Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout113294 DRAHOTA CONSTRUCTION - CONTRACT - BID - 5684 TRAFFIC OPERATIONS FACILITY (3)Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
BID #5684
TRAFFIC OPERATIONS FACILITY
ADDENDUM No. 2
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid Package: Bid No. 5684, Traffic Operations Facility
OPENING DATE: 3:00 p.m. (our clock) March 22, 2002
To all prospective bidders under the specifications and contract documents described
above, the following changes are made:
A. DRAWINGS:
1. SHEET A1.1, Main Floor Plan:
a.) Add base and upper cabinets to north wall of Work Area 111. Raise all
electrical outlets to above counter height. Refer to details on attached sheet AD-1.
b.) Provide 24" wide x 48" high FRP panels, at south and west walls, above mop
basin, in southwest corner of Mechanical Room 117. Also, provide mop holder and
shelf unit, model number B224 x 30, by Bobrick, or equal, above mop basin, on
west wall.
c.)Delete workstation units, from North & South walls of Crew Room 128.
2. SHEET A2.1:
a.) Rename Detail 4 to read, "SCUPPER and CONDUCTOR HEAD DETAIL".
b.) At Detail 5, there should be a 2" maximum vertical dimension shown, where the
roof meets the wall / scupper.
c.) At SECTION THRU LADDER, Detail 3, add blocking, in stud wall, for ladder
anchoring.
3. SHEET A3.4:
a.) Add metal ceiling joists and 5/8" gypsum board lid to the top of wall at Detail 4,
WALL SECTION 12. Joists to be 6" x 20 Ga. @ 16" O.C.
4. SHEET A3.5:
a.) At Detail 8, modify precast window sill shape. Refer to details on attached
sheet AD-2.
b.) Add precast window sill details. Refer to attached sheets AD-3 and AD-4.
c.) Add typical wall parapet details, for clarification. Refer to attached sheets AD-
5, AD-6 and AD-7.
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
1