HomeMy WebLinkAboutAddenda - BID - 5683 2203303 CABLE 27 WORK A HAULICS (6)Admini Jive Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
CABLE 27 STUDIO AT CITY HALL — PHASE 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5683 Cable 27 Studio At City Hall — Phase 1
OPENING DATE: March 15, 2002, 3:00p.m. (Our Clock)
To all proposed Bidders for the above -referenced project, the following changes are hereby made and
will become a part of the Contract Documents:
A. General:
1. There is no known Geotechnical report for this site.
2. Contractor shall include in the base bid four (4) eight (8) hour days of weekend construction
for the entire anticipated crew.
3. All demolition of existing equipment shall be by contractor. The owner shall remove
miscellaneous furnishings in the construction area.
Contractor shall coordinate mechanical and electrical disconnect with the owner. Owner shall
disconnect or shut down existing before contractor removal.
5. In section 13.12.1 and 13.12.3 Correction Period, of the General Conditions, change two (2) years
to one (1)year. There may, however, be specific warranty requirements in various specification
sections of this document.
B. Specifications:
1. Section 01024, MULTIPLE BID PACKAGES, Paragraph 1.02 B work of bid Package 2
Clarification: A release date for Bid package #2 has not been defined.
2. Sections 01590, FIELD OFFICES AND SHEDS, Paragraph 2.01 TEMPORARY FIELD
OFFICE.
Delete Paragraph 2.01. No field office is required
3. Section 07130, 07150 Waterproofing, Dampproofing paragraph 1.01 WORK INCLUDED:
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (9701 221-6707
Addendum 11
Clarification Waterproofing shall occur at occupied spaces and concrete vault. Dampproofing
shall occur at retaining walls.
C. Drawings:
1. Sheet X1,
Delete General note #2
Delete 1 the southernmost 3'-4"X7'-0" saw cut door opening in northeast wall.
The concrete pad (approximately 4'-0"X4'-0") in approximately the center of room B12 is
to be removed.
2. SheetA1.1,
Delete temporary infill at deleted opening.
Add concrete leveling compound @ all removed concrete pads.
If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
Addendum #1