HomeMy WebLinkAboutRESPONSE - BID - 5737 UNION PACIFIC TRAIL DRAKE ROAD TO HORSETOOTH (9)SECTION 00300 BID FORM PROJECT: UNION PACIFIC TRAIL DRAKE ROAD TO HORSETOOTH ROAD; Bid No. 5737 Place 2 1 S- u- t'/1RSv,.:, ZrO -r-G. Date 10-4(o-uZ 1. In compliance with your Invitation to Bid dated Sc�t=H3cZ Z3 ?vo L and subject to all conditi thereof, the undersigned L.1 Fl Z3i:ow. C-ia— �tst a ** Corporatioht Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 51 ($ in accordance with the Invitation To Bid and Instructionsto Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: +'.LS /n15v2as c� cv..aa 'f i�.32L-7 ?F-o2iu =L (vl lotZ -3-1 &7 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No.1 through 2 7/96 Section 00300 Page 1 "ATTACHMENT N2" Sheetl 10/10/2002 NEW BLDG. PROJECTS NAME & TYPE ARCHITECT Dodge -Detail Shop by Ford Dacona- Foundationrfik Up Shell Interplan/ConSteel CONTRACT AMOUNT LOCATION $ 292,525.00 Denver $ 680,000.00 Dacona Zeiler Pennock/Design Townhomes Build $ 1,400,000.00 Lakewood Shonline Suzuki- Foundation Package Interplan Dodge Foundation/Slabs Inter Plan CM Electric Office Design Build tod College Class Room Addition Dauer Haswell J.G. Johnson- Kevin I Suites/Melody Plaza Stockton Merrick & Co.- Fred Front Range Armory Hynek Phase II Manufacturing Zeiler Pennock $ 208,600.00 Denver $ 794,131.00 Golden $ 520,000.00 Littleton $ 1,093,680.00 Denver, CO $ 2,300,000.00 Westminster, CO $ 3,600,000.00 Watkins, CO $ 3,947,000.00 Watkins, CO PRUJtCI-PROJECI REFERENCE MANAGER/SUPER OWNER S INTENDENT Diednchs 3031 Dan Harrington/Jim 721-1133 lRobinson Kevin Dan Diedrichs 303- Harrington/Howard Formby Ford/Interplan 721-1133 Essen John Hellgren- Zeiler Mary Pennock 303 Anderson/Dan On the Hill Corp. 455-3322 Kaiser Kevin Dan Diedrichs 303- Harrington/Jim Shortline Suzuki 721-1133 Robinson Kevin -Dan Diednchs 303- Harrignton/Jerry Christopher Dodge 721-1133 Downs Jr. John Hellgren- Zeiler Mary Anderson -PM Pennock 303 Jerry Downs Jr. - Generic Electric 455-3322 Supt. Wayne Brown -PM Chuck Mangus- Chandell & Associates Bonnie Supan Supt. Mark Mary Anderson -PM Lionberger Howard Essen- Stondebridge Co. 696-7700 Supt. Mary Anderson -PM Leon Harrell Jerry Downs Sr. - State of Colorado 397-3275 Supt. Michael Brown/PM Garo Robert OEA 693-1248 Maestas/Supt. "ATTACHMENT #2" Sheett NEW BLDG. PROJECTS 10/10/2002 �- BROWN CONSTAUCTIUN �- - CONTRACT ERENCEOJECT PROJECT NAME 8 TYPE (ARCHITECT AMOUNT (LOCATION OWNER REF("' Mp' NAGER/SU S INTENDENT Advantage 9 Coover Clark $ 500,000.00 DIA_ �— John Miller 210-669- 4929 Advantage Rent_ -A-Car Carol Coover Clark IMary Anderson/PM 7� 83-0p40 John Ciancio/Supt. —McRae Buckley Office of Special Investigations Merrick 8 Co. I $ 1,900,000.00 -Buckley ANG rTMary Corp. of Engineers Rich IMary Anderson/PM 28.6-7910 iJerry Downs/Supt. Anderson & District #4 Police — I Roth Shepard $ 1,203,130.00 (Denver, CO --jDenver City & County of Wayne Brown/PM Mike Brown/Supt. Michael Brown/PM Hoover Village — - — Hoffman PartnershiHoward +— P�$ 1,048,000.00 Longmont, COCO�Rocky Mtn. Methodist Bob Maestas/Supt. 'E�en/Asst Supt. - ,Michael Brown/PM Hoover Village Personal Care Facility Avis -Rent -Car (Concrete Package) Hoffman Partnershi P $ 1,098,000.00 (Longmont, CO jRocky InterPlan $ 244,659.00 DIA - �43,429.00 Mtn. Methodist Howard Essen/Asst Supt. h Value Rent-A-Car (Concrete Package) — InterPlan - ,Avis DIA--TValue _. _ el Brown/PM Michael Brown/PM Peter's Joslins Southglenn Mall (Concrete Packa e I 8) (Steven Construction- Bosley) _ THP Limited — $ 1,192,847.00 Joslins 1-926-4520 Michael Brown/PM lj Robert iMichael Brown/PM Colorado National Bank Bear Valley Airport Mail Center Bear Valley Herndon Associates J $ 450,000.00 Shopping Center iChandell &Associates I393-1419 Hemdon Howard ;Essen/Supt. _$ 171,847.00 DIA_— Colorado National Bank Montbello _ , Color _ .---- Herndon Associates $ 508,000.00 4590 Peoda I�Charles DPR Construction .Roberti P. Woods Hemdon 393-1419 Michael_Brown/PMT —.—.