BID FORM
PROJECT: UNION PACIFIC TRAIL DRAKE ROAD TO HORSETOOTH ROAD; Bid No. 5737
Place 2 1 S- u- t'/1RSv,.:, ZrO -r-G.
Date 10-4(o-uZ
1. In compliance with your Invitation to Bid dated Sc�t=H3cZ Z3 ?vo L
and subject to all conditi thereof, the undersigned
L.1 Fl Z3i:ow. C-ia— �tst a ** Corporatioht Limited Liability Company,
Partnership, Joint Venture, or Sole Proprietor)** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of 51 ($
in accordance with the Invitation To Bid and
Instructionsto Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows:
+'.LS /n15v2as c� cv..aa 'f i�.32L-7 ?F-o2iu =L (vl lotZ -3-1 &7
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.1
through 2
7/96 Section 00300 Page 1
"ATTACHMENT N2" Sheetl 10/10/2002
NEW BLDG. PROJECTS
NAME & TYPE ARCHITECT
Dodge -Detail Shop
by Ford Dacona- Foundationrfik Up
Shell Interplan/ConSteel
CONTRACT
AMOUNT LOCATION
$ 292,525.00 Denver
$ 680,000.00 Dacona
Zeiler Pennock/Design
Townhomes Build $ 1,400,000.00 Lakewood
Shonline Suzuki- Foundation Package Interplan
Dodge Foundation/Slabs Inter Plan CM
Electric Office
Design Build
tod College Class Room Addition Dauer Haswell
J.G. Johnson- Kevin
I Suites/Melody Plaza Stockton
Merrick & Co.- Fred
Front Range Armory Hynek
Phase II Manufacturing Zeiler Pennock
$ 208,600.00 Denver
$ 794,131.00 Golden
$ 520,000.00 Littleton
$ 1,093,680.00 Denver, CO
$ 2,300,000.00 Westminster, CO
$ 3,600,000.00 Watkins, CO
$ 3,947,000.00 Watkins, CO
PRUJtCI-PROJECI
REFERENCE MANAGER/SUPER
OWNER S INTENDENT
Diednchs 3031 Dan Harrington/Jim
721-1133 lRobinson
Kevin Dan
Diedrichs 303- Harrington/Howard
Formby Ford/Interplan
721-1133 Essen
John Hellgren-
Zeiler Mary
Pennock 303 Anderson/Dan
On the Hill Corp.
455-3322 Kaiser
Kevin Dan
Diedrichs 303- Harrington/Jim
Shortline Suzuki
721-1133 Robinson
Kevin -Dan
Diednchs 303- Harrignton/Jerry
Christopher Dodge
721-1133 Downs Jr.
John Hellgren-
Zeiler Mary Anderson -PM
Pennock 303 Jerry Downs Jr. -
Generic Electric
455-3322 Supt.
Wayne Brown -PM
Chuck Mangus-
Chandell & Associates
Bonnie Supan Supt.
Mark Mary Anderson -PM
Lionberger Howard Essen-
Stondebridge Co.
696-7700 Supt.
Mary Anderson -PM
Leon Harrell Jerry Downs Sr. -
State of Colorado
397-3275 Supt.
Michael Brown/PM
Garo Robert
OEA
693-1248 Maestas/Supt.
"ATTACHMENT #2" Sheett
NEW BLDG. PROJECTS 10/10/2002
�-
BROWN
CONSTAUCTIUN
�-
-
CONTRACT
ERENCEOJECT
PROJECT NAME 8 TYPE
(ARCHITECT
AMOUNT
(LOCATION
OWNER
REF("'
Mp' NAGER/SU
S INTENDENT
Advantage
9
Coover Clark $ 500,000.00 DIA_
�—
John Miller 210-669-
4929
Advantage Rent_ -A-Car
Carol Coover
Clark IMary Anderson/PM
7� 83-0p40 John Ciancio/Supt.
—McRae
Buckley Office of Special Investigations
Merrick 8 Co. I $ 1,900,000.00 -Buckley ANG
rTMary
Corp. of Engineers
Rich IMary Anderson/PM
28.6-7910 iJerry Downs/Supt.
Anderson &
District #4 Police
—
I Roth Shepard $ 1,203,130.00 (Denver, CO --jDenver
City & County of
Wayne Brown/PM
Mike Brown/Supt.
Michael Brown/PM
Hoover Village
— - —
Hoffman PartnershiHoward
+— P�$ 1,048,000.00 Longmont, COCO�Rocky
Mtn. Methodist
Bob Maestas/Supt.
'E�en/Asst Supt.
-
,Michael Brown/PM
Hoover Village Personal Care Facility
Avis -Rent -Car (Concrete Package)
Hoffman Partnershi P $ 1,098,000.00 (Longmont, CO jRocky
InterPlan $ 244,659.00 DIA
-
�43,429.00
Mtn. Methodist
Howard
Essen/Asst Supt.
h
Value Rent-A-Car (Concrete Package)
—
InterPlan - ,Avis
DIA--TValue
_.
