Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5670 MULBERRY BRIDGE EXTENSION (2)SECTION 00300 BID FORM PROJECT: MULBERRY BRIDGE EXTENSION; BID NO. 5670 Place Fort Collins, CO Date February 15, 2002 1. In compliance with your Invitation to Bid dated January 17, 2002 and subject to all conditions thereof, the undersigned G.L. Hoff Company a **(Corporation, bimited----hiatri3Zty- Fr�}r-Parip,�-3eiat-e±�+�++-c,--or-Swig F�rogrtetmzy** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5% bid bond ($ in accordance with the Invitation To Bid and Instructions to Bidders. 9. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: Employers Mutual Casualty Company, PO Box 441098 Aurora, CO 80044 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. 1 through 2 7/96 Section 00300 Page 1 G.L. Hoff Company 2001 Projects Elkhorn Retail Shops Construction of a new, two stor-;, 16,000 square foot retail buildin, in Estes Park. The scope of work included contaminated soil remediation, foundation, utility lines, building construction, rough in for twelve retail units, exterior finishes, elevator, mechanical and electrical. Owner: Ed Grueff, 970-586-5421 3225 Devils Gulch Road Estes Park, CO 80517 Contact: owner Contract: $1,248,085.00 Completion: September, 2001 Edora Skate Park Construction of a new concrete, in ground, skate board park with flat and vertical curved concrete work. Scope of work included excavation, structural steel, and shotcrete work. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Jason Stutzman, 970-221-6366 Park Planning and Development Contract: $347,846.00 Completion: August, 2001 East Drive to Center Street Steam Loop Construction of concrete trench and installation of steam piping for Colorado State University. Scope of work included excavation, structural concrete, and mechanical work. Owner: Colorado State University 365 Aylesworth Hall Southeast Fort Collins, CO 80523 Contact: Cass Beitler, Project Manager, 970-491-0158 Contract: $667,652.00 Completion: August, 2001 Pella Crossin, Irrigation System Improvements Installation of a nCv subinersibie pump and guide rail systern and construction of a new set well and piping. Scope of work included remoral or existing lake pump, wet well, catwalk and discharge piping, and installation of meter pit, discharge line, suction line, intake screen, slide `,ate, and sitework. Owner: Boulder County 2040 loth Street Boulder, CO 80302 Contact: Kenneth V. Sjodin, 720-622-0109 Boulder County Parks and Open Space Contract: $92,305.85 Completion: May, 2001 George Rist Dam Rehabilitation Project Construction of new outlet structure, repair of damaged section of dam and replacement of riprap. Scope of work included excavation, sitework, structural concrete and pipeline installation. Owner: City of Loveland 500 East Third Street Loveland, CO 80537 Contact: Rod Chapman, Project Manager, 970-962-2454 Contract: $157,918.00 Completion: July, 2001 Geist Reservoir Dam Rehabilitation Project Repair of dam and outlet. Scope of work included construction of coffer dam and excavation for new outlet, installation of outlet, upstream and downstream headwalls, sluice gate, staff gage and trash rack, removal and replacement of existing spillway culvert, raise top of dam, and set riprap. Owner: Frank Walsh PO Box 30 Sterling, CO 80751 Contact: David Marsh, Project Engineer, 970-490-2620 Smith Geotechnical Engineering Consultants Contract: $37,895.2� Completion: February, 2001 G.L. Hoff Company 2000 Completed Projects Arkius Pump Station Construction of cast in place buried pump building including interior piping, pump equipment, installation of manual hoist and sectionalizing valve, earthwork, and reclamation of construction site. Owner: Little Thompson Water District Mike Cook PE, (970) 532-2096 835 East Highway 56 Berthoud, CO 80513 Contact: The Engineering Company Warren Mesloh, (970) 484-7477 Contract: $86,538.00 Completion: February, 2000 Centennial Village Pump Station Construction of non -potable water pump station including well drilling, pump system, building construction, electrical, and landscaping. Owner: City of Greeley Phil Carter, (970) 350-9826 1000 loth Street Greeley, CO 80631 Contact: Amy Johnson, Aqua Engineering, (970)229-9668 Contract: $119,511.00 