-- _ $ 341, 165.00 Denver, CO DPR Construction _ - Dan Harrin ton/PM 9, Kraig Anderson - Huron Animal Hospital - P _-- Zeiler Pennock $ 1,131,422.00Thornton I Huron Animal Hospital PM/Jerry Downs- Dc Heller _IMark iSupt. Dan Harrington - Zimmerman Metals Machine Shop Zeiler Pennock 4 368,539.00 I Denver, CO Zimmerman Metals Zimmerman PM /Howard Essen-, Supt. "ATTACHMENT #2" Sheeti 10/10/2002 NEW BLDG. PROJECTS =Ac_ - - ARCHITECT CONTRACT AMOUNT --- LOCATION __�ECT---PRQJEGY— _ REFERENCE MANAGERISUPER OWNER S INTENDENT PROJECT NAME & TYPE Goldco Retaining Wall Hertz Site Package TST_Inc. of Denver $ 443,814.00 $ 112,026.00 Golden 'City Dan Harrington- PM/Jim Robinson- of Golden Supt. - - —" - Page 3 "ATTACHMENT #2" Sheett 10/10/2002 TENANT FINISH REMODEL ADDITION BROWN i�Nilli<IIi01i; COMPLETION PROJECT NAME & TYPE CONTRACT- AMOUNT LOCATION ARCHITECT Owner PTUMECT-- REFERENCES PROJECT - MANAGERISUPT Feb-87 Denver General Hospital $ 1,062,119.00 Denver, CO Hoffman Partnership City & County of Denver Dennis Sobolik 436-5840 Craig Anderson/PM Howard Essen/Supt. Mar-87 BOR Computer Facility Denver Federal Center Bldg. (53) Renovations $ 3,482,000.00 Lakewood, CO EMS GSA Feb-88 St. Charles Recreation Center $ 276,212.00 Denver, CO Tom Morris City & County of Denver Mar-88 Lantrin Bldg. (3 66) Lowry AFB $ 140,000.00 Denver, CO Civil Engineering Lowry AFB US Air Force May-88 Denver Federal Center Bldg. 20 & 25 Initial Space Alterations $ 409,000.00 Lakewood, CO Slater & Paul Associates GSA Aug-88 City Permit Center Concrete Package Exterior Finish $ 466,412.00 200 W. 14th Denver, CO C.W. Fentress City & County of Denver Roger Booker 640-3554 Owner Apr-89 Denver Federal Center Bldg. 21 New Mechanical Penthouse $ 5D0,000,00 Slater & Paul Associates GSA Jun-89 FAA Office Relocation $ 1,069,977.00 5440 Roslyn Denver, CO Roybal & Associates City & County of Denver Jan-90 Mile High Stadium Restroom Remodel $ 222,000.00 Denver, CO WC Muchow City & County of Denver Jun-91 Congress Park Swimming Pool $ 965,735.00 Denver, CO Hemdon & Associates City & County of Denver May-92 US Customs House Denver Federal Center $ 539,748.00 Lakewood, CO GSA GSA Beth Smith 236-7144 Owner Se -92 Mile High Stadium Improvements $ 221,'011.00 Denver, CO Martin & Martin City & County of Denver Page 1 "ATTACHMENT #2" Sheeti 10/10/2002 TENANT FINISH REMODEL ADDITION BROWN ta��laa:t�laa COMPLETION PROJECT NAME & TYPE AMOUNT LOCATION ARCHITECT Owner REFERENCES MANAGER/SUPT Apr-94 20th Street Recreation Center $ 1,205,137.00 Oz Architects City & County of Denver Jim Gilbert 640-3500 Owner Sep-94 Thornton High School Remodel $ 968,750.00 901h & Washington Dulaney Architect Adams Twelve Five Star Schools Pat Dulaney 615- 9123 Architect Wayne Brown/PM Jerry Downs/Supt. Jan-95 DGH General Electric AFM Angio/CT Labs $ 366,860.00 8th & Bannock Anderson Mason Dale General Electric Dennis Sobolik 4365840 Owner Craig Anderson/PM Howard Essen/Supt. Bob Patterson Jan-95 Littleton Plaza Renovations $ 2,923,000.00 1690 Liftlleton Blvd. Lewis Associates 7954515 Arapahoe County Gordon Lewis 738-9988 Architect Wayne Brown/PM Jerry Downs/Supt. Mar-95 Vehicle Emissions Lab $ 200,000.00 Denver, CO General Motors General Motors Jerry Lohmeyer 375-5050 Owner Jul-95 5 Recreation centers Denver Public Schools $ 2,000,000.00 Denver, CO Wong Strauch Denver Parks & Rec. Roger Booker 640-3554 Owner Mary Anderson/PM Jerry Downs/Supt. Aug-95 Goldrick, Force & Doull $ 893,600.00 Denver, CO Allred Architects DPS Jose 292-1875 Architect Mike Brown/PM Craig Anderson/PM Sep-95 Sep-95 DGH Davis Pavilion Clinics Mile High Stadium 1994 Improvements $ 1,273,600.00 $ 700,075.00 700 DeMrare Denver, CO RNL Design Lonco City & County of Denver City of Denver Park & Rec. Dennis Sobolik Alex Abel 620- 0098 Owner Archkect Howard Essen/Supt. Wayne Brown/PM Denver Public Aug-96 Lincoln Elementary School $ 875,000.00 Denver, CO Roybal Architects Schools Greg McMenamir Architect Mary Anderson/PM Jun-97 Fitzsimons