HomeMy WebLinkAboutRESPONSE - BID - 5688 TRAFFIC OPERATIONS COMMUNICATIONS PHASE IMasTec North America
695 N. r Ave.
Brighton, CO 80601
Phone (303) 659-0161
Facsimile (303) 659-7950
City of Fort Collins
James O'Neill II
215 North Mason Street
2nd Floor
Fort Collins, CO 80524
Attn: Mr. O'Neill:
Subject: Bid #5688
Dear Mr. O'Neill:
MAR 1 �20p?
•: asTec
SC068-001.doc
March 14, 2002
Attached you will find our Pre -Qualification package for Bid #5688 in Fort Collins,
Colorado. We have filled out the forms that were issued with the Bid Package. Please
contact me at (303) 659-0161 if you require any additional information.
Sincerely,
8'sM. Brittain
Contracts Manager
Cc: Bid File
c1REA Prequalrpb history.xla
Specific Bid Work Completed
-A a s T e
c
MASTEC
NORTH AMERICA, Colorado
Division
PROJECT
PROJECT
JOB NUMBER
OWNER
LOCATION
PROJECT DESCRIPTION
COMPLETION
AMOUNT
715926
SPRINT
Denver, CO to Cheyenne, WY Phase 1
Fiber Optic Cable Installation
3/99
It
1,730,271.00
150927
US WEST
Colorado Springs, CO
Cable Installation
11198
$
69,500.00
715928
LEVEL 3 COM.
DOWNTOWN DENVER
MULTIPLE CONDUIT INSTALLATION
4/99
$
876,048.00
715929
OWEST COM.
Colorado Springs Colorado
Directional Boring
4/99
$
139.635.09
715930
SPRINT
Denver, CO to Cheyenne, WY Phase 2
Fiber Optic Cable Installation
459
$
821,926.00
715931
US WEST
Colorado Springs Colorado
600 pair cable Installation
4/99
$
13,1,91
715932
LEVEL 3 COW
Denver and Broomfield
MULTIPLE CONDUIT INSTALLATION
9/99
$
3,264,a%,23
715934
LEVEL 3 COM.
South Denver and Denver Metro
Fiber Optic Cable Installation
759
$
196,000,00
715935
US WEST
Gillette Wyoming
600 pair cable installation
759
$
69,670,00
7159W
US WEST
Fort Lupton, CO
Placement of Fiber Optic Cable
8199
$
65,470 W
715937
US WEST
Sedalia, CO
Placement of Fiber Optic Cable
9/99
$
SSW w
715938
Lucent Technologies
Fort Carson, Colorado
Fiber Optic Cable Installation
2100
$
355,480 00
715939
US WEST
Colorado Springs, Colorado
Cable Installation
1100
$
165,01M 00
715940
US WEST
Fort Collins, Colorado
B00 pair cable Installation
3/00
$
316,270.00
715 11
ADESTA
Denver, Colorado
Conduit Installation
4100
$
4,132,OW.00
715942
LEVEL 3 COM.
North Denver, Colorado
Fiber Optic Cable Installation
1/00
$
945,000.00
715943
US WEST
Windsor. Colorado
Cable Installation
31W
$
64.000.00
715945
GILBERT WESTERN
Denver, Colorado
Directional Boring
3MO
$
642,000.DO
715946
ADESTA
Denver, Colorado
Fiber Optic Cable Installation
7/01
$
122,ODO.00
715947
ADESTA
Denver, Colorado
Engineering/Placenrent of 13'x23'27' Vault
201
$
a:tS'".00
715948
ADESTA
Denver, Colorado
Conduit Installation
9100
$
1,720,000.00
715949
ADESTA
Darner, Colorado
Conduit Installation
In Progress
$
1 341,00000
715950
US WEST
Boulder, Colorado
Cable Installation
am
$
65,430.00
715951
ADESTA
Denver, Colorado
Conduit Installation
1/01
$
2,660,000.W
715952
US WEST
Berthoud, Colorado
Cable Installation
9100
$
73.000.00
715953
US WEST
Dillon, Colorado
Cable Installation
9/00
$
135,682.00
715954
ADESTA
Oenvar, Colorado
Conduit Installation
151
$
1,470,00).00
715955
ADESTA
Darner, Colorado
Conduit Installation
151
$
1,434,000.00
C.lPre-Qua[/REA - SoutWSC Policy. doc
MasTec North America, Inc.
