HomeMy WebLinkAboutRESPONSE - BID - 5694 BACKFLOW TESTINGBID SCHEDULE - BID #5694
BACKFLOW ASSEMBLY
TESTING AND REPAIR
Award will be based on lowest total for all phases (1 through 3) of the Bid Schedule.
Provide testing of any size PVB
2. Provide testing of any size RP
3. Repair labor rates
$ 5 01� per test X 76 = $�
$ `� 5per test X 55 = $�
$ LAS,2 per hour X 6 hrs $
Od
GRAND TOTAL $__�
4. Minimum charge if any
5. Maximum material mark-up City will pay:
1) < $500.00 + 10% Bidder's mark-up_%
2) > $500.00 + 8% Bidder's mark-up _DS—%
Since miscellaneous materials and minimum charge will be a minor factors with this
contract in most cases, they will not be calculated in bid method of award, but contractor
must honor both mark-up rate and minimum charge.
FIRM NAME ((_ d$EQ� QV SgVt SKa�yLe L (�
Ar you a Corpo tionn, Partnership, DBA, LLC, or PC
SIGNATURE19. - I
ri-l , "QCj� 0. 6os z q
PHONE/FAX# A\� )% d1o1b`2JZt$JA 1Cj,1011j