_ el Brown/PM
Michael Brown/PM
Peter's
Joslins Southglenn Mall (Concrete
Packa e I
8)
(Steven
Construction-
Bosley)
_
THP Limited — $ 1,192,847.00
Joslins
1-926-4520 Michael Brown/PM
lj
Robert iMichael Brown/PM
Colorado National Bank Bear Valley
Airport Mail Center
Bear Valley
Herndon Associates J $ 450,000.00 Shopping Center iChandell
&Associates I393-1419
Hemdon Howard
;Essen/Supt.
_$
171,847.00 DIA_—
Colorado National Bank Montbello _ ,
Color _ .----
Herndon Associates $ 508,000.00 4590 Peoda I�Charles
DPR Construction
.Roberti
P. Woods
Hemdon
393-1419 Michael_Brown/PMT
—.—.-- _
$ 341, 165.00 Denver, CO
DPR Construction _
-
Dan Harrin ton/PM
9,
Kraig Anderson -
Huron Animal Hospital
- P _--
Zeiler Pennock $ 1,131,422.00Thornton I
Huron Animal Hospital
PM/Jerry Downs-
Dc Heller
_IMark
iSupt.
Dan Harrington -
Zimmerman Metals Machine Shop
Zeiler Pennock 4 368,539.00 I Denver, CO Zimmerman
Metals Zimmerman
PM /Howard Essen-,
Supt.
"ATTACHMENT #2" Sheeti 10/10/2002
NEW BLDG. PROJECTS
=Ac_
-
-
ARCHITECT
CONTRACT
AMOUNT
---
LOCATION
__�ECT---PRQJEGY— _
REFERENCE MANAGERISUPER
OWNER S INTENDENT
PROJECT NAME & TYPE
Goldco Retaining Wall
Hertz Site Package
TST_Inc. of Denver
$ 443,814.00
$ 112,026.00
Golden 'City
Dan Harrington-
PM/Jim Robinson-
of Golden Supt.
- - —" -
Page 3
"ATTACHMENT #2" Sheett 10/10/2002
TENANT FINISH
REMODEL
ADDITION
BROWN
i�Nilli<IIi01i;
COMPLETION
PROJECT NAME & TYPE
CONTRACT-
AMOUNT
LOCATION
ARCHITECT
Owner
PTUMECT--
REFERENCES
PROJECT -
MANAGERISUPT
Feb-87
Denver General Hospital
$ 1,062,119.00
Denver, CO
Hoffman Partnership
City & County of
Denver
Dennis Sobolik
436-5840
Craig Anderson/PM
Howard
Essen/Supt.
Mar-87
BOR Computer Facility
Denver Federal Center Bldg.
(53) Renovations
$ 3,482,000.00
Lakewood, CO
EMS
GSA
Feb-88
St. Charles Recreation
Center
$ 276,212.00
Denver, CO
Tom Morris
City & County of
Denver
Mar-88
Lantrin Bldg. (3 66) Lowry
AFB
$ 140,000.00
Denver, CO
Civil Engineering Lowry
AFB
US Air Force
May-88
Denver Federal Center Bldg.
20 & 25 Initial Space
Alterations
$ 409,000.00
Lakewood, CO
Slater & Paul Associates
GSA
Aug-88
City Permit Center Concrete
Package Exterior Finish
$ 466,412.00
200 W. 14th
Denver, CO
C.W. Fentress
City & County of
Denver
Roger Booker
640-3554
Owner
Apr-89
Denver Federal Center Bldg.
21 New Mechanical
Penthouse
$ 5D0,000,00
Slater & Paul Associates
GSA
Jun-89
FAA Office Relocation
$ 1,069,977.00
5440 Roslyn
Denver, CO
Roybal & Associates
City & County of
Denver
Jan-90
Mile High Stadium Restroom
Remodel
$ 222,000.00
Denver, CO
WC Muchow
City & County of
Denver
Jun-91
Congress Park Swimming
Pool
$ 965,735.00
Denver, CO
Hemdon & Associates
City & County of
Denver
May-92
US Customs House Denver
Federal Center
$ 539,748.00
Lakewood, CO
GSA
GSA
Beth Smith
236-7144
Owner
Se -92
Mile High Stadium
Improvements
$ 221,'011.00
Denver, CO
Martin & Martin
City & County of
Denver
Page 1
"ATTACHMENT #2" Sheeti
10/10/2002
TENANT FINISH
REMODEL
ADDITION
BROWN
ta��laa:t�laa
COMPLETION
PROJECT NAME & TYPE
AMOUNT
LOCATION
ARCHITECT
Owner
REFERENCES
MANAGER/SUPT
Apr-94
20th Street Recreation
Center
$ 1,205,137.00
Oz Architects
City & County of
Denver
Jim Gilbert
640-3500
Owner
Sep-94
Thornton High School
Remodel
$ 968,750.00
901h &
Washington
Dulaney Architect
Adams Twelve Five
Star Schools
Pat Dulaney 615-
9123
Architect
Wayne Brown/PM
Jerry Downs/Supt.
Jan-95
DGH General Electric AFM
Angio/CT Labs
$ 366,860.00
8th & Bannock
Anderson Mason Dale
General Electric
Dennis Sobolik
4365840
Owner
Craig Anderson/PM
Howard
Essen/Supt.