Colorado Division
Subcontract Policy
The MasTec of North America, Inc. (MasTec) Colorado Division currently employs
between 100 and 400 full time personnel, and two hundred and seventy (270) pieces of
equipment. We can mobilize to perform virtually any size project for our customers.
Whether the job includes plowing, trenching, boring, manhole and handhole placement,
copper or fiber optic cable placement, aerial construction, etc., MasTec has the resources
to complete the job in a timely and cost-effective manner.
The MasTec Colorado Division also has strategic relationships with approximately sixty
(60) miscellaneous subcontractors who when utilized, can also assist to provide the full
gamut of construction activities throughout Colorado, Wyoming, and New Mexico.
MasTec evaluates each job we are awarded to most effectively complete the project in the
timeframe requested by the customer. Many times we can mobilize a subcontractor in an
area quicker and more cost-effective than mobilizing MasTec resources. By being so
flexible, we are able to pass this advantage to our customers.
MasTec North America, Inc.
Colorado Division
Project Management Personnel
Senior Vice President
of telecommunications ex
Area Manager
of telecommunications
Project Manager Project Manager
of telecommunications experience 1 20 + years of telecommunications
to Project Manager I I IForeman reports directly to
to Project Manager I I IForeman reports directly to
to Proiect Manager I IForeman reports directly to
C lSubcontracts/Bond Lest.doc
MasTec North America, Inc.
Colorado Division
Current Asset List
Attached is a list of assets currently owned by MasTec North America, Inc. (MasTec) and
maintained and utilized by the Colorado Division. This list does not encompass assets
that MasTec owns across the country and utilized by other divisions.
MasTec North America, Inc.
Colorado Division Asset List
1
2000
CASE
EMMEENEWEEM
BACKHOE
2
2000
CASE
BACKHOE
3
1993
CAT
BACKHOE
4
1996
JD
BACKHOE
5
1996
JD
BACKHOE
6
1996
JD
BACKHOE
7
1996
JD
BACKHOE
8
1995
J-D
BACKHOE
9
1995
J-D
BACKHOE
10
1995
J-D
BACKHOE
11
1995
J-D
BACKHOE
12
1997
J-DEERE
BACKHOE
13
1997
J-DEERE
BACKHOE
14
1988
CASE
BACKHOE
15
1989
CASE
BACKHOE
16
1989
CASE
BACKHOE
17
2000
CASE
BACKHOE
18
2000
CASE
BACKHOE
19
2000
CASE
BACKHOE
20
2000
CASE
BACKHOE
21
2000
CASE
BACKHOE
22
2000
CASE
BACKHOE
23
2000
CASE
BACKHOE
24
1996
JD
BACKHOE
25
1996
JD
BACKHOE
26
1996
JD
BACKHOE
27
1994
J-D
BACKHOE
28
1994
J-D
BACKHOE
29
1995
J-D
BACKHOE
30
1997
J-DEERE
BACKHOE
31
1997
J-DEERE
BACKHOE
32
1997
J-DEERE
BACKHOE
33
1997
J-DEERE
BACKHOE
34
1998
JOHNDEER
BACKHOE
35
1998
JOHNDEER
BACKHOE
36
1999
JOHNDEER
BACKHOE
37
2000
CASE
BACKHOE
38
1994
JD
BACKHOE
39
1996
JD
BACKHOE
40
1998
JOHNDEER
BACKHOE
1
1999
VERMEER
BORING
3/13/2002 11:09 AM assets overall CS
MasTec North America, Inc.
