HomeMy WebLinkAboutCHANGE ORDER - RFP - P707 LOCUST ST OUTFALL & FUTURE SW MASTER PLANNINGCHANGE ORDER NO. 4 PROJECT TITLE: West Vine Basin Drainage CONTRACTOR: URS Greiner P.O. NUMBER: 9907813 ,NDOR NUMBER: 101409 �-,HARGE NUMBER: 50452803.528180.3 DESCRIPTION In preparing change orders show inorder as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time 1. Additional work required outside of scope of work. 2. Additional analysis for detention upstream of Overland Trail. 3. $9,070 (Nine Thousand Seventy Dollars) 4. Not Applicable. (Attach additional sheets as ORIGINAL CONTRACT COST $228,914.00 TOTAL APPROVED CHANGE ORDERS $128,183.88 JTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $9,070.00 ADJUSTED CONTRACT COST $366,167.88 (Assuming all change orders approved) ACCEPTED BY � F�� DATE: (Contractor's Representative) REVIEWED BY: DATE: %'(Q 4ur ect Manager) APPROVED BY: ATE 6 2 ) APPROVED BY: DATE: hasing Agent Over $15,000) CC: City Clerk Purchasing NOTE: Signature of Contractor indicates Contractor Project File agreement herewithin, including any adjustment Stormwater Finance Manager in contract sum or contract time. urschng4.x1s June 4, 2002 Sue Paquette City of Fort Collins Utilities 700 Wood Street P.O. Box 580 Fort Collins, CO 80522-0580 Subject: Change Order for Alternatives Analysis on CSU Property for the West Vine Master Plan Dear Sue, The purpose of this letter is to request compensation for work previously completed in the year 2000 for additional alternatives analysis conducted on CSU property for the West Vine Master Plan project. This additional alternatives analysis work was described in detail in a change order dated December 19, 2000 (copy attached). As stated in that letter, these additional costs were not requested to be included in the change order at that time as URS was attempting to negotiate a contract with CSU for the work already completed and to perform additional alternatives analysis on their property. As a result, the identified $9,070 (which was out -of -scope work) was not included in the December 19, 2000 change order request. Since the December 19, 2000 change order was submitted, a formal proposal was presented to CSU to complete the alternatives analysis on their property (Foothills Campus Master Drainage Plan). }lowever, CSU decided to use another consultant to complete the Foothills Campus Master Plan. In conclusion we are requesting a change order to our contract for an additional $9,070 to cover these expenses Please call me at (303) 740-3962 if you have any questions or require further clarification. Sincerely, URS Cor /oration G Steve Rogers, P.E. Project Manager SR/jls URS Corporation 8181 E. Tufts Avenue Denver, CO 80237 7el: 303.694.2770 and 303.740.260C Fax: 303.694.3946 Administrative Services Purchasing Division June 7, 2002 Steve Rogers URS Greiner 8181 E Tufts Ave. Denver, CO 80237 Re: Change Order #4 Dear Mr. Rogers: Enclosed please find your copy of the signed change order for the above -mentioned matter. Sincerely, k2. m B. O'Neill II, CPPO Di for of Purchasing and Risk Management enc JBO/imv cc: Susan Paquette, Stormwater 215 North Mason Street • 2nd Floor • F.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 Administrative Services Purchasing Division laity of Fort Collins April 20, 2000 John Sikora P. E. URS Greiner Woodward Clyde International America Stanford Place 3 STE 1000 4582 South Ulster St. Denver, CO 80237 RE: West Vine Master Plan Update -Change Order #1 Dear Mr. Sikora: Enclosed please find your copy of the signed Change Order for the above -mentioned matter. Sincerely, Ja s B. O'Neill II, CPPO ctor of Purchasing and Risk Management enc JBO/imv cc: Susan Hayes, Utilities 256 W. Mountain Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 Illa-Mae an erwater - U age From: Opal Dick To: Illa-Mae Vandenaater; joneill Date: Wed, Apr 19, 2000 9:48 AM Subject: URS Line #2 has been entered for C.O. #1 to URS for the West Vine Master Plan Update. - amt. $15,800.00 Ilia Mae - please distribute copies of the C.O. CC: Shannon Gallegos