Loading...
HomeMy WebLinkAboutBID - 5677 COLLINDALE GOLF COURSE CLUBHOUSEJRN-30-2002 11:24 IJRJGHTFRYE/UF RIPLEYTS 970 224 1662 P.01iO3 ITEMIZED KITCHEN EQUIPMENT SPECIFICATIC COLLXNDALE CLUB HOUSE Fort Collins, Colorado 10.29.2001 74 -0- Receive, move into space, uncrating/assembly/setting into place ready for electrical and mechanical connections by others - Caulk -seat with Pure Silicone sealant all joints -cracks -seams with matching color... trim -flash and enclose voids and spaces leaving a tight -sealed seam. Coordinate all work with job -site sequence and need/work with contractors to facilitate book -ups, perform final startup/check outlealibration and employee training. Perform all corrective work as indicated in Kitchen Tech Project Completion repon applicable Health Department final inspection report prior to opening. (excludes storage trailer/fork lift rental if needed. Will be billed @ cost) Kitchen Equipment Contractor is fully responsible for timely delivery, coordination of equtpmetir_. with other supplierecontractors, taking of required field measurements and insuring that equipment "lines" fit tight and properly. KEC is responsible for completion of the "weekly" PROJECT EQUIPMENT STATUS REPORTS and submittal to the owner and Kitchen Tech.. Provide Sea. bound and cataloged operations & service manuals showing each item/service agency/KEC emergency 24-hour telephone numbers and deliver to owner at time of opening. ALL equipment is needed on -site as of the date the owner indicates. 'Upon reward it is absolutely imperative that these orders be placed without delay .... ship to warehouse as directed. EXACT item status reports are an integral part of this order .... any item being received incorrectly do to non-compliance with the specifications/details/drawings/job site and owners needs, will be refused and ordered from "first delivery" supplier. Any condition and/or situation that may adversely affect this project in anyway, is the responsibility of the KEC to immediately notify Kitchen Tech and the Owner of same with the options for correction or alternatives available. All equipment to carry the standard manufactures warranty. All refrigeration to carry a full parts & labor 5-year compressor warranty including all Freon, etc.. All equipment provided shall carry a full one year parts and labor warranty at a minimum. The commercial kitchen equipment specified herein has been sized specifically for the owners operation and restricted job -site size requirements, as well as meeting existing rough -in electricaVmechanicallplumbing service utility stubs. Alternates will not be considered in the base bid package. Should alternates be encouraged.... see "altercate specifications" for details and directions. In no case will warranties be modified and/or changed from that specified herein. Any alternate/change that may be approved, the KEC is totally responsible for any and all job -site - roughin - conditions that are required and/or necessary to accept and receive same.