Colorado Division Asset List
2
1996
DITCH-W
BORING =920
3
1997
VERMEER
BORING NAVI
1997
FORD
BORING TRUCK
4
1995
VERMEER
D24A BORING
5
1996
VERMEER
DRILL =7/11
6
1996
DITCH W
R100
1999
VERMEER
MIXER
1997
VERMMER
MIXER
2000
D W
MIXER
2000
D W
MIXER
7
2000
D W
BORING
8
2000
D W
BORING
1985
MACK
MIXER
1
1997
BUTLER
CABLE TRAILER
2
1997
BUTLER
CABLE TRAILER
3
1999
REDI HAUL
CABLE TRAILER
4
1999
REDI HAUL
CABLE TRAILER
5
1999
REDI HAUL
CABLE TRAILER
6
1998
INTERSTATE
E TRAILER
7
1996
VERMEER
FEL TRAILER
8
1999
CUSTOM
FLAT TRAILER
9
1999
CUSTOM
FLAT TRAILER
10
1999
CUSTOM
FLAT TRAILER
11
2000
HILLSBORO
FLAT TRAILER
12
2001
HILLSBORO
FLAT TRAILER
13
1998
LOADTRAIL
LOADTRAILER
14
1998
LOADTRAIL
LOADTRAILER
15
1998
LOADTRAIL
LOADTRAILER
16
2001
KIEFER
REEL TRAILER
17
1993
BEBU
TRAILER
18
1995
BELSHE
TRAILER
19
1995
BELSHE
TRAILER
20
1999
BELSHE
TRAILER
21
1996
BUTLER
TRAILER
22
1996
BUTLER
TRAILER
23
1996
BUTLER
TRAILER
24
2000
BUTTLER
TRAILER
25
1994
CUSTOM
TRAILER
26
2000
DW
TRAILER
27
1999
FONTAINE
TRAILER
28
1996
HIL
TRAILER
29
1996
MIL
TRAILER
30
1996
HIL
TRAILER
31
1996
HIL
TRAILER
32
1984
LOAD KING
TRAILER
3/13/2002 11:09 AM assets overall CS
MasTec North America, Inc.
Colorado Division Asset List
33
1969
TRA
TRAILER
34
1998
VERMEER
TRAILER
35
1971
HOG DAVIS
CABLE TRAILER
36
1999
REDI HAUL
CABLE TRAILER
37
1999
REDI HAUL
CABLE TRAILER
38
1999
REDI HAUL
CABLE TRAILER
39
2001
KIEFER
REEL TRAILER
40
2001
KIEFER
REEL TRAILER
41
1999
CUSTOM
FLAT TRAILER
42
1999
CUSTOM
FLAT TRAILER
43
1999
CUSTOM
FLAT TRAILER
44
1999
CUSTOM
FLATTRAILER
45
1999
CUSTOM
FLATTRAILER
46
1999
CUSTOM
FLATTRAILER
47
2001
HILLBORO
FLATTRAILER
48
2001
HILLBORO
FLATTRAILER
49
2001
HILLSBORO
FLATTRAILER
50
1995
BELSHE
TRAILER
51
1995
BELSHE
TRAILER
52
1995
BELSHE
TRAILER
53
1995
BELSHE
TRAILER
54
1995
BELSHE
TRAILER
55
1995
BELSHE
TRAILER
56
1962
BUR
TRAILER
57
1996
BUTLER
TRAILER
58
1996
BUTLER
TRAILER
59
1996
BUTLER
TRAILER
60
1976
DAKOTA
TRAILER
61
1983
DUK
TRAILER
62
2000
FONTAINE
TRAILER
63
1996
HIL
TRAILER
64
1999
HILLSBOR
TRAILER
65
1999
HILLSBOR
TRAILER
66
1999
HILLSBOR
TRAILER
67
1999
HILLSBOR
TRAILER
68
1999
HILLSBOR
TRAILER
69
2000
KIEFER
TRAILER
70
1998
STOW
TRAILER
71
2000
TSE
TRAILER
72
2000
VACMASTER
TRAILER
73
2001
CIR J
CARGO TRAILER
74
2000
CIRCLE J
TRAILER
75
1996
HIL
TRAILER
76
2001
HILLSBORO
FLATTRAILER
77
1999
BUTLER
CABLE TRAILER
78
1999
REDI HAUL
CABLE TRAILER
3/13/2002 11:09 AM assets overall CS
MasTec North America, Inc.
