HomeMy WebLinkAboutRESPONSE - BID - 5737 UNION PACIFIC TRAIL DRAKE ROAD TO HORSETOOTH (8)SECTION 00300
BID FORM
PROJECT: UNION PACIFIC TRAIL DRAKE ROAD TO HORSETOOTH ROAD; Bid No. 5737
Place i; TU o4 �t coy, s �P� ctios,
Date lo�it/oti
1. In compliance with your Invitation to Bid dated Se�s(a�
and subject to all conditions the: eo the undersigned
n ` a * Cor oration, Limited Liability Company,
Partnership, Joint Venture, or Sole Proprie r ** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of rZ �/o, ($
in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows:
t r\A
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.1
through%.
7/96 Section 00300 Page 1
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractor
performing over 1,5' of the contract.
ITEM
SUBCONTRACTOR
7/96 Section 00430 Page 1
��
`''ZAK
=.• Elder Reservoir
Owner: Windsor Rervoir and Canal Company
Engineer: Smith Geotechnical
Contract Amount: $320,000
%Complete: 100%
Scheduled Completion: July 1, 2001
Owner:
Engineer:
Contract Amount:
%Complete:
Scheduled Completion:
CandieLight Ridpe
Boulder Valley Investments
Alliance Development Services
$600,000
100%
May, 2001
Plaza Dr./Dad Clark Gulch Water
Quality lm9[Q ements
Owner: Centennial Water and Sanitation District
Engineer: CH2MHill
Contract Amount: $576,639
%Complete: 100%
Scheduled Completion: April, 2001
�i PAR 737
Owner: Metro Wastewater Reclaimation District
Engineer: Metro Wastewater Reclaimation District
Contract Amount: $239,000-00
%Complete: 100%
Scheduled Completion: May, 2001
:: Foothills Reservoir Dain Rehabilitation
Owner: Highland Ditch Company, Inc.
Engineer: Smith Geotechnical
Contract Amount: $746,746-00
%Complete: 100%
Scheduled Completion: April, 2001
17th Ave, Underpass & Culvert
City of Longmont
City of Longmont
$796,365.00
100%
August, 2001
Union Ditch Diversion Dam
Union Ditch Company.
Engineer:
Contract Amount:
%Complete:
Scheduled Completion
Smith Geotechnical
$460,214.00
100%
April 2001
�.- Park View Manor PUD Phase ll
Owner: T.R.A.C.
Engineer: Sear Brown
Contract Amount: $522,290.00
%Complete: 85%
Scheduled Completion: October 2002
�:- South Taft Hill Road
Owner:
City of Fort Collins
Engineer:
Sear Brown
Contract Amount:
$4,840,495.60
%Complete:
99%
Scheduled Completion:
October 2002
Owner:
Engineer:
�i- Wellington Capital Improvements
Town of Wellington
Contract Amount:
%Complete:
Scheduled Completion:
Owner:
VV
Owner:
Engineer:
Contract Amount:
%Complete:
Scheduled Completion:
Owner:
Sear Brown
$292,133.43
98%
October 2002
Iv Cedar Mesa
Cedar Mesa Ditch & Reservoir Co.
Engineer: National Society of Professional Enqin.
Contract Amount: $93,370.00
%Complete: 98%
Scheduled Completion: October 2002
Zak Dirt,Inc.
A&
��
`1'ZAK
KEY PERSONNEL:
James S. Sewczak President
35 years experience in earthmoving, drainage and construction. Ownership of own
business for 26years.
Larry D. Crouch Vice President
30 years experience in earthmoving, pipeline and drainage construction. Ownership of
own business for 7 years
Kerry Sewczak, Secretary/Treasurer
15 years experience in accounts payable/receivable,payroll and insurance
Ken Nokes EquinmentlSafety Mana er
40 years in construction industry. 21 years as Equipment Manager and 8 years in
Construction Safety.
Dan Sewczak, Project Manager/Estimator
8 years experience in earthwork, concrete structures, drainage, project management.
graduate B.S. Civil Engineering, CSU
Angelo Mancina Assistant Estimator/Project Manaz
5 years experience in earthwork,concrete structures, drainage, project management
graduate B.S. Civil Engineering, S. Dakota School of Mines
Tino Flores Field Manager
25 years experience in earthwork, concrete structures, drainage.
