Price.
RESP C ULLY SU0,MI T D
2-15-2002
Signature G eg y Ho Date
President
Title
#B-6
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest: /
Miriam T. Hoff �Sec.TjWs.
Address 1815 West 12th Street
Loveland, CO 80537
Telephone 970-669-3255
7/96 Section 00300 Page 2
Overland Trail Box Culvert
l"onsta'Ction of a Cast in QI,IC box Culvert extension to the existims boy
culvert located at the Pleasant Valle,, canal and Overland Trail in For?
Collins
0%. ner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Gary Martinson, 221-6605
Contract: $43,022.00
Completion: 4-98
Fromme Prairie Observatory Structure
Construction of a reinforced concrete structure along the Fossil Creek Bike
Trail to provide a raptor observation building.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Janet Meisel, 221-6367
Contract: $68,221.00
Completion: 8-98
Home State Bank
Remodel of existing bank facility including interior remodeling and finishes
and exterior sitework and facade renovation.
Owner: Home State Bank
935 North Cleveland Avenue
Loveland, CO 80537
Contact: Mark Bower, (970)203-6125
Home State Bank
Contract: $156,000.00
Completion: 8-98
1998 Concrete Street Maintenance
Remove and replace sections of concrete pavement to repair various areas
on Mountain Avenue for the City of Fort Collins.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Erika Rasmussen, 221-6605
Contract: $97,126.00
Completion. 5-98
Surth �� ater Treatment Plant Sludge Basin
Construction of an 88' r 160' reinforced concrete sludue basin at the Citv of
Longmont North Water Treatment Plant ineludins sub�,rade preparation_
reinforced concrete push walls, asphalt pavement and drain line
Contact
UNC Non -Potable Irrigation Supply
Construction of a non -potable irrigation supply for the University of
Northern Colorado including earthwork, irrigation system, landscaping,
pond and pump station, concrete walls and walkways, and PVD inline drains
Owner: University of Northern Colorado
Carter Hall, Greeley, CO 80639
Greeley, CO 80639
Contact: Scott McLean, (970) 351-1982
UNC Facilities Services
Contract: $260,621.00
Completion: 11-98
G.L. Hoff Company
Construction Experience
Gregory L. Hoff, President and Construction Manager
For the past twenty seven years, Greg has been involved with all aspects of construction
from architectural drafting, surveying and carpentry to supervision and construction
management.
Graduating from Northeastern Junior College in 1972 with a degree in Civil Engineering
Technology, his early work included surveying and architectural design and drafting. He
has held a commercial contractor's license with the City of Fort Collins since 1976.
Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, Longmont,
Boulder, and Thornton.
Prior to 1984, Greg worked with Al Hockett, Inc. initially as an architectural draftsman and
progressing to project superintendent. He was also a partner in H&M Builders from 1976
to 1980. This company specialized in custom homes, tenant finish and custom millwork.
Beginning in 1984, Greg started his own general contracting business, G.L. Hoff Company,
which specializes in all types of commercial construction including sitework, excavation
and concrete construction. As president and construction manager for G.L. Hoff Company,
Greg works with a wide variety of projects including, schools, churches, city and
government projects, city park developments, as well as many light industrial and concrete
construction jobs. Greg oversees all project scheduling, review of construction procedures,
quality control and safety enforcement.
Joel S. Reger, Estimator and Project Manager
Joel has a Bachelor of Science Degree in Construction Management from Colorado State
University and fourteen years experience in the construction field. He has continued his
education with estimating seminars including training with American Building Company's
estimating Access workshop. He is also an active member of the Sigma Lambda Chi
honorary national construction fraternity.
During the past ten years, as the chief estimator with G.L. Hoff Company, Joel has
compiled bids and development estimates for projects valued at up to five million dollars.
As estimator, he directs project bidding process as well as the review of specifications. He
is also involved with project management, coordinating proposal requests and change
orders with the architect or owner, overseeing material orders to insure that the project is
completed in a timely manner and according to specifications.
William L. Vance, Project Superintendent
Bill brings over twenty three years of experience in construction related fields to his position
as project superintendent. His background includes heavy equipment operating, truss
construction, carpentry, and cost estimating. He also has experience in both commercial
and residential property development from site work and utility lines through finish
carpentry. Bill has built over five hundred new homes as well as several light commercial
properties. His commanding knowledge of construction methods enables Bill to be an
especially effective project superintendent.