Colorado Division Asset List
79
1999
REDI HAUL
CABLE TRAILER
80
1979
DTC
TRAILER
81
1999
HILLSBOR
TRAILER
82
1999
CUSTOM
FLATTRAILER
1
1991
SUL
COMPRESSOR
2
1995
SUL
COMPRESSOR
3
1995
SUL
COMPRESSOR
4
1995
SUL
COMPRESSOR
5
1996
SUL
COMPRESSOR
6
1996
SUL
COMPRESSOR
7
1983
SUL
COMPRESSOR
8
1984
SUL
COMPRESSOR
9
1984
SUL
COMPRESSOR
10
1984
SUL
COMPRESSOR
11
1984
SUL
COMPRESSOR
12
1984
SUL
COMPRESSOR
13
1991
SUL
COMPRESSOR
14
1993
SUL
COMPRESSOR
15
1995
SUL
COMPRESSOR
16
1995
SUL
COMPRESSOR
17
1996
SUL
COMPRESSOR
18
1996
SUL
COMPRESSOR
19
1996
SUL
COMPRESSOR
20
1996
SUL
COMPRESSOR
21
1971
WAB
COMPRESSOR
22
1997
SUL
AIR COMPRESS
23
1999
SULLIVAN
AIR COM-D185Q
24
1997
SUL
AIR COMPRESS
1
2001
FORD
CREW 4X4
2
2001
FORD
CREW 4X4
3
1999
FORD
F800
4
1992
FORD
PICKUP
5
1993
FORD
PICKUP
6
1995
FORD
PICKUP
7
1995
FORD
PICKUP
8
1995
FORD
PICKUP
9
1995
FORD
PICKUP
10
1995
FORD
PICKUP
11
1996
FORD
PICKUP
12
1990
FORD
TRUCK
13
1997
FORD
TRUCK
14
1997
FORD
TRUCK
15
1997
FORD
TRUCK
16
1998
FORD
TRUCK
3/13/2002 11:09 AM assets overall CS
MasTec North America, Inc.
Colorado Division Asset List
17
1998
FORD
TRUCK
18
1991
INT
TRUCK
19
1995
INT
TRUCK
20
1995
INT
TRUCK
21
1972
ISUZU
TRUCK
22
1986
MAC
TRUCK
23
1995
MACK
TRUCK
24
2000
STE
TRUCK
25
1995
FORD
Truck - 1 TON
26
1997
FORD
Truck - 1 TON
27
1997
FORD
Truck - 1 TON
28
1997
FORD
Truck - 1 TON
29
1997
FORD
Truck - 1 TON
30
1999
FORD
Truck - 1 TON
31
1999
FORD
Truck - 1 TON
32
1999
FORD
Truck - 1 TON F350
33
2001
FORD
Truck - 1/2 TON
34
1997
FORD
Truck - 3/4 TON
35
1998
FORD
PU
36
1997
FORD
Truck - 3/4 TON
37
1997
FORD
Truck - 3/4 TON
38
1997
FORD
Truck - 3/4 TON
39
1997
FORD
Truck - 3/4 TON
40
1999
FORD
Truck - 3/4 TON
41
2001
FORD
Truck - 3/4 TON
42
2001
FORD
Truck - 3/4 TON
43
2000
FORD
Truck -F150
44
2000
FORD
Truck -F150
45
2000
FORD
Truck - F150
46
1999
FORD
Truck - F250
47
1999
FORD
Truck - F250
48
1996
FORD
TRUCK 3/4
49
1996
FORD
TRUCK 3/4
50
1996
FORD
TRUCK 3/4
51
1996
FORD
TRUCK 3/4
52
1996
FORD
TRUCK 3/4
53
1997
FORD
TRUCK P/U
54
2001
FORD
CREW 4X4
55
2001
FORD
CREW 4X4
56
1993
FORD
PICKUP
57
1995
FORD
PICKUP
58
1995
FORD
PICKUP
59
1995
FORD
PICKUP
60
1995
FORD
PICKUP
61
1996
FORD
PICKUP
62
1996
FORD
PICKUP
63
1996
FORD
PICKUP
3/13/2002 11:09 AM assets overall CS
MasTec North America, Inc.