Matt Kaun
7 years experience in the construction industry ( site utilities )
Arnuljo Hernandez
10 years experience in the construction industry, specializing in concrete structures.
�\
`1'ZAK
ZAK DIRT, INC.
14290 HILLTOP ROAD
LONGMONT, CO. 80504
970-535-4657 Phone
970-535-4561 Fax
303-289-4406 metro line Credit References
FED. ID # 84-0713877
CO. ID # 21-01930
D&B # 08-039-5619
Wagner Equipment Company
US Filter
17667 East 881h Avenue
Branch 228
Denver, CO. 80217
1910 38th Street
303/739-3000
Denver, CO. 80216
303/292-1112
Contact: David Perry
Wear Parts &Equipment
P.O. Box 470233
Aurora, CO. 80047-0233
303 / 287-1966
Aggregate Industries
21 South Sunset
Longmont, CO. 80501
303 / 776-1003
Cox Oil Company
555 E. 8rh Street
Greeley, CO. 80631
970/352-9208
Valley Bank & Trust
340 Lashley
Longmont, CO. 80501
Mngr. Doug Scherrer
303/655-4475 (direct line)
303/659-4183 (fax)
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder:
2. Permanent main office address:
3. When organized:
4. If a corporation, where incorporated:
5. How many years have you been engaged in the contracting business under your
present firm or trade name?
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
7. General character of Work performed by your company:
B. Have you ever failed to complete any Work awarded to you?
If so, where and why?
9. Have your ever defaulted on a contract?
If so, where and why?
10. Are you debarred by any government agency?
If yes list agency name.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
12.
List your major equipment available for this
contract.
13.
Experience in construction Work similar in
project:
importance to this
14.
Background and experience of the principal
including officers:
members of your organization,
15.
16.
17.
Credit available: $
Bank reference:
Will you, upon request, fill out a detailed
any other information that may be
financial statement and
required by the
furnish
OWNER?
18.
19.
20.
Are you licensed as a General CONTRACTOR?
If yes, in what city, county and state?
class, license and numbers?
Do you anticipate subcontracting Work under
If yes, what percent of total contract?
and to whom?
Are any lawsuits pending against you or your
If
DETAIL
this Contract?
firm at this time?
What
yes,
7/96 Section 00420 Page 2
21. What are the limits of your public liability? DETAIL
What company?
22. What are your company's bonding limitations?
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at this day of
20
Name of E
By:
Title:
State of
County of
being duly sworn deposes and says that he is
of (name of or
and that
)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this day of
20
Notary Public
My commission expires
7/96
Section 00420 Page 3
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM
7/96
SUBCONTRACTOR
Section 00430 Page 1
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
BID #5737
UNION PACIFIC TRAIL DRAKE ROAD TO HORSETOOTH ROAD
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5737 Union Pacific Trail Drake Road To Horsetooth Road
OPENING DATE: October 16, 2002, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
DIVISION 2
SECTION 02900 - SITE REVEGETATION
PART 1-GENERAL
1.01 Description of Work
A. The work covered by this specification includes the furnishing of all materials and
application of fertilizer, seed and mulch to areas defined in the plans or required
by field condition. The work shall be completed in accordance with these
specifications, accepted horticultural practice, and with the plans.
1.02 Related Work
A. See appropriate sections for site work needed prior to work required in this
section. Obtain approval from the Engineer prior to starting work required in this
section.
1.03 Submittals
A. Submit manufacturer's specifications and literature on all products.
B. Submit materials list including quantities and description of materials.
1.04 Quality Assurance
A. Source Quality Control: Manufacturer's test for purity and germination of seed,
dated within six months of seeding.
B. Certificates: Manufacturer's certification that fertilizer meets specification
requirements.
zio rvorrn mason otreet • ana moor • I:U. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
01
(Se
7/96
Zq�L 1>jt 10G
CONTRACTOR
BY:�a(. �CWL7�d... Ets ,.-ertoc aM-`Dc t.
ADDRESS:
BID SCHEDULE (Base Bid)
Please use the attached Bid Schedule when submitting your bid.
PRICES
The foregoing prices shall include all labor, materials,. transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item s long as the deletion or change does not exceed
twenty-five pent (25 ) of the total Agreement Price.
