Description of Bid #5696 South Shields Street Improvements
OPENING DATE: April 16, 2002, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above,
the following changes are hereby made.
Bid item clarifications: The highlighted items are the changes that have been made
210-04
Adjust Manhole Ring/Cover
10
EA
304-03
Aggregate Base Course — (CI 5 or 6) — 6" Depth — (CIP)
225
TON
403-07
Asphalt Hand Patching — Grading SG PG 64-22 Binder
55
TON
608-08
Concrete Sidewalk 7' (Thickness = 6")
2325
SF
608-10
Concrete Crosspan and Aprons (Thickness = 8")
250
SF
608-11
Concrete Sidewalk (Various Widths) — (Thickness = 4")
1000
SF
2810-02
Sprinkler Line Install
300
LF
NOTE: Attached
is a new Bid Schedule that reflects the above changes.
Please disregard
the
previous
Bid Schedule and use the attached in it's place.
11. Item Description Clarification:
• Roll -Over Curb and Gutter— This item includes curb and gutter and sidewalk that has been monolithically poured
• 630-03 Night Time Traffic Control — This item will cover the weekend closures that will be necessary to mill
and overlay the Prospect and Shields Intersection and will be paid for as a lump sum price.
• Landscaping Maintenance — This item (as defined in the specifications) has a warranty period of 2 years. During
the 2 year warranty, the landscaper will be required to mow and keep the parkway clean until final acceptance.
• Orange 4' Safety fence with T-Posts (Approx. 300 feet) shall be installed along the staging area during
construction.
If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Page -1-
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
Project: South Shields Street Improvement Project ADDENDUM #1
spectra.
NumMr
Description
Esmabd tl
OuantiN
Unit Unit Cost item cost
South Shields Street Quantities:
202-01
Remove Vertical Curb 8 Gutter
285
LF
202.02
Remove Cmsspan, Apron, Driveway
860
SF
202-03
Remove Roll Over Curb
160
SF
202-N
Remove Asphalt S-8-thlck
2.390
SY
202-05
Remove Sidewalk
8.295
SF
202-06
Remove Concrete Light Pde Bases (Top T) and Haul
3
FA
202-07
Remove Exisibng Inlet Type R 5'
2
EA
202-08
Remove Tree Sol (Avg Width = 48' Diameter)
1
EA
202-09
Remove Landscape Boulders (Comer of Stuart and Shields- apprax. 4'-8' cobbles)
1
LS
203.01
Unclassified Excavation
2,350
CY
20M2
Embankment (CIP)
2,020
CY
20M3
Bomrv- Suitable Fill Materd(Udorrein Circumstances Only)
517
CY
203-04
Haul and Dispose
330
CY
203-05
Muck Excavation (CIP)
275
CY
20M6
Bopow, ABC( cl 5 or 6) CIP
385
TON
203.07
Topsdl(shipping, stockpile, placing)
730
CY
203.08
Swele Grading
615
LF
203-09
Pothding
1
LS
208-01
Erosion Control
1
LS
21D01
Adjust Manhole Ring,Cover
5
EA
21D02
Mai Mai
2
EA
21093
Adjust Valve Box
4
EA
30"1
Aggregate Base Course - (CI S or 6) - 6' Depth - (CIP)
3,180
TON
304-02
Aggregate Base Course Patch Placement -(CI5 or 6)-6-Depth-(CIP)
200
TON
3W01
Recomiboning(8')
2.435
SY
307-01
Flyesh Subgrade Stablllzatun(12k)
7,300
SY
40Y01
Hot Bituminous Pavement- Grading S(4- Depth) (PG 7628)
2,430
TON
40302