Bob Patterson
Jan-95
Littleton Plaza Renovations
$ 2,923,000.00
1690 Liftlleton
Blvd.
Lewis Associates
7954515
Arapahoe County
Gordon Lewis
738-9988
Architect
Wayne Brown/PM
Jerry Downs/Supt.
Mar-95
Vehicle Emissions Lab
$ 200,000.00
Denver, CO
General Motors
General Motors
Jerry Lohmeyer
375-5050
Owner
Jul-95
5 Recreation centers
Denver Public Schools
$ 2,000,000.00
Denver, CO
Wong Strauch
Denver Parks & Rec.
Roger Booker
640-3554
Owner
Mary Anderson/PM
Jerry Downs/Supt.
Aug-95
Goldrick, Force & Doull
$ 893,600.00
Denver, CO
Allred Architects
DPS
Jose 292-1875
Architect
Mike Brown/PM
Craig Anderson/PM
Sep-95
Sep-95
DGH Davis Pavilion Clinics
Mile High Stadium 1994
Improvements
$ 1,273,600.00
$ 700,075.00
700 DeMrare
Denver, CO
RNL Design
Lonco
City & County of
Denver
City of Denver Park &
Rec.
Dennis Sobolik
Alex Abel 620-
0098
Owner
Archkect
Howard
Essen/Supt.
Wayne Brown/PM
Denver Public
Aug-96
Lincoln Elementary School
$ 875,000.00
Denver, CO
Roybal Architects
Schools
Greg McMenamir
Architect
Mary Anderson/PM
Jun-97
Fitzsimons Elevator Repairs
$ 1,653,408.00
Aurora, CO
Moyes Assoc.
FAMC
Pat Harville 361-
3001
Craig Anderson/PM
Jim Robinson/Supt.
Page 2
"ATTACHMENT #2" Sheetl 10/1012002
TENANT FINISH
REMODEL
ADDITION
BRd N -
illA'�iA1�tIip�`
COMPLETION
PROJECT NAME & TYPE
AMOUNT
ILOCATION
ARCHITECT
Owner
REFERENCES
MANAGERISUPT
Craig Anderson/PM
Dec-97
5/96 - 9/96
12196-11/97
New York Bldg.
Colorado State Penitentiary
Bid Package #1
Colorado State Penitentiary
Bid Package #4
$ 1,874,000.00
$ 1,247,506.00
$ 1,040,000.00
Lakewood, CO
Canon City, CO
Canon City, CO
Durrant Architects
DMJM
DMJM
Jefferson County
State of Colorado
State of Colorado
Eric Hjelle
271-5009
Ed Starr 719-269
5779
Ed Starr 719-269
5779
Owner
Architect
Architect
Chuck
Mangus/Supt.
Wayne Brown/PM
Gene Lutz/Supt.
Wayne Brown/PM
Gene Lutz/Supt.
Craig AndersonIPM
99/98-5/98
Cook Park Recreation Center
$ 1,699,150.00
Denver, CO
Slater & Paul Associates
City & County of
Denver
Roger Booker-
640-3554
Owner
Howard
Essen/Supt.
Mark
Ford Emmission Lab
$ 137,723.00
Denver, CO
Harley Ellington Design
Ford Motor Co.
SchlindweintPM
Jim Robinson/Supt.
Craig Anderson/PM
1997 Mile High Stadium
$ 2,442,772.00
Denver, CO
Denver
Owner
Chuck
Mangus/Supt.
1/00-12/00
Boulder Valley Schools Bid
Package #13
$ 3,263,000.00
Boulder, CO
Hagen Cameron
Boulder Valley
Schools
John Bollinger
303-447-5113
Owner
Dan Harrington- PM
Jerry Downs- Supt.
11/99-4/00
Boulder Valley Schools Bid
Package #7
$ 1,608,000.00
Boulder, CO
Larson Architects
Boulder Valley
Schools
Lou Novak
Owner
Dan Harrington- PM
Jim Robinson-
Supt.
Dan
Lincoln Elementary School
$ 730,002.00
Denver
Hans Kahn
Denver Public�375
Schools
Owner I
HarringtoNKatie
Hoff-Supt.
Page 3
"ATTACHMENT #2" Sheeti
10/1 OY2002
TENANT FINISH
REMODEL
ADDITION
B ur %N
i11�:1�t1i0�
COMPLETION
PROJECT NAME & TYPE
AMOUNT
LOCATION
ARCHITECT
Owner
REFERENCES
MANAGER/SUPT
North High School
$ 919,000.00
Denver
TSP Five Inc.
Denver Public
Schools
ITrena Jones 30
575-4146
Owner
Mike Brown -PM/
Jim Robinson/Supt.
UCAR Main Drive & Front
Entrance Replacment
$ 1,294,655.00
Boulder, CO
Merrick & Co.
UCAR
Roseann Suer
303-497-8867
Owner
Craig Anderson -PM
/Howard Essen -
Supt.