Signature
I�F/SP CTF[yhL9 SUBMITTED: 99 �//
Date
i
Title
License Number (If Applicable)
i by gprporationA,
ss /41250 !lm-'o00 keod
Telephone 970 S3S=5�45`7
Section 00300 Page 2
PART 2 - MATERIALS
2.01 Grass Seed
A. Grass seed shall be of the latest crop available. Seed shall meet Colorado
Department of Agriculture Seed Laws, Chapter 35, Article 27.
B. The seeding mixture shall be applied at a pure live seed (PLS) rate per acre AS
SHOWN ON SHEET 4 OF 4.
C. Do not use seed which has become wet, moldy, or otherwise damaged in transit
or in storage.
D. The Contractor shall compensate for percentage of purity and germination by
furnishing sufficient additional seed to equal the specified pure live seed product.
The formula for determining the quantity of pure live seed (PLS) shall be:
Pounds of Seed (Bulk) x Purity x Germination
E. Pounds of Pure Live Seed (PLS)
F. The Contractor shall present to the Engineer a certificate of the PLS test of the
grass seed which he intends to use. All grass furnished shall be delivered in
sealed bags showing the weight, analysis and vendor's name.
2.02 Fertilizer
A. Commercial fertilizer type and application rate shall be AS SHOWN ON SHEET 4
OF 4.
2.03 Mulch
A. Hydraulically spray or approved equal.
2.04 Topsoil
A. Topsoil shall be select earth material of loose friable loam reasonably free of
admixtures of subsoil, refuse stumps, roots, rocks, brush, weeds or other material
which can be detrimental to the proper development of ground cover.
PART 3-EXECUTION
3.01 General
A. The pattern of seeding and mulching, and fertilization if required, shall be as
detailed or as required by field conditions to provide a uniform stand of grass
acceptable to the City. In no case shall revegetation occur within 30 days of the
application of a chemical weed control substance.
B. Warranty excludes replacement of plants after final acceptance because of injury
by storm, drought, drowning, hail, freeze, insects or diseases.
3.02 Preparation
A. Verify that soil preparation has been completed prior to seeding.
B. Seed areas damaged by construction activities as directed by the Engineer.
C. Apply by broadcasting or drillings at the rate specified herein.
D. Selection of the time of seeding shall be Contractor's responsibility, consistent
with erosion control.
E. Rework previously prepared areas that have become compacted or damaged by
rains or traffic.
F. Do not drill or sow during windy weather or when ground is frozen or untillable.
G. Cover seed to depth between'/< to %2 inch by raking or harrowing.
H. Firm seed areas with roller weighing maximum of 100 lbs. per foot to width.
3.03 Hydraulic Seeding and Mulching
A. Seed and fertilize in the amounts per acre designated. Wood cellulose fiber
mulch at 2,000 Ibs/ acre.
B. Combine with water to provide a slurry. Perform hydraulic application in such a
manner that the liquid carrier will uniformly distribute the material over the entire
area to be seeded at rates not less than indicated herein. Do not compact.
Double the amount of seed per acre if seed and mulch are applied in a single
application.
3.04 Drill Seeding
A. Seed shall be applied in a minimum of two passes at 90 degrees two each other.
3.05 Reseeding and Repair
A. Reseed and mulch areas where there is not a satisfactory stand of grass at the
end of 60 days after seeding.
B. Minimum satisfactory stand: 4 plants per square foot.
3.06 Areas to be Seeded
A. All areas that have been damaged or disturbed by the Contractor's operation shall
be reseeded according to these specifications and as indicated on the plans.
3.07 Maintenance
A. No maintenance is required, UNLESS NOTED ON THE BID SCHEDULE.
From Union Pacific Trail Specification
Fertilizer and Seed Mix
Commercial Fertilizer (18-46-0)
Nitrogen
Phosphorus
Potassium
Application rate of 250 Ibs per acre
Percent available by weight
18
46
0
Buffalo Grass 40%
13
Blue Gramma 30%
14
Sheep's Fescue 30%
13
100
40
END OF SECTION
If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
Administrative Services
Purchasing Division
City of Fort Collins
UNION
City of Fort Collins
Addendum No. 1
BID #5737
PACIFIC TRAIL DRAKE ROAD TO HORSETOOTH ROAD
Specifications and Contract Documents
Description of Bid # Bid No. 5737 Union Pacific Trail Drake Road to Horsetooth Road
OPENING DATE: October 16, 2002, 3:00 pm (Our Clock)
To all prospective bidders under the specifications and contract documents described
above, the following clarifications are hereby made.
