Loading...
HomeMy WebLinkAboutBID - 5683 2203303 CABLE 27 WORK A HAULICSSECTION 00300 BID FORM PROJECT: CABLE 27 STUDIO AT CITY HALL -PHASE 1; Bid No. 5683 Place $ /y0✓�i y,�, !� Date 1. In compliance with your Invitation to Bid —dated /iiGliLr 3CD% and subject tPp a 1 conditions thereof, rsigned JaE-A- % ;(,C. �l a (Corporation Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or c}shker's check or standard Bid bond in the sum of�.e4/� iw�. J�t1� ✓✓�, t. z; �: ��/�.�. (Sy�o7irA9 Instructions to Bidders. in sccordance with the Invitation To Bid and 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performances and p�}yment bonds is as follows: %/�iy�lr 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. N through. 7/96 Section 00300 Page 1 G.L. Hoff Company CONTRACTO BY: Greg ry L. Hoff Presi ent ADDRESS: 1815 West 12th Street Loveland, CO 80537 8. BID SCHEDULE (Base Bid) LUMP SUM TOTAL A�LIARS ($ 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (250) of the total Agreement Price, RESPECT ULLY SUBMITTED- y y o20Da Signa r p ry o Y, Date President / Title #B-6 License Number (If Applicable) (Seal - if Bi is by cor ration) Attest: Zirm Hof .Tress. Address PO Box Loveland, CO 80537 Telephone 970-669-3255, fax 970-663-1566 7/96 Section 00300 Page 2 STATEMENT OF BIDDER'S QUALIFICATIONS .--- n•-'=-+- musC e answered and t— data given must be Clear a- -cmp^ehens ve. This statement must be notarized. If necessary, questions may On separate attached sh2ets. The Bidder may submit env additional information he desires. 1. Name of Bidder: G.L. Hoff Company =. Permanent main office address: 1815 West 12th Street, Loveland, CO 80537 3. When organized: January 1984 4 IF a corporation, where incorporated: Colorado 5. How many years have you been engaged in the contracting business under your present firm or trade name? eighteen years E. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) Rehabilitation of Owl Creek Ditch• $374 057 00 completion 3-2002 7. General character of Work performed by your company: Commercial general contractor: complete the following areas with our own forces. sitework, concrete, carpentry, project management. 6. Have you ever failed to complete any Work awarded to you? no If so, where and whv? 9. Have your ever defaulted on a contract? no If so, where and why? 10. Are you debarred by any government agency? no I_' ves list agency name. I 4 1 7/96 Section 00420 Page 1 L roja_cs ur = ,redny, sca" Cn_ dpprJ:i : did=2 VCOoC of each, and cn mon-_n and yedr cumpieCea' location the attached lists ��. JOLT m34,or equipment available for this contract. dump truck, CAT 928 loader, CAT 320 track excavator, backhoe bobcat motor grader, grading tractor, concrete pumD 13. Experience in construction Work similar in importance to this Project: Please refer to the attached lists 14. Background and experience of the principal members of your organization, including officers: Please refer to the attached lists 15. Credit available: $ $250,000.00 16. Bank reference: Loran Emmonds, Bank One Loveland, CO 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the " OWNER? yes 18. Are you licensed as a General CONTRACTOR? yes If yes, in what city, county and state? Fort Collins and others What class, license and numbers? #B-6 I 19. Do you anticipate subcontracting Work under this Contract? yes If yes, what percent of total contract? and to whcr::? Please refer to section 430 70. Are any lawsuits pending against you or your firm at this time? if DE.=.IL 7/96 no Section 00420 Page 2 yes, I i 1 7 j? ETA:7 2 million plus 2 million umberlla s'•':' Travelers Insurance. Agent: Flood & Peterson What are .your company's bonding limitations? 5 million The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the .OWNER in verification of the recital comprising this Statement of Bidder's '2ualiflcations. I U I [J I I gated at Loveland this 4th day of April 2002. ._t_e: Miriam T. Hoff, Secretary Treasurer State Of Colorado County of Lorimer Miriam T. Hoff being duly sworn deposes and says that he is Sec. Treas. of G.L.Hoff Company and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this Y _ day of , 2oC?. � L/ it � L241 otary Pub is / My �:cmmission expires /_' - 03 7/96 Section 00420 Page 3 G.L. Hoff Company 2001 Projects Elkhorn Retail Shops Construction of a new, two story, 16,000 square foot retail building in Estes Park. The scope of work included contaminated soil remediation, foundation, utility lines, building construction, rough in for twelve retail units, exterior finishes, elevator, mechanical and electrical. Owner: Ed Grueff, 970-586-5421 3225 Devils Gulch Road Estes Park, CO 80517 Contact: owner Contract: $1,248,085.00 Completion: September, 2001 Edora Skate Park Construction of a new concrete, in ground, skate board park with flat and vertical curved concrete work. Scope of work included excavation, structural steel, and shotcrete work. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Jason Stutzman, 970-221-6366 Park Planning and Development Contract: $347,846.00 Completion: August, 2001 East Drive to Center Street Steam Loop Construction of concrete trench and installation of steam piping for Colorado State University. Scope of work included excavation, structural concrete, and mechanical work. Owner: Colorado State University 365 Aylesworth Hall Southeast Fort Collins, CO 80523 Contact: Cass Beitler, Project Manager, 970-491-0158 Contract: $667,652.00 Completion: August, 2001 Pella Crossing Irrigation System Improvements Installation of a new submersible pump and guide rail system and construction of a new set well and piping. Scope of work included removal of existing lake pump, wet well, catwalk and discharge piping, and installation of meter pit, discharge line, suction line, intake screen, slide gate, and sitework. Owner: Boulder County 2040 14th Street Boulder, CO 80302 Contact: Kenneth V. Sjodin, 720-622-0109 Boulder County Parks and Open Space Contract: $92,305.85 Completion: May, 2001 George Rist Dam Rehabilitation Project Construction of new outlet structure, repair of damaged section of dam and replacement of riprap. Scope of work included excavation, sitework, structural concrete and pipeline installation. Owner: City of Loveland 500 East Third Street Loveland, CO 80537 Contact: Rod Chapman, Project Manager, 970-962-2454 Contract: $157,918.00 Completion: July, 2001 Geist Reservoir Dam Rehabilitation Project Repair of dam and outlet. Scope of work included construction of coffer dam and excavation for new outlet, installation of outlet, upstream and downstream headwalls, sluice gate, staff gage and trash rack, removal and replacement of existing spillway culvert, raise top of dam, and set riprap. Owner: Frank Walsh PO Box 30 Sterling, CO 80751 Contact: David Marsh, Project Engineer, 970-490-2620 Smith Geotechnical Engineering Consultants Contract: $37,895.25 Completion: February, 2001 G.L. Hoff Company 2000 Completed Projects Arkins Pump Station Construction of cast in place buried pump building includins interior piping, pump equipment, installation of manual hoist and sectionalizing valve, earthwork, and reclamation of construction site. Owner: Little Thompson Water District Mike Cook PE, (970) 532-2096 835 East Highway 56 Berthoud, CO 80513 Contact: The Engineering Company Warren Mesloh, (970) 484-7477 Contract: $86,538.00 Completion: February, 2000 Centennial Village Pump Station Construction of non -potable water pump station including well drilling, pump system, building construction, electrical, and landscaping. Owner: City of Greeley Phil Carter, (970) 350-9826 1000 1Oth Street Greeley, CO 80631 Contact: Amy Johnson, Aqua Engineering, (970)229-9668 Contract: $119,511.00 Completion: February, 2000 Associated Thermoforming, Inc Pre-engineered metal building addition and remodel of manufacturing facility. Scope of work included sitework, landscaping, structural and site concrete, metal building construction, mechanical, electrical. Owner: Associated Thermoforming, Inc. 765 Second Street Berthoud, CO 80513 Contact: John Nix. President (970) 532-2000 Contract: $806,679.00 Completion: August, 2000 Colorado State University Condensate Replacement Phase 16 G/H Remove existin_ underground condensate lines from campus main lines to building entrances For CSU heating system. Scope of work included excavation, landscaping, concrete tunnels, piping and insulation. Owner: Colorado State University Facilities Services Fort Collins, CO 80523 Contact: Jim Stoddard, Project Manager, 491-0138 Contract: $319,552.00 Completion: October, 2000 Colorado State University Steam and Condensate Insulation Repair Insulation repair