HomeMy WebLinkAboutRESPONSE - BID - 5737 UNION PACIFIC TRAIL DRAKE ROAD TO HORSETOOTH (11)SECTION 00300 BID FORM PROJECT: UNION PACIFIC TRAIL DRAKE ROAD TO HORSETOOTH ROAD; Bid No. 5737 Place Fort Collins, October 16, 2002 Date 1. In compliance with your Invitation to Bid dated September 23, 2002 and subject to all conditions thereof, the undersigned G.L. Hoff Company a **(Corporation, firm ct atrYYYLyZ'tS1tg53 Ra��A6£1H.pl;g}A-y}r� _er_ x 3er=etrox j *> authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5% of bid amount to ($ 5% ) in accordance with the Invitation To Bid and Instructions Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: Employers Mutual Companies, Agent: Flood 5 Peterson Insurance Fort Collins. CO 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No.1 through 2 7/96 Section 00300 Page 1 Pella Crossing Irrigation System Improvements Installation of a new submersible pump and guide rail system and construction of a new set well and piping. Scope of work included removal of existing lake pump, wet well, catwalk and discharge piping, and installation of meter pit, discharge line, suction line, intake screen, slide gate, and sitework. Owner: Boulder County 2040 14th Street Boulder, CO 80302 Contact: Kenneth V. Sjodin, 720-622-0109 Boulder County Parks and Open Space Contract: $92,305.85 Completion: May, 2001 George Rist Dam Rehabilitation Project Construction of new outlet structure, repair of damaged section of dam and replacement of riprap. Scope of work included excavation, sitework, structural concrete and pipeline installation. Owner: City of Loveland 500 East Third Street Loveland, CO 80537 Contact: Rod Chapman, Contract: $157,918.00 Completion: July, 2001 Project Manager, 970-962-2454 Geist Reservoir Dam Rehabilitation Project Repair of dam and outlet. Scope of work included construction of coffer dam and excavation for new outlet, installation of outlet, upstream and downstream headwalls, sluice gate, staff gage and trash rack, removal and replacement of existing spillway culvert, raise top of dam, and set riprap. Owner: Frank Walsh PO Box 30 Sterling, CO 80751 Contact: David Marsh, Project Engineer, 970-490-2620 Smith Geotechnical Engineering Consultants Contract: $37,895.25 Completion: February, 2001 Sheldon Lake North Shore Construction of concrete and crusher fines pavement and access ramp. Install a stone cap on the existing wall, and provide furnishings and related site work for the north shore of Sheldon Lake. Owner: City of Fort Collins 215 North Mason Street Fort Collins, CO 80521 Contact: Contract: Completion: Loveland Financial Center Hetty Bixby, Project Manager, 970-416-2192 $84,180.00 December 2001 Subcontractor to Big T Construction for construction of the site grading, site concrete and parking lot at the new commercial building. Owner: Loveland Financial Center West 37th Street, Loveland, CO 80538 Contact: Jasper Johnson, Bid T Construction, 970-635-050, Contract: $68,272.00 Completion: December 2001 G.L. Hoff Company 2000 Completed Projects Arkins Pump Station Construction of cast in place buried pump building including interior piping, pump equipment, installation of manual hoist and sectionalizing valve, earthwork, and reclamation of construction site. Owner: Little Thompson Water District Mike Cook PE, (970) 532-2096 835 East Highway 56 Berthoud, CO 80513 Contact: The Engineering Company Warren Mesloh, (970) 484-7477 Contract: $86,538.00 Completion: February, 2000 Centennial Village Pump Station Construction of non -potable water pump station including well drilling, pump system, building construction, electrical, and landscaping. Owner: City of Greeley Phil Carter, (970) 350-9826 1000 loth Street Greeley, CO 80631 Contact: Amy Johnson, Aqua Engineering, (970)229-9668 Contract: $119,511.00 Completion: February, 2000 Associated Thermoforming, Inc Pre-engineered metal building addition and remodel of manufacturing facility. Scope of work included sitework, landscaping, structural and site concrete, metal building construction, mechanical, electrical. Owner: Associated Thermoforming, Inc. 765 Second Street Berthoud, CO 80513 Contact: John Nix, President (970) 532-2000 Contract: $806,679.00 Completion: August, 2000 Colorado State University Condensate