Elevator Repairs $ 1,653,408.00 Aurora, CO Moyes Assoc. FAMC Pat Harville 361- 3001 Craig Anderson/PM Jim Robinson/Supt. Page 2 "ATTACHMENT #2" Sheetl 10/1012002 TENANT FINISH REMODEL ADDITION BRd N - illA'�iA1�tIip�` COMPLETION PROJECT NAME & TYPE AMOUNT ILOCATION ARCHITECT Owner REFERENCES MANAGERISUPT Craig Anderson/PM Dec-97 5/96 - 9/96 12196-11/97 New York Bldg. Colorado State Penitentiary Bid Package #1 Colorado State Penitentiary Bid Package #4 $ 1,874,000.00 $ 1,247,506.00 $ 1,040,000.00 Lakewood, CO Canon City, CO Canon City, CO Durrant Architects DMJM DMJM Jefferson County State of Colorado State of Colorado Eric Hjelle 271-5009 Ed Starr 719-269 5779 Ed Starr 719-269 5779 Owner Architect Architect Chuck Mangus/Supt. Wayne Brown/PM Gene Lutz/Supt. Wayne Brown/PM Gene Lutz/Supt. Craig AndersonIPM 99/98-5/98 Cook Park Recreation Center $ 1,699,150.00 Denver, CO Slater & Paul Associates City & County of Denver Roger Booker- 640-3554 Owner Howard Essen/Supt. Mark Ford Emmission Lab $ 137,723.00 Denver, CO Harley Ellington Design Ford Motor Co. SchlindweintPM Jim Robinson/Supt. Craig Anderson/PM 1997 Mile High Stadium $ 2,442,772.00 Denver, CO Denver Owner Chuck Mangus/Supt. 1/00-12/00 Boulder Valley Schools Bid Package #13 $ 3,263,000.00 Boulder, CO Hagen Cameron Boulder Valley Schools John Bollinger 303-447-5113 Owner Dan Harrington- PM Jerry Downs- Supt. 11/99-4/00 Boulder Valley Schools Bid Package #7 $ 1,608,000.00 Boulder, CO Larson Architects Boulder Valley Schools Lou Novak Owner Dan Harrington- PM Jim Robinson- Supt. Dan Lincoln Elementary School $ 730,002.00 Denver Hans Kahn Denver Public�375 Schools Owner I HarringtoNKatie Hoff-Supt. Page 3 "ATTACHMENT #2" Sheeti 10/1 OY2002 TENANT FINISH REMODEL ADDITION B ur %N i11�:1�t1i0� COMPLETION PROJECT NAME & TYPE AMOUNT LOCATION ARCHITECT Owner REFERENCES MANAGER/SUPT North High School $ 919,000.00 Denver TSP Five Inc. Denver Public Schools ITrena Jones 30 575-4146 Owner Mike Brown -PM/ Jim Robinson/Supt. UCAR Main Drive & Front Entrance Replacment $ 1,294,655.00 Boulder, CO Merrick & Co. UCAR Roseann Suer 303-497-8867 Owner Craig Anderson -PM /Howard Essen - Supt. Page 4 Sheets 10/10r2002 BRIDGES, CONCRETE STRUCTURES HIGHWAY PROJECTS BROWN C 0 N S T R U C T i 0 N COMPLETION PROJECT NAME & TYPE AMOUNT LOCATION ARCHITECT Owner REFERENCES Hallack Junction Pedestrian Bridge $ 1,268,328.00 Sheridan & Boulder Turnpike S.A. Miro- 303-741-3737 RTD Sam Miro Concourse B & C Paving & Lighting $ 3,120,066.00 DIA City & County of Denver F-115 G South Cargo Apron $ 431,822.00 DIA City & County of Denver Airfield Signage $ 569,351.00 DIA oun o Denver Adams Country Bridge Replacement #96 $ 218,999.00 Richard Weingardt Adams County c ar Weingardt 671-7033 DIA 1Gewit $ 1,017,404.00 DIA City & County of Denver F-111A Apron Grading & Drainage $ 2,685,618.00 DIA Turner Collie & Braden City & County of Denver 1989 Bridge & Viaduct Repair $ 625,143.00 City & County of Denver Jim Barwick 720-913-4500 RTD Bridge Widening $ 687,558.00 US 36 Lowell Blvd. RTD RTD Sound Barrier 1-25 & 104th $ 603,009.00 CDOT CDOT Dist. 6 RTD Structural Repairs $ 217,000.00 RTD RTD 1990 Bridge & Viaduct Repairs $ 327,216.00 City Engineer City & County of Denver Jim Barwick 720-913-4500 F-128A Airport Taxiway E- 470 Concrete Structures $ 2,446,260.00 DIA Lonco City & County of Denver Runway 17R/35L Paving Underdrains $ 833,733.00 DIA City & County of Denver Runway 7-25 Concrete Structures $ 497,105.00 DIA City & County of Denver Runway 16R/351 Concrete Structures $ 486,473.00 DIA City & County of Denver Page i Sheets 10/10/2002 BRIDGES, CONCRETE STRUCTURES HIGHWAY PROJECTS BROWN C 0 N S T 9 U C T I 0 N COMPLETION PROJECT NAME & TYPE AMOUNT LOCATION ARCHITECT Owner REFERENCES Airport Runway Grading 8LI26R $ 2,322,788.00 DIA City & County of Denver Upper Level Roadways $ 440,997.00 SIA Longo oun o Denver Perimeter Drains AGTS Tunnels $ 136,000.00 DIA City 8 County of Denver 8/95-11195 51 st Avenue at Havana