Page 4
Sheets 10/10r2002
BRIDGES, CONCRETE STRUCTURES HIGHWAY PROJECTS
BROWN
C 0 N S T R U C T i 0 N
COMPLETION
PROJECT NAME & TYPE
AMOUNT
LOCATION
ARCHITECT
Owner
REFERENCES
Hallack Junction Pedestrian
Bridge
$ 1,268,328.00
Sheridan &
Boulder
Turnpike
S.A. Miro-
303-741-3737
RTD
Sam Miro
Concourse B & C Paving &
Lighting
$ 3,120,066.00
DIA
City & County of
Denver
F-115 G South Cargo Apron
$ 431,822.00
DIA
City & County of
Denver
Airfield Signage
$ 569,351.00
DIA
oun o
Denver
Adams Country Bridge
Replacement #96
$ 218,999.00
Richard Weingardt
Adams County
c ar
Weingardt
671-7033
DIA 1Gewit
$ 1,017,404.00
DIA
City & County of
Denver
F-111A Apron Grading &
Drainage
$ 2,685,618.00
DIA
Turner Collie & Braden
City & County of
Denver
1989 Bridge & Viaduct
Repair
$ 625,143.00
City & County of
Denver
Jim Barwick
720-913-4500
RTD Bridge Widening
$ 687,558.00
US 36 Lowell
Blvd.
RTD
RTD
Sound Barrier 1-25 & 104th
$ 603,009.00
CDOT
CDOT Dist. 6
RTD Structural Repairs
$ 217,000.00
RTD
RTD
1990 Bridge & Viaduct
Repairs
$ 327,216.00
City Engineer
City & County of
Denver
Jim Barwick
720-913-4500
F-128A Airport Taxiway E-
470 Concrete Structures
$ 2,446,260.00
DIA
Lonco
City & County of
Denver
Runway 17R/35L Paving
Underdrains
$ 833,733.00
DIA
City & County of
Denver
Runway 7-25 Concrete
Structures
$ 497,105.00
DIA
City & County of
Denver
Runway 16R/351 Concrete
Structures
$ 486,473.00
DIA
City & County of
Denver
Page i
Sheets 10/10/2002
BRIDGES, CONCRETE STRUCTURES HIGHWAY PROJECTS
BROWN
C 0 N S T 9 U C T I 0 N
COMPLETION
PROJECT NAME & TYPE
AMOUNT
LOCATION
ARCHITECT
Owner
REFERENCES
Airport Runway Grading
8LI26R
$ 2,322,788.00
DIA
City & County of
Denver
Upper Level Roadways
$ 440,997.00
SIA
Longo
oun o
Denver
Perimeter Drains AGTS
Tunnels
$ 136,000.00
DIA
City 8 County of
Denver
8/95-11195
51 st Avenue at Havana St.
Drainage Culvert & Roadway
Denver, CO
Denver City Engineer
City & County of
Denver
6th Avenue Viaduct
$ 3,484,628.00
Denver, CO
City -County of
Denver
Jim Barwick
720-913-4500
Golden Pedestrian Bridge
$ 256,265.00
Golden, CO
City of Golden
Scott Lewis 38
8153
16th Street Bridge
$ 1,797,943.00
Denver, CO
City & County of
Bob StewartDenver 720-913-45M
48th Avenue Viaduct
$ 359,157.00
Denver, CO
City & County of
Denver
Structural Railing at
Montbello
$ 131,079.00
Denver, CO
City & County of
Denver
Page 2
Sheets
PARKS SPECIALTY PROJECTS
BROWN
C O N S T R 0 C T 1 0 N
COMPLETION
PROJECT NAME & TYPE
AMOUNT
ILOCATION
ARCHITECT
Owner
REFERENCES
Civic Center Parking Lots
$ 1,381,691.00
Denver, CO
Humphries Poll
Architects
City & County of
Denver
Elizabeth
Hamilton
720-913-8824
Westminster College Park
Pond & Pedestrian Bridge
$ 112,170.00
112th &
Sheridan
Drexell Barrell
City of Westminster
Kirk Haines
RTD South Wadsworth
Corridor
$ 490,614.00
RTD
City & County of
Denver
CFR Burn Pit
$ 215,575.00
HWS
City & County of
Denver
Pete Stokowski
303-342-2200
Mile High Stadium
Improvement
$ 221,011.00
Martin & Martin
City & County of
Denver
Mike Smith
303-W-3500
North Speer Blvd.
Revitilization
$ 379,797.25
William Wenk & Assoc.