Completion: February, 2000 Associated Thermoforming, Inc Pre-engineered metal building addition and remodel of manufacturing facility. Scope of work included sitework, landscaping, structural and site concrete, metal building construction, mechanical, electrical. Owner: Associated Thermoforming, Inc. 765 Second Street Berthoud, CO 80513 Contact: John Nis, President (970) 532-2000 Contract: $806,679,00 Completion: August, 2000 Colorado State University Condensate Replacement Phase 16 GiH Remove aristiM4 under round condensate lines Crum campus main lines :u building entrances for CSU heating system. Scope Of wWrk included excavation, landscaping, concrete tunnels, piping and insulation Owner: Colorado State University Facilities Services Fort Collins, CO 50523 Contact: Jim Stoddard, Project Manager, 491-0135 Contract: $319,552.00 Completion: October, 2000 Colorado State University Steam and Condensate Insulation Repair Insulation repair to existing underground steam and condensate lines at CSU. The scope of work included excavation, landscaping, concrete, mechanical and piping insulation, and tunnel lid replacement. Owner: Colorado State University Facilities Services Fort Collins, CO 50523 Contact: Jim Stoddard, Project Manager, 491-0135 Contract: $263,306.00 Completion: October, 2000 Colorado State University: University Avenue Plaza Three projects combined for the removal of an road through campus and construction of a landscaped plaza. The scope of work included demolition, structural and flatwork concrete, paving stones, masonry, landscaping, asphalt, drain line, fencing and bike parking. Owner: Colorado State University Facilities Services Fort Collins, CO 30523 Contact: Bill Conn, Project Manager, 491-0145 Contract: $302,796.00 Completion: October, 2000 Colorado State University Master Storm Drainage Phase II Construction of a storm water drain system including excavation, installation of storm sewer and manifold pipe, precast vaults, manholes, asphalt paving,,. cast in place concrete, masonry and landscaping. Owner: Colorado State University Facilities Services Fort Collins, CO 50523 Contact: Jim Stoddard, Project Manager, 491-013S Contract: S219,773.00 Completion: December 2000 flarmmny Substation Construction of containment $tciIity For the City of Fort Collins suh�t,ltion. The scope of work included excavation_ concrete catch basin, draina�_e channel, and concrete box, sand interceptor/imbiber bead vault, installation of precast containment tank, and concrete flow till. Owner: City of Fort Collins 700 Wood Street Fort Collins, CO 80521 Contact: Anthony Barsoom, Project Manager, 482-5922 Sear -Brown Group, Engineering Contract: S85,739.68 Completion: August, 2000 Emerald Glen Pump Station Installation of a new non -potable water pump station and transfer pump station for neighborhood irrigation system. Scope of work included sitework, irrigation, and abandonment of potable water sprinkler taps. Owner: Glen Properties 2707 West Eisenhower Blvd. Loveland, CO 80538 Contact: Richard Aust, Engineer, 970,229-9668 Aqua Engineering, Inc. Contract: $321,668.50 Completion: August, 2000 Home State Bank Interior Remodel Interior remodel of the first and second floor of the main bank building. Scope of work included construction of new walls, interior finishes, and electrical. Owner: Home State Bank Contact: Contract: Completion: 935 North Cleveland Loveland, CO 80537 Mary McCambridge. Bank Officer, 669-4040 $97,824.00 October, 2000 G.L. Hoff Company 1999 Completed Projects Equalizer Dam Project Construction of new structural concrete dam outlet structure at the Equalizer Reservoir. Work included removal of existing structure, excavation, concrete foundation and walls, gate system, and sitework. Owner: Greeley & Loveland Irrigation Company Ron Brinkman, (970) 352-0495 808 23rd Avenue, Greeley, CO 80631 Contact: Boyle Engineering, Lee Queen (303)987-3443 165 South Union Blvd., Suite 200 Lakewood, CO 80228 Contract: $308.752.00 Completion: 2-99 Ridgeview Park Construction Construction of a new city park for the Fort Collins including demolition, layout, earthwork and drainage, utilities rough -in, irrigation, site paving and surfacing, fine grading and seeding, playground, picnic shelter and furnishings, lighting, and landscaping. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221-6366 Parks and Recreation Department Contract: $2K900.00 Completion: 3-99 Mosier Hill Non -Potable System Construction of a non -potable water irrigation system including precast concrete building, aeration system, pump system intake, irrigation pond lining, cast in place concrete. irrigation pump system, and electrical. Owner: City of Greeley 1300 A Street Greeley, CO 80631 Contact Phil Carter, (970)350-9826 City of Greeley Contract: $193,963.00 Completion: 3-99 Fusil ('reek yN est Constniction oC a concrete bike and pedestrian trail section west oC' Hll Road for the City of Fort Collins trail system Scope of work included sitework, grading, concrete, bridge installation, fencin„ and seeding. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221,6366 Park Planning and Development Contract: $168,642.00 Completion: 11-99 Nielson Greenway Construction of a concrete and crusher fines pedestrian trail for the Town of Berthoud. Scope of work included extensive site grading, storm sewer, soil preparation, concrete sidewalk and curb ramp and stone trail. Owner: Town of Berthoud P.O. Box 1229 Berthoud, CO 80513 Contact: Marty Lafontaine, 532-2643 Parks Department Contract: $123,548.60 Completion: 11-99 L&INI Parking Lot Construction of the L & M Parking Lot at the University of Northern Colorado. The scope of work includes sitework, grading, concrete curb, gutter, walk, and drive pans, asphalt paving, and lighting. Owner: University of Northern Colorado Carter Hall 1002 Greeley, CO 80639 Contact: Scott McLean, (970) 351-1982 University of Northern Colorado Contract: $223,377.00 Completion: 12-99 ( ath Fronune Prairie Parking Area Construction of a parkin, area at Tad Hill Road ar(, Harmom in Fort Collins. Project includes demolition of existing roadway. concrete curb gutter and asphalt paving. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221-6618 Parks and Recreation Department Contract: $101.412.00 Completion: 1 1-99 Fossil Creek Trail West of Taft Hill Construction of a section of the Fort Collins bike trail system. Work includes sitework, concrete sidewalk and bridge abutments, pedestrian bridge and seeding. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221-6618 Parks and Recreation Department Contract: $156,247 Completion: 10-99 Loveland Office Max Construction of all concrete work for the new Office Max facility. Work includes excavation for foundation, and sitework, concrete building foundation, floors and all site concrete such as curb and gutter, sidewalks, dock and pads. Owner: TCC-BTS Loveland OM. Inc. 7535 E. Hampden Avenue, Suite 650 Denver, CO 80231 Contact: Tap Pritchard, (303) 843-1947 Contract: $191,845.00 Completion: 10-99 G.L. Hoff Company 1998 Completed Projects Cathy Fromme Prairie Parking Lot Construction of new parking lot including earthwork, asphalt paving, paving blocks, seeding, and fencing. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221-6366 Parks and Recreation Department Contract: $78,431.00 Completion: 3-98 Loveland Rental Center Construction of new rental center facility including sitework, concrete paving and flatwork, masonry buildings and finishes. Owner: Bill and Debbie Mortellaro 211 Barberry Place Loveland, CO 80537 Contact: Bill Mortellaro, 669-6060 Contract: $495,705.00 Completion: 4-98 Ivy and Rockwell Street Bridges Bridge repairs including sitework, grouting, and new concrete and masonry railings. Owner: Town of Estes Park 170 MacGregor Avenue Estes Park, CO 80517 Contact: Greg Sievers, 586-5331 Town of Estes Park Contract: $171,574.00 Completion: 4-98 1� ussil ('reel. Trail Constriction of concrete bike and pedestrian trail section east of Taft Hill Road ror City of Fort Collins trail system. Owner City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221-6366 Parks & Recreation Department Contract: $111,569.00 Completion: 3-98 Golden Ponds Fishing Pier Construction of a handicap accessible fishing pier with caisson foundation, concrete and steel pier structure, wood decking, shoreline grading, riprap and concrete walk construction. Owner: City of Longmont 1100 South Sherman Street Longmont, CO 80501 Contact: Paula Fitzgerald, (303) 651-8448 Contract: $38,046.00 Completion: 4-98 LDS Church Remodel Restroom remodel for the Church of Jesus Christ of Latter Day Saints for ADA requirements including electrical modification and interior finishes. Owner: LDS Church 1400 Lynwood Fort Collins, CO 80521 Contact: Douglas Coates, (307)635-4922 Douglas Coates, Architect Contract: $70,539.00 Completion: 4-98 G.L. Hoff Company CONTRACTO BY: G r e o Hof , P .sident ADDRESS: 1815 West 12th Street Loveland, CO 80537 970-669-3255 8. BID SCHEDULE (Base Bid) Please use the attached Bid Schedule when submitting your bid. 