to existing underground steam and condensate lines at CSU. The scope of work included excavation, landscaping, concrete, mechanical and piping insulation, and tunnel lid replacement. Owner: Colorado State University Facilities Services Fort Collins, CO 80523 Contact: Jim Stoddard, Project Manager, 491-0138 Contract: $263,306.00 Completion: October, 2000 Colorado State University: University Avenue Plaza Three projects combined for the removal of an road through campus and construction of a landscaped plaza. The scope of work included demolition, structural and flatwork concrete, paving stones, masonry, landscaping, asphalt, drain line, fencing and bike parking. Owner: Colorado State University Facilities Services Fort Collins, CO 80523 Contact: Bill Conn, Project Manager, 491-0145 Contract: $302,796.00 Completion: October, 2000 Colorado State University Master Storm Drainage Phase H Construction of a storm water drain system including excavation, installation of storm sewer and manifold pipe, precast vaults, manholes, asphalt paving. cast in place concrete, masonry and landscaping. Owner: Colorado State University Facilities Services Fort Collins, CO 80523 Contact: Jim Stoddard, Project Manager, 49 1 -0 13 8 Contract: $219,773.00 Completion: December 2000 Harmony Substation Constriction of containment facility for the City of Fort Collins substation. The scope of work included excavation, concrete catch basin, drainage channel, and concrete box, sand interceptor/imbiber bead vault, installation of precast containment tank, and concrete flow fill. Owner: City of Fort Collins 700 Wood Street Fort Collins, CO 80521 Contact: Anthony Barsoom, Project Manager, 482-5922 Sear -Brown Group, Engineering Contract: $85,739.68 Completion: August, 2000 Emerald Glen Pump Station Installation of a new non -potable water pump station and transfer pump station for neighborhood irrigation system. Scope of work included sitework, irrigation, and abandonment of potable water sprinkler taps. Owner: Glen Properties 2707 West Eisenhower Blvd. Loveland, CO 80538 Contact: Richard Aust, Engineer, 970,229-9668 Aqua Engineering, Inc. Contract: $321,668.50 Completion: August, 2000 Home State Bank Interior Remodel Interior remodel of the first and second floor of the main bank building. Scope of work included construction of new walls, interior finishes, and electrical. Owner: Home State Bank Contact: Contract: Completion 935 North Cleveland Loveland, CO 80537 Mary McCambridse, Bank Officer, 669-4040 $97,824.00 October, 2000 G.L. Hoff Company 1999 Completed Projects Equalizer Dam Project Construction of new structural concrete dam outlet structure at the Equalizer Reservoir. Work included removal of existing structure, excavation, concrete foundation and walls, gate system, and sitework. Owner: Greeley & Loveland Irrigation Company Ron Brinkman, (970) 352-0495 Contact Contract: Completion Rideeview Park Construction 808 23rd Avenue, Greeley, CO 80631 Boyle Engineering, Lee Queen (30))987-3443 165 South Union Blvd., Suite 200 Lakewood, CO 80228 $308,752.00 2-99 Construction of a new city park for the Fort Collins including demolition, layout, earthwork and drainage, utilities rough -in, irrigation, site paving and surfacing, fine grading and seeding, playground, picnic shelter and furnishings, lighting, and landscaping. Owner: City of Fort Collins 256 West Mountain Avenue Contact Contract: Completion: Mosier Hill Non -Potable System Fort Collins, CO 80521 Craig Foreman, 221-6366 Parks and Recreation Department $200,900.00 3-99 Construction of a non -potable water irrigation system including precast concrete building, aeration system, pump system intake, irrigation pond lining, cast in place concrete, irrigation pump system, and electrical. Owner: City of Greeley 1300 A Street Greeley, CO 80631 Contact: Phil Carter, (970)350-9826 City of Greeley Contract: $193,963.00 Completion: 3-99 CONTRACTOR BY: gat, ADDRESS: / ,� S � �� _�_� d 6. BID SCHEDULE (Base �Bid) / LUMP SUM TOTAL _ear �1 L1 9. PRICES The foregoing prices shall include all, labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. CTFULLY SUBMITTED: Signatur Date —,C�'!U� Pre 5 Title E-63 P /)2- 0/4 - / �(rd�N�� License Number (If Applicable) (Seal - if Bid is by corporation) Attest • V_� :! q,_, j�L Address �t Telephone 7/96 D Section 00300 Page 2 Fossil Creek NN est Construction of a concrete bike and pedestrian trail section west of Taft Hill Road for the City of Fort Collins trail system. Scope of work included sitework, grading, concrete, bridge installation, fencing, and seeding. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221,6366 Park Planning and Development Contract: $168,642.00 Completion: I 1-99 Nielson Greenway Construction of a concrete and crusher fines pedestrian trail for the Town of Berthoud. Scope of work included extensive site grading, storm sewer, soil preparation, concrete sidewalk and curb ramp and stone trail. Owner: Town of Berthoud P.O. Box 1229 Berthoud, CO 80513 Contact: Marty Lafontaine, 532-2643 Parks Department Contract: $121,548.60 Completion: 11-99 L&M Parking Lot Construction of the L & M Parking Lot at the University of Northern Colorado. The scope of work includes sitework, grading, concrete curb, gutter, walk, and drive pans, asphalt paving, and lighting. Owner: University of Northern Colorado Carter Hall 1002 Greeley, CO 80639 Contact: Scott McLean, (970) 351-198 University of Northern Colorado Contract: $223,377.00 Completion: 12-99 Cnth� Froninte Prairie Parking Area Construction of a parking area at Taft Hill Road and Harmony in Fort Collins. Project includes demolition of existing roadway, concrete curb & gutter and asphalt paving. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221-6618 Parks and Recreation Department Contract: $101,412.00 Completion: 11-99 Fossil Creek Trail West of Taft Hill Construction of a section of the Fort Collins bike trail system. Work includes sitework, concrete sidewalk and bridge abutments, pedestrian bridge and seeding. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221-6618 Parks and Recreation Department Contract: $156,247 Completion: 10-99 Loveland Office Max Construction of all concrete work for the new Office Max facility. Work includes excavation for foundation, and sitework, concrete building foundation, floors and all site concrete such as curb and gutter, sidewalks, dock and pads. Owner: TCC-BTS Loveland OM, Inc. 7535 E. Hampden Avenue, Suite 650 Denver, CO 80231 Contact: Tap Pritchard, (303) 843-1947 Contract: $191,845.00 Completion: 10-99 G.L. Hoff Company 1998 Completed Projects Cathy Fromme Prairie Parking Lot Construction of new parking lot including earthwork, asphalt paving, paving blocks, seeding, and fencing. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221-6366 Parks and Recreation Department Contract: $78,431.00 Completion: 3-98 Loveland Rental Center Construction of new rental center facility including sitework, concrete paving and flatwork, masonry buildings and finishes. Owner: Bill and Debbie Mortellaro 211 Barberry Place Loveland, CO 80537 Contact: Bill Mortellaro, 669-6060 Contract: $495,705.00 Completion: 4-98 Ivy and Rockwell Street Bridges Bridge repairs including sitework, grouting, and new concrete and masonry railings. Owner: Town of Estes Park 170 MacGregor Avenue Estes Park, CO 80517 Contact: Greg Sievers, 586-5331 Town of Estes Park Contract: $173,574.00 Completion: 4-98 Fossil Creek Trail Constriction of concrete bike and pedestrian trail section east of Taft Hill Road for City of Fort Collins trail system. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Craig Foreman, 221-6366 Parks & Recreation Department Contract: $111,569.00 Completion: 3-98 Golden Ponds Fishing Pier Construction of a handicap accessible fishing pier with caisson foundation, concrete and steel pier structure, wood decking, shoreline grading, riprap and concrete walk construction. Owner: City of Longmont 1100 South Sherman Street Longmont, CO 80501 Contact: Paula Fitzgerald, (303) 651-8448 Contract: $38,046.00 Completion: 4-98 LDS Church Remodel Restroom remodel for the Church of Jesus Christ of Latter Day Saints for ADA requirements including electrical modification and interior finishes. Owner: LDS Church 1400 Lynwood Furt Collins, CO 80521 Contact: Douglas Coates, (307)635-4922 Douglas Coates, Architect Contract: $70,539.00 Completion: 4-98 Overland Trail Box Culvert Construction of a cast in place box Culvert extension to the existim, box culaert located at the Pleasant Valley canal and Overland Trail in Fort Collins. Owner City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Gary Martinson, 221-6605 Contract: $43,022.00 Completion: 4-98 Fromme Prairie Observatory Structure Construction of a reinforced concrete structure along the Fossil Creek Bike Trail to provide a raptor observation building. