Loading...
HomeMy WebLinkAbout109420 HYDRO - PURCHASE ORDER - 9923959 (2)Administrative Services Purchasing Division city of Fort Collins June 19, 2001 Hydro Construction Co., Inc. 383 West Drake STE 201 Ft. Collins, CO 80526 Re: Construction of WTF Retaining Wall and North Tank Concrete Repairs Gentlemen:: 1 have enclosed four (4) sets of work order documents regarding the above captioned matter. Please sign the four copies and return .all copies to me along with the required insurance certificates and performance and payment bonds. After the signatures have been obtained, a copy of the work order will be sent to you. B. O'Neill II, CPPO a of Purchasing and Risk Management enc imv 256 W. Mountain Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 loa Information For Hydro Work Order H-WTF-2001-3 A new work order to Hydro for additional work items not in any previous scope of work. Title: Construction of WTF retaining wall and North Tank Concrete Repairs Notice of Award Date: June 6, 2001 Bid Dated: June 3,2001 Description of Work: Provide all materials and labor as necessary to construct a 5 foot wide side walk and retaining wall from the parking lot stairs to the Flow Blending Building as directed by the Owner. Use landscaping block selected by the Owner and concrete mix and placement to be followed as per 2000 WTF Modifications Specifications. Provide all materials, labor, and special equipment as necessary to perform concrete repairs at the North Water Storage Tank per enclosed details by Bates Engineering. Also, recoat areas on piping supports where paint has failed using Amercoat 370 per the enclosed specifications and letter. Contract Times: Substantial Completion and Final Completion shall be one and the same and therefore there will be one Completion date. That date shall be No later than July 13, 2001, Liquidated Damages: $500.00 per day for every day or fraction thereof that expires after July 13, 2001. Date of Notice to Proceed: Shall be immediately upon receipt. Compensation: GMP of $22,820.00. Allowable Cost of Work is $19,639.00 and a Fixed Fee of $3,181.00 From: Kelley Gonzales To: Opal Dick Date: Wed, Jun 6, 2001 10:40 AM Subject: Another Hydro Work Order Opal, Attached is some information and requisition for another Work Order to Hydro Construction. One of the items included is repair work to the North Treated Water Reservoir. This work was done some time ago under an emergency situation so that the reservoir could be put back into service quickly. We have just now got all the costs back for the repair and figured out where the money should be coming from. The other is for a retaining wall at the WTF that Hydro is preparing to start. Dave Agee was to transfer the money for the Tank repair back into 62702. 1 just checked and that still has not been done. Can you get with him on that please? Let me know the status. At noon today I will bring you hard copies of the estimate and other items to be included into the Work Order. Thanks so much for you help! Let me know if you need anything else and when it is ready for my review. Kelley Vend� ' - B3 W D Fotl Collin _---_ C0.8052 __ Inc _ ada a Dab: - June 8,2001 i1B �aP 9`_'ed 1 T8 To: _Y_.- �_.. __.. ppadal lnslmdlona: bab Danletl: aemk QuaMEY . um Cgn6WdOnM eGOnG2le Wdk M re 'us at Me NMIr Treaba piWn Rla'Inln k _- _ ------- 'Td Raservak. um GrIce Tdal _ _. r CRaga Nlunber __------ _ ---_ _—___ 1 1 LS, - — -— ------- ---- onGde walk artl re1Tni wall — -- --------- _ - -"_ _ _ ___ _ WTF FB $11 B2 $1, M. 502U330.5292W6--- 3_ _ 1_ _ _ .ua __ _l5_ _eu y6orvtl a abS Tore WAh Trewgq W R.-.-p -_ .. .. $11,05J.Otl $11,U,Q" W .6 mnm ae .. - " L ." _ — Sb262]62.529280.6 --- _ Information For Hydro Work Order H-WTF-2001-3 A new work order to Hydro for additional work items not in any previous scope of work Title: Construction of WTF retaining wall and North Tank Concrete Repairs Notice of Award Date: June 6, 2001 Bid Dated: June 3,2001 Description of Work: Provide all materials and labor as necessary to construct a 5 foot wide side walk and retaining wall from the parking lot stairs to the Flow Blending Building as directed by the Owner. Use landscaping block selected by the Owner and concrete mix and placement to be followed as per 2000 WTF Modifications Specifications. Provide all materials, labor, and special equipment as necessary to perform concrete repairs at the North Water Storage Tank per enclosed details by Bates Engineering. Also, recoat areas on piping supports where paint has failed using Amercoat 370 per the enclosed specifications and letter. Contract Times: Substantial Completion and Final Completion shall be one and the same and therefore there will be one Completion date. That date shall be No later than July 13, 2001. Liquidated Damages: $500.00 per day for every day or fraction thereof that expires after July 13, 2001. Date of Notice to Proceed: Shall be immediately upon receipt. Compensation: GMP of $22,820.00. Allowable Cost of Work is $19,639.00 and a Fixed Fee of $3,181.00 LETTER OF TRANSMITTAL ATTN:1 V DATE .: �. SUBJECT _1 PROJECT TITLE The following items are: # copies i ) REQUESTED () ENCLOSED Description ITEMS SUBMITTED ( j For Your Review "4 For Your Action For Your Files ( ) At Your Request ( ) For Your Information ( ) For Your Approval REMARKS: .\' ,Y\ i Q 1 v • ( ( D r YiQ BY: P.O. Box 580 , Fort Collins, CO 80522-0580_• (303) 221-6691