St. Drainage Culvert & Roadway Denver, CO Denver City Engineer City & County of Denver 6th Avenue Viaduct $ 3,484,628.00 Denver, CO City -County of Denver Jim Barwick 720-913-4500 Golden Pedestrian Bridge $ 256,265.00 Golden, CO City of Golden Scott Lewis 38 8153 16th Street Bridge $ 1,797,943.00 Denver, CO City & County of Bob StewartDenver 720-913-45M 48th Avenue Viaduct $ 359,157.00 Denver, CO City & County of Denver Structural Railing at Montbello $ 131,079.00 Denver, CO City & County of Denver Page 2 Sheets PARKS SPECIALTY PROJECTS BROWN C O N S T R 0 C T 1 0 N COMPLETION PROJECT NAME & TYPE AMOUNT ILOCATION ARCHITECT Owner REFERENCES Civic Center Parking Lots $ 1,381,691.00 Denver, CO Humphries Poll Architects City & County of Denver Elizabeth Hamilton 720-913-8824 Westminster College Park Pond & Pedestrian Bridge $ 112,170.00 112th & Sheridan Drexell Barrell City of Westminster Kirk Haines RTD South Wadsworth Corridor $ 490,614.00 RTD City & County of Denver CFR Burn Pit $ 215,575.00 HWS City & County of Denver Pete Stokowski 303-342-2200 Mile High Stadium Improvement $ 221,011.00 Martin & Martin City & County of Denver Mike Smith 303-W-3500 North Speer Blvd. Revitilization $ 379,797.25 William Wenk & Assoc. City & County of Denver William Wank 303-295-0778 Downtown Creekfmnt $ 314,186.00 Richard Weingardt City & County of Denver Richard Weingardt 303-671-7033 Cherry Creek Park $ 1,053,123.22 DHM City 8 County of Denver Dick Marshall 303-892-5566 Mile High Stadium Restrooms Remodel $ 222,000.00 W.C. Muchow City, & County of Denver Barry Smith 720-913-8833 1994 Mile High Stadium Improvements $ 840,542.00 Luis O. Acosta City & County of Denver Barry Smith 720-913-8833 Auraria Campus Lot M Parking Lot Expansion $ 637,000.00 Denver, CO S.A. Miro Aurana Campus Kathryn McNally 303-556-3118 Heritage Pedestrian Bridge $ 256,265.00 Golden, CO City of Golden Clement Park Amphitheater $ 415,561.00 Jefferson COunty Pahl Pahl Pahl Foothills Park 10/10/2002 Page 1 am ADDRESS: -3i.lL40 Wy%I a! -AL (Aj C-5T-M, 1�5 Vy' CO zOt)3 67 8. BID SCHEDULE (Base Bid) Please use the attached Hid Schedule when submitting your bid. 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the totpl Agreement Price. RESPECTF I,Y SUBN3:. Signature Tit e License Number (Ii (Seal i Bid is by corporation) Attest: Date Applicable - lo ( / 1 4(' Address �IiES ruy:r co 5TOy� C) Telephone 303-43o- gq 7/96 Section 00300 Page 2 Sheetl PARKS SPECIALTY PROJECTS B ROWN C N S T 0 O C T I O N a0 COMPLETION PROJECT NAME & TYPE AMOUNT LOCATION ARCHITECT Owner PRDJECr— REFERENCES Bromwell & University Elementary Soccer & Playgrounds $ 300,000.00 Denver, CO Jump Design Denver Public Schools Thraemoore in the Park - Town Homes Site Developments $ 1,200,000.00 Lakewood, CO Design/Build On the Hill Corp. On the Hill Corp. i I I en/s cial 10/10/2002 Page 2 CONTRACTOR'S LICENSES STATE OF COLORADO Westminster #44603 Westminster #977951 Denver #11075 Englewood #12378 Alamosa #6251 Aurora #44447 Aurora #A 16924 Thornton #A00093838 RESUME MARY R. ANDERSON 5845 W. 33rd Ave. Denver, CO 80212 CURRENT Chairman of Board of Directors, President and Principle Owner of W. M. Brown Construction Corp. WORK EXPERIENCE: Operation Manaoer Coordinate work procurements, estimating, pricing, development of business plan and continuity schedule, including man loading and cash flow of projects. Estimator Including price development and final estimates $200,000.00 to 10 Million Project Manager For projects ranging from $200,000.00 to 6 Million. These projects included commercial projects consisting of Hotels, Banks, Office Space, Schools, Tenant Finish, Remodel and Additions, Civil projects consisting of bridges, bridge and road repairs, concrete drainage features, utilities, parking lots, box culverts. Superintendent For projects ranging from $500,000.00 to $3,000,000.00. This work includes: The interior remodel of first floor clinic spaces at Denver General Hospital. Foundations, elevator shafts, and