HomeMy WebLinkAboutRESPONSE - BID - 5737 UNION PACIFIC TRAIL DRAKE ROAD TO HORSETOOTH (11)SECTION 00300
BID FORM
PROJECT: UNION PACIFIC TRAIL DRAKE ROAD TO HORSETOOTH ROAD; Bid No. 5737
Place Fort Collins, October 16, 2002
Date
1. In compliance with your Invitation to Bid dated September 23, 2002
and subject to all conditions thereof, the undersigned
G.L. Hoff Company a **(Corporation, firm ct atrYYYLyZ'tS1tg53
Ra��A6£1H.pl;g}A-y}r� _er_ x 3er=etrox j *> authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of 5% of bid amount to ($
5% ) in accordance with the Invitation To Bid and
Instructions Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows: Employers Mutual Companies, Agent: Flood 5 Peterson Insurance
Fort Collins. CO
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.1
through 2
7/96 Section 00300 Page 1
Pella Crossing Irrigation System Improvements
Installation of a new submersible pump and guide rail system and
construction of a new set well and piping. Scope of work included removal
of existing lake pump, wet well, catwalk and discharge piping, and
installation of meter pit, discharge line, suction line, intake screen, slide gate,
and sitework.
Owner: Boulder County
2040 14th Street
Boulder, CO 80302
Contact: Kenneth V. Sjodin, 720-622-0109
Boulder County Parks and Open Space
Contract: $92,305.85
Completion: May, 2001
George Rist Dam Rehabilitation Project
Construction of new outlet structure, repair of damaged section of dam and
replacement of riprap. Scope of work included excavation, sitework,
structural concrete and pipeline installation.
Owner: City of Loveland
500 East Third Street
Loveland, CO 80537
Contact:
Rod Chapman,
Contract:
$157,918.00
Completion:
July, 2001
Project Manager, 970-962-2454
Geist Reservoir Dam Rehabilitation Project
Repair of dam and outlet. Scope of work included construction of coffer
dam and excavation for new outlet, installation of outlet, upstream and
downstream headwalls, sluice gate, staff gage and trash rack, removal and
replacement of existing spillway culvert, raise top of dam, and set riprap.
Owner: Frank Walsh
PO Box 30
Sterling, CO 80751
Contact: David Marsh, Project Engineer, 970-490-2620
Smith Geotechnical Engineering Consultants
Contract: $37,895.25
Completion: February, 2001
Sheldon Lake North Shore
Construction of concrete and crusher fines pavement and access ramp.
Install a stone cap on the existing wall, and provide furnishings and
related site work for the north shore of Sheldon Lake.
Owner: City of Fort Collins
215 North Mason Street
Fort Collins, CO 80521
Contact:
Contract:
Completion:
Loveland Financial Center
Hetty Bixby, Project Manager, 970-416-2192
$84,180.00
December 2001
Subcontractor to Big T Construction for construction of the site grading,
site concrete and parking lot at the new commercial building.
Owner: Loveland Financial Center
West 37th Street, Loveland, CO 80538
Contact: Jasper Johnson, Bid T Construction, 970-635-050,
Contract: $68,272.00
Completion: December 2001
G.L. Hoff Company
2000 Completed Projects
Arkins Pump Station
Construction of cast in place buried pump building including interior
piping, pump equipment, installation of manual hoist and sectionalizing
valve, earthwork, and reclamation of construction site.
Owner:
Little Thompson Water District
Mike Cook PE, (970) 532-2096
835 East Highway 56
Berthoud, CO 80513
Contact:
The Engineering Company
Warren Mesloh, (970) 484-7477
Contract:
$86,538.00
Completion:
February, 2000
Centennial Village Pump Station
Construction of non -potable water pump station including well drilling,
pump system, building construction, electrical, and landscaping.
Owner:
City of Greeley
Phil Carter, (970) 350-9826
1000 loth Street
Greeley, CO 80631
Contact:
Amy Johnson, Aqua Engineering, (970)229-9668
Contract:
$119,511.00
Completion:
February, 2000
Associated Thermoforming, Inc
Pre-engineered metal building addition and remodel of manufacturing
facility. Scope of work included sitework, landscaping, structural and site
concrete, metal building construction, mechanical, electrical.
Owner: Associated Thermoforming, Inc.