Colorado Division Asset List
64
2001
FORD
REG 4X4
65
2001
FORD
REG 4X4
66
1981
FORD
TRUCK
67
1994
FORD
TRUCK
68
1996
FORD
TRUCK
69
1997
FORD
TRUCK
70
1997
FORD
TRUCK
71
1998
FORD
TRUCK
72
1998
FORD
TRUCK
73
1984
INT
TRUCK
74
1987
INT
TRUCK
75
1989
KEN-W
TRUCK
76
1993
MAC
TRUCK
77
1995
FORD
Truck - 1 TON
78
1995
FORD
Truck - 1 TON
79
1995
FORD
Truck - 1 TON
80
1997
FORD
Truck - 1 TON
81
1997
FORD
Truck - 1 TON
82
1997
FORD
Truck- 1 TON
83
1997
FORD
Truck- 1 TON
84
1997
FORD
Truck- 1 TON
85
1999
FORD
Truck- 1 TON
86
1999
FORD
Truck - 1 TON
87
1999
FORD
Truck - 1 TON
88
1999
FORD
Truck - 1 TON F350
89
2001
FORD
Truck - 1 /2 TON
90
2001
FORD
Truck - 112 TON
91
1997
FORD
Truck - 3/4 TON
92
1997
FORD
Truck - 3/4 TON
93
2001
FORD
Truck - 3/4 TON
94
2001
FORD
Truck - 3/4 TON
95
2001
FORD
Truck - 3/4 TON
96
2001
FORD
Truck - 3/4 TON
97
2000
FORD
Truck - F150
98
2000
FORD
Truck - F150
99
2000
FORD
Truck - F150
100
1999
FORD
Truck - F250
101
1999
FORD
Truck - F250
102
1999
FORD
Truck - F250
103
1999
FORD
Truck - F250
104
1999
FORD-T.
Truck - F350
105
1996
FORD
TRUCK 3/4
106
1996
FORD
TRUCK 3/4
107
1990
FORD
TRUCK
108
1997
FORD
TRUCK
109
1984
INT MIXER
TRUCK
3/13/2002 11:09 AM assets overall CS
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may
be answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: MasTec North America, Inc.
2. Permanent main office address: 695 N. 7th Avenue, Brighton,CO 80607
3. When organized: 1969
01
If a corporation, where incorporated: Florida
5. How many years have you been engaged in the contracting business under your
present firm or trade name? 3 years in Colorado
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
Qwest - General Construction & Maintenance - approx. $24 million
per year through March, 2004
WorldCom - $228,469 - March, 2002
Adesta - approx. $16 million in open contracts - end o 2002
7. General character of Work performed by your company:
MasTec performs all types of underground telecommunications construction
including conduit and cable placement. See attached Work History
8. Have you ever failed to complete any Work awarded to you? yes
If so, where and why? Non Payment by the Client. MasTec was
owed in excess of $14 million.
9. Have your ever defaulted on a contract? No
If so, where and why? N / A
10. Are you debarred by any government agency? No
If yes list agency name. N / A
7/96 Section 00420 Page i
MasTec North America, Inc.
Colorado Division Asset List
110
1987
INT MIXER
TRUCK
111
2001
FORD
Truck - 1/2 TON
112
2001
FORD
Truck - 1/2 TON
113
2001
FORD
Truck - 3/4 TON
114
1999
FORD
Truck -F250
115
1995
FORD
TRUCK
116
1992
GMC
TRUCK
117
1995
FORD
Truck - 1 TON
118
1997
FORD
Truck - 314 TON
119
1999
FORD
Truck - 314 TON
120
2001
FORD
Truck - 314 TON
121
2001
FORD
REG4X4
122
1995
FORD
PU
123
1993
FORD
PICKUP
124
2001
FORD
REG4X4
125
2001
FORD
REG4X4
126
2001
FORD
REG4X4
127
2001
FORD
CREW 4X4
128
1999
FORD
F800
129
1999
FORD
F800
130
1999
FORD
F800
131
1999
FORD
F800
132
1999
FORD
F800
133
1999
FORD
F800
134
1999
FORD
F800
135
1995
FORD
BRONCO
136
1995
FORD
BRONCO
137
1 1999
Ford
Expedition
138
2000
FORD
EXPLORER
139
1999
FORD
Expedition
140
1999
FORD
EXPLORER
1
1990
FOFD
DUMP TRUCK
2
1990
FORD
DUMPTRUCK
3
1990
FORD
DUMPTRUCK
4
1990
FORD
DUMP TRUCK
5
1991
FORD
DUMP TRUCK
6
2001
INT TRUCK
DUMPTRUCK
7
1990
FORD
DUMPTRUCK
8
1990
FORD
DUMPTRUCK
9
1998
FORD
DUMP TRUCK
10
1990
FOFD
DUMPTRUCK
11
1993
FORD
DUMPTRUCK
1
1997 1
DITCH W I
PLOW
3/13/2002 11:09 AM assets overall CS
MasTec North America, Inc.