1. The contract period is 75 days for substantial completion and 90 days for final
completion as stated in the Bid Documents, Section 00520, Article 3.
2. The crusher fines trail is not indicated on the Bid Schedule (Section 00300) and it is
not indicated in Section 01800. Crusher fines trail is by others. Subgrade elevation
is included in this contract.
3. Erosion control measures are inlet protection only as indicated on the drawing
"Area Inlet Filter Gravel" page 5 of 6. Use this detail at the five pipe locations
indicated on the drawings. No silt fence or other temporary measures are required.
4. Any tree work required will be performed by the City.
If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-
221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM
HAS BEEN RECEIVED.
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
ATTENDANCE RECORD
PREBID CONFERENCE
Project: Union Pacific Trail
Time: 10:00a.m.
Date: October 3, 2002
Location: At the intersection of Parklake Drive and Centennial Road
SAME
FIRM NAME
ADDRESS
ELEPHONE
FAX #
E-MAIL ADDRESS
7a-W�2Y
C Alllow
6��f
CF! dbytt
p
6+ L 4,r-/Z G �
r� 6�/
V
,
Gyre/
n/
t7oli-&,x g
✓C v 1IC�
i
`
`IRY9 �,
303•-
3�3—�`
ZI
. p I
z
.co
sP�wzi
735 �- (plor }h.0 54
oBfr�l-OV
3c3-`h{2-1 io l
3°3_142._2.-L
eSPe rfPlme.4ePriSest�
. Co. Soy
October 10, 2002
CITY OF FORT COLLINS
PLANHOLDERS LIST FOR
BID #5737
UNION PACIFIC TRAIL
G R CONSTRUCTION BRIGHTON LANDSCAPING
1908 MEADOW VALE ROAD 397-S 24T" AVE
LONGMONT, CO 80504 BRIGHTON, CO 80601
PH 303-678-1127 PH 303-654-0840
FAX 303-678-5341 FAX 303-654-0161
BURKE CONCRETE
AQUATIC & WETLAND
2900 SUMAC STREET, #3
9999 WELD COUNTY RD. 25
FT. COLLINS, CO 80526
FT. LUPTON, CO 80621
PH 970-308-1115
PH 303-442-4766
FAX 970-484-1062
FAX 303-857-2455
WALSH CONSTRUCTION
WORK-A-HAULICS
5828 N ST. LOUIS AVE
820 E COUNTY RD. 58
LOVELAND, CO 80538
FT. COLLINS, CO 80524
PH 970-622-8227
PH 970-484-0888
FAX 970-278-9396
FAX 970-484-9082
L & M ENTERPRISES G L HOFF
P O BOX W P O BOX 7448
BERTHOUD, CO 80513 LOVELAND, CO 80537
PH 970-532-3706 PH 970-669-3255
FAX 303-442-2231 FAX 970-663-1566
TLM CONSTRUCTORS
EXPRESS CONCRETE
P O BOX 336638
5305 ZIEBLER RD
GREELEY, CO 80634
FT. COLLINS, CO 80528
PH 970-346-8323
PH 970-225-1287
FAX 970-346-8324
FAX 970-229-0846
BROWN CONSTRUCTION SINNETT BUILDERS
P O BOX 1048 P O BOX 1969
WESTMINSTER, CO 80036-1048 FT. COLLINS, CO 80522
PH 303-430-8935 PH 970-493-1770
FAX 303-430-8940 FAX 970-482-4532
H & L CONCRETE
651 28T"
COLORADO CONSTRUCTORS
ST
GREELEY, CO 80631
6810 N BROADWAY, SUITE B
PH 970-356-7909
DENVER, CO 80221
PH 303-427-0868
FAX 970-356-0887
FAX 303-427-0882
Project: Union Pacific Trail
BID SCHEDULE (BASE BID)
Bid items are described in Section 01800
BID
ESTIMATED
UNIT
ITEM
ITEM #
DESCRIPTION
QUANTITY
UNIT
PRICE
TOTAL
1
Mobilization
1
LS
$
$
General Conditions
1
LS
$ \21-1b'
$ �a18
2
Traffic Control
1
LS
$ \2 00 0l
$ \a
3
Demolition
1
LS
$2 16zo
$� $
4
Topsoil Removal/Replacement
1420
CY
$—�
5
Erosion Control
1
LS
$ 73.'�175 J
$ aQ�
6
Earthwork: Cut
102
CY
T �
7
Earthwork: Import Fill
490
CY
$ aQ
$ 98�°a
8
Various Pipe Extensions
1
LS
$ \O C�o�
$
9
Concrete Trail 10' wide, 5" thick
49820
SF
$ a-g3
$ iy0 0
10
Handicap Ramp
2
LS
$ \goy
$ 36
11
Fine Grading
1.72
AC
$ \90�3=
$ 16A0�o
12
Metal Gate
2
LS
$ %75�'
$ \{,SO"'
13