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESP C ULLY SU0,MI T D 2-15-2002 Signature G eg y Ho Date President Title #B-6 License Number (If Applicable) (Seal - if Bid is by corporation) Attest: / Miriam T. Hoff �Sec.TjWs. Address 1815 West 12th Street Loveland, CO 80537 Telephone 970-669-3255 7/96 Section 00300 Page 2 Overland Trail Box Culvert l"onsta'Ction of a Cast in QI,IC box Culvert extension to the existims boy culvert located at the Pleasant Valle,, canal and Overland Trail in For? Collins 0%. ner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Gary Martinson, 221-6605 Contract: $43,022.00 Completion: 4-98 Fromme Prairie Observatory Structure Construction of a reinforced concrete structure along the Fossil Creek Bike Trail to provide a raptor observation building. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Janet Meisel, 221-6367 Contract: $68,221.00 Completion: 8-98 Home State Bank Remodel of existing bank facility including interior remodeling and finishes and exterior sitework and facade renovation. Owner: Home State Bank 935 North Cleveland Avenue Loveland, CO 80537 Contact: Mark Bower, (970)203-6125 Home State Bank Contract: $156,000.00 Completion: 8-98 1998 Concrete Street Maintenance Remove and replace sections of concrete pavement to repair various areas on Mountain Avenue for the City of Fort Collins. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Erika Rasmussen, 221-6605 Contract: $97,126.00 Completion. 5-98 Surth �� ater Treatment Plant Sludge Basin Construction of an 88' r 160' reinforced concrete sludue basin at the Citv of Longmont North Water Treatment Plant ineludins sub�,rade preparation_ reinforced concrete push walls, asphalt pavement and drain line Contact UNC Non -Potable Irrigation Supply Construction of a non -potable irrigation supply for the University of Northern Colorado including earthwork, irrigation system, landscaping, pond and pump station, concrete walls and walkways, and PVD inline drains Owner: University of Northern Colorado Carter Hall, Greeley, CO 80639 Greeley, CO 80639 Contact: Scott McLean, (970) 351-1982 UNC Facilities Services Contract: $260,621.00 Completion: 11-98 G.L. Hoff Company Construction Experience Gregory L. Hoff, President and Construction Manager For the past twenty seven years, Greg has been involved with all aspects of construction from architectural drafting, surveying and carpentry to supervision and construction management. Graduating from Northeastern Junior College in 1972 with a degree in Civil Engineering Technology, his early work included surveying and architectural design and drafting. He has held a commercial contractor's license with the City of Fort Collins since 1976. Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, Longmont, Boulder, and Thornton. Prior to 1984, Greg worked with Al Hockett, Inc. initially as an architectural draftsman and progressing to project superintendent. He was also a partner in H&M Builders from 1976 to 1980. This company specialized in custom homes, tenant finish and custom millwork. Beginning in 1984, Greg started his own general contracting business, G.L. Hoff Company, which specializes in all types of commercial construction including sitework, excavation and concrete construction. As president and construction manager for G.L. Hoff Company, Greg works with a wide variety of projects including, schools, churches, city and government projects, city park developments, as well as many light industrial and concrete construction jobs. Greg oversees all project scheduling, review of construction procedures, quality control and safety enforcement. Joel S. Reger, Estimator and Project Manager Joel has a Bachelor of Science Degree in Construction