Colorado Division Asset List
2
1991
DITCH-W
PLOW
3
1973
CAT
PLOW
4
1995
VERMEER
PLOW
5
1991
CASE
PLOW
6
1999
DITCH WITC
TRACK PLOW
7
1996
DITCH W
DROP PLOW
1
1982
DIWITCH
TRENCHER
2
1993
DITCH-W
TRENCHER
3
1996
DITCH-W
TRENCHER
4
1996
DITCH-W
TRENCHER
5
1988
VERMEER
TRENCHER
6
1998
VERMEER
TRENCHER
7
1998
VERMEER
TRENCHER
8
1998
VERMEER
TRENCHER
9
1996
DITCH W
TRENCHER
10
1999
DITCH W
TRENCHER
11
1992
TESMEC
TRENCHER
12
1988
VERMEER
TRENCHER
13
1995
VERMEER
TRENCHER
1
1995
CASE
FORKLIFT
2
2000
STERLING
LT7500
3
1995
KEN-W
SEMI
4
1999
DW
T9B
5
1999
TSE
TL
6
1999
FORD
VAN
7
1972
LINCOLN
WELDER
8
1995
INT
Crane TRUCK
9
1995
INT
Crane TRUCK
10
1975
INT
DOZER
11
1978
INT
DOZER
12
1996
FORD
F800 DIGGER
13
1980
INT
FORKLIFT
14
1965
CAT
GRADER
15
2000
STERLING
LT7500
16
1975
ARROW
TAMPER
17
1992
ARROW
TAMPER
18
1999
STERLING
TELSTA
19
2000
STO
TRAILER Mixer
20
2001
INT
VAC TRUCK
21
1984
MILLER
WELDER
22
2000
McElroy
850101 Fusion Machine
23
2000 1
McElroy 1
850101 Fusion Machine
24
1999
NEW HOLL
SKID LOADER
25
1995
FORD
REELTRUCK
3/13/2002 11:09 AM assets overall CS
MasTec North America, Inc.
Colorado Division Asset List
26
2000
STOW
CEMENT MIXER
27
1985
JOHN-DEERE
CRAWLER
270 Total Pieces of Equipment
3/13/2002 11:09 AM assets overall CS
IR
way. In addition, wo 1 .' equally suitable alternative locations are 'able in e;: a. where we currently
^ass.
We also own a substantial amount in ��oment, which at December 31, 2000 had a gross book value of
$269.0 million. This equipment includes vans, It tractors, trailers, bucket trucks, backhoes, bulldozers,
directional boring machines, digger derricks, cranes and tesnu, .:went and software. We obtain our equipment
from various third -party vendors, none of which we depend upon, and have not c,perienced any difficulties in
obtaining desired equipment.
LEGAL PROCEEDINGS
We have filed lawsuits in Florida state court against a subsidiary of Artcom Technologies, Inc., a
holding company for a Spanish infrastructure provider that we formerly owned, to recover more than $5.0
million due under a promissory note and for breach of contract. We are also pursuing other claims against Artcom
affiliates totalling approximately $4.0 million. Artcom has responded by suing us in federal court in Florida to
recover approximately $6.0 million (subject to trebling) it alleges we received as a result of certain allegedly
unauthorized transactions by two former employees of Arteom that occurred after we sold the company.
In January 2001, we filed suit in Florida state court against Broward County, Florida, to recover
approximately $5.0 million for work performed to construct a detention facility for the Broward Sheriffs Office
("BSO"). The BSO has filed a separate lawsuit in response to our lawsuit claiming $13.0 million in damages for
alleged delays in constructing the facility.
In November 1997, we filed a suit against Miami -Dade County in Florida state court alleging breach
of contract and seeking damages exceeding $3.0 million in connection with the county's refusal to pay amounts
due to us under a multi -year agreement to perform road restoration work for the Miami -Dade Water and Sewer
Department ("MWSD"), a department of the county. The county has counterclaimed against us seeking
unspecified damages.
We are a party to other pending legal proceedings arising in the normal course of business, none of
which we believe is material to our financial position or results of operations.
None.
SUBMISSION OF MATTERS TO A VOTE OF SECURITY HOLDERS
11. List the more important project
the approximate cost of each,
and type of construction.
See attached Work History
s recently completed by.your company, stating
and the month and year completed, location
and List
12. List your major equipment available for this contract.
Plows, Trenchers, Bore Machines,_ Excavators. Backhoes,Trackhoes, etc.