Seeding
1.72
AC
$ a5ao
$
TOTAL OF BASE BID
rL �\®yS�n� 0t,'-
(written) �oA�ncy o.- a S;,�T,,V "^1,5
$ 1`11\O5
Figure
Section 00300 Page 3
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410Bid Bond
00420Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
7/96 Section 00410 Page 1
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned
as Principal, and as
Surety, are hereby held and firmly bound unto the City of Fort Collins Colorado
as OWNER, in .the sum of $ for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction of
Fort Collins Project, UNION PACIFIC TRAIL DRAKE ROAD TO HORSETOOTH ROAD; Bid No.
5737.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a
Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
7/96 Section 00410 Page 2
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this day of , 20 , and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
above.
PRINCIPAL
Name:
Address:
By:
Title:
ATTEST:
By:
(SEAL)
7/96
sm
Title:
SURETY
(SEAL)
Section 00410 Page 3
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: ZAK DIRT, INC.
2. Permanent main office address: 14290 HILLTOP ROAD LONGMONT. CO. 80504
3. When organized: 1976
4. If a corporation, where incorporated: COLORADO _
S. How many years have you been engaged in the contracting business under your
present firm or trade name? 26 YEARS
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
7. General character of Work performed by your ccmpany:
EARTHWORK, CONCRETE STRUCTURES, PIPE WORK,
8. Have you ever failed to complete any Work awarded to you?
If so, where and why? NO
9. Have your ever defaulted on a Contract? NO
If so, where and whv?
10. Are you debarred by any government agency? NO
If yes list agency name.
7/96 Section 00420 Page 1
ll. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and vear location and type of construction. completed,
17. TLst your major equipment available for this contract.
150 LOADER/210 JOHN DEERE/416 TIB/ D-6 DOZER
13. Experience in construction Wor'v, similar in importance to this
preject:
TRAIL/ EARTHWORK
i
i4. Background and experience of the principal members of your organization,
including officers:
15.
Credit available: $ 500 Don no I .
ln.
Eank reference: SEE ATTACHED SHEET
17,
ill you, upon request, fill out a detailed
a n V c=her information
financial statement d
furnisOWNERh
that may be
required by the
i0.
Are you licensed as a General CONTRACTOR?
YES
11 yes, in what city, county and state?
class, license and numbers?
CDOT UNT T •TTED
DENZER,COLQRAD0
805.4
_What
i9.
Do you anticipate subcontracting Work under
If
this Contract?
:es, what percent of total contract?
1% ---YES
and tc ,,hcm? CARNES TRAFFIC CONTROL
20.
Are any lawsuits pending :;cainst you or your
firm
Tt
at this time? NO
DE:ATL_
yes,
7/96
Section 00420 Page 2
21. What are the limits of your public liability? DETAIL
What company? TRAVELERS !NStTRANCE
22. What are your company's bonding limitations? _
$?non_nnn nn
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
VV
Dated at 0 ..r, this day of OCfchct 200->.
Nam o Bi er
By: O1 54 1e�
Title:
State of Lp�o:a
County of W'"�
of
being duly sworn deposes and says that he is
and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this U; — day of
No ary P
My commission expires
Mr Commission Expires Janurary 31, 2005