Hot Bituminous Pavement - Grading SG (6-Depth) (PG 84-22)
3,180
TON
403-03
Asphalt Paver Patching - Gradbg S (4- Depth) PG 6 n Binder
100
TON
403N
Asphalt Paver Patching- Grading SG (7' Depth) PG Ga22 Binder
150
TON
412-01
Portland Cement Concrete Pavement (1PDepth)
260
SY
420-0i
Mlrae Filter Material
800
SY
50B-01
16x20'X1.5' Class 12 RipRap with 6-topsail (CIP per derall)
33
SY
506-02
5'x5'X1.5 Class 12 Rip -Rep with 6' topsoll(CIP per detail)
6
SY
603-01
4- PVC Schedule 2001mgation Sleeving
100
LF
604-01
5' Type R hall
1
EA
604-02
Combination Type 131nlet
1
EA
608.01
Concrete Sidewalk 7' (Thickness = 6-)
9,000
SF
WS02
Concrete Aces Ramps with Colored Landings (Thickness =6')
1,860
SF
608.03
Concrete Canal and Aprons (Thickness=l0')
900
SF
608-N
Concrete Bus Pad (Thickness = 6')
250
SF
W"5
Paaerenad Asphalt Crosswalks
3,000
SF
608.06
Hi Early Concrete
75
CY
608.02
Flaw Fill
150
CY
609-01
Vertical Curb and Gutter
1,200
LF
609-02
RdpOver Curb and Gutter
100
LF
619-01
8"x2"Plug and slow ON
1
EA
619.02
NNW' Tapping Saddle(FC Spec)
1
EA
619-03
8' Taping Valve and Connection
1
EA
619-04
8-DIP with Pdy Wrap
40
LF
619-05
Imnall 72" Valve Mani aver Exisiting 30'
1
EA
619-06
IMgation Seri (3l4')- City of Fan Collins Spec
1
EA
Subtotal South Shields Street Quantities: $
Pavement Management - Street Rehabilitation Quantities:
202-10
Rotomill Monett (Avg. Depth = 4-)
12,000.0
SY
202-11
Remove Glue-0own Curb & Gutter with Hardscape
1.0
LS
202-12
Remove Vertical Curb & Gutter
05
LF
202.13
Remove Crosspan, Apron, Driveway
610
SF
202-14
Remove Roll Over Curb and Gutter
90
LF
202-15
Remove Asphalt Pavement (Y-8-thick)
2.000
SY
202-16
Remove Sidewalk
3,225
SF
202-17
Cap oe Imrigation I Sprinkler
4
EA
20&10
Unclassified Excavation
60
CY
203-11
Embankment
60
CY
203-12
Borrow ABC ( cl 5 or 6 ) OP
130
TON
210-N
Adjust Mani RinglCover
10
EA
210-05
Adjust Valve Box
T
EA
3 -03
Aggregate Base Course - (CI 5 or 6)-V Depth -(CIP)
225
TON
40305
Hot Bituminous Pavement - Grading 8 (4-Depth) (PG 76.28)
31000
TON
40G06
Hot Bituminous Pavement -Grading SG (6-Depth) (PG6,i
275
TON
4O-07
Asphalt Hand Parching - Grading SG PG 6422 Bitter
55
TON
60MB
Concrete Sidewalk 7' (Thickness = 6-)
2.325
SF
608-09
Concrete Acess Ramps with Colored Landings (Thickness = F)
360
SF
60&10
Concrete Christian and Aprons (Thickness = 81
2W
SF
60&11
Ccecreb Sidewalk(Various WlMhsl- (Thickness •4')
1.000
SF
609-03
Vertical Cut and Gutter
625
LF
60&04
Roll -Over Cut and Gutter
180
LF
Subtotal Pavement Management - Rehabilitation Quantities: $
Landscaoino
Quantities:
2810.01
Inigadon
1.0
LS
2810.02
Sprinkler Line Install
300
LF
2900-01
Burr Oak - 2' Caliper B&B
38
EA
2900-02
Import Topsdl(Screened-3- Depth) -(BOC)-(CIP)
300
CY
2900-03
Tud Sod
2,700
SF
2900-N
Ede Prep Replacement
1.300
SY
Subtotal Landscaping Quantities: $
Miscellaneous Quantities:
-
Contract Bond
625.01
Construction Surveying
626.01
Mabllicition
630-01
Type Ill Banned.
630-02
Traits Control
63P03
Night Time Traffic Control
Subtotal Misc. Quantities: $
TOTAL CONSTRUCTION COST as
IN
Fi