I
SECTION 00410
BID BONG
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned G. L. Hoff
Company as Principal, and Employers Mutual Casualty Company as
ll
Surety, are hereby held and firmly bound unto the City of Fort Coins Colorado
as OWNER, in the sum of $ 57 of total bid for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction
of Fort Collins Project, MULBERRY BRIDGE EXTENSION; BID NO. 5670.
NOW THEREFORE,
(a; If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver
a Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, is being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
LI
E
1 7/96
I
Section 00410 Page 1
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this 15th day of _ February 2002, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
above.
PRINCSPAL
Name: G. L. Hoff Company
Address: 1815 W. 12th St.
Loveland CO 80537
By:
Title:
i
7/96
(SEAL)
SURETY
Employers Mutual Casualty Company
P.O. Box 441098
Aurora, CO 80044
By:
Title: Attorney-in-F ct
(SEAL)
Section 00410 page 2
JEMC Wuarance Companies qq'�
P,O, Taos f12 a Tins Moines, Toga $0303 NO" µ -6 g 9 2 ."
CERTIFICATE OF AUTHORITY INDIVIDUAL ATTORNEY -IN -FACT
K40W ALL MEN 6Y TH: FSE PRESENTS, that:
1• 9mployors'Mutual Casualty Company, an Iowa Corporation 8. Dakota Fire Insurance Company, a North Dakota Corporatiod
4. EMCA$CO insurance Company, an Iowa Corporation 16, EMC Property & Casualty Company, ph Iowa Corporation
t Union Insurance Company of Ptovfderioo, an Iowa Corporation ` 7. The Hamilton Mutual Insurance Compal£yr, an tfhlo Corporation
4,: Illinois EMGA$CO Insurance Company, an Illinois Corporation
hereinalter referred to severally as "Company and collectively as "Companies", each does, by these presents, make constitute and appoint
C;HRIS IRICHMOND, RUSSELL MICHELS, DARLENI= KRINGS, INDIVIDUALLY, FORTCOLLINS, COLORADO
its true and lawful attorneyan-fact with full power and authority conferred to sign, seal, and execute its lawful bonds, undertakings and other obligatory instruments of a
*nor nature as follows:
iN "AN AMOUNT NOT EXCEEDING TEN MILLION DOLLARS ,:'. ........ .......:: ($10,000000.00)
and to bind each Company thereby as fully and to the same extent as if such instruments were signed by the duly authorized officers of each such Company, and all of
the acts of said attorney pursuant to the authorty, hereby given are hereby ratified and confirmed.
The authorityhereby ranted shall expire April 1, 2003
Y 9 P unless sooner revoked.
AUTHORITY FOR POWER OF ATTORNEY
This Power -of -Attorney is mad@ and executed pursuant to and by the authority of the following resolution of the Boards of Directors of each of the Companies at a
regularly scheduled meeting of each company duly called and held in 1999:
RESDLYED: The President and Chef Executive Officer, any Vice President the Treasurer and the Secretary of Employers Mutual Casualty Company shall have power
and authority to (1) appoint atkimeys•in-fact and authorize them to execute on behalf of each Company and attach the seal of the Company thereto, bonds and
,undertakings. recognizances, contracts of indemnity and other writings obligatory in the nature thereof; and (2) to remove any such attorney in -fact at ahy time; and revoke
the power and authority given to film orher. Attomeys-in-fact shall have power and authority, subject to the terms and limitations of the power oI�atlgmey Issued to them
to execute and deliver on behalf of the Company, and to attach the seal of the Company thereto bonds and undertakings, recognizorioae, contracts of indemnity and
other Wllfings obligatory in the nature thereof, and any such instrument executed by any such ahomey-in-fact shall be fully and in all respects biddingg upon the Company.
Codification as to the yafidity of any powenohattorney authorized herein made by an officer of Employers Mutual Casualty Company shall be fully and In as respects
pinding upon this,. Company. The facsimile or mechanically reproduced signature of such officer, whether made heretofore or hereafter, Wherever appearing upon a
Ce11 rtified Copy of any power-ofattomey of the Company, shall be valid and binding upon the Company with the same force and affect as though manually affixed.