City & County of
Denver
William Wank
303-295-0778
Downtown Creekfmnt
$ 314,186.00
Richard Weingardt
City & County of
Denver
Richard
Weingardt
303-671-7033
Cherry Creek Park
$ 1,053,123.22
DHM
City 8 County of
Denver
Dick Marshall
303-892-5566
Mile High Stadium
Restrooms Remodel
$ 222,000.00
W.C. Muchow
City, & County of
Denver
Barry Smith
720-913-8833
1994 Mile High Stadium
Improvements
$ 840,542.00
Luis O. Acosta
City & County of
Denver
Barry Smith
720-913-8833
Auraria Campus Lot M
Parking Lot Expansion
$ 637,000.00
Denver, CO
S.A. Miro
Aurana Campus
Kathryn McNally
303-556-3118
Heritage Pedestrian Bridge
$ 256,265.00
Golden, CO
City of Golden
Clement Park Amphitheater
$ 415,561.00
Jefferson
COunty
Pahl Pahl Pahl
Foothills Park
10/10/2002
Page 1
am
ADDRESS: -3i.lL40 Wy%I a! -AL
(Aj C-5T-M, 1�5 Vy' CO zOt)3 67
8. BID SCHEDULE (Base Bid)
Please use the attached Hid Schedule when submitting your bid.
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (25%) of the totpl Agreement Price.
RESPECTF I,Y SUBN3:.
Signature
Tit e
License Number (Ii
(Seal i Bid is by corporation)
Attest:
Date
Applicable
- lo ( / 1 4('
Address
�IiES ruy:r co 5TOy� C)
Telephone 303-43o- gq
7/96 Section 00300 Page 2
Sheetl
PARKS SPECIALTY PROJECTS
B ROWN
C N S T 0 O C T I O N
a0
COMPLETION
PROJECT NAME & TYPE
AMOUNT
LOCATION
ARCHITECT
Owner
PRDJECr—
REFERENCES
Bromwell & University
Elementary Soccer &
Playgrounds
$ 300,000.00
Denver, CO
Jump Design
Denver Public
Schools
Thraemoore in the Park -
Town Homes Site
Developments
$ 1,200,000.00
Lakewood, CO
Design/Build
On the Hill Corp.
On the Hill Corp.
i
I
I
en/s cial
10/10/2002
Page 2
CONTRACTOR'S LICENSES
STATE OF COLORADO
Westminster
#44603
Westminster
#977951
Denver
#11075
Englewood
#12378
Alamosa
#6251
Aurora
#44447
Aurora
#A 16924
Thornton
#A00093838
RESUME
MARY R. ANDERSON
5845 W. 33rd Ave.
Denver, CO 80212
CURRENT Chairman of Board of Directors, President and Principle Owner of W. M. Brown
Construction Corp.
WORK EXPERIENCE: Operation Manaoer
Coordinate work procurements, estimating, pricing, development of business
plan and continuity schedule, including man loading and cash flow of projects.
Estimator
Including price development and final estimates $200,000.00 to 10 Million
Project Manager
For projects ranging from $200,000.00 to 6 Million. These projects included
commercial projects consisting of Hotels, Banks, Office Space, Schools, Tenant
Finish, Remodel and Additions, Civil projects consisting of bridges, bridge and
road repairs, concrete drainage features, utilities, parking lots, box culverts.
Superintendent
For projects ranging from $500,000.00 to $3,000,000.00. This work includes:
The interior remodel of first floor clinic spaces at Denver General Hospital.
Foundations, elevator shafts, and exterior finish system at City & County of
Denver Permit Center.
PROJECTS/ Current 2002
EXPERIENCE Operations Manager/President
Boulder Valley School Dist.
Bid Package #7 & #13
5 million of school renovation projects being completed during school year and
summer of 2000
Dillion Comfort Suites
Westminster Comfort Suites
OTHER KEY 98 Unit Comfort Inn at DIA
Denver Public Schools- Lincoln Elementary School
Addition & Remodel 1995
My Responsiblities on this project as operations manager I oversaw the project
manager and superintendent.
Denver General Hospital Interior Remodel of First Floor Clinic Spaces,
PROJECTS Project size was $1,062,000. July 1986- February 1987.
My Responsibilities on this project included quantity take off, on site
Superintendent /Project Manager.
FAA Office Relocation , Project Size was $1,069,000. March 1989- July 1989.
This project was a fast track interior remodel with a 60 day duration this was
accomplished despite 70 Change Orders. The project involved demolition and
remodel of 3 story building with 1 story Garage Warehouse.
My Responsibilities on this project included Estimating, Project Management.
Cherry Creek Park, Project size was $1,053,123. February 1990.
This project involved relocating utilities and building park with fountaining and
monuments over old dump area next to Platte River and Cherry Creek Mall.
My Responsibilities included Project Manager
F-111A Apron Grading & Drainage at Denver International Airport, project
size $2,700,000, October 1991- March 1992.
This project involved a combination of cast in place, precast offsite and onsite
over 500 Inlets and manholes which were under the aprons and handled sewer.
Water and De icing the average manhole was 8' x 10' x 15'.
My Responsibilities included Estimating, Project Manager and over seeing
Quality Control of off site suppliers.
