HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 2202988 CHANGE ORDER 1301/10/2003 FRI 11:05 FAX 970 221 6586 CITY OF FT COLLINS CLRS 1)001/001 CHANGE ORDER NO. #13 PROJECTTITLE: FOSSIL CREEK COMMUNifY PARK PHASE I CONTRACTOR: Clark Construction Company, Inc. PROJECTNUMBFR SM11 PURCHASE ORDER NO.: 2202988 DESCRIPTION: A. Temporary Ponce r Overexcavate at Bono Dig (Ctark#17) B. Grout Same Store Wails (Clark #24) C. Concrete Retaining Wail at Ballfleld Restrooms (Clark #26) D. Additional Window Framing at Maintenance Building (Clark #29) E. Additional Flashing at Maintenance Building (Clark #33) F. Additional ulcer untel at Malrrf. Bldg. Looker Room (Clark #34) G. Additional 8 Round Picnic Tables (Clark #37) 1. Reason for change: A. Management and Security for Paleontological Find B. Omission f m plans and specs C. Substitution for stone retaining wall D. Dotal ornission from drawings E Detallomission from drawings F. Detail omission from drawings G. Bid form quaintly discrepancy 2. Description of Change: A. Temporary Fence f Overoxcavate at Bone Dig - $7,503 B. Grout Some More Walls - $6T7 ; C- Concrete Retaining Wait at Balldeld Restrooms - $8A43 D. Additional Window Framing at Maintenance Building' $862 i E. Additional Flashing at Maintenance Building - $4,898 c F. Additional Steel Lintel at Maint Bidg. Locker Room - $2W 'd G. Additional 3 Round Picnic Tables - $2,054 3. Change in Contract Cast $22,806.00 4. Change in Contract Tine: 0 days TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER $g819_00 TOTAL THIS CHANGE ORDER $22 80G,00 TOTAL % OF ORIGINAL CONTRACT, THIS C-O. 0.37% TOTAL % OF ORIGINAL CONTRACT, ALL C.O: S 4.30% ADJUSTED CONTRACT COST 56,35ti,183.58 (Assuming all charge orders approved) ACCEPTED BY: Contractor's Representative ACCEPTED BY: Pro)eCt Manager 97 REVIFWED BY: �- Title:.— APPROVED BY: Tide: APPROVED BY: Purchasing Agent over $30,000 wCsy Clerk Arddkea Codreela Eniiin m Pmped File PwdhssnV DATA 1 703 DATE: d /-O Z-D ,5 DATE: 3, 2003 DATE: DATE: 01/10/2003 FRI 11:24 FAX 970 221 6586 CITY OF FT COLLINS CLRS �4d&-"+ zoili/001 3AA - I ct,44-5 CHANGE ORDER NO, M4 PROJECT TITLE: FOSSIL CREEK COMMUNITY PARK PHASE 16 CONTRACTOR Clark Construction Company, Inc. PROJECT NUMBER 5681 PURCHASE ORDER NO.: 2202M d,,O_ r C7 DESCRIPTION: A. Additional Grading and and Earthwork (Clark #21) B. Credit for Alternative Slade Structures (Clark #2S) C. Storm Drain Extension for Future Pedestrian Underpass (Clark #27) D. Credit for Anti -Graffiti Coatings (Clark 431) E. Scoreboards Substitution at Ballfields (Clark#92) F. Increase Size of Roof Hatch at Pumphouse{Clark 439) G. Add Safety Fence to West South and East Bdy. (Cbuk #40) 1. Reason for Grange: A. DisoMparwies between as -designed and as -built from phase 1A B. Contractor proposal to save owner money C. Construct Lamay Avenue project feature now to mid future site disruption D. Deletion of coatings not needed E. Recreation program requested chernge F. Needed to allow for pump repair and fuure extraction r replacement C- Needed to keep wandering neighbors out of site 2. Description of Change: A. Additional Grading and and Parthxork $39,870 B. Credit forAltemative Shade Stuctures($72,301) C. Storm Drain Extension for Future Pedestrian Underpass $6,899 D. Credit for An6-Gralfl6Coalinga ($9,906) E. Scoreboards Substitution at Wfields $8.144 F. Increase Size of Roof Hatch at Pumphouse $713 G. Add Safety Fence to West South and East Bdy. $2,623 3- Change in Contract Cost ($23,958.00) 4. Change In Contract Time: 0 days ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT. THIS C.O. TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S ADJUSTED CONTRACT COST $8.331.225.58 (Assuming as change orders approved) ACCEPTED BY: Conlrs t s Representative ACCEPTED BY: Projed Manager on MA REVIEWED BY: T''Itle. APPROVED BY. Title: APPROVED BY' Purchasing Agent over aGly Gorh Archhep Cenaecrnr Enenney Prolate Fie Pummahg DATE: 3 3 DATE: / • O DATE: -r DATE; DATE'