Replacement Phase 16 G/H Remove existing underground condensate lines from campus main lines to building entrances for CSU heating system. Scope of work included excavation, landscaping, concrete tunnels, piping and insulation. Owner: Colorado State University Facilities Services Fort Collins, CO 80523 Contact: Jim Stoddard, Project Manager, 491-0138 Contract: $319,552.00 Completion: October, 2000 Colorado State University Steam and Condensate Insulation Repair Insulation repair to existing underground steam and condensate lines at CSU. The scope of work included excavation, landscaping, concrete, mechanical and piping insulation, and tunnel lid replacement. Owner: Colorado State University Facilities Services Fort Collins, CO 80523 Contact: Jim Stoddard, Project Manager, 491-0138 Contract: $263,306.00 Completion: October, 2000 Colorado State University: University Avenue Plaza Three projects combined for the removal of an road through campus and construction of landscaped plaza. The scope of work included demolition, structural and flatwork concrete, paving stones, masonry, landscaping, asphalt, drain line, fencing and bike parking. Owner: Colorado State University Facilities Services Fort Collins, CO 80523 Contact: Bill Conn, Project Manager, 491-0145 Contract: $302,796.00 Completion: October, 2000 Colorado State University Master Storm Drainage Phase H Construction of a storm water drain system including excavation, installation of storm sewer and manifold pipe, precast vaults, manholes, asphalt paving, cast in place concrete, masonry and landscaping. Owner: Colorado State University Facilities Services Fort Collins, CO 80523 Contact: Jim Stoddard, Project Manager, 491-0138 Contract: $219,773.00 Completion: December 2000 Harmony Substation Construction of containment facility for the City of Fort Collins substation. The scope of work included excavation, concrete catch basin, drainage channel, and concrete box, sand interceptor/imbiber bead vault, installation of precast containment tank, and concrete flow fill. Owner: City of Fort Collins 700 Wood Street Fort Collins, CO 80521 Contact: Anthony Barsoom, Project Manager, 482-5922 Sear -Brown Group, Engineering Contract: $85,739.68 Completion: August, 2000 Emerald Glen Pump Station Installation of a new non -potable water pump station and transfer pump station for neighborhood irrigation system. Scope of work included sitework, irrigation, and abandonment of potable water sprinkler taps. Owner: Glen Properties 2707 West Eisenhower Blvd. Loveland, CO 80538 Contact: Richard Aust, Engineer, 970,229-9668 Aqua Engineering, Inc. Contract: $321,668.50 Completion: August, 2000 Home State Bank Interior Remodel Interior remodel of the first and second floor of the main bank building. Scope of work included construction of new walls, interior finishes, and electrical. Owner: Home State Bank 935 North Cleveland Loveland, CO 80537 Contact: Mary McCambridge, Bank Officer, 669-4040 Contract: $97,824.00 Completion: October, 2000 G.L. Hoff Company 1999 Completed Projects Equalizer Dam Project Construction of new structural concrete dam outlet structure at the Equalizer Reservoir. Work included removal of existing structure, excavation, concrete foundation and walls, gate system, and sitework. Owner: Greeley & Loveland Irrigation Company Ron Brinkman, (970) 352-0495 808 23rd Avenue, Greeley, CO 80631 Contact: Boyle Engineering, Lee Queen (303)987-3443 165 South Union Blvd., Suite 200 Lakewood, CO 80228 Contract: $308,752.00 Completion: 2-99 Ridgeview Park Construction Construction of a new city park for the Fort Collins including demolition, layout, earthwork and drainage, utilities rough -in, irrigation, site paving and surfacing, fine grading and seeding, playground, picnic shelter and furnishings, lighting, and landscaping. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221-6366 Parks and Recreation Department Contract: $200,900.00 Completion: 3-99 Mosier Hill Non -Potable System Construction of a non -potable water irrigation system including precast concrete building, aeration system, pump system intake, irrigation pond lining, cast in place concrete, irrigation pump system, and electrical. Owner: City of Greeley 1300 A Street Greeley, CO 80631 Contact: Phil Carter, (970)350-9826 City of Greeley Contract: $193,963.00 Completion: 3-99 Fossil Creek West Construction of a concrete bike and pedestrian trail section west of Taft Hill Road for the City of Fort Collins trail system. Scope of work included sitework, grading, concrete, bridge installation, fencing, and seeding. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221,6366 Park Planning and Development Contract: $168,642.00 Completion: 11-99 Nielson Greenway Construction of a concrete and crusher fines pedestrian trail for the Town of Berthoud. Scope of work included extensive site grading, storm sewer, soil preparation, concrete sidewalk and curb ramp and stone trail. Owner: Town of Berthoud P.O. Box 1229 Berthoud, CO 80513 Contact: Marty Lafontaine, 532-2643 Parks Department Contract: $123,548.60 Completion: 11-99 L&M Parking Lot Construction of the L & M Parking Lot at the University of Northern Colorado. The scope of work includes sitework, grading, concrete curb, gutter, walk, and drive pans, asphalt paving, and lighting. Owner: University of Northern Colorado Carter Hall 1002 Greeley, CO 80639 Contact: Scott McLean, (970) 351-1982 University of Northern Colorado Contract: $223,377.00 Completion: 12-99 Cathy Fromme Prairie Parking Area Construction of a parking area at Taft Hill Road and Harmony in Fort Collins. Project includes demolition of existing roadway, concrete curb & gutter and asphalt paving. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221-6618 Parks and Recreation Department Contract: $101,412.00 Completion: 11-99 Fossil Creek Trail West of Taft Hill Construction of a section of the Fort Collins bike trail system. Work includes sitework, concrete sidewalk and bridge abutments, pedestrian bridge and seeding. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221-6618 Parks and Recreation Department Contract: $156,247 Completion: 10-99 Loveland Office Max Construction of all concrete work for the new Office Max facility. Work includes excavation for foundation, and sitework, concrete building foundation, floors and all site concrete such as curb and gutter, sidewalks, dock and pads. Owner: TCC-BTS Loveland OM, Inc. 7535 E. Hampden Avenue, Suite 650 Denver, CO 80231 Contact: Tap Pritchard, (303) 843-1947 Contract: $191,845.00 Completion: 10-99 G.L. Hoff Company Construction Experience Gregory L. Hoff, President and Construction Manager For the past twenty seven years, Greg has been involved with all aspects of construction from architectural drafting, surveying and carpentry to supervision and construction management. Graduating from Northeastern Junior College in 1972 with a degree in Civil Engineering Technology, his early work included surveying and architectural design and drafting. He has held a commercial contractor's license with the City of Fort Collins since 1976. Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, Longmont, Boulder, and Thornton. Prior to 1984, Greg worked with AI Hockett, Inc. initially as an architectural draftsman and progressing to project superintendent. He was also a partner in H&M Builders from 1976 to 1980. This company specialized in custom homes, tenant finish and custom millwork. Beginning in 1984, Greg started his own general contracting business, G.L. Hoff Company, which specializes in all types of commercial construction including sitework, excavation and concrete construction. As president and construction manager for G.L. Hoff Company, Greg works with a wide variety of projects including, schools, churches, city and government projects, city park developments, as well as many light industrial and concrete construction jobs. Greg oversees all project scheduling, review of construction procedures, quality control and safety enforcement. Joel S. Reger, Estimator and Project Manager Joel has a Bachelor of Science Degree in Construction Management from Colorado State University and fourteen years experience in the construction field. He has continued his education with estimating seminars including training with American Building Company's estimating Access workshop. He is also an active member of the Sigma Lambda Chi honorary national construction fraternity. During the past ten years, as the chief estimator with G.L. Hoff Company, Joel has compiled bids