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Janet Meisel, 221-6367 Contract: $68,221.00 Completion: 8-98 Home State Bank Remodel of existing bank facility including interior remodeling and finishes and exterior sitework and facade renovation. Owner: Home State Bank 935 North Cleveland Avenue Loveland, CO 80537 Contact: Mark Bower, (970)203-6125 Home State Bank Contract: $156,000.00 Completion: 8-98 1998 Concrete Street Maintenance Remove and replace sections of concrete pavement to repair various areas on Mountain Avenue for the City of Fort Collins. Owner: City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact: Erika Rasmussen, 221-6605 Contract: $97,126.00 Completion: 5-98 North 1Fater Treatment Plant Sludge Basin Construction of an 88' s 160' reinforced concrete sludge basin at the Citv_ of Longmont North Water Treatment Plant including subgrade preparation, reinforced concrete push walls, asphalt pavement and drain line Contact UNC Non -Potable Irrigation Supply Construction of a non -potable irrigation supply for the University of Northern Colorado including earthwork, irrigation system, landscaping, pond and pump station, concrete walls and walkways, and PVD inline drains Owner: University of Northern Colorado Carter Hall, Greeley, CO 80639 Greeley, CO 80639 Contact: Scott McLean, (970) 351-1982 UNC Facilities Services Contract: $260,621.00 Completion: 11-98 G.L. Hoff Company Construction Experience Gregory L. Hoff, President and Construction Manager For the past twenty seven years, Greg has been involved with all aspects of construction from architectural drafting, surveying and carpentry to supervision and construction management. Graduating from Northeastern Junior College in 1972 with a degree in Civil Engineering Technology, his early work included surveying and architectural design and drafting. He has held a commercial contractor's license with the City of Fort Collins since 1976. Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, Longmont, Boulder, and Thornton. Prior to 1984, Greg worked with AI Hockett, Inc. initially as an architectural draftsman and progressing to project superintendent. He was also a partner in H&M Builders from 1976 to 1980. This company specialized in custom homes, tenant finish and custom millwork. Beginning in 1984, Greg started his own general contracting business, G.L. Hoff Company, which specializes in all types of commercial construction including sitework, excavation and concrete construction. As president and construction manager for G.L. Hoff Company, Greg works with a wide variety of projects including, schools, churches, city and government projects, city park developments, as well as many light industrial and concrete construction jobs. Greg oversees all project scheduling, review of construction procedures, quality control and safety enforcement. .Joel S. Reger, Estimator and Project Manager Joel has a Bachelor of Science Degree in Construction Management from Colorado State University and fourteen years experience in the construction field. He has continued his education with estimating seminars including training with American Building Company's estimating Access workshop. He is also an active member of the Sigma Lambda Chi honorary national construction fraternity. During the past ten years, as the chief estimator with G.L. Hoff Company, Joel has compiled bids and development estimates for projects valued at up to five million dollars. As estimator, he directs project bidding process as well as the review of specifications. He is also involved with project management, coordinating proposal requests and change orders with the architect or owner, overseeing material orders to insure that the project is completed in a timely manner and according to specifications. William L. Vance, Project Superintendent Bill brings over twenty three years of experience in construction related fields to his position as project superintendent. His background includes heavy equipment operating, truss construction, carpentry, and cost estimating. He also has experience in both commercial and residential property development from site work and utility lines through finish carpentry. Bill has built over five hundred new homes as well as several light commercial properties. His commanding knowledge of construction methods enables Bill to be an especially effective project superintendent. SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 20% of the contract. ITEM ,AM 7/96 SUBCONTRACTOR Section 00430 Page 1 1 6 6 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned G. L. Hoff Company as Principal, and Employers Mutal Casualty Company as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado as OWNER, in the sum of $ 5% of total bid for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, CABLE 27 STUDIO AT CITY HALL -PHASE 1; Bid No. 5683. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: 2. Permanent main office address: Q/2 QA41 nf�/ �� � ' go�iy 3. When organized: 4. If a corporation, where incorporated: 5. How many years have you been engaged in the contracting business under your present firm or trade name? 114L- 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate ant'cipated dates of completion.) Gl -P 7. G//e`n_eral character /qf oork perfo/ymed byT'your company: �A/%'+ S L �i T� / 8. Have you ever failed to complete any Work awarded to you? If so, where and why? 9. Have your ever defaulted on a contract? If so, where and why? 10. Are you debarred by any government agency? �Q If yes list agency name. 7/96 Section 00420 Page 1 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 15th day of March 2002, and such of them as are corporations have caused their corporate seals to be hereto affixed and these above. presents to be signed by their proper officers, the day and year first set forth PRINCIPAL Name: G. L. Hoff Company Address: 1815 W. 12th St. ATTEST: By. --.. (SEAL) 7/96 SURETY Empl2yers Mutual Casualty Company P.O. Box 441098 Aurora, CO 80044 By: -� _— Title: Attorney -in -Fact (SEAL) Section 00410 Page 2 AMC Insurance Companies P.O. Box 712 • Des Moines, Iowa 50303 N°" 469,948, CERTIFICATE OF AUTHORITY INDIVIDUAL ATTORNEY -IN -FACT KNOW ALL MEN BY THESE PRESENTS, that: 1. Employers Mutual Casualty Company, an Iowa Corporation 5. Dakota Fire Insurance Company, a North Dakota Corporation 2. EMCASCO Insurance Company, an Iowa Corporation 6. EMC.Property & Casualty Company, an Iowa Corporation 3. Union Insurance Company of providence, an Iowa Corporation7. The Hamilton Mutual Insurance Company, an Ohlo Corporation 4.' Illinois EMCASCO insurance Company, an Illinois Corporation hereinafter referred to severalty as "Company" and collectively as "Companies", each does, by these presents, make, constitute and appoint: CHRIS RICHMOND, RUSSELL MICHELS, DARLENE KRINGS, INDIVIDUALLY, FORT COLLINS, COLORADO .., ..... ......... its true and lawful attorney -in -fact, with full power and authority conferred to sign, seal, and execute its lawful bonds undertakings, and other obligatory instruments of a similar nature as follows. IN AN AMOUNT NOT EXCEEDING TEN MILLION DOLLARS .......