765 Second Street
Berthoud, CO 80513
Contact: John Nix, President (970) 532-2000
Contract: $806,679.00
Completion: August, 2000
Colorado State University Condensate Replacement Phase 16 G/H
Remove existing underground condensate lines from campus main lines to
building entrances for CSU heating system. Scope of work included
excavation, landscaping, concrete tunnels, piping and insulation.
Owner: Colorado State University
Facilities Services
Fort Collins, CO 80523
Contact: Jim Stoddard, Project Manager, 491-0138
Contract: $319,552.00
Completion: October, 2000
Colorado State University Steam and Condensate Insulation Repair
Insulation repair to existing underground steam and condensate lines at
CSU. The scope of work included excavation, landscaping, concrete,
mechanical and piping insulation, and tunnel lid replacement.
Owner: Colorado State University
Facilities Services
Fort Collins, CO 80523
Contact: Jim Stoddard, Project Manager, 491-0138
Contract: $263,306.00
Completion: October, 2000
Colorado State University: University Avenue Plaza
Three projects combined for the removal of an road through campus and
construction of landscaped plaza. The scope of work included demolition,
structural and flatwork concrete, paving stones, masonry, landscaping,
asphalt, drain line, fencing and bike parking.
Owner: Colorado State University
Facilities Services
Fort Collins, CO 80523
Contact: Bill Conn, Project Manager, 491-0145
Contract: $302,796.00
Completion: October, 2000
Colorado State University Master Storm Drainage Phase H
Construction of a storm water drain system including excavation, installation
of storm sewer and manifold pipe, precast vaults, manholes, asphalt paving,
cast in place concrete, masonry and landscaping.
Owner: Colorado State University
Facilities Services
Fort Collins, CO 80523
Contact: Jim Stoddard, Project Manager, 491-0138
Contract: $219,773.00
Completion: December 2000
Harmony Substation
Construction of containment facility for the City of Fort Collins substation.
The scope of work included excavation, concrete catch basin, drainage
channel, and concrete box, sand interceptor/imbiber bead vault, installation
of precast containment tank, and concrete flow fill.
Owner:
City of Fort Collins
700 Wood Street
Fort Collins, CO 80521
Contact:
Anthony Barsoom, Project Manager, 482-5922
Sear -Brown Group, Engineering
Contract:
$85,739.68
Completion:
August, 2000
Emerald Glen Pump Station
Installation of a new non -potable water pump station and transfer pump
station for neighborhood irrigation system. Scope of work included
sitework, irrigation, and abandonment of potable water sprinkler taps.
Owner: Glen Properties
2707 West Eisenhower Blvd.
Loveland, CO 80538
Contact: Richard Aust, Engineer, 970,229-9668
Aqua Engineering, Inc.
Contract: $321,668.50
Completion: August, 2000
Home State Bank Interior Remodel
Interior remodel of the first and second floor of the main bank building.
Scope of work included construction of new walls, interior finishes, and
electrical.
Owner: Home State Bank
935 North Cleveland
Loveland, CO 80537
Contact: Mary McCambridge, Bank Officer, 669-4040
Contract: $97,824.00
Completion: October, 2000
G.L. Hoff Company
1999 Completed Projects
Equalizer Dam Project
Construction of new structural concrete dam outlet structure at the
Equalizer Reservoir. Work included removal of existing structure,
excavation,
concrete foundation and walls, gate system, and sitework.
Owner:
Greeley & Loveland Irrigation Company
Ron Brinkman, (970) 352-0495
808 23rd Avenue, Greeley, CO 80631
Contact:
Boyle Engineering, Lee Queen (303)987-3443
165 South Union Blvd., Suite 200
Lakewood, CO 80228
Contract:
$308,752.00
Completion:
2-99
Ridgeview Park Construction
Construction of a new city park for the Fort Collins including demolition,
layout, earthwork and drainage, utilities rough -in, irrigation, site paving and
surfacing, fine grading and seeding, playground, picnic shelter and
furnishings, lighting, and landscaping.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Craig Foreman, 221-6366
Parks and Recreation Department
Contract: $200,900.00
Completion: 3-99
Mosier Hill Non -Potable System
Construction of a non -potable water irrigation system including precast
concrete building, aeration system, pump system intake, irrigation pond
lining, cast in place concrete, irrigation pump system, and electrical.