See attached Asset List
13. Experience in construction Work similar in importance to this
project:
We have had General Construction and Maintenance Contracts with
the following companies: Sprint, Owest, WorldCom, A T & T, etc. and
continue to perform work for them. See attached Work History and List
14. Background and experience of the principal members of your organization,
including officers:
Willie Lessard, Senior Vice President - 33 years experience
Brian Jones, Area Manager - 16 years experience
Blake Dye, Project Manager - 25 years experience
15. Credit available: $ 150,000,000.00 +
16. Bank reference: First Union National Bank of Florida
Plantation, FL 33322 - Checking Account #15320013694
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
Yes
18. Are you licensed as a General CONTRACTOR? N / A- Fed Tax ID #650829357
If yes, in what city, county and state? What
class, license and numbers?
19. Do you anticipate subcontracting Work under this Contract?
If yes, what percent of total contract? T. B. D.
and to whom? See attached Subcontract Policy
20. Are any lawsuits pending against you or your firm at this time? Yes
If See attached yes,
DETAIL
7/96 Section 00420 Page 2
21. What are the limits of your public liability? DETAIL
We can cover what ever limit is required by Contract
What company? MasTec North America, Inc.
22. What are your company's bonding limitations? $175,000,000.00
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at .p this / day of /�CiYC� 2002,
r
By:
Title: Senior Vice Pres
State of Colorado
County of Adams
duly sworn deposes and says that he is
and that
(name ct organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
i�b d/a�nd sworn to/befo e me this _��day of
7 z 0,2
k
is
My commission expires
7/96 1. ,tion 00420 Page 3
m
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM SUBCONTRACTOR
T.B.D. - See attached Subcontract Policy. More information can be
supplied if requested.
/9r
Section 004') Fage 1
Welcome it
Yai,. „r"
Corporate Hett,iquarters:
3155 NW 77th Avenue
Miami, FL 33122-1205
305-599-1800
Stock Information:
Listed on New York Stock Exchange
Trading Symbol MTZ
Registered Agent:
Corporation Service Company
1201 Hays Street
Tallahassee, FL 32301
Corporate Officers
Date of Incorporation:
July 26,1968
State of Incorporation:
Florida
Tax I.D. Number:
65-0829355
Dun & Bradstreet No.:
00-692-4385
Austin Shanfelter
President & Chief Executive Officer
Donald P. Weinstein
Executive Vice President & Chief Financial Officer
Jose Mas
Executive Vice President & Business Development
Jose M. Sariego
Senior Vice President - General Counsel
Arlene Vargas
Vice President - Corporate Controller
Auditors:
PricewaterhouseCoopers LLP
200 South Biscayne Blvd.
Suite 1900
305-375-7400
Transfer Agent:
First Union National Bank
Shareholder's Services Departmenr
1-800-829-8432
httn://www.mastec.cocii).n,i]r facts.asp
2/25/2002
CREDIT APPLICATION
Full Legal Name of Applicant Phone # Fax #
Mastec North America, Inc. 303-659-0161 303-659-7928
TYPE of BUSINESS
Construction — Telecom
HEADQUARTERS:
Mastec Miami 3155 NW 77`h Ave. Miami, FL 33122-1205
BILLING CONTACT:
Accounts Payable
BILLING ADDRESS:
695 NORTH 7TH AVE. BRIGHTON, CO 80601
IN BUSINESS SINCE: YEAR OF INCORPORATION
1976 FL - 1968
PRIMARY BANK:
First Union National Bank of Florida Plantation, FL 33322
CHECKING ACCOUNT #
15320013694
CREDIT REFERENCES:
Ready Mix Denver, Co (303)292-1771
AUTHORIZED SIGNATURE: 7� ''//
x CR"rna_P__n .o_W'o D&44nk&A na./o LNN. COnl1Vlle(
Signature Date Print Name Title
C: /REA Pre-gual/Work History. doe
MasTec North America, Inc.
