HomeMy WebLinkAboutWORK ORDER - BID - 5522 CONCRETE PROJECT PHASE IIMAY-13-2002 MON 08:28 AM CFO ENG. FAX NO. 9702216378 t,. Change Order Form City of Fart Collins PROJECT TITLE: 2002 Street Maintenance Program PROJECT NUMBER: 30522121.6 (Concrete Rehab Project- Bid #5522) CONTRACTOR: Vogel Concrete (PO #2202707) CHANGE ORDER NUMBER: 1 ennam o n1lenhararl naranrao F e nwlno: 1. Reason for change. 2. Description of change. 3. Change In contract cost. 4. Change in contract time. 1 A2. See attached invoice for details 3. The contract cost will Increase by $2,684.49 4. Therc will be no change in contract time. P. 01 ORIGINAL CONTRACT POST $554,741,16 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $2,664.49 TOTAL % OF THIS CHANGE ORDER 0.48% TOTAL C.U. % OF ORIGINAL CONTRACT 0.48% ADJUSTED CONTRACT COST $557,426.65 ACCEPTED BY: �✓"lG C _ DATE! ��' ACCEPTED BY: 11-2& \ �`y'fa �-- - DATE: (Project Manager) REVIEWED BY: -k, A DATE: (Engineer) APPROVED BY: APPROVED BY: cc: City Clack Contractor Purchasing Project File (Purchasing Agent over $30,000) street Maint. $ 0768Y. y9 Pad Access $ Lq DATE: 5' 1.3 0.1 DATE: Englncermg Department 0 281 North College Avenue • P.O. Box 580 4 Fort Collins. CO 80522.0580 • (303) 221.6605 MAY-13-2002 MON 08:28 AM CFO ENG, FAX NO, 9702216378 P. 02 2002 Concrete Rehab. Vogel Concrete Bid No. 5522 Change order No.: 1 Date: 5002 1. Reason For Change; a. Additional work not Included In the original contract b, Apply new standard detail to Item 606.06 Driveover Curb & Gutter, No Sidewalk c. There Is no One Item for colored concrete -Son Diego Buff d. Progress delays due to utility relocatlons 2, Description Of Change: a. Time and materials - remove and backfill abandoned Irrigation line and install ballards b. Adjust price for Item 508.06 Driveover Curb & Gutter, No Sidewalk to account for new standard requirements c. Lump sum payment for colored concrete at Pedestrian Refuge at Hill Pond and Shields d. Add 3 days to the contract time 3. Change In Contract Amount: Item Oty Unit Unit Cost Total Cost a. Labor- Install Ballards 1 Hr. $ 43.00 $ 43,00 Material - Concrete 0.25 Yd. $ 84,00 $ 21,00 Equipment - Baboat, remove existing clay pipe and backhll 2.5 Hr, $ 53.75 $ 134.37 Equipment - Jumping Jack, compact backfill 0,5 Day $ 100.00 $ 50.00 Labor- backnl pipe removal 0.5 Hr. S 32.24 $ 16.12 $ 264.49 b. DrNemr Curb & Gutter, No 5idewalk .575 LF $ 21.40 $ (18,725.00) Driveover Curb & Gutter, No Sldewelk (W' Revised) 875 LP $ 23.40 $ 20,475.00 $ 1.760.00 c. Colored Goncrale - Pedestrian Refuge 1 LS $ 670,00 $ 670.00 TOTAL CHANGE IN CONTRACT AMOUNT $ 2,614.49 4. Change In Contract Time a. There Is no change in cordract tima b. There Is no change in contract time o. There Is no change In contract time d. Add three (3) days to the contract time TOTAL CHANGE IN CONTRACT TIME 3 Days Y