and development estimates for projects valued at up to five million dollars. As estimator, he directs project bidding process as well as the review of specifications. He is also involved with project management, coordinating proposal requests and change orders with the architect or owner, overseeing material orders to insure that the project is completed in a timely manner and according to specifications. William L. Vance, Project Superintendent Bill brings over twenty three years of experience in construction related fields to his position as project superintendent. His background includes heavy equipment operating, truss construction, carpentry, and cost estimating. He also has experience in both commercial and residential property development from site work and utility lines through finish carpentry. Bill has built over five hundred new homes as well as several light commercial properties. His commanding knowledge of construction methods enables Bill to be an especially effective project superintendent. G.L. Hoff Company CONTRACTOR BY: Gregory L. Hoff President ADDRESS: 1815 West 12th Stree Loveland, CO 80537 970-669-3255 BID SCHEDULE (Base Bid) Please use the attached Bid Schedule when submitting your bid. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (250) of the total Agreement Price. RESPECT)FULLY S.MITT D: October 16, 2002 Signature Greg ry L f Date �.; +..- ;. •>�:'' President ° Title rI; #B-6 i Dicense Number (If Applicable) (Seal ,-•if $id''is by corporation) Attest':'� Mi iam T. Hoff Sedr Treasurer Address 1815 West 12th Street Loveland, CO 80537 Telephone 970-669-3255, FAX: 970-663-1566 7/96 Section 00300 Page 2 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors Performing over 150 of the contract. ITEM 7/96 SUBCONTRACTOR j�e_O. r„ , i J)-.Q ( 0-s t 0 I S-T,) Section 00430 Page 1 Project: Union Pacific Trail BID SCHEDULE (BASE BID) Bid items are described in Section 01800 BID ESTIMATED UNIT ITEM ITEM# DESCRIPTION QUANTITY UNIT PRICE TOTAL 1 Mobilization 1 LS $ 913.00 $ 913.00 General Conditions i LS $3881.00 $3,881.00 2 Traffic Control 1 LS $ 634.00 $ 634.00 3 Demolition 1 LS $ 457.00 $ 457.00 4 Topsoil Removal/Replacement 1420 CY $ 6.15 $8, 733.00 5 Erosion Control 1 LS $1007.00 $1,007.00 6 Earthwork: Cut 102 CY $ 4.50 $ 459.00 7 Earthwork: Import Fill 490 CY $ 13.00 $6,370.00 8 Various Pipe Extensions 1 LS $13834.00 $13, 834.00 9 Concrete Trail 10' wide, 5" thick 49820 SF $ 3.34 $166, 398.80 10 Handicap Ramp 2 LS $1275.00 $2 , 550.00 11 Fine Grading 1.72 AC $ 353.00 $ 607.16 12 Metal Gate 2 LS $1286.00 $2,572.00 13 Seeding 1.72 AC $2364.00 $4,066.08 TOTAL OF BASE BID Two hundred twelve thousand four hundred eighty two dollars $ 212,482.04 (written) and four cents Figure Section 00300 Page 3 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410 Bid Bond 00420Statement of Bidder's Qualifications 00430Schedule of Subcontractors 7/96 Section 00410 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: G.L. Hoff Comany 2. Permanent main office address: 1815 West 12th Street, Loveland, CO 80537 3. When organized: 1 4. If a corporation, where incorporated: Colorado. 1989 5. How many years have you been engaged in the contracting business under your present firm or trade name? 18 years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) CSU Trial Garden Shade Structure. $118,973.00 Dec 31 2002 Hoffman Lake Spillway Project $103 135 07 Oct 31 2002 Estes Park Retaining Wall Project $362 576 09 May 16 2003 7. General character of Work performed by your company: Commercial general contractor: complete the following areas with our own forces: sitework, concrete, carpentry, project management �. Have you ever failed to complete any Work awarded to you?no If so, where and why? 9. Have your ever defaulted on a contract? no If so, where and why? 10 Are you debarred by any government agency? no If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. Please refer to the attached lists 12. List your major equipment available for this contract. dump truck, CAT 928 loader, DAT 320 track excavator, backhoe bobcat motor grader, grading tractor, concrete pump 13. Experience in construction Work similar in importance to this project: Please refer to the attached lists 14. Background and experience of the principal members of your organization, including officers: Please refer to the attached lists 15. Credit available: $ $200,000. 