exterior finish system at City & County of Denver Permit Center. PROJECTS/ Current 2002 EXPERIENCE Operations Manager/President Boulder Valley School Dist. Bid Package #7 & #13 5 million of school renovation projects being completed during school year and summer of 2000 Dillion Comfort Suites Westminster Comfort Suites OTHER KEY 98 Unit Comfort Inn at DIA Denver Public Schools- Lincoln Elementary School Addition & Remodel 1995 My Responsiblities on this project as operations manager I oversaw the project manager and superintendent. Denver General Hospital Interior Remodel of First Floor Clinic Spaces, PROJECTS Project size was $1,062,000. July 1986- February 1987. My Responsibilities on this project included quantity take off, on site Superintendent /Project Manager. FAA Office Relocation , Project Size was $1,069,000. March 1989- July 1989. This project was a fast track interior remodel with a 60 day duration this was accomplished despite 70 Change Orders. The project involved demolition and remodel of 3 story building with 1 story Garage Warehouse. My Responsibilities on this project included Estimating, Project Management. Cherry Creek Park, Project size was $1,053,123. February 1990. This project involved relocating utilities and building park with fountaining and monuments over old dump area next to Platte River and Cherry Creek Mall. My Responsibilities included Project Manager F-111A Apron Grading & Drainage at Denver International Airport, project size $2,700,000, October 1991- March 1992. This project involved a combination of cast in place, precast offsite and onsite over 500 Inlets and manholes which were under the aprons and handled sewer. Water and De icing the average manhole was 8' x 10' x 15'. My Responsibilities included Estimating, Project Manager and over seeing Quality Control of off site suppliers. TRADE ASSOCIATIONS Women's Construction Owners & Executives Past Colorado Chapter President 1993-1995 Past National Board Member Reference: Past National President- Rosemary Breiner-Breiner Construction Current Executive Vice President- Cheryl Brooks- J.C. Brooks- 428-1604 Associated General Contractors Previous Chapter Board Member Executive Director- Dick O'Brecht- 388-2422 Colorado Building Industry Coalition Past Board Member AWARDS RECOGNITION 1996- Women's Construction Owners & Executives Outstanding Service for Changing the Image of Construction Industry 1996 Colorado Leadership Coalition Award of Excellence (See Attached Letter) 1992-1997 Listed as a Top 100 Women Business in Colorado 1996-1997 Listed as a Top 250 Private Held Business in Colorado EDUCATION: Metro State College Denver, CO Civil Engineering Westminster High School Westminster, CO REFERENCES: Jam Wong- Wong Strauch Architects- 303-293-9206 Barry Smith -City of Denver- 720-913-8833 Michael W. Brown 6655 Y, Yale Lakewood, CO 80227 303-989-4596 SUMMARY I have comprehensive understanding of the Construction Industry. My exposure and involvement have been nearly continuos since I was fourteen. I am knowledgeable of IBM PC's both hardware and software aspects. I understand DOS, Windows and network environments. I have supervised a small (11 node) Novel Network that involved installing programs and training on software or applications that I developed for use. I am comfortable with use of Word Perfect, Word for Windows, Exel, Lotus, Primevera, Project 3.0 for Windows and Access Data Base. I have worked as an estimator, project manager, safety officer and computer consultant. Frequently I have had to perform many of these duties simultaneously. PROJECT ASSIGNMENTS/WORK EXPERIENCE 8/85 to Present W. M. Brown Construction Corp. 3440 W. 715' PI. Westminster, CO 80030 430-8935 Working for a small family owned business I have had to perform numerous duties and responsibilities simultaneously. The major project responsibilities are listed below. 