„ . ....... ........................... ............. ($10,000,000m) and to bind each Company thereby as fully and to the same extent as if such instruments were signed by the duly authorized officers of each such Company, and all of the acts of said attorney pursuant to the authority hereby given are hereby ratified and confirmed. The authority hereby granted shall expire April 1, 2003 unless sooner revoked. AUTHORITY FOR POWER OF ATTORNEY This Power•of-Aftorney Is made and executed pursuant to and by the authority of the following resolution of the Boards of Directors of each of the Companies at a regularly scheduled meeting of each company duly called and held in 1999 RESOLVED: The president and Chief Executive Officer, any Vice President, the Treasurer and the Secretary of Employers Mutual Casualty Company shall have power and authority to (1) appoint attorneys -in -fact and authorize them to execute on behalf of each Company and attach the seal of the Company thereto; bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof, and (2) to remove any such attorney -in -fact at any time and revoke the power, and authority given to him or her..Aftorneys-in-fact shall have power and authority, subject to the terms and limitations of the power -of -attorney issued to them, to execute and :deliver on behalf of the Company, and to attach the seal of the Company thereto, bonds and undertakings; recognizances, contracts of indemnityand other writings obligatory in the nature thereof, and any such instrument executed by any such attomey-in-fact shall be fully and in all respects binding upon the Company. Certification as to the validity of any power-of-attomey authorized herein made by an officer of Employers Mutual Casualty Company shall be fully and In all respects binding upon this Company. The facsimile or mechanically reproduced signature of such officer, whether made heretofore' or hereafter, wherever appearing upon certified Copy ofany power-ofattomey of the.. Company, shall be valid and binding upon the Company with the same force and affect as though manually affixed. IN �NES; WHEREOF, the C�amhpUa es have caused thesepLe rats to be signed for each by their as shown, and the Corporate seals to be hereto affixed tins y � Seals Bruce G. Kelley,Chairman J ffre S. Birdsle s�o i sog4g Q¢�..... co oA . kP�r a cqs % of Companies 3, 4, 5 & 6; resident Assistant Secretary ay oar°PA*r ` J 40pP0q o % o �pP0g9 ` of Company 1; Vice Chairman and ry d : SEAL s z c 1863 a � 1953 CEO of Company 7 $ ♦ bb IOWn h U$ O ryh+ ......... �a`JEIIN0511111WW On thi y27th day of January AD 2000 osiora me a °Nsa uANrEOo Pis#soelNc c " es�°� "; o9s Notary Public in and for the State of Iowa, personally appeared Bruce G. Kelley and Jeffrey S. Q < 3 owPOen. Po°", &rdsley, who lasing by me duly sworn, did say that they are and are known to me to be the f - 9 ' Chairman, President, Vice Chairman and CEO, and/or Assistant Secretary, respective7ly of SEAL ? a9 SEAL SEAL o each of The Companies above; that the seals affixed to this instrument are the seals otsaid'. gyp;, corporations; that said instrument was signed and seated on behalf of each of the Companies iowP �� °aa° Mornes�0 by authority of their respective Boards of Directors; and that the said Bruce G. Kelley and Jeffrey S. Birdsley, as such officers, acknowledge the execution of said instrument to be the T voluntary act and deed of each of the Companies. My Commission Expires September 30, 2003. 1il RUTA KRUMINS Commission Number 176255'+-...",,u.,„�� i Gomm. Exp. Sept. 30, 2003 Notary Public in and for the State of Iowa CERTIFICATE` I, David 1,Hixenbough Vice President of the Companies, do hereby certify that the foregoing resolution of the Boards of Directors by each of the Companies, H d',th 4:�ansPrCwor rolcI seclt January27, 2000%sUtK anbehatf of M$,arenerm are'true and correct and are still in full force and effect. in Testimonymoreof I have subecribed'my name and affixed the facsimile seat of each Company this15 thday of March 2002 L 4a�l Vi re Pros dent SECTION 00300 BID FORM PROJECT: CABLE 27 STUDIO AT CITY HALL -PHASE 1; Bid No. 5683 Place Fort Collins Date April 4, 2002 1. In compliance with your Invitation to Bid dated February 12, 2002 and subject to all conditions thereof, the undersigned Sun Construction and Design Services Inc, a **(Corporation, - iffriEed-- Iri-ftb444ty r5'7-gait-�r'}�r�3o3-e-`�ct�rre--e�-�o-le-Pap�io}** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or ,persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5% of Bid Amount ($ in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: Linden/Bartels & Noe 2900 S. college • r 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. 1 through 5 7/96 Section 00300 Page 1 Sun Construc - n & Design Services, Inc. CONTRACT BY: S9i11lam B. Prout, Vice Dresident/GM ADDRESS: 1232 Boston Avenue Longmont, Colorado 80501 (303) 444-4780 8. BID SCHEDULE (Base Bid) LUMP SUM TOTAL OnP�i✓ndt� fov�/y 9. PRICES C�u,SPRQ SGUen*'/ DOLL//?/.f The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (250) of the total Agreement Price, RES'PrEC()TFULLY S/�'/,-B�MI ED: �1/+w� t J•il�► April 4 2002 Signature William B. Prout Date ar Vice President/General Manager r C-1-#84/John Saraent Certificate Holder #872 "License Number (If Applicable) P•I- (S�al isby corporation) r;�,d�inela K. Belcamino Address 1232 Boston Avenue Longmont, Colorado 80501 Telephone (303) 444-4780 7/96 Section 00300 Page 2 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Sun Construction & Design Services, Inc. 2. Permanent main office address: 1232 Boston Ave Longmont. CO 80501 3. When organized: February 1985 4. If a corporation, where incorporated: Colorado 5. How many years have you been engaged in the contracting business under your present firm or trade. name?17 Years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) See Attached Work in Progress Exhibit A 7. General character of Work performed by your company: Concrete Rough Carpentry DrUwall & Framing Acoustical & Speciality Ceilings, Dnr)rs, Fram .9 ° Hardware. cnatom Cabinets & Casework, Light Steel, Finish Carpentry, Specialties & Equip. Install., Pre-Enaineered 8. Have you ever failed to complete any Work awarded to you? No Blda Erect If so, where and why? N/A 9. Have your ever defaulted on a contract? No If so, where and why? N/A 10. Are you debarred by any government agency? If yes list agency name. N/A 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. See Attached- Exhibit B 12. List your major equipment available for this contract. See Attached Equipment List- Exhibit C 13. Experience in construction Work similar in importance to this project: See Attached Similar Projects Completed- Exhibit D 14. Background and experience of the principal members of your organization, including officers: See Attached Officer Profiles- Exhibit E 15. Credit available: $Necessary Financial Information Available 16. Bank reference: Wells Fargo, 635 Coffman St Longmont CO 80501 303-776-7240 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes. 18. Are you licensed as a General CONTRACTOR? Yes If yes, in what city, county and state? See Attached- Exhibit F What class, license and numbers?See Attached- F.xh;h;+ F 19. Do you anticipate subcontracting Work under this Contract? Yes If yes, what percent of total contract? and to whom? See Attached Subcontractor Schedule- Section 00430 20. Are any lawsuits pending against you or your firm at this time? No If yes, DETAIL N/A 7/96 Section 00420 Page 2 0 21. What are the limits of your public liability? DETAIL See Attached Insurance Liability Policy- Exhibit C What company? Liberty Mutual 22. What are your company's bonding limitations? See Attached Bonding Letter Exhibit H 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at Longmont this 4th day of April 20 02 Name By: -William B. Prout Title: Vice President/General Manager State of Colorado county of Boulder Prout ing duly sworn deposes and says that he is Vice President/GM of Sun Construction & Desicm Serviceand that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and swo n to before me this 4th day of April 20 01 Notary Public Pamela K. Belcamino 338 Grant Street Longmont, Co 80501 My commission expires August 20, 2003 7/96 Section 00420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 20% of the contract. ITEM LnndSGaOre- -Re-191 , fr (-C SUBCONTRACTOR 13elrn ;'re - Pr, rn I cr7L Add N/A A"14 &clde:1 � e,,14 IIIA IV/IA S /7.0o AAA,, iyd Section 00430 Page 1 Sun Construc. .n & Design Services, Inc. General Contractor WORK IN PROGRESS TOTAL CONTRACT JOB NAME A1NONT Market Wise office Bldg $2,451,496.00 Sturgeon: Wastewater Rechn $550,999.00 BW:Denver Mint $203,232.00 Avaya:Ext Repr Fee $15,210.00 Market wise 3rd Fir Finish $364,970.00 CBRE:Cooling Tower Platfm $6,339.00 Graham Family Room $7,351.00 Lucent:Fed Systems Water $4,320.00 CBRE:Relocate Solder Train $12,592.00 Celestica:Phase II Bays $6,131.00 Celestica:Reinstl Rollup $1,541.00 CBRE:6' Watermian R&R $17,955.00 Celestica:Phase III Bays $3,152.00 CBRE:Ceiling Bdlg 21 $1,300.00 Market Wise patio $6,500.00 Celestica:Break Area $3,735.00 ColoPipe-CU Arch Support $40,247.00 CUFAC:Ext Light upgrade $180,544.00 LPI Prop Tenant Finish $68,330.00 STA Labs New Office $1,103,500.00 Jacobs Roche Alcove Demo $50,639.00 Skyway Commercial Center $3,167,673.00 CSU Wager $1,277,708.00 GSA:CDC Lab Foothill $572,386.00 CSU:CDC Modular Office $58,610.00 CSU:Green Hall Remodel $61,489.00 Aguirre:CDC Insect Screen $2,924.00 MS Strong Befus Anexation $20,000.00 Wall Technology $1,505,937.00 City of Longmont Bdg Maint $75,049.00 Westview Pres Church Remd $6,600.00 F&PS Bldg 9 Chiller Add $1,701,344.00 F&PS IBM ADA Bath $53,546.00 F&PS Bldg 2 NCFC $246,129.00 Valley Ford Dealership $2,782,000.00 Valley Subaru: remodel $245,000.00 Pratt:Body Works $15,679.00 Or Towner Vet Clinic $39,945.00 Samsonite Reim Turnstile $6,062.00 $16,938,164,00 $0.00 Exhibit A Exhibit B ADVANCED TECHNOLOGY PROJECTS Avaya/Lucent Technology $ 3,000 to $88,000 Per Move Description of Work: Sun Construction is currently involved in several projects with Avaya, formally known as Lucent Technologies. Our scope of work includes relocation and rotation of highly technical robotic equipment, which is performed with the use of air cushions. Extreme caution as well as close and constant contact with the Avaya Representatives is mandatory as some of the equipment is valued at $10 Million per piece. Owner: Lucent Technologies, Inc. 1200 West 120t' Avenue Westminster, Colorado 80234 AT&TNCC West Expansion -System 85 $ 602,306.00 Description of Work: Demolition of existing and construction of metal and gyp -board partitions. Patching and painting as needed, removal and reinstallation of hollow metal doors and frames and patching of existing carpet. Upgrades to mechanical and electrical as well as fire alarm modifications were also included. All work was performed around the telecommunications equipment of AT&T. Owner: AT&T Communications 2535 East 40`" Avenue Denver, Colorado 80216 Architect: MCB Architects Contact: Kurt Madrid 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year /completed, location and type of construction. 