16. Bank reference: Loran Emmonds, Bank One Loveland, CO 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? 18. Are you licensed as a General CONTRACTOR? yes If yes, in what city, county and state? Fort Collins and others What class, license and numbers? ikR-F 19. Do you anticipate subcontracting Work under this Contract? yes If yes, what percent of total contract? to be determined and to whom? Please refer to section 430 20. Are any lawsuits pending against you or your firm at this time? no If DETAIL yes, 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL 2 million plus 2 million umbrella What company? Travelers INsurance, Agent: Flood & Peterson Insurance 22. What are your company's bonding limitations? 5 million 23. The undersigned corporation to verification of Qualifications. Dated at Loveland ff Name of idder By: //dlv hereby authorizes and requests any person, firm or furnish any information requested by the OWNER in the recital comprising this Statement of Bidder's Title: Secretary Treasurer State of Colorado County of Larimer this 16th day of October 2002. Miriam T. Hoff being duly sworn deposes and says that he is _Secretary Treasurer of G.L. Hoff Company and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and coprect. Subsgr,tigeyh and sworn to before me this / day of 20QZ . otar'y ;Public .' My commission expires 7/96 Section 00420 Page 3 G.L. Hoff Company 2002 Projects Estes Park Sanitation District Centrifuge Building Construction of a new concrete block building with precast tee construction for a centrifuge. The work included piping, valves, electrical and instrumentation. Owner: Estes Park Sanitation District 1201 Graves Avenue Estes Park, CO 880517 Contact: Jim Duell, District Manager 970-586-2866 John Burgeson, 970-223-9600 Shepherd Miller Inc., Project Engineer Contract: $264,053.00 Completion: January, 2002 Rehabilitation of Owl Creek Ditch Hydraulic Structures Removal and replacement often concrete hydraulic structures, providing and installing 25 meter gates, 21 precast concrete flumes, and constructior of 4 cast -in -place flumes and other miscellaneous headwalls and structures along the Owl Creek Ditch. Owner: Owl Creek Supply and Irrigation Company PO Box 206 Eaton, CO 80615 Contact: Duane Smith, 970-490-2620 Smith Geotechnical Contract: $383,000.00 Completion: April, 2002 Sitework and Utilities for New Kuck Mechanical Building Subcontracted the sitework and utilities for the new Kuck Mechanical building to Delehoy Construction. Scope of work included overlot grading, structural fill, building excavation, foundation insulation, underslab gravel, fine grading, installation of sewer line, storm drainage, waterline, fireline and asphalt patch. Owner: Kuck Mechanical, Inc. General Contractor: Delehoy Construction 3109 South Taft Hill Road Fort Collins, CO 80526 Contact: Mark Delehoy, 970-226-0836 Contract: $125,840.00 Completion: March, 2002 G.L. Hoff Company 2001 Projects Elkhorn Retail Shops Construction of a new, two story, 16,000 square foot retail building in Estes Park. The scope of work included contaminated soil remediation, foundation, utility lines, building construction, rough in for twelve retail units, exterior finishes, elevator, mechanical and electrical. Owner: Ed Grueff, 970-586-5421 3225 Devils Gulch Road Contact: Contract: Completion Edora Skate Park Estes Park, CO 80517 owner $1,363,217 .00 November, 2001 Construction of a new concrete, in ground, skate board park with flat and vertical curved concrete work. Scope of work included excavation, structural steel, and shotcrete work. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Jason Stutzman, 970-221-6366 Park Planning and Development Contract: $347,846.00 Completion: August, 2001 East Drive to Center Street Steam Loop Construction of concrete trench and installation of steam piping for Colorado State University. Scope of work included excavation, structural concrete, and mechanical work. Owner: Colorado State University 365 Aylesworth Hall Southeast Fort Collins, CO 80523 Contact: Cass Beitler, Project Manager, 970-491-0158 Contract: $702,443.00 Completion: August, 2001