1994 Denver Public Schools Goldrick, Force & Doull Elementary Schools Additions & Remodel 1/92 to 2/94 Project Manager Denver International Airport Various Projects (total 15 projects) 3/90 to 12/92 Project Manager City & County of Denver 1990 Bridge & Viaduct Repairs 3/91 to 12/91 Project Manager Hoover Village Personal Care Facility II A 15,000 SF addition to an elderly care facility in Longmont. Negotiated, estimated and managed this project. 6/90 to 4/91 Project Manager RTD Wadsworth Corridor Bus Shelters Performing concrete work and installing glass bus shelters on 30 sites along Wadsworth in Denver. 6190 to 8/90 Project Manager Stapleton International Airport Upper Level Roadways Repairs Removal & replacement of expansion joint, asphalt & waterproofing deck while maintaining vehicle and pedestrian traffic during peck hours. 10/89 to 6/90 Project Manager Hoover Village Personal Care Facility I A 18,000 SF addition to an elderly care facility in Longmont. Negotiated, estimated and managed this project. 11/88 to 2/89 Project Manager/Superintendent FAA Office Relocation To Roslyn St. A 50,000 SF renovation of office space within a 60 day schedule. Numerous changes were added at the end of the contract. 2/88 to 9/88 Project Manager/Superintendent City & County of Denver Permit Center Concrete & Exterior Finishes 6/87 to 10/87 Project Manager/Superintendent St. Charles Recreation Center 4/86 to 4187 Project Manager/Superintendent City & County of Denver District #4 Police Station 9/85 to 2/86 Superintendent Office Remodel #1 & #2 for the Colorado Division of Wildlife This was W. M. Brown first 2 projects that were used to launch the company. 1974 to 9/85 Centric Corp. 5490 West 13th Ave. P.O. Box 14026 Denver, CO 80214 303/233-8440 I worked for Centric starting as a labor when I was fourteen. I worked my vacations through school and worked my way through the ranks to Superintendent/Assistant Project Manager. 3/85 to 8/85 Superintendent Mervyn's Department Store (Boulder) Estimated and engineered drawings to local code. 10/83 to 11/84 Superintendent/Assistant Project Manager Holiday Inn @ Hampden & Wadsworth Estimated, negotiated and managed this fine hotel. 9/82 to 8/83 Superintendent/Assistant Project Manager Denver West Marriott (Site work & concrete) 12/80 to 7/82 Superintendent/Assistant Project Manager 17th Street Plaza Concrete Package for 34 Story Prepared of 40 pages of size C shop drawings prior to start 6180 to 12/80 Project Engineer/Assistant Project Manager Beaver Creek Ski Area Service Center Reception Center and Water Pump Station Facility 1980 Wheatland Power Plant Wheatland, WY Foundations & Structures for Power Plan & Cooling Tower Water Discharge Mains to river. 1978 to 1979 Project Engineer/Assistant Project Manager 1-70 Vail Pass Segmental Bridges over Gore Creek and Hillside Bridges 1976 to 1977 Project Engineer Mountain Bell Service Center 17th & Curtis 1974 Ironworker Apprentice McNichols Sports Arena Between field assignments I worked in the home office as an estimator and as an assistant project manager. EDUCATION High School- Regis High School 1971-1974 Graduated College- Trinidad Jr. College 1974-1975 1 year C.S.U. Ft. Collins, Colo. 1975-1976 1 year University of Wyoming 1976-1979 2 years At Trinidad and University of Wyoming my major was civil engineering. At C.S.U. my major was Industrial Construction Management. References: Upon Request Dale G. Harrington 160 S. Holland Lakewood, CO 80226 303-232-7123 WORK EXPERIENCE: 2000 to Present W.M. BROWN CONSTRUCTION CORPORATION Westminster, Colorado Operations & Marketing Manager 1992 to 2000 WARD CONSTRUCTION Englewood, Colorado Superintendent/Estimator 1991 to 1994 CONSULTANT & ON CALL FOR SPECIAL PROJECTS American Eagle Industries Cheyenne, Wyoming B.E.I. Engineers/Constructors Inc. Lakewood, Colorado Grain Processors Inc. Denver, Colorado Western States Construction Loveland, Colorado 1987-1991 GRACON CORPORATION Loveland, Colorado Superintendent/Project Manager/Estimator 1981-1986 WRG CONSTRUCTION COMPANY Denver, Colorado President 1973-1980 CENTRIC CORPORATION Denver, Colorado Executive Vice President Manager, Building Division Director of Personnel Responsible for hiring project management personnel and coordinating assignment of all jobsite personnel. 