12. List your major equipment availabqle for this contract. fAC K 0V,07 P Xs i-4 Load 13. Experience in construction Work/ similar in i portance to thi project: �/F &jJfP lo,0,%e�d� n9 Y/ (�✓�; lO••n 9 j � Sv.r,.w,tr e, 3Od/ IQe,,., cvn/ d Gi.: /t:s t.t�!'k �fn �rf� wark 14. Background and experience of the principal members of your organization, includ''ng/Joffice s: U4I�GU %h iv,6iYVLi`an ��r.�..i .fiOy' I bs rd4la�z/ f : r/�s 15. Credit available: 16. Bank reference��p7�y 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required bythe OWNER? jjI? 18. Are you licensed as a General CONTRACTOR? // If yes, in what city, county and state? ` e j�hG „ What class, license and numbers?_�� 19. Do you anticipate subcontracting Work under this Contract? If yes, what percent of total contract? ly � �f< and to whom? 20. Are any lawsuits pending against you or your firm at this time? If DETAIL yes, 7/96 Section 00420 Page 2 Exhibit B, cont. HEALTH RELATED FACILITIES CU-Boulder MCDB Laboratory $ 445,306.00 Description of Work: This work involved interior laboratory and office tenant finish at the department of Molecular, Cellular and Developmental Biology at the Colorado University -Boulder Campus. Sun Construction started with a large open area and created individual research laboratories including all stages of finish, mechanical, electrical and fire alarm systems. Owner: University of Colorado Boulder Facilities Management Boulder, Colorado Architect: P.E.H. Architects Contact: Peter E. Heinz Storage Technology Corporation $ 1,750,000.00 Description of Work: Sun Construction has a long list of projects completed at the Storage Tek Facility, including renovation of Research Laboratories and Clean Rooms. Copper -based, anti -static flooring was installed, modifications and erection of walls and ceilings, and HVAC, Plumbing and Electrical upgrades. Work on various Storage Tek projects was performed while spaces under construction were occupied by Storage Tek employees and extra precaution while working in Clean Rooms was achieved by using plastic barrier protection, filter systems and safety suits were worn by workers in these areas. Owner: Storage Technology Corporation 2270 South 88d Avenue Louisville, Colorado Architect: Engineering Solutions Contact: Jerry Toomer Exhibit B, cont. PHASED PROJECTS CSU Weber Building —Phase H $ 1,101,927.00 Description of Work: This 19,750 s.f. project included historic renovations and the replacement of mechanical systems; remodel of interior spaces, and various maintenance items as specified. No asbestos abatement required. Owner: Colorado State University - Facilities Management Facilities Services Center North Fort Collins, Colorado 80523-6030 Architect: Architectural Resources Group 1828 Wallenberg Fort Collins, Colorado 80526 Contact: Larry Trampe (970) 484-0126 UNC ADA, Phase H Modifications $ 1,189,700.00 Description of Work: This project contained work in 22 buildings around the UNC campus including 2 new elevators, 6 new handicap ramps, a building addition, restroom modifications and door alterations. Owner: University of Northern Colorado Facilities Management Greeley, Colorado Architect: Randell E. Larson 215 Nottingham Dr. Huntersville, NC. 28078 Contact: Randell Larson (704) 947-6150 CSU Gibbons Building $ 805,779.00 Description of Work: Gibbons Building was a full 3-floor renovation covering all divisions, from Landscaping to Electrical. Owner: Colorado State University Facilities Management Fort Collins, Colorado 80523-6030 Architect: Architecture 2000 5031 S. Ulster Greenwood Village, CO. 80111 Contact: Kathy Lingo (303) 290-9930 Exhibit B, cont. RENOVATION PROJECTS AT&T NCC West Expansion $ 6,326,237.00 Description of Work: This project was a 32,000 s.f. Warehouse, converted into a 32,000 a two story 32,000 s.f per floor office space for AT&T Communications. The project required all of the components of a ground up structure. This included new electrical service, three new chillers and cooling towers (These were tied in, to serve the existing building of over 250,000 s.f.), new air handlers, elevator, restrooms, raised floor, structural steel and a concrete 2nd floor, and all other finish requirements. Owner: AT&T Corporation 1425 Champa St. Room 100 Denver, CO. 80202 Contact: Jim Hernandez (303) 620-2181 Architect: MCB Architects P.C. 1780 Bellaire St. Suite 800 Denver, CO. 80222 Contact: Kurt Madrid (303) 758-7858 Lucent Toilet Renovations $ 2,218,099.00 Description of Work: This project was a complete renovation of 8 sets of bathrooms; all 16 bathrooms were totally demolished and rebuilt to include all new plumbing and 21 new fixtures ea. All bathrooms had asbestos abatement performed prior to remodel. Owner: Lucent Technologies, Inc. 1200 West 120th Ave. Westminster, CO 80234 Contact: Mike Miller (303) 538-2344 Architect: C41 Architects 7550 W. Yale Ave. Suite A-150 Denver, CO. 80222 Contact: Eric Maule (303) 987-3881 CSU Laurel Hall $ 1,250,203.00 Description of Work: Historical renovation, including replacement of mechanical and electrical systems, re -roofing, re -pointing brick and stone, and interior architectural finishes. Owner: Colorado State University Facilities Management Fort Collins, Colorado 80523-6030 Architect: Architectural Resources Group 1828 Wallenberg Fort Collins, Colorado 80527 Contact: Larry Trampe Sun Construction & Design Services, Inc. General Contractor Company Owned Equipment - Rental Rates Exhibit C Description (�yt Days Used Daily Rate Weekly Rate Monthly Expendables Extension Telescopic Manlift - 24' $100.00 $250 on RRnn nn Scissor Lift - 24' $110.00 $270.00 $850.00 Scissor Lift - 20' $85.00 $240.00 $750.00 Scissor Lift - 18' $85.00 $240.00 $650.00 12' 1 Ton Trucks $180.00 $350.00 $550.00 Fuel 16' 2 Ton Trucks $180.00 $360.00 $550.00 Fuel 60' Extension Ladder $35.00 $100.00 $350.00 Laser & Tripod $45.00 $135.00 $450.00 TP 800 Chipping Hammer $30.00 $100.00 $300.00 Electric Jack Hammer 40# $50.00 $150.00 $450.00 Gas Welder $40.00 $120.00 $400.00 Gas Wire Welder $55.00 $150.00 $200.00 Wire Torch & Gas Tanks $30.00 $90.00 $300.00 Gas Large Hammer Drill $25.00 $80.00 $290.00 6000 # Fork Lift $275.00 $900.00 $3,000.00 Fuel Walk behind Saw $60.00 $180.00 $425.00 Blades Compressor & Jack Hammer $100.00 $300.00 $800.00 Gas 45' Snorkel Lift 1 $375.00 $800.00 $1,800.00 Gas Scaffolding(per section) 1 $10.00 $30.00 $50.00 Texture Machine 1 $30.00 $90.00 $300.00 Large Generator $35.00 $140.00 $425.00 Gas Demo Saw with Blades $50.00 $150.00 $275.00 Blades 2.5 Cubic Feet Concrete Mixer $25.00 $75.00 $300.00 4 Cubic Feet Concrete Mixer $50.00 $150,00 $450.00 62' Snorkel Lifts $400.00 $1,200.00 $3,500.00 Gas 10,000# all terrain Forklift $400.00 $1,200.00 $3,500.00 Gas Equipment Rental Rates Updated 2119/02 Exhibit D LIST OF SIMILAR PROJECTS CSU Weber Building — Phase H $ 1,101,927.00 Description of Work: This 19,750 s.f project included historic renovations and the replacement of mechanical systems; remodel of interior spaces, and various maintenance items as specified. No asbestos abatement required. Owner: Colorado State University - Facilities Management Facilities Services Center North Fort Collins, Colorado 80523-6030 Architect: Architectural Resources Group 1828 Wallenberg Fort Collins, Colorado 80526 Contact: Larry Trampe (970) 484-0126 CSU Laurel Hall $ 1,250,203.00 Description of Work: Historical renovation, including