Management from Colorado State University and fourteen years experience in the construction field. He has continued his education with estimating seminars including training with American Building Company's estimating Access workshop. He is also an active member of the Sigma Lambda Chi honorary national construction fraternity. During the past ten years, as the chief estimator with G.L. Hoff Company, Joel has compiled bids and development estimates for projects valued at up to five million dollars. As estimator, he directs project bidding process as well as the review of specifications. He is also involved with project management, coordinating proposal requests and change orders with the architect or owner, overseeing material orders to insure that the project is completed in a timely manner and according to specifications. William L. Vance, Project Superintendent Bill brings over twenty three years of experience in construction related fields to his position as project superintendent. His background includes heavy equipment operating, truss construction, carpentry, and cost estimating. He also has experience in both commercial and residential property development from site work and utility lines through finish carpentry. Bill has built over five hundred new homes as well as several light commercial properties. His commanding knowledge of construction methods enables Bill to be an especially effective project superintendent. I SECTION 00410 BID BONG KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned G. L. Hoff Company as Principal, and Employers Mutual Casualty Company as ll Surety, are hereby held and firmly bound unto the City of Fort Coins Colorado as OWNER, in the sum of $ 57 of total bid for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, MULBERRY BRIDGE EXTENSION; BID NO. 5670. NOW THEREFORE, (a; If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, is being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. LI E 1 7/96 I Section 00410 Page 1 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 15th day of _ February 2002, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCSPAL Name: G. L. Hoff Company Address: 1815 W. 12th St. Loveland CO 80537 By: Title: i 7/96 (SEAL) SURETY Employers Mutual Casualty Company P.O. Box 441098 Aurora, CO 80044 By: Title: Attorney-in-F ct (SEAL) Section 00410 page 2 JEMC Wuarance Companies qq'� P,O, Taos f12 a Tins Moines, Toga $0303 NO" µ -6 g 9 2 ." CERTIFICATE OF AUTHORITY INDIVIDUAL ATTORNEY -IN -FACT K40W ALL MEN 6Y TH: FSE PRESENTS, that: 1• 9mployors'Mutual Casualty Company, an Iowa Corporation 8. Dakota Fire Insurance Company, a North Dakota Corporatiod 4. EMCA$CO insurance Company, an Iowa Corporation 16, EMC Property & Casualty Company, ph Iowa Corporation t Union Insurance Company of Ptovfderioo, an Iowa Corporation ` 7. The Hamilton Mutual Insurance Compal£yr, an tfhlo Corporation 4,: Illinois EMGA$CO Insurance Company, an Illinois Corporation hereinalter referred to severally as "Company and collectively as "Companies", each does, by these presents, make constitute and appoint C;HRIS IRICHMOND, RUSSELL MICHELS, DARLENI= KRINGS, INDIVIDUALLY, FORTCOLLINS, COLORADO its true and lawful attorneyan-fact with full power and authority conferred to sign, seal, and execute its lawful bonds, undertakings and other obligatory instruments of a *nor nature as follows: iN "AN AMOUNT NOT EXCEEDING TEN MILLION DOLLARS ,:'. ........ .......:: ($10,000000.00) and to bind each Company thereby as fully and to the same extent as if such instruments were signed by the duly authorized officers of each such Company, and all of the acts of said attorney pursuant to the authorty, hereby given are hereby ratified and confirmed. The authorityhereby ranted shall expire April 1, 2003 Y 9 P unless sooner revoked. AUTHORITY FOR POWER OF ATTORNEY This Power -of -Attorney is mad@ and executed pursuant to and by the authority of the following resolution of the Boards of Directors of each of the Companies at a regularly scheduled meeting of each company duly called and held in 1999: RESDLYED: The President and Chef Executive Officer, any Vice President the Treasurer and the Secretary of Employers Mutual Casualty Company shall have power and authority to (1) appoint