Owner: City of Greeley
1300 A Street
Greeley, CO 80631
Contact: Phil Carter, (970)350-9826
City of Greeley
Contract: $193,963.00
Completion: 3-99
Fossil Creek West
Construction of a concrete bike and pedestrian trail section west of Taft Hill
Road for the City of Fort Collins trail system. Scope of work included
sitework, grading, concrete, bridge installation, fencing, and seeding.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Craig Foreman, 221,6366
Park Planning and Development
Contract: $168,642.00
Completion: 11-99
Nielson Greenway
Construction of a concrete and crusher fines pedestrian trail for the Town of
Berthoud. Scope of work included extensive site grading, storm sewer, soil
preparation, concrete sidewalk and curb ramp and stone trail.
Owner: Town of Berthoud
P.O. Box 1229
Berthoud, CO 80513
Contact: Marty Lafontaine, 532-2643
Parks Department
Contract: $123,548.60
Completion: 11-99
L&M Parking Lot
Construction of the L & M Parking Lot at the University of Northern
Colorado. The scope of work includes sitework, grading, concrete curb,
gutter, walk, and drive pans, asphalt paving, and lighting.
Owner: University of Northern Colorado
Carter Hall 1002
Greeley, CO 80639
Contact: Scott McLean, (970) 351-1982
University of Northern Colorado
Contract: $223,377.00
Completion: 12-99
Cathy Fromme Prairie Parking Area
Construction of a parking area at Taft Hill Road and Harmony in Fort
Collins. Project includes demolition of existing roadway, concrete curb &
gutter and asphalt paving.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Craig Foreman, 221-6618
Parks and Recreation Department
Contract: $101,412.00
Completion: 11-99
Fossil Creek Trail West of Taft Hill
Construction of a section of the Fort Collins bike trail system. Work
includes sitework, concrete sidewalk and bridge abutments, pedestrian
bridge and seeding.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Craig Foreman, 221-6618
Parks and Recreation Department
Contract: $156,247
Completion: 10-99
Loveland Office Max
Construction of all concrete work for the new Office Max facility. Work
includes excavation for foundation, and sitework, concrete building
foundation, floors and all site concrete such as curb and gutter, sidewalks,
dock and pads.
Owner: TCC-BTS Loveland OM, Inc.
7535 E. Hampden Avenue, Suite 650
Denver, CO 80231
Contact: Tap Pritchard, (303) 843-1947
Contract: $191,845.00
Completion: 10-99
G.L. Hoff Company
Construction Experience
Gregory L. Hoff, President and Construction Manager
For the past twenty seven years, Greg has been involved with all aspects of construction
from architectural drafting, surveying and carpentry to supervision and construction
management.
Graduating from Northeastern Junior College in 1972 with a degree in Civil Engineering
Technology, his early work included surveying and architectural design and drafting. He
has held a commercial contractor's license with the City of Fort Collins since 1976.
Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, Longmont,
Boulder, and Thornton.
Prior to 1984, Greg worked with AI Hockett, Inc. initially as an architectural draftsman and
progressing to project superintendent. He was also a partner in H&M Builders from 1976
to 1980. This company specialized in custom homes, tenant finish and custom millwork.
Beginning in 1984, Greg started his own general contracting business, G.L. Hoff Company,
which specializes in all types of commercial construction including sitework, excavation
and concrete construction. As president and construction manager for G.L. Hoff Company,
Greg works with a wide variety of projects including, schools, churches, city and
government projects, city park developments, as well as many light industrial and concrete
construction jobs. Greg oversees all project scheduling, review of construction procedures,
quality control and safety enforcement.
Joel S. Reger, Estimator and Project Manager
Joel has a Bachelor of Science Degree in Construction Management from Colorado State
University and fourteen years experience in the construction field. He has continued his
education with estimating seminars including training with American Building Company's
estimating Access workshop. He is also an active member of the Sigma Lambda Chi
honorary national construction fraternity.
During the past ten years, as the chief estimator with G.L. Hoff Company, Joel has
compiled bids and development estimates for projects valued at up to five million dollars.
As estimator, he directs project bidding process as well as the review of specifications. He
is also involved with project management, coordinating proposal requests and change
orders with the architect or owner, overseeing material orders to insure that the project is
completed in a timely manner and according to specifications.