TRADE
ASSOCIATIONS Women's Construction Owners & Executives
Past Colorado Chapter President 1993-1995
Past National Board Member
Reference: Past National President- Rosemary Breiner-Breiner Construction
Current Executive Vice President- Cheryl Brooks- J.C. Brooks- 428-1604
Associated General Contractors
Previous Chapter Board Member
Executive Director- Dick O'Brecht- 388-2422
Colorado Building Industry Coalition
Past Board Member
AWARDS
RECOGNITION 1996- Women's Construction Owners & Executives
Outstanding Service for Changing the Image of Construction Industry
1996 Colorado Leadership Coalition
Award of Excellence
(See Attached Letter)
1992-1997
Listed as a Top 100 Women Business in Colorado
1996-1997
Listed as a Top 250 Private Held Business in Colorado
EDUCATION: Metro State College Denver, CO
Civil Engineering
Westminster High School Westminster, CO
REFERENCES: Jam Wong- Wong Strauch Architects- 303-293-9206
Barry Smith -City of Denver- 720-913-8833
Michael W. Brown
6655 Y, Yale
Lakewood, CO 80227
303-989-4596
SUMMARY
I have comprehensive understanding of the Construction Industry. My exposure and involvement have been nearly
continuos since I was fourteen.
I am knowledgeable of IBM PC's both hardware and software aspects. I understand DOS, Windows and network
environments. I have supervised a small (11 node) Novel Network that involved installing programs and training on
software or applications that I developed for use. I am comfortable with use of Word Perfect, Word for Windows,
Exel, Lotus, Primevera, Project 3.0 for Windows and Access Data Base.
I have worked as an estimator, project manager, safety officer and computer consultant. Frequently I have had to
perform many of these duties simultaneously.
PROJECT ASSIGNMENTS/WORK EXPERIENCE
8/85 to Present W. M. Brown Construction Corp.
3440 W. 715' PI.
Westminster, CO 80030
430-8935
Working for a small family owned business I have had to perform numerous
duties and responsibilities simultaneously. The major project responsibilities are
listed below.
1994
Denver Public Schools
Goldrick, Force & Doull Elementary Schools
Additions & Remodel
1/92 to 2/94
Project Manager
Denver International Airport
Various Projects (total 15 projects)
3/90 to 12/92
Project Manager
City & County of Denver
1990 Bridge & Viaduct Repairs
3/91 to 12/91
Project Manager
Hoover Village Personal Care Facility II
A 15,000 SF addition to an elderly care facility in Longmont.
Negotiated, estimated and managed this project.
6/90 to 4/91
Project Manager
RTD Wadsworth Corridor Bus Shelters
Performing concrete work and installing glass bus shelters
on 30 sites along Wadsworth in Denver.
6190 to 8/90
Project Manager
Stapleton International Airport
Upper Level Roadways Repairs
Removal & replacement of expansion joint, asphalt &
waterproofing deck while maintaining vehicle and pedestrian
traffic during peck hours.
10/89 to 6/90
Project Manager
Hoover Village Personal Care Facility I
A 18,000 SF addition to an elderly care facility in
Longmont. Negotiated, estimated and managed this
project.
11/88 to 2/89
Project Manager/Superintendent
FAA Office Relocation To Roslyn St.
A 50,000 SF renovation of office space within a 60 day
schedule. Numerous changes were added at the end of the
contract.
2/88 to 9/88
Project Manager/Superintendent
City & County of Denver Permit Center
Concrete & Exterior Finishes
6/87 to 10/87
Project Manager/Superintendent
St. Charles Recreation Center
4/86 to 4187
Project Manager/Superintendent
City & County of Denver
District #4 Police Station
9/85 to 2/86
Superintendent
Office Remodel #1 & #2 for the Colorado Division of
Wildlife
This was W. M. Brown first 2 projects that were used to
launch the company.
1974 to 9/85
Centric Corp.
5490 West 13th Ave.
P.O. Box 14026
Denver, CO 80214
303/233-8440
I worked for Centric starting as a labor when I was fourteen. I worked my
vacations through school and worked my way through the ranks to
Superintendent/Assistant Project Manager.
3/85 to 8/85
Superintendent
Mervyn's Department Store (Boulder)
Estimated and engineered drawings to local code.
10/83 to 11/84
Superintendent/Assistant Project Manager
Holiday Inn @ Hampden & Wadsworth
Estimated, negotiated and managed this fine hotel.
9/82 to 8/83
Superintendent/Assistant Project Manager
Denver West Marriott (Site work & concrete)
12/80 to 7/82
Superintendent/Assistant Project Manager
17th Street Plaza Concrete Package for 34 Story
Prepared of 40 pages of size C shop drawings prior to start
6180 to 12/80
Project Engineer/Assistant Project Manager
Beaver Creek Ski Area Service Center
Reception Center and Water Pump Station Facility
1980
Wheatland Power Plant
Wheatland, WY
Foundations & Structures for Power Plan & Cooling Tower
Water Discharge Mains to river.
1978 to 1979
Project Engineer/Assistant Project Manager
1-70 Vail Pass Segmental Bridges over Gore Creek
and Hillside Bridges
1976 to 1977 Project Engineer
Mountain Bell Service Center 17th & Curtis
1974 Ironworker Apprentice
McNichols Sports Arena
Between field assignments I worked in the home office as an estimator and as an assistant project manager.
EDUCATION
High School- Regis High School 1971-1974 Graduated
College- Trinidad Jr. College 1974-1975 1 year
C.S.U. Ft. Collins, Colo. 1975-1976 1 year
University of Wyoming 1976-1979 2 years
At Trinidad and University of Wyoming my major
was civil engineering.