replacement of mechanical and electrical systems, re -roofing, re -pointing brick and stone, and interior architectural finishes. Owner: Colorado State University Facilities Management Fort Collins, Colorado 80523-6030 Architect: Architectural Resources Group 1828 Wallenberg Fort Collins, Colorado 80527 Contact: Larry Trampe CSU Wagar Controlled Maintenance $ 1,227,708.00 Description of Work: The Wagar Building is approximately 48,160 gross square feet, on two floors and basement. Work for this project is being performed in two phases. Phase 1 completed in the fall of 2001 and Phase 2 work will begin in the spring/summer of 2002. The entire project includes remodel of controlled maintenance areas, chilled water system, and renovation and remodel of existing laboratories. Owner: Colorado State University Facilities Management Fort Collins, Colorado 80523-6030 Architect: Architectural Resources Group 1828 Wallenberg Fort Collins, Colorado 80527 Contact: Larry Trampe Exhibit E Personnel Profile Stephen B. Strong Owner/President Years of Experience: 25 Steve has been in construction most of his fife. He started work as a laborer and moved through the ranks until starting Sun Construction & Design Services, Inc. in February 1985. As the Chief Executive Officer of the Company, he provides long range planning and maintains key relationships with clients. Steve's community and charitable organization involvement have provided him the opportunity to utilize the resources of Sun Construction to aid numerous worthy causes. Bill Prout Vice President/General Manager Years of Experience: 35 Bill has been involved with project management and controls for his entire career since receiving a degree in Construction Management from Colorado State University. His project experience ranges from small jobs for standing order clients to very large projects valued to $250 million. Bill is responsible for the day- to-day operation of all aspects of Sun Construction, and is heavily involved with the strategic long-range direction of the Company. Additionally, Bill adds strength and experience to our pre -construction services where he provides guidance in budget estimating, preliminary scheduling, constructability, reviews, value engineering and guaranteed maximum price development for design -build projects. Tom Smith Vice President/Project Manager Years of Experience: 38 Having more than 14 years with Sun Construction, Tom has developed and maintained client relationships with some of the largest companies in Colorado (AT&T, Lucent Technologies and Raytheon to just name a few). Tom has completed such projects as restaurants, executive briefing centers, auditoriums, manufacturing facilities, shopping facilities, high security areas for the Department of Defense, hospitals, pharmaceutical plants, and schools. Tom enjoys challenging and different types of projects such as the relocation of a 75' two-story shielded anechoic chamber. John Sargent Vice President of Design and Development/Project Manager Years of Experience: 35 John brings an extensive estimation and project management background to Sun Construction. Starting at the trades level, John has experience ranging from crane operation to the completion of a carpenter apprenticeship program. He has also worked as a general field superintendent for a large commercial general contractor. A promotion to estimator brought John into the management sector and eventually to the position of chief estimator. While in that capacity he worked closely with many design teams, as the company was primarily a design -build firm. John spent the next 11 years working on a wide variety of projects from large industrial plants, school remodels, retail, medical and a daycare facility at the Pentagon. In May 1991, he joined the team at Sun Construction. John has established many new clients and managed many diverse projects from high tech to high profile and is now our prime contact for Butler sales. John's projects range from small to over $20 million. Exhibit F Sun Construction & Design Services, Inc. General Contractor CONTRACTOR'S LICENSE NUMBERS CITY LICENSE # City of Aurora 101119871 00 CL Class B 1/l/03 Errol Unverzagt Supervisor Certification E011598 11/30/03 City of Boulder LIC-0001670-08 5/15/02 City of Boulder 98-0025-28 Right Of Way 3/20/02 City of Broomfield Class A — A2001-529 12/31/02 City of Cheyenne Class B — 02 05174 8/15/02 Larry Hill Certificate Holder 025175 8/15/02 City of Denver BLDG. B 18209 8/31/02 John Sargent Certificate Holder 41016167 5/31/02 City of Erie 2001-267 Class A 12/31/02 City of Federal Heights 94-0129 12/31/02 City of Fort Collins C-1 #84 4/18/02 John Sargent Certificate Holder #872 4/18/02 City of Golden 99-603 7/22/02 City of Longmont Class A - A-00000002 6/30/02 City of Louisville Class A — 00273 12/31/02 City of Thornton A 1088 9/05/02 City of Westminster Class A -10 — 956261 6/30/02 Certificate of Insurance TI{15 CERTIFICATE IS ISSUED AS A MATTER OF IN IATION ONLY AND CONFERS NO RIGHTS UPON YOUTH, : rIFICATE HOLDER. THIS CERTIFICATE IS NOT AN INSURANCE POLICY AND DOES Nor AMEND. EXHuSID, OR ALFER I HF. COVERAGE AFFORDED UY HiF. POILICIES LISPED GFLOW. TI !� Exhibit G Name and _ Liberty �— address of MutualT. LInsured. Is, at the issue date of this certificate, insured by the Company under the to all their terms, exclusions and conditions and is not altered by any requipolicy(ies) listed below. The insurance afforded by the listed policy(ies) is subject this certificate may be issued. rement, term or condition of any contract or other document with respect to which EXP.DATE ❑ CONTINUOUS TYPE OF POLICY ❑ EXTENDED POLICY NUMBER LIMIT OF LIABILITY POLICY TERM WORKERS COMPENSATION 4/1/2001 TO 4/1/2002 WC7-191-097457-011 COVERAGE AFFORDED UNDER WC EMPLOYERS LIABILITY LAW OF THE FOLLOWING STATES' COLORADO Bodily Injury By Accident 500,000 Each Accident Bodily Injury By Disease 500,000 Policy Limit Bodily Injury By Disease GENERAL LIABILITY 1/1/2002 TO YY2-191-097457-042 500,100 Each General A Person G 99regate -Other than Products/Completed 1 /1 /2003 2,000,000 ® OCCURRENCE Products/Completed Operations ' 1,000, 000 ❑ CLAIMS MADE Bodily Injury and Property Damage 11 ,ODD,DOD Per Occurrence Personal Injury RETRO DATE 1,000,000 Per Person/ Organization Other Other AUTOMOBILE LIABILITY 1/1/2002 TO 1/1/2003 AS1.191-097457-032 1000,000 Each Accident- Single Limit , B.I. and P.D. Combined ® OWNED Each Person ® NON -OWNED Each Accident or Occurrent ® HIRED Each Accident or Occurrent OTHER ADDITIONAL COMMENTS ' If the certificate expiration date is continuous or extended term ill b You wa nohfad If coverage Is terminated or reduced before the certificate expiration date. SPECIAL NOTICE-0HIO: ANY PERSON WHO. WITH INTENT TO DEFRAUD OR KNOWING THAT HE IS FACILITATING A FRAUD AGAINST AN INSURER, SUBMITS AN APPLICATION OR FILES A CLAIM CONTAINING A FALSE OR DECEPTIVE STATEMENT IS GUILTY OF INSURANCE FRAUD. IMPORTANT NOTICE TO FLORIDA POLICYHOLDERS AND CERTIFICATE HOLDERS IN THE EVENT YOU HAVE ANY QUESTIONS OR NEED INFORMATION ABOUT THIS CERTIFICATE FOR ANY REASON, PLEASE CONTACT YOUR LOCAL SALES PRODUCER, WHOSE NAME AND TELEPHONE NUMBER APPEARS IN THE LOWER RIGHT HAND CORNER OF THIS CERTIFICATE. THE APPROPRIATE LOCAL SALES OFFICE MAILING ADDRESS MAY ALSO BE OBTAINED BY CALLING THIS NUMBER. NOTICE OF CANCELLATION: (NOT APPLICABLE UNLESS A NUMBER OF DAYS IS ENTERED BELOW.) BEFORE Liberty Mutual Group THE STATED EXPIRATION DATE THE COMPANY WILL NOT CANCEL OR REDUCE THE INSURANCE AFFORDED UNDER THE ABOVE POLICIES UNTIL AT LEAST DAYS NOTICE OF SUCH CANCELLATION HAS BEEN MAILED TO: (HZ➢FCATE Sandra J. F HanE3 AUTHORIZED REPRESENTATIVE SUN CONSTRUCTION & DESIGN SERVICES INC 1232 BOSTON AVE LONGMONT CO 80501 L_ _Englewood CO (303) 799-0818 J OFFICE PHONE NUMBER DATE ISSUED BS772A R12 This certificate is executed by LIBERTY MUTUAL GROI'^ - rrnpects such insurance as is afforded by Those Companies Exhibit H Linden Bartels & Noe INSURANCE -BONDS Re: Sun Construction & Design Services, Inc. To Whom It May Concern: Sun Construction & Design Services, Inc. has been a valued surety client for many years. With their reputation and experience in the industry, we consider them to be one of the premier contractors in Colorado. They have done an outstanding job in establishing a solid organization with an excellent work ethic that performs thoroughly and economically. Sun Construction & Design Services, Inc. enjoys a fine relationship with their peers as well as owners, architects and suppliers with whom they have worked. Sun Construction is bonded through Travelers Casualty and Surety Company of America. They