atkimeys•in-fact and authorize them to execute on behalf of each Company and attach the seal of the Company thereto, bonds and ,undertakings. recognizances, contracts of indemnity and other writings obligatory in the nature thereof; and (2) to remove any such attorney in -fact at ahy time; and revoke the power and authority given to film orher. Attomeys-in-fact shall have power and authority, subject to the terms and limitations of the power oI�atlgmey Issued to them to execute and deliver on behalf of the Company, and to attach the seal of the Company thereto bonds and undertakings, recognizorioae, contracts of indemnity and other Wllfings obligatory in the nature thereof, and any such instrument executed by any such ahomey-in-fact shall be fully and in all respects biddingg upon the Company. Codification as to the yafidity of any powenohattorney authorized herein made by an officer of Employers Mutual Casualty Company shall be fully and In as respects pinding upon this,. Company. The facsimile or mechanically reproduced signature of such officer, whether made heretofore or hereafter, Wherever appearing upon a Ce11 rtified Copy of any power-ofattomey of the Company, shall be valid and binding upon the Company with the same force and affect as though manually affixed. Ni ]M1TNE$SdW RERF, the C�my ofnpa�nrys have caused thesvegnts to be signed for each by their officers as shown and the Corporate seals to be hereto affixed this Seals • Sg6INSUyq •aHcc co o Pw a °' Bruce G. Kelleyf C uman Jeffrey S. Bardsiey� ��`pPPOPq 2R'n $p$4PpOgq .p: 40. OPPORq FSGrI of o C of Company mpa2, 3,4Chairman and 56:6, resident Assistant Secretary let y 9 Vice SEA1 iz1863 = a: 1953 = CEO of Company 7 u Z} d 2e OWA On this27th day of January 2600 yo Pooq,"rF�a Qe^µSO"^Nc `, WQS ..�.... ys ; re me a Notary PubNc in and for the State of Iowa, personally appeared Bruce G. Kelleyand Jeffre S h , VO < ,; ¢ •`OPrURa, O:I > OPP�R4�i^, 9 ; Birdsley, who, being by me duly swom, did say that they are, and are known to me to be the W SEAL =' SEAL b is SEAL Chairman, President, Vice Chairman and CEO, and/or Assistant Secretary, raspecfively, of a - o ; each of The Companies above; that the seals affixed to this instrument are the seals of said %+ o "b a Vests... es o?° q. corporations; that said instrument was signed and seated on behalf of each of the Companies by authority of their respective Boards of Directors' and that the said Bruce G, Kelley and Jeffrey S. Birdsley, as such officers, acknowledge the execution of said instrument to be the UT voluntary act and deed of each of the Companies My Commission Expires September 30, 2003. .��4 RUTA KRUMINS : Commission Number 176255--n,.,.,,,,,,,„,,,.) My Comm. Exp. Sept. 3q, 2003 I Notary Public in and for the State of Iowa CERTIFICATE I David L. Hixenbaugh, Vice President of the Companies, do hereby certify that the foregoing resolution of the Boards of Directors by each of the Companies, d,th Powerofgtkxnevis d rstrit heret on January27,2000 or, I half Of �ris:�licnrrtontl, W0282 l �clieyS, uarlene �Crings are t1. and correct and are still in full force and effect. In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this 15 43ay of February 2002 T V@x.Pramidahf aid #5670 Addendum #1 Bid Schedule Mulberry Bridge Extensionll.aPorts Guardrail Bid Schedule A & B ltam Number J51rostmiDing Description Improvements Quantity Unit UnitCott ($) Item ost (S) 1 I cl*aft and zrubbina 1 LS 1375.00 1 375.0 2 remowls 1 LS 7438.00 7, 3 3 structure excavadon 190 CY 3 , 4 structure ba Class 1 165 CY 34.50 5, 692.5 5 hotbkumiraus S h 8.5 TON 367.00 119.5 6 hot bituminous SG (asphalt) 13 TON 7 wade membrane 118 SF 601. 