At C.S.U. my major was Industrial Construction
Management.
References: Upon Request
Dale G. Harrington
160 S. Holland
Lakewood, CO 80226
303-232-7123
WORK EXPERIENCE:
2000 to Present W.M. BROWN CONSTRUCTION CORPORATION
Westminster, Colorado
Operations & Marketing Manager
1992 to 2000 WARD CONSTRUCTION
Englewood, Colorado
Superintendent/Estimator
1991 to 1994 CONSULTANT & ON CALL FOR SPECIAL PROJECTS
American Eagle Industries
Cheyenne, Wyoming
B.E.I. Engineers/Constructors Inc.
Lakewood, Colorado
Grain Processors Inc.
Denver, Colorado
Western States Construction
Loveland, Colorado
1987-1991 GRACON CORPORATION
Loveland, Colorado
Superintendent/Project Manager/Estimator
1981-1986 WRG CONSTRUCTION COMPANY
Denver, Colorado
President
1973-1980 CENTRIC CORPORATION
Denver, Colorado
Executive Vice President
Manager, Building Division
Director of Personnel
Responsible for hiring project management personnel and
coordinating assignment of all jobsite personnel.
1967-1973 PENNER CONSTRUCTION (now Centric Corporation)
Denver, Colorado
Project Manager/Estimator
Estimated and managed projects throughout the Rocky Mountain
area ranging from 500 thousand to 15 million dollars
1958-1967 MARTIN K. EBY CONSTRUCTION
Wichita, Kansas
Superintendent/Estimator
Obtained field experience in all phases of construction on contracts
from 300 thousand to 40 million dollars. These jobs required
living in 11 places and ranged from buildings to a nuclear reactor.
FORMAL
EDUCATION: B.S., Friends University, Wichita Kansas, 1958
Dale Carnegie Institute, Denver, CO, 1972
Fails Management Seminars
American Management Training
PAST
PROFESSIONAL
AFFILIATION
EXPERIENCE: Associated General Contractors of America, National Director
A.G.C. of Colorado, President
A.G.C. Of Colorado, Chairman of Labor Negotiations Committee
Western Force Director
Colorado Transportation Association Director
CIMC/CBCTC Co -Chairman
Dan A. Harrington
6307 N. St. Louis Ave.
Loveland, CO 80538
WORK EXPERIENCE:
1996 to Present W.M. BROWN CONSTRUCTION CORPORATION
Westminster, CO
Project Manager
Bridge Projects: City and County of Denver Projects - 6TH Ave.
Viaduct Rehabilitation, 16a' Street Pedestrian Bridge, and 48s' Ave.
Viaduct Repairs
Schools: Boulder Valley Public Schools — Fairview HS and
Southern Hills MS (Bid Package 413), Base Line MS, University
Hill Elementary, Community Montessori, and Flat Irons
Elementary Schools (Bid Package #7)
Automobile Dealerships: All structural concrete for
Christopher's Dodge World — Golden, CO., Formby Ford —
Dacono, Colorado (design -build tilt -up concrete / structural steel),
Shortline Suzuki -Hyundai — Aurora, CO (structural concrete
work).
1989 to 1996 GRACON CORPORATION
Loveland, Colorado
On -Site Project Manager
Upgrade Drainage Facilities, Offutt AFB, Nebraska, involved
installation of underground fuel spill containment tanks, fuel
dispensers, above ground de-icing tank, and modifications to the
storm and sewer piping at eighteen separate work sites.
Rocky Mountain Project, Rome, Georgia. A 10 million dollar
mechanical subcontract for a 150 million dollar 760 MW hydro-
electric power plant project.
Satellite Boilers, Denver Federal Center, a 5 million dollar project
involving installation of 32 new boilers to replace the central steam
system.
Project: Union Pacific Trail
BID SCHEDULE (BASE BID)
Bid items are described in Section 01800
BID
ESTIMATED
UNIT ITEM
ITEM#
DESCRIPTION
QUANTITY
UNIT
PRICE TOTAL
1
Mobilization
1
LS
$ 2,7OU
General Conditions
1
LS
$ '30 00 v $
2
Traffic Control
1
LS
$ 22 "7pp $ �2-1oC PL7
3
Demolition
1
LS
$ 1, 42O $ /, (0,26, U U
4
Topsoil Removal/Replacement
1420
CY
$ / 57, $ 2 1 S) 3 O c->
5
Erosion Control
1
LS
$ /("O $ / 6 O p
6
Earthwork: Cut
102
CY
$ 3 p• yQ L-3JJ 1, Oo
7
Earthwork: Import Fill
490
CY
$ / ,Qc7 L-5 20„Op
8
Various Pipe Extensions
i
LS
$ (o $ (Q50
9
Concrete Trail 10- wide, Y thick
49820
SF
$ $ 191, ?(3 7, o e->
10
Handicap Ramp
2 j p
lS
$ Jlo $ 1 7�2$•.�v
11
Fine Grading
1.72
AC
$ y, 0-7/, 1 $ 0c),3, f) a
12
Metal Gate
2
LS
00 7,2 $ �}
13
Seeding
1.72
AC
$ 647, y "$ y, 5-M O a
TOTAL OF BASE BID
MAJU F.lUNDYr� r=� .sTf'F��.-e-r T/$us�.lD onlsl/a-„ rlv..!-rEFw/ $.28$j1/g, OU
(written)
Figure
Section 00300 Page 3
1985 to 1989 ROBERT E. MCKEE, INC.