are an A++ rated company with a Best Financial Rating of XV. Sun Construction & Design Services, Inc. can provide bonds in excess of $15,000,000 for single projects with a total aggregate that is determined by their needs. Sun Construction's bonding capabilities have been structured by their needs because they are a well -run and financially solid organization. If a project has met the scrutiny of the management team of Sun Construction & Design Services, Inc., the surety is in a position of comfort that all aspects of that particular project have been reviewed and there are solid reasons to follow their request. Should there be any questions, please do not hesitate to contact us. Sincerely, Kathryn Y. Dryg Linden/Bartels & Noe 2900 SOUTH COLLEGE AVENUE • SUITE 2A FORT COLLINS, CO 80525 970-229-9304 • METRO 303-444-7443 FAX 970-229-1398 • 1-800-664-8285 SECTION 00410 BID BOND KNOW T-LL MEN BY THESE PRESENTS: that we, the umYersigned Sun Construction & Design Services, I&s.principal, and Travelers Casualty and Surety Compan .rrecy, i.,�.e hCreJDV held ar,d firmly bound unto't.he CitvTof Fcrt_ Collins, Colorado, as OWNU , in the sum of $--5%-- * for thl= payment of which, we-il and truly to h,e made, we hereby jointly and severally bind oursei�ies, suc- assign-sor , s. *Five Percent of Total Amount Bid-- and THE CONDITION Of this obligation is such that whereas the Principal has submitted to the city Of Fort- Collins, Colorado the accompanvi.ng Bid and hereby made a parr_ hereof to' enter into a Ccnstruction Agreement for the construction of Fort Collins Project, CABLE 27 STUDIO AT CITY HALL -PHASE 1; Bid No. 5683. NOW THEP.EFORE:, (a) IE said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obl.igation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and ag:-red that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations ;f said surety and its BOND shall be in no way impaired or affected by any xtension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 page 1 u 21. What are the limits of your public liability? DETAIL What company? rC 22. What are your company's bonding limitations? 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at 4 �/i� 1 S e!!:�- this �_ day of 200,E Title: State of County of Gy,��`Zvj-pr au )ein'g/ duly sworn deposes and says that he is - /-{aLTO �,,4 and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. U Subscribed and sworn to before me this )rd day of Notary Public or !Qaj We to PD 1 N-39 LCNOULC34 rtp CD 8053.5 My commission expires _ 1010(0IZ003 7/96 Section 00420 Page 3 IN WITNESS WHEREOF, the Frinci�al and the Surety h e hereunto se[heir hands and seals this 26th day of arch 70$ and ,,�ch t of them a, are corpor.-ation.e: hrsvn caused their r_r,;rporate seals to ba hereto a -f' presents to be signed b their ; trzt and theme above. y Proper officers, the day and year. Yirst ::mot Torch FRINr,2 PAI, Sun Construction & Design !Name: Services, Inc. Address: 1232 Boston Ave. Longmo ••II,p4 CO 8001 William B. Prp Titlei v,',. ATTEST: 9 ,/ Manager By: L'Y q Pamela K. Belcamino (SEAL) 7/96 SURETY Travelers Casualty and Surety Company of America 7600 E. Orchard Road, #330 T` Englewood, CO 80111 By: c3- GSA Rae L. Campbell —" Title: A o n y-in-Fact (SEA,) Section 00410 Page 2 TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA Hartford, Connecticut 06183-9062 POWER OF ATTORNEY AND CERTIFICATE OF AUTHORITY OF ATTORNEYS) -IN -FACT KNOW ALL MEN BY THESE PRESENTS, THAT TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, a corporation duly organized under the laws of the State of Connecticut, and having its principal office in the City of Hartford, County of Hartford, State of Connecticut, hath made, constituted and appointed, and does by these presents make, constitute and appoint Don R. Broyles, Frank C. Penn, DiLynn Guem, Kathryn K. Coulson, Lisa M. Loeffler, Pamela J. Hansen, Jeanne M. Sikkens, Jeffrey L. Broyles, Rae L. Campbell, Kevin W.'McMahon, Michelle L. Lemus, Theresa J. Finn, Kathryn Y. Broyles or Michael D. Pierce "" of, Denver/Longmont, CO, its true and lawful Attomey(s)-in-Fact, with full power and authority hereby conferred to sign, execute and acknowledge, at any place within the United States, or, if the following line be filled in, within the area there designated , the following instrument(s): by his/her sole signature and act, any and all bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of s bond, recognizance, or conditional undertaking and any and all consents incident thereto and to bind TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, thereby as fully and to the same extent as if the came were signed by the duly authorized officers of TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, and all the acts of said Attomey(s)-in-Fact, pursuant to the authority herein given, are hereby ratified and confirmed. This appointment is made under and by authority of the following Standing Resolutions of said Company, which Resolutions are now in full force and effect: VOTED: That each of the following officers: Chairman, Vice Chairman, President, Any Executive Vice President, Any Group Executive, Any Senior Vice President, Any Vice President, Any Assistant Vice President, Any Secretary, Any Assistant Secretary, may from time to time appoint Resident Vice Presidents, Resident Assistant Secretaries, Attomeys-in- Fact, and Agents to act for and on behalf of the Company and may give any such appointee such authority as his certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors may at any time remove any such appointee and revoke the power and authority given him or her. VOTED: That any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the Chairman, the Vice Chairman, the President, an Executive Vice President, a Group Executive, a Senior Vice President, a Vice President, an Assistant Vice President or by a Resident Vice President, pursuant to the power prescribed in the certificate of authority of such Resident Vice President, and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary or by a Resident Assistant Secretary, pursuant to the power prescribed in the certificate of authority of such Resident Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attomeys-in-Fact pursuant to the power prescribed in his or their certificate or certificates of authority. This Power of Attorney and Certificate of Authority is signed and sealed by facsimile under and by authority of the following Standing Resolution voted by the Board of Directors of TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, which Resolution is now in full force and effect: VOTED: That the signature of each of the following officers: Chairman, Vice Chairman, President, Any Executive Vice President, Any Group Executive, Any Senior Vice President, Any Vice President, Any Assistant Vice President, Any Secretary, Any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attomeys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such power of attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking to which it is attached. (over) SECTION 00300 BID FORM PROJECT: CABLE 27 STUDIO AT CITY HALL -PHASE 1; Bid No. 5683 Place 215 N. Mason St. Date 1. In compliance with your Invitation to Bid dated February 12, 2002 and subject to all conditions thereof, the undersignedDown Zan ey Construction, Inc. a **(Corporation, b; �Eqh �i4 business in the State of Colorado hereb' authorized to do do everything required by the Contract Documentstowhich this roposes to f refers forurnishd the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other Person or ,persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5% of bid amount in accordance with the Invitation To Bid and' Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate "surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: Pioneer General Insurance Company 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7 7/96 The undersigned Bidder hereby acknowledges receipt of Addenda No. 1 through 5 Section 00300 Page 1 Down Zankey Construction Inc CONTRACTOR President ADDRESS: 519 Locust Street Fort Collins, CO 80524 BID SCHEDULE (Base Bid) LUMP SUM s a. TOTAL ri i ,1,�1� DOLLARS ��w PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY SUBMITTED: - /Z_ 4/4/2002 Si nature Date President Title B-256 License Number (If Applicable) (Seal - if is by corporat Attest: Ad ss 13S S, �6w_ywoo6 57— art. COi L/NS Cr7 `dOS� Telephone __ t `7D) 5 6 7_ ' y 5t 7/96 Section 00300 Page 2 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: _Down Zankey Construction Tn 2. Permanent main office address: 519 Locust Strppt 3. When organized: 1997 4. If a corporation, where incorporated: .m; Colei-a do 5. How many years have you been engaged in the contracting business under your present firm or trade name? s 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) T.ariMpr fnunty Tandfill FdnnAtinn Vyihi4 $90 nnn 6/15/02 Poudre Schnnl Distrirt rare ntrjz T n t t x�nn nnn 7. General character of Work performed by your company: S1lnpr17l c i r n, names. Lion, Carpentry 8. Have you ever failed to complete any Work awarded to you? no If so, where and why? 0 Have your ever defaulted on a contract?no If so, where and why? 10. Are you debarred by any government agency? If yes list agency name. no 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your. company, stating the approximate cost of each, and the month and year completed, location and type of construction. I -a •-;mcn County Human R GnlirrPC/Rpnncation/$245,000/07/2001 L2. List your major equipment available for this contract. 