William L. Vance, Project Superintendent
Bill brings over twenty three years of experience in construction related fields to his position
as project superintendent. His background includes heavy equipment operating, truss
construction, carpentry, and cost estimating. He also has experience in both commercial
and residential property development from site work and utility lines through finish
carpentry. Bill has built over five hundred new homes as well as several light commercial
properties. His commanding knowledge of construction methods enables Bill to be an
especially effective project superintendent.
G.L. Hoff Company
CONTRACTOR
BY: Gregory L. Hoff President
ADDRESS: 1815 West 12th Stree
Loveland, CO 80537
970-669-3255
BID SCHEDULE (Base Bid)
Please use the attached Bid Schedule when submitting your bid.
PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (250) of the total Agreement Price.
RESPECT)FULLY S.MITT D:
October 16, 2002
Signature Greg ry L f Date
�.;
+..- ;. •>�:'' President
° Title
rI; #B-6
i Dicense Number (If Applicable)
(Seal ,-•if $id''is by corporation)
Attest':'�
Mi iam T. Hoff Sedr Treasurer
Address 1815 West 12th Street
Loveland, CO 80537
Telephone 970-669-3255, FAX: 970-663-1566
7/96 Section 00300 Page 2
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
Performing over 150 of the contract.
ITEM
7/96
SUBCONTRACTOR
j�e_O. r„ , i J)-.Q ( 0-s t 0 I S-T,)
Section 00430 Page 1
Project: Union Pacific Trail
BID SCHEDULE (BASE BID)
Bid items are described in Section 01800
BID
ESTIMATED
UNIT
ITEM
ITEM#
DESCRIPTION
QUANTITY
UNIT
PRICE
TOTAL
1
Mobilization
1
LS
$ 913.00
$ 913.00
General Conditions
i
LS
$3881.00
$3,881.00
2
Traffic Control
1
LS
$ 634.00
$ 634.00
3
Demolition
1
LS
$ 457.00
$ 457.00
4
Topsoil Removal/Replacement
1420
CY
$ 6.15
$8, 733.00
5
Erosion Control
1
LS
$1007.00
$1,007.00
6
Earthwork: Cut
102
CY
$ 4.50
$ 459.00
7
Earthwork: Import Fill
490
CY
$ 13.00
$6,370.00
8
Various Pipe Extensions
1
LS
$13834.00
$13, 834.00
9
Concrete Trail 10' wide, 5" thick
49820
SF
$ 3.34
$166, 398.80
10
Handicap Ramp
2
LS
$1275.00
$2 , 550.00
11
Fine Grading
1.72
AC
$ 353.00
$ 607.16
12
Metal Gate
2
LS
$1286.00
$2,572.00
13
Seeding
1.72
AC
$2364.00
$4,066.08
TOTAL OF BASE BID
Two hundred twelve thousand four hundred eighty two dollars $ 212,482.04
(written) and four cents
Figure
Section 00300 Page 3
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410 Bid Bond
00420Statement of Bidder's Qualifications
00430Schedule of Subcontractors
7/96 Section 00410 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: G.L. Hoff Comany
2. Permanent main office address: 1815 West 12th Street, Loveland, CO 80537
3. When organized: 1
4. If a corporation, where incorporated: Colorado. 1989
5. How many years have you been engaged in the contracting business under your
present firm or trade name? 18 years
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
CSU Trial Garden Shade Structure. $118,973.00 Dec 31 2002
Hoffman Lake Spillway Project $103 135 07 Oct 31 2002
Estes Park Retaining Wall Project $362 576 09 May 16 2003
7. General character of Work performed by your company:
Commercial general contractor: complete the following areas with our own
forces: sitework, concrete, carpentry, project management
�. Have you ever failed to complete any Work awarded to you?no
If so, where and why?
9. Have your ever defaulted on a contract? no
If so, where and why?