Denver, Colorado
Project Engineer
EDUCATION:
Tarrant County Jail Facility, Fort Worth Texas. A 40 million
dollar maximum security prison project.
North Secondary Clarifier Chlorination / Dechlorination Facility
Improvements, Metro Denver Waste Water Treatment Plant,
Commerce City, Colorado. (5 million dollar project)
Quality Control Administrator
Primary Plant Expansion, Metro Denver Waste Water Treatment
Plant, Commerce City, Colorado. (12 million dollar project)
Colorado State University, B.S. in Industrial Construction Management
Graduation December of 1984.
Courses of study: Estimating, Scheduling, Drafting, Surveying, Engineering Structures /
Design, Safety, Management, Business Law, and Construction Contracts.
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410Bid Bond
00420Statement of Bidder's Qualifications
00430Schedule of Subcontractors
7/96 Section 00410 Page 1
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractor
performing over 150 of the contract.
ITEM
L��s�.syc
SUBCONTRACTOR
7/96
Section 00430 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions- must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: W. M. Brown Construction Corp.
2. Permanent main office address: 3440 W.71stPlace
3. When organized: May17,1985
4. If a corporation, where incorporated: Colorado
5. How many years have you been engaged in the contracting business under your
present firm or trade name? 17 years
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
See attachment #1
7. General character of Work performed by your company:
Concrete forming grading,pathways misc excavation structural concrete misc. metals
Layout & field engineering. —
8. Have you ever failed to complete any Work awarded to you? No
If so, where and whv?
.9. Have your ever defaulted on a contract? No
If so, where and why?
10. Are you debarred by any government agency? No
If yes list agency name.
7/96
Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
See attachment #2
12
13
List your major equipment available for this contract.
Pettibone Forklift, 863 Bobcat. Most major equipment is leased or rented on a as needed basis on a pea
iob basis.
Experience in construction Work similar in importance to this
project:
See attachment #3
14. Background and experience of the principal members of your organization,
including officers:
See Resumes
15. Credit available: $
16. Bank reference: Bank of Denver
17. Will you, upon request, fill out a detailed financial statement and furnish
any Yes other information that may be required by the OWNER?
18. Are you licensed as a General CONTRACTOR? Yes
If yes, in what city, county and state? See attachementof Licenses what
class, license and numbers?
19. Do you anticipate subcontracting Work under this Contract? Yes
If yes, what percent of total contract? 50o�a
and to whom?
20. Are any lawsuits pending against you or your firm at this time? Yes
If
DETAIL We are current) ursuin foreclosure on liens against On the Hill Development Incyve were
enqaqed as a CM/GC _nnrrarrnr._. ., --
7/96 Section 00420 Page 2
I
I
1 21
What are the limits of your public liability? DE'_"A7L
2 Mil.
What company? CNA insurancd--'
What are your company's bonding lim; tations? 4 Mil. Single Project
23. The undersigned hereby authorizes and requests any person, firm, or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at F'00 A-M this /S day of dfjc &G 200h
W. M. Brown Construction Corp.
By:
Title: � -ep P L_
State of Colorado
County of Adams
%LU.f lt" & IAA
iing /d�,ully sworn deposes and says that he is
(name of organization) �—`'�'np and that
the answers to the foregoing questions and all statements therein contained are
true and correct.
ubscribed and sworn to before me this day of
20p%. /J
N tary Public
3yyo Gv- -7/
My commission expires
7/96
Section 00420 Page 3
"ATTACHMENT 1" CURRENT WORK UNDER CONTRACT 10/10/2002
BROWN
CONSTRUCTION-- -�
CONTRACT
DATE BEGIN &
END
% COMPLETE
PROJECT NAME & TYPE
CONTRACT
AMOUNT
LOCATION
ARCHITECT
OWNER
PROJECT
MANAGER/
SUPERINTENDENT
60%
Owens Brothers Batch
Plant
South Suburban Big Dry
Creek
$ 1,450,000.00
$ 267,757.00
Aurora
Denver
Bruce Cousins
Owens Brothers
South Suburban
Recreation District
Dan Harrington/Jerry
Downs
Dan HaningtoNBob
Maestas
50°k
_
Crestview Vehicle
Maintenance Facility
Fitzsimons Pool HVAC
Replacement
$ 487,000.00
$ 749,000.00
Westminster
Aurora
Durrant Architects
Colorado Design
Scapes
Crestview Vehicle
City of Aurora
Craig Anderson/Dan
Kaiser
Mike Blown/Katie
Hoff
30%
Alamosa Family Recreation
Center
$ 3,035,000.00
Alamosa
DLR Grou
Cit of Alamosa
Mary Anderson/Dale
Harrington