Colorado Division
Work History
The MasTec of North America, Inc. (MasTec) Colorado Division is capable of
completing almost any type of underground construction including, but not limited to the
following: trenching and plowing of conduit and cable, including large scale conduit
infrastructures, installation of handholes and manholes, installation, splicing and testing
of fiber optic and copper cables, and the installation of commercial and residential
telephone drops. MasTec is also poised to provide overhead construction services,
including, but not limited to: installation of overhead strand wire, installation of
overhead lashing of fiber optic and coaxial cable, grounding of overhead cable, anchoring
of existing poles and towers, relocation of existing overhead facilities (as well as pole
structures), and the splicing and testing of overhead utility installations.
c:IREA Pre-qual/pb history.xls
Specific Bid Work Completed
-A a s T e
c
MASTEC
NORTH AMERICA, Colorado
Division
PROJECT
PROJECT
JOB NUMBER
OWNER
LOCATION
PROJECT DESCRIPTION
COMPLETION
AMOUNT
150972
US WEST
Bailey Exchange, Bailey, CO
Placement & restoration of cable @ W'
12t95
$
454,862.00
150973
DRAKE CONTRACTORS
Brighton Exchange, Bnghton, CO
Placement& restoration of 31.852 ft of conduct
IM5
$
80,000.00
150974
US WEST
Pueblo Exchange, Pueblo, CO
Placement&restoration of 40,000+ft Maerial cable
12A15
$
182,124.00
150975
US WEST
IMerlociu n Business Loop, Broomfield. CO
Placement of Approx 14000 ft of corMu4
2196
$
186,328 00
150976
US WEST
Hudson, CO
Placement of Approx 27000 ft of condud & Nil 56,000 ft of fiber
1M
$
167,163,02
150977
US WEST
Leadville Exchange, Leadville, CO
Wrocldng of existing Asnel cable & pole removal
9/96
$
50,000,00
150978
US WEST
Castle Rock Exchange, Castle Rork, CO
Placement & restoration of approx 30,ODO ft of cable @ W'
11196
$
82.822,00
150979
US WEST
Fountain, CO
Placement of approx 8,600 ft of 900 pr cable in frost
12M
$
89,750,00
150980
PTI Communications
Red Feathers, CO
Placement of fiber optic cable
1/97
$
8.287.80
150981
US WEST
Tiepras, NM
Placement of 12,000 ft of underground fiber & 56,000 ft of aerial
4197
$
106,076,81
150982
SP Construction Services
Glen Elder to Willard KS
T&M usage of foreman & operator (Sub -Contracted)
2197
$
9,121.11
160983
AT&T
Scoft City, KS
Cable Removal approx 190,000It
5197
$
1,315,BB7D6
150984
US WEST
Golden Exchange, Golden, CO
Restoration & removal of utility vault & Din Boring 16 way 4" PVC
7197
$
47,737.46
150985
US WEST
Venous within Wyoming
Cable spicing
5197
$
51,67306
150986
US WEST
Pueblo Exchange, Puebo, CO
Various
6FJ7
$
56,650.00
150987
US WEST
881h & Lowell, Westrninster, CO
Directional Boring of 4,950 ft of cable 600 pr to 1500 pr
7197
$
58,42829
15098E
US WEST
Colorado Springs, CO
Various
M7
$
87,000.00
150989
US WEST
Greeley, CO
Cable placement along 1 Oth St
4199
$
110,000.00
150990
US WEST
Fort Collins, CO
Cable Placement
1 V97
$
46,25341
150991
AT&T
Cheyenne, WY
Directional Bourg
5I98
$
349,506.24
150992
US WEST
Salida, CO
Various
6198
$
56,470,00
150993
AT&T
Cheyenne, WY to Wallington, CO
Cable Removal
9198
$
1,567.".W
150994
US WEST
Broomfield, CO
Cable installation
9198
$
78,460.00
150995
US WEST
Colorado Springs, CO
Various
7/98
$
SS'" 00
150920
Ncri Line Layers
Red Feathers, CO
Cable installation (Plow, Directional Bare)
898
$
79,000.00
150921
US WEST
Loveland, CO
Cable installation (Plow, Directional Bore)
9/98
$
54.000,00
150922
AT&T
Cheyenne, WY
Directional Boring
11w
$
174,000.00
150923
AT&T
Mojave, CA to Colorado River, NV
Cable Removal
10AJB
$
1,789,000.GO
150924
US WEST
Windsor, CO
Cable Installation
10/98
$
SBO00.00
160925
US WEST
Denver I Columbine Exchange
Plow and Directlanal Bore
10198
$
64,000,00