8 conore class 13 CY 669.00 8 697.0 4 concrete Case D (bridge)12 CY 686.00 8 232. Od 10 class 5 Mlsh 330 SF 4.20 1 386.0 11 rein steN 2220 LB 1.00 0 12 reinfo steel a 2975 LB 1.10 13 guardrail 3 3=11/2 cn 37.5 LF 64.10 14 and 3K 2 EA 15 remo ofexise rail 1 LS 137 16 brid rail 41 LF 250.00 17 river rock stone fa 120 SF 8.00 g23 18 r n 2-rwide 24 LF 20.0019 r tocate Utllltles 1 LS — 20 conslrucomsu 1 LS 00 mobiltra 1 LS 11850.00 22 construebon traffic control 1 LS .00 a- a;d 4rd T� Raid aS� k (3 �1 -u2 iriu 16:23 AM cii' T CCLLiNS, PURCHAS rAS Nu. 970 16707 P.03/05 Mulberry Bridge Extension Mulberry spanning Latimer County Cartel #2 Bid Schedule A Item Number Description Streetscaping Improvements Quantity Unit 1 clearim and grubbing LS 2 wnpvals 1 LS 3 structure excavation 190 CY 4 structure baddlp (dass 1 166 CY 5 trot bltuminous amen( S (asphalt) 8.5 TON biWminous vement tad' SG es ]t 13 TON vra fins (membrane) 118 SF Comm class B b e 1 CY ntrete class 0 brill e a CY Fhot class 5 finish 330 SFreinfor awe] 2220 LB relnford steel coated 1925 LB rap 3 3'-1 112" st d 18.75 LF 14 and anctlora s 3K 1 EA 15 bridaerail 21 LF 16 utter pan(2W wide 24 17 relocate utpi' 1 16 construction 1 19 river atone facing85 dLLSS 20 mobilization 0.8 21 wnstue*n traftlo cc" 0.8 co-ui-u2 17:U i0;23 Al`I i, i'° -T COLLINS, PUROHAS tA,X NO, 970 T16707 P. 04/05 Laporte Guardrail Replacement Laporte spanning New Mercer Dttch Bid Schedule B Item Number Istrestseeptrig Dwriptlon Improvements Quantity UnU 1 removal of e)dsgm ray 1 L 2 concrete loss D 4 CY 3 rairfting stem coated 1050 LB 4 red 20 LF S ardraa 3 3'-11r2" s 18.75 LF 8 and ancharsize 3K 1 EA 7 river rack stone facing 55 SF s mobatzatlon 0.2 9 constns0on c control 0.2 L SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. ITEM SUBCONTRACTOR Traffic Control United Rental Asphalt Connell Resources Guardrail Ideal Fence Masonry QM Masonry 7/96 Section 00430 Page 1 -m71,r , STATEMENT OF 81DDEP.'S QUALIFICATIONS ::cmprehensive. This statement must be giv_-a must notarized. If be cigar and b= answered on separate atta^hed sheets. necessary, The Bidder may submit questions may any additional information he desires. Name of Bidder: G.L. Hoff Company =• Permanent main office address: 1815 West 12th Street, Loveland, CO 80537 3. when organized: January 1984 4. If a corporation, where incorporated: Colorado 3. How many years have you been engaged in the contracting business under your present firm or trade name? eighteen ;ears F. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) Rehabilitation of Owl Creek Ditch 374 057.00 completion 3-2002 I B 9 General character of Work performed by your company: Commercial general contractor: complete the following areas with our own Have you ever failed to complete any Work awarded to you? no If so, where and why? Have your ever defaulted on a contract? If so, where and why? iu. Are you debarred by any government agency? If yes list agency name. I no no 1 7/95 Section 00420 Page i :J)e_ts re _?'�___, _._`C,D Le Led :^,Cd,^,V, s C a __❑ t (le dCCCJ:i :;il3 Ce vJOSC 04 each, and Cne monC❑ ana y'23r.': cumpyeted, location Please refer to the attached lists i2. ..._.._ your m3]Or ?gnlpme.^.t 3C3i13b1? fJr this contract. sump truck, uAT Yzd loader, CAT 320 track excavator, backhoe bobcat motor grader, grading tractor, concrete numn 13. Experience in construction Work similar in importance to this p=-j- ct: = Please refer to the attached lists 14. Background and experience of the principal members of your organization, including officers: Please refer to the attached lists 15. Credit available: $$250,000.00 16. Bank reference: Loran Emmonds, Bank One Loveland, CO 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? 18. Are you licensed as a General CONTRACTOR? yes If yes, in what city, county and state? Fort Collins and others What class, license and numbers? #B-6 19. Do you anticipate subcontracting Work under this Contract? yes If yes, ghat percent of total contract? and tc whom? Please refer to section 430 20. Are any lawsuits pending against you or your firm at this time? no if yes, 7/96 Section 00420 Page 2 1 I n I 2 million plus 2 million umberlla =- - Travelers Insurance. Agent: Flood E Peterson __. ,drat are .our company's bonding limitations? 5 million The undersigned 'hereby authorizes and requests any person, firm or corporation to furnish anv information requested by the OWNER in •i=_rification of the recital comprising this Statement of Bidder's Qualifications. i A Dated at this 1b5_0 day of r. L . f- u ham or Cie By: DYL�V✓\ :itl r State of to County of—_ La, t being duly sworn deposes and says that he is k t*-S of (`�,.L r„c eovw✓._A,K 14 and that yo (name of organization; the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this I5)16 day of 2017. Mary Publi1 k!": _c?_ .Lss-ion expires 7/96 Section 00420 Page 3