10
Are you debarred by any government agency? no
If yes list agency name.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
Please refer to the attached lists
12. List your major equipment available for this contract.
dump truck, CAT 928 loader, DAT 320 track excavator, backhoe bobcat
motor grader, grading tractor, concrete pump
13. Experience in construction Work similar in importance to this
project:
Please refer to the attached lists
14. Background and experience of the principal members of your organization,
including officers:
Please refer to the attached lists
15. Credit available: $ $200,000.
16. Bank reference: Loran Emmonds, Bank One Loveland, CO
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
18. Are you licensed as a General CONTRACTOR? yes
If yes, in what city, county and state? Fort Collins and others What
class, license and numbers? ikR-F
19. Do you anticipate subcontracting Work under this Contract? yes
If yes, what percent of total contract? to be determined
and to whom? Please refer to section 430
20. Are any lawsuits pending against you or your firm at this time? no
If
DETAIL yes,
7/96 Section 00420 Page 2
21. What are the limits of your public liability? DETAIL
2 million plus 2 million umbrella
What company? Travelers INsurance, Agent: Flood & Peterson Insurance
22. What are your company's bonding limitations? 5 million
23. The undersigned
corporation to
verification of
Qualifications.
Dated at Loveland
ff
Name of idder
By: //dlv
hereby authorizes and requests any person, firm or
furnish any information requested by the OWNER in
the recital comprising this Statement of Bidder's
Title: Secretary Treasurer
State of Colorado
County of Larimer
this 16th day of October 2002.
Miriam T. Hoff being duly sworn deposes and says that he is
_Secretary Treasurer of G.L. Hoff Company and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and coprect.
Subsgr,tigeyh and sworn to before me this / day of
20QZ .
otar'y ;Public
.'
My commission expires
7/96
Section 00420 Page 3
G.L. Hoff Company
2002 Projects
Estes Park Sanitation District Centrifuge Building
Construction of a new concrete block building with precast tee
construction for a centrifuge. The work included piping, valves, electrical
and instrumentation.
Owner:
Estes Park Sanitation District
1201 Graves Avenue
Estes Park, CO 880517
Contact:
Jim Duell, District Manager 970-586-2866
John Burgeson, 970-223-9600
Shepherd Miller Inc., Project Engineer
Contract:
$264,053.00
Completion:
January, 2002
Rehabilitation of Owl Creek Ditch Hydraulic Structures
Removal and replacement often concrete hydraulic structures, providing
and installing 25 meter gates, 21 precast concrete flumes, and constructior
of 4 cast -in -place flumes and other miscellaneous headwalls and structures
along the Owl Creek Ditch.
Owner: Owl Creek Supply and Irrigation Company
PO Box 206
Eaton, CO 80615
Contact: Duane Smith, 970-490-2620
Smith Geotechnical
Contract: $383,000.00
Completion: April, 2002
Sitework and Utilities for New Kuck Mechanical Building
Subcontracted the sitework and utilities for the new Kuck Mechanical
building to Delehoy Construction. Scope of work included overlot
grading, structural fill, building excavation, foundation insulation, underslab
gravel, fine grading, installation of sewer line, storm drainage, waterline,
fireline and asphalt patch.
Owner: Kuck Mechanical, Inc.
General Contractor: Delehoy Construction
3109 South Taft Hill Road
Fort Collins, CO 80526
Contact: Mark Delehoy, 970-226-0836
Contract: $125,840.00
Completion: March, 2002
G.L. Hoff Company
2001 Projects
Elkhorn Retail Shops
Construction of a new, two story, 16,000 square foot retail building in Estes
Park. The scope of work included contaminated soil remediation,
foundation, utility lines, building construction, rough in for twelve retail
units, exterior finishes, elevator, mechanical and electrical.
Owner: Ed Grueff, 970-586-5421
3225 Devils Gulch Road
Contact:
Contract:
Completion
Edora Skate Park
Estes Park, CO 80517
owner
$1,363,217 .00
November, 2001
Construction of a new concrete, in ground, skate board park with flat and
vertical curved concrete work. Scope of work included excavation,
structural steel, and shotcrete work.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Jason Stutzman, 970-221-6366
Park Planning and Development
Contract: $347,846.00
Completion: August, 2001
East Drive to Center Street Steam Loop
Construction of concrete trench and installation of steam piping for
Colorado State University. Scope of work included excavation, structural
concrete, and mechanical work.
Owner: Colorado State University
365 Aylesworth Hall Southeast
Fort Collins, CO 80523
Contact: Cass Beitler, Project Manager, 970-491-0158
Contract: $702,443.00
Completion: August, 2001