1967-1973 PENNER CONSTRUCTION (now Centric Corporation) Denver, Colorado Project Manager/Estimator Estimated and managed projects throughout the Rocky Mountain area ranging from 500 thousand to 15 million dollars 1958-1967 MARTIN K. EBY CONSTRUCTION Wichita, Kansas Superintendent/Estimator Obtained field experience in all phases of construction on contracts from 300 thousand to 40 million dollars. These jobs required living in 11 places and ranged from buildings to a nuclear reactor. FORMAL EDUCATION: B.S., Friends University, Wichita Kansas, 1958 Dale Carnegie Institute, Denver, CO, 1972 Fails Management Seminars American Management Training PAST PROFESSIONAL AFFILIATION EXPERIENCE: Associated General Contractors of America, National Director A.G.C. of Colorado, President A.G.C. Of Colorado, Chairman of Labor Negotiations Committee Western Force Director Colorado Transportation Association Director CIMC/CBCTC Co -Chairman Dan A. Harrington 6307 N. St. Louis Ave. Loveland, CO 80538 WORK EXPERIENCE: 1996 to Present W.M. BROWN CONSTRUCTION CORPORATION Westminster, CO Project Manager Bridge Projects: City and County of Denver Projects - 6TH Ave. Viaduct Rehabilitation, 16a' Street Pedestrian Bridge, and 48s' Ave. Viaduct Repairs Schools: Boulder Valley Public Schools — Fairview HS and Southern Hills MS (Bid Package 413), Base Line MS, University Hill Elementary, Community Montessori, and Flat Irons Elementary Schools (Bid Package #7) Automobile Dealerships: All structural concrete for Christopher's Dodge World — Golden, CO., Formby Ford — Dacono, Colorado (design -build tilt -up concrete / structural steel), Shortline Suzuki -Hyundai — Aurora, CO (structural concrete work). 1989 to 1996 GRACON CORPORATION Loveland, Colorado On -Site Project Manager Upgrade Drainage Facilities, Offutt AFB, Nebraska, involved installation of underground fuel spill containment tanks, fuel dispensers, above ground de-icing tank, and modifications to the storm and sewer piping at eighteen separate work sites. Rocky Mountain Project, Rome, Georgia. A 10 million dollar mechanical subcontract for a 150 million dollar 760 MW hydro- electric power plant project. Satellite Boilers, Denver Federal Center, a 5 million dollar project involving installation of 32 new boilers to replace the central steam system. Project: Union Pacific Trail BID SCHEDULE (BASE BID) Bid items are described in Section 01800 BID ESTIMATED UNIT ITEM ITEM# DESCRIPTION QUANTITY UNIT PRICE TOTAL 1 Mobilization 1 LS $ 2,7OU General Conditions 1 LS $ '30 00 v $ 2 Traffic Control 1 LS $ 22 "7pp $ �2-1oC PL7 3 Demolition 1 LS $ 1, 42O $ /, (0,26, U U 4 Topsoil Removal/Replacement 1420 CY $ / 57, $ 2 1 S) 3 O c-> 5 Erosion Control 1 LS $ /("O $ / 6 O p 6 Earthwork: Cut 102 CY $ 3 p• yQ L-3JJ 1, Oo 7 Earthwork: Import Fill 490 CY $ / ,Qc7 L-5 20„Op 8 Various Pipe Extensions i LS $ (o $ (Q50 9 Concrete Trail 10- wide, Y thick 49820 SF $ $ 191, ?(3 7, o e-> 10 Handicap Ramp 2 j p lS $ Jlo $ 1 7�2$•.�v 11 Fine Grading 1.72 AC $ y, 0-7/, 1 $ 0c),3, f) a 12 Metal Gate 2 LS 00 7,2 $ �} 13 Seeding 1.72 AC $ 647, y "$ y, 5-M O a TOTAL OF BASE BID MAJU F.lUNDYr� r=� .sTf'F��.-e-r T/$us�.lD onlsl/a-„ rlv..!