No preview available
HomeMy WebLinkAbout113294 DRAHOTA CONSTRUCTION - CONTRACT - BID - 5684 TRAFFIC OPERATIONS FACILITY (3)Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS BID #5684 TRAFFIC OPERATIONS FACILITY ADDENDUM No. 2 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid Package: Bid No. 5684, Traffic Operations Facility OPENING DATE: 3:00 p.m. (our clock) March 22, 2002 To all prospective bidders under the specifications and contract documents described above, the following changes are made: A. DRAWINGS: 1. SHEET A1.1, Main Floor Plan: a.) Add base and upper cabinets to north wall of Work Area 111. Raise all electrical outlets to above counter height. Refer to details on attached sheet AD-1. b.) Provide 24" wide x 48" high FRP panels, at south and west walls, above mop basin, in southwest corner of Mechanical Room 117. Also, provide mop holder and shelf unit, model number B224 x 30, by Bobrick, or equal, above mop basin, on west wall. c.)Delete workstation units, from North & South walls of Crew Room 128. 2. SHEET A2.1: a.) Rename Detail 4 to read, "SCUPPER and CONDUCTOR HEAD DETAIL". b.) At Detail 5, there should be a 2" maximum vertical dimension shown, where the roof meets the wall / scupper. c.) At SECTION THRU LADDER, Detail 3, add blocking, in stud wall, for ladder anchoring. 3. SHEET A3.4: a.) Add metal ceiling joists and 5/8" gypsum board lid to the top of wall at Detail 4, WALL SECTION 12. Joists to be 6" x 20 Ga. @ 16" O.C. 4. SHEET A3.5: a.) At Detail 8, modify precast window sill shape. Refer to details on attached sheet AD-2. b.) Add precast window sill details. Refer to attached sheets AD-3 and AD-4. c.) Add typical wall parapet details, for clarification. Refer to attached sheets AD- 5, AD-6 and AD-7. 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 1