Ni ]M1TNE$SdW RERF, the C�my ofnpa�nrys have caused thesvegnts to be signed for each by their officers as shown and the Corporate seals to be hereto affixed this
Seals •
Sg6INSUyq •aHcc co o Pw a °' Bruce G. Kelleyf C uman Jeffrey S. Bardsiey�
��`pPPOPq 2R'n $p$4PpOgq .p: 40. OPPORq FSGrI of o
C
of Company mpa2, 3,4Chairman and 56:6, resident Assistant Secretary
let
y 9 Vice
SEA1 iz1863 = a: 1953 = CEO of Company 7
u
Z} d 2e OWA
On this27th day of January 2600
yo Pooq,"rF�a Qe^µSO"^Nc `, WQS ..�.... ys ; re me a
Notary PubNc in and for the State of Iowa, personally appeared Bruce G. Kelleyand Jeffre S
h , VO < ,; ¢ •`OPrURa, O:I > OPP�R4�i^, 9 ; Birdsley, who, being by me duly swom, did say that they are, and are known to me to be the
W SEAL =' SEAL b is SEAL Chairman, President, Vice Chairman and CEO, and/or Assistant Secretary, raspecfively, of
a - o ; each of The Companies above; that the seals affixed to this instrument are the seals of said
%+ o "b a Vests... es o?° q. corporations; that said instrument was signed and seated on behalf of each of the Companies
by authority of their respective Boards of Directors' and that the said Bruce G, Kelley and
Jeffrey S. Birdsley, as such officers, acknowledge the execution of said instrument to be the
UT voluntary act and deed of each of the Companies
My Commission Expires September 30, 2003.
.��4 RUTA KRUMINS
: Commission Number 176255--n,.,.,,,,,,,„,,,.)
My Comm. Exp. Sept. 3q, 2003
I Notary Public in and for the State of Iowa
CERTIFICATE
I David L. Hixenbaugh, Vice President of the Companies, do hereby certify that the foregoing resolution of the Boards of Directors by each of the
Companies, d,th Powerofgtkxnevis d rstrit heret on January27,2000
or, I half Of �ris:�licnrrtontl, W0282 l �clieyS, uarlene �Crings
are t1. and correct and are still in full force and effect.
In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this 15 43ay of February 2002
T V@x.Pramidahf
aid #5670
Addendum #1 Bid Schedule
Mulberry Bridge Extensionll.aPorts Guardrail
Bid Schedule A & B
ltam
Number
J51rostmiDing
Description
Improvements
Quantity
Unit
UnitCott ($)
Item ost (S)
1
I cl*aft and zrubbina
1
LS
1375.00
1 375.0
2
remowls
1
LS
7438.00
7, 3
3
structure excavadon
190
CY
3
,
4
structure ba Class 1
165
CY
34.50
5, 692.5
5
hotbkumiraus S h
8.5
TON
367.00
119.5
6
hot bituminous SG (asphalt)
13
TON
7
wade membrane
118
SF
601.
8
conore class
13
CY
669.00
8 697.0
4
concrete Case D (bridge)12
CY
686.00
8 232. Od
10
class 5 Mlsh
330
SF
4.20
1 386.0
11
rein steN
2220
LB
1.00
0
12
reinfo steel a
2975
LB
1.10
13
guardrail 3 3=11/2 cn
37.5
LF
64.10
14
and 3K
2
EA
15
remo ofexise rail
1
LS
137
16
brid rail
41
LF
250.00
17
river rock stone fa
120
SF
8.00
g23
18
r n 2-rwide
24
LF
20.0019
r tocate Utllltles
1
LS
—
20
conslrucomsu
1
LS
00
mobiltra
1
LS
11850.00
22
construebon traffic control
1
LS
.00
a- a;d 4rd T� Raid aS� k (3 �1
-u2 iriu 16:23 AM cii' T CCLLiNS, PURCHAS rAS Nu. 970 16707 P.03/05
Mulberry Bridge Extension
Mulberry spanning Latimer County Cartel #2
Bid Schedule A
Item
Number
Description
Streetscaping Improvements
Quantity
Unit
1
clearim and grubbing
LS
2
wnpvals
1
LS
3
structure excavation
190
CY
4
structure baddlp (dass 1
166
CY
5
trot bltuminous amen( S (asphalt)
8.5
TON
biWminous vement tad' SG es ]t
13
TON
vra fins (membrane)
118
SF
Comm class B b e
1
CY
ntrete class 0 brill e
a
CY
Fhot
class 5 finish
330
SFreinfor
awe]
2220
LB
relnford steel coated
1925
LB
rap 3 3'-1 112" st d
18.75
LF
14
and anctlora s 3K
1
EA
15
bridaerail
21
LF
16
utter pan(2W wide
24
17
relocate utpi'
1
16
construction
1
19
river atone facing85
dLLSS
20
mobilization
0.8
21
wnstue*n traftlo cc"