-rEFw/ $.28$j1/g, OU (written) Figure Section 00300 Page 3 1985 to 1989 ROBERT E. MCKEE, INC. Denver, Colorado Project Engineer EDUCATION: Tarrant County Jail Facility, Fort Worth Texas. A 40 million dollar maximum security prison project. North Secondary Clarifier Chlorination / Dechlorination Facility Improvements, Metro Denver Waste Water Treatment Plant, Commerce City, Colorado. (5 million dollar project) Quality Control Administrator Primary Plant Expansion, Metro Denver Waste Water Treatment Plant, Commerce City, Colorado. (12 million dollar project) Colorado State University, B.S. in Industrial Construction Management Graduation December of 1984. Courses of study: Estimating, Scheduling, Drafting, Surveying, Engineering Structures / Design, Safety, Management, Business Law, and Construction Contracts. SECTION 00400 SUPPLEMENTS TO BID FORMS 00410Bid Bond 00420Statement of Bidder's Qualifications 00430Schedule of Subcontractors 7/96 Section 00410 Page 1 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractor performing over 150 of the contract. ITEM L��s�.syc SUBCONTRACTOR 7/96 Section 00430 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions- must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: W. M. Brown Construction Corp. 2. Permanent main office address: 3440 W.71stPlace 3. When organized: May17,1985 4. If a corporation, where incorporated: Colorado 5. How many years have you been engaged in the contracting business under your present firm or trade name? 17 years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) See attachment #1 7. General character of Work performed by your company: Concrete forming grading,pathways misc excavation structural concrete misc. metals Layout & field engineering. — 8. Have you ever failed to complete any Work awarded to you? No If so, where and whv? .9. Have your ever defaulted on a contract? No If so, where and why? 10. Are you debarred by any government agency? No If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. See attachment #2 12 13 List your major equipment available for this contract. Pettibone Forklift, 863 Bobcat. Most major equipment is leased or rented on a as needed basis on a pea iob basis. Experience in construction Work similar in importance to this project: See attachment #3 14. Background and experience of the principal members of your organization, including officers: See Resumes 15. Credit available: $ 16. Bank reference: Bank of Denver 17. Will you, upon request, fill out a detailed financial statement and furnish any Yes other information that may be required by the OWNER? 18. Are you licensed as a General CONTRACTOR? Yes If yes, in what city, county and state? See attachementof Licenses what class, license and numbers? 19. Do you anticipate subcontracting Work under this Contract? Yes If yes, what percent of total contract? 50o�a and to whom? 20. Are any lawsuits pending against you or your firm at this time? Yes If DETAIL We are current) ursuin foreclosure on liens against On the Hill Development Incyve were enqaqed as a CM/GC _nnrrarrnr._. ., -- 7/96 Section 00420 Page 2 I I 1 21 What are the limits of your public liability? DE'_"A7L 2 Mil. What company? CNA insurancd--' What are your company's bonding lim; tations? 4 Mil. Single Project 23. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at F'00 A-M this /S day of dfjc &G 200h W. M. Brown Construction Corp. By: Title: � -ep P L_ State of Colorado County of Adams %LU.f lt" & IAA iing /d�,ully sworn deposes and says that he is (name of organization) �—`'�'np and that the answers to the foregoing questions and all statements therein contained are true and correct. ubscribed and sworn to before me this day of 20p%. /J N tary Public 3yyo Gv- -7/ My commission expires 7/96 Section 00420 Page 3 "ATTACHMENT 1" CURRENT WORK UNDER CONTRACT 10/10/2002 BROWN CONSTRUCTION-- -� CONTRACT DATE BEGIN & END % COMPLETE PROJECT NAME & TYPE CONTRACT AMOUNT LOCATION ARCHITECT OWNER PROJECT MANAGER/ SUPERINTENDENT 60% Owens Brothers Batch Plant South Suburban Big Dry Creek $ 1,450,000.00 $ 267,757.00 Aurora Denver Bruce Cousins Owens Brothers South Suburban Recreation District Dan Harrington/Jerry Downs Dan HaningtoNBob Maestas 50°k _ Crestview Vehicle Maintenance Facility Fitzsimons Pool HVAC Replacement $ 487,000.00 $ 749,000.00 Westminster Aurora Durrant Architects Colorado Design Scapes Crestview Vehicle City of Aurora Craig Anderson/Dan Kaiser Mike Blown/Katie Hoff 30% Alamosa Family Recreation Center $ 3,035,000.00 Alamosa DLR Grou Cit of Alamosa Mary Anderson/Dale Harrington