0.8
co-ui-u2 17:U i0;23 Al`I i, i'° -T COLLINS, PUROHAS tA,X NO, 970 T16707 P. 04/05
Laporte Guardrail Replacement
Laporte spanning New Mercer Dttch
Bid Schedule B
Item
Number Istrestseeptrig
Dwriptlon
Improvements
Quantity
UnU
1
removal of e)dsgm ray
1
L
2
concrete loss D
4
CY
3
rairfting stem coated
1050
LB
4
red
20
LF
S
ardraa 3 3'-11r2" s
18.75
LF
8
and ancharsize 3K
1
EA
7
river rack stone facing
55
SF
s
mobatzatlon
0.2
9
constns0on c control
0.2
L
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM SUBCONTRACTOR
Traffic Control United Rental
Asphalt Connell Resources
Guardrail Ideal Fence
Masonry QM Masonry
7/96 Section 00430 Page 1
-m71,r ,
STATEMENT OF 81DDEP.'S QUALIFICATIONS
::cmprehensive.
This statement must be
giv_-a must
notarized. If
be cigar and
b= answered on
separate atta^hed sheets.
necessary,
The Bidder may submit
questions may
any additional
information he
desires.
Name of Bidder: G.L. Hoff Company
=•
Permanent main office address: 1815
West 12th Street, Loveland, CO 80537
3.
when organized: January 1984
4.
If a corporation, where incorporated:
Colorado
3.
How many years have you been engaged
in the contracting business under your
present firm or trade name? eighteen
;ears
F.
Contracts on hand: (Schedule these, showing
the amount of each contract and
the appropriate anticipated dates of
completion.)
Rehabilitation of Owl Creek Ditch
374 057.00 completion 3-2002
I
B
9
General character of Work performed by your company:
Commercial general contractor: complete the following areas with our own
Have you ever failed to complete any Work awarded to you? no
If so, where and why?
Have your ever defaulted on a contract?
If so, where and why?
iu. Are you debarred by any government agency?
If yes list agency name.
I
no
no
1 7/95 Section 00420 Page i
:J)e_ts re _?'�___, _._`C,D Le Led :^,Cd,^,V, s C a __❑
t (le dCCCJ:i :;il3 Ce vJOSC 04 each, and Cne monC❑ ana y'23r.': cumpyeted, location
Please refer to the attached lists
i2. ..._.._ your m3]Or ?gnlpme.^.t 3C3i13b1? fJr this contract.
sump truck, uAT Yzd loader, CAT 320 track excavator, backhoe bobcat
motor grader, grading tractor, concrete numn
13. Experience in construction Work similar in importance to this
p=-j-
ct:
=
Please refer to the attached lists
14. Background and experience of the principal members of your organization,
including officers:
Please refer to the attached lists
15. Credit available: $$250,000.00
16. Bank reference: Loran Emmonds, Bank One Loveland, CO
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
18. Are you licensed as a General CONTRACTOR? yes
If yes, in what city, county and state? Fort Collins and others What
class, license and numbers? #B-6
19. Do you anticipate subcontracting Work under this Contract? yes
If yes, ghat percent of total contract?
and tc whom? Please refer to section 430
20. Are any lawsuits pending against you or your firm at this time? no
if yes,
7/96 Section 00420 Page 2 1
I
n
I
2 million plus 2 million umberlla
=- - Travelers Insurance. Agent: Flood E Peterson
__. ,drat are .our company's bonding limitations? 5 million
The undersigned 'hereby authorizes and requests any person, firm or
corporation to furnish anv information requested by the OWNER in
•i=_rification of the recital comprising this Statement of Bidder's
Qualifications.
i A
Dated at this 1b5_0 day of
r. L . f- u
ham or Cie
By: DYL�V✓\
:itl r
State of to
County of—_ La,
t being duly sworn deposes and says that he is
k t*-S of (`�,.L r„c eovw✓._A,K 14 and that
yo
(name of organization;
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this I5)16 day of
2017.
Mary Publi1
k!": _c?_ .Lss-ion expires
7/96
Section 00420 Page 3