13 Experience in construction Work similar in importance to this project: 14. Background and experience of the principal members of your organization, including officers: 5. Credit available: $ Bank reference: First State Rank 7. Wi.I you, upon request, fill out a detailed financial statement and furnish an; other information yesthat may be required by the OWNER? -- 8. Are you licensed as a General CONTRACTOR? —�res_ If yes, in what city, county and state? Cit— y of Fort Collins vhat class, license and numbers? n_,)Sr —' :.9. Do you anticipate subcontracting Work under this Contrct a? yes _ If yes, what percent of total contract? S 5 % -- 7.S and to whom? — 20. Are any lawsuits pending against you or your firm at this time-, no If — DE".;.k:CL ves, 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL —aaa--attachment What company? III 22• What are your company's bonding limitations? 0,000,000 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at this 4 day of April 20 02 Down Zankey construction, Inc. Name of Bidder ��jj By: __C,T-% /" Title: President State of Colorado County of Larimer ) Jeffrey P. Down being duly s qrn deposes and says that he is President of Down an ey Construction y (name of organization) ' that the answers to the foregoing questions and all statements therein contained are true and correct. l/ Su scribed and sworn to before me this Y 2_9, day of 20 — M Notary Public My commission expires p s 7/96 Section 00420 Page 3 ACORD CERTIFICA'i E OF LIABILITY INSURANCE o3/zDA IS 002 PRODUCER John C. Beckett i Associates, Inc. 220 Smith Street Ft. Collins CO 80524- THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLIgE3 BELOW. INSURERS AFFORDING COVERAGE INSIAIWO Down Sankey Construction, Inc. P.O. Box 1925 sort Collins CO 80522- MSVRERA, DNITW FIRS 6r CASL7ZTY CQNPANY INSURERS P72MCOL ASSURANCE INSURER C. INSURER D. INSURERS. THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUEDTO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWTH,STANDING ANY RECUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT MATH RESPECT TO AHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POUCIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHONRN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR R TYPE OF INSURANCE POLICY NUMBER POLICYEFFECTIVE DA POLICYEXPIRATION GATE MADDA'Y LIM" A GENERAL LIABILITY X COMMERCIAL GENERAL ABIIITY CLAIMSMADE OCCUR PENDING 03/03/2002 03/03/2003 EACH OCCURRENCE a 1,000,000 FIRE DAMAGE [Any Pnefire 5 100,000 MED E%P Any one Person) a 5,000 PERSONAL B ADV INJURY a 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE 7X POLICY LIMIT APPLIES JECOi F7 PER'. LOC PRODUCTS-00AP10PASG S 21000,000 A AUTOMOSILELIABILITY ANYAUTO ALL OWNED AUTOS SCHEOULEDAUTOS HIREDAUTOS NON -OPINED AUTOS PENDING / / 03/03/2002 / / / / 03/03/2003 / / COMBINED SINGLE LIMIT )Ea acclaen9 5 1, 000, 000 BODILYTNJURY (Par Person) s X X BODILYINJURY (Pareccmenp g X PROPERTY DAMAGE IP...LCI 1B't) 6 GARAGE LIABILITY ANY AU TO / / / / AUTO ONLY-EAACCIOENT $ OTHER THAN EAACC AUTO ONLY AGU $ 9 A EXCESS LIABILITY X OCCUR CLAIMSMADE DEDUCTIBLE X RETENTION $ 10,000 PENDING 03/03/2002 63/03/2003 EAcH occuppENcEs 1,000,000 AGGREGATE S 1,000,000 6 8 B ylp L EMPLOYERS LINBILINTION AND 4038613 12/09/200112/09/2002 X TORY LIMITS ER E.L. EACH ACCIDENT a 500, 000 EL DISEASEEAEMPI-OiFES 500,000 E.L. DISEASE -POLICY L'AR7 9 500, 000 OTHER DESCRIPTION OF OPERAnONSLOCATONSIVEHICLE& XCLUBIONS ADDED BY ENOORBEMENTBPECIAL PROVISIONS CITY Or ET COLLINS 281 N. CCLLEGS P.O. BOX 580 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED SEFORE THE EXPIRATION DATE THEREOF, THE $$SUING INSURER WALL ENDEAVOR TO X" 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO 80 SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY HIND UPON THE AUTHORIZED REPRESENTATIVE 0 ACOI M INS025S(9910).Bi FLECTRON)C LASER FORMS, INC.-(DOD)327-➢SY5 Pa➢5)e12 IMPORTANT It the certificate holder is an ADDITIONAL INSURED, the policy(tes) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. 1 h• IN30253 (9eio) of Paye 2 m 2 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 20% of the contract. ITEM SUBCONTRACTOR E� ✓,yn e n E rC rn v va l l?yG ya t ^11? / n C 7/Cay&ti�vj 7/96 Section 00430 Page 1 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 20% of the contract. ITEM 7/96 SUBCONTRACTOR f 1171 Elee 1`-,G cbw,a,P✓ :,( I Oh cvele Section 00430 Page 1 SECTION 00410 BID BOND FNOW :kLL >11N BY THESE PRESENTS: that we, the u: INC. as Principal., and PIONEER GENERAL I suite_ ate hereby held and firmly bound unto the as OWNi:R, in the :;um of S 5% of. BID for truly to be made, we hereby jointly and severally assigns. -Si payment of which, Weil and our:selves, suer:essors, and THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made .a part hereof to enter into a Construction Agreement for: the construction of Focl: Collins ProjecC, CABLE 27 STUDIO AT CITY H LL-PH.kSr 1;• Bid No. 5693. NOW Ti-1V..REF0RE, a If ::aid Bid shall be rejected, or ty If ::a:id Bid shall be accepted and the Principal shall axecute and deliver a Con:ract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furni h a BOND for his faithful pe:,Vosmance of said Contract, and for payme t of all persons performing Labor or fu:_nishing materials in connection therew_th, and sizall in all cthe.r respects perform the Agreement created by the acceptance of said Bid, then this o:oligatlon shall be void; otherwi a the same shdii remain irr force and effect., it being, expressly undo stood and agreed that the liability off the Surety for any and all a). ,i.m.s hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. "he Surety, for value received, hereby stipulates and agrees that:: t.l-ie obligations of: said Surety a:zd its BOND shall be in no'wa_v impaired or affected by any eixtension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Ccmpanies executing bonds must be authorize Co transact business in ftht State of Colorado and be accepted by the OWNER. 7,19G Sect�on 00110 Page 1. 1 TN WITNESS WHEREOF, the Principal and the Surety h ve hereunto set thoi.r hams and seals this 22nd day of MARCH 20 2, and such of tl-.em las are corporati.cr.s have caused their. corporate seals to be hereto affixed amd these pre:ienr.s tc be signed by their proper officers, tt,e day and year fist Bet: fcrth above-. PRINC I P.AL Name: DOWN ZANKEY.CONSTRUCTION, INC. Address:P.O. BOX 1925 By: - " h- JED/OWN Tit.1e: PRESIDENT ATT E S'T By t� 7/96 (SEAL) SURETY PIONEER GENERAL INSURANCE COMPANY 6780 E. HAMPD N AVE. DZNVFR. Q.Q_ 0 224 Hy: A'I"I'ORNET- -Z A Title: UNDERWRITER GENERAL REINSURANCE CORPORATION 695 EAST MAIN ET STAMFOR 9 By: Brian A. 0 Neal Attorn.y-in-f`act ( SEAL ) 00410 Page 2 PIONEER GENERAL INSURANCE COMPANY Denver, Colorado POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: P 58155 That the PIONEER GENERAL INSURANCE COMPANY, a corporation of the State of Colorado has Its princpal office in the City of Denver, Colorado pursuant to the following By-law, which was adopted by the Board of Directors of the said Company in 19go, to wit: 'Article VI - Section 2 - RESIDENT OFFICERS AND ATTORNEYS -IN -FACT. The President or any Vice -President, acting with any Secretary or Assistant Secretary, shall have the authority to appoint Resident Vice -Presidents and Attorneys -In -Fact, with the power and authority to sign, execute, acknowledge and deliver on Its behalf, as Surety: Any and all undertakings of suretyship and to affix thereto the corporate seal of the corporation. The President or any Vice -President, acting with any Secretary or Assistant Secretary, shall also have the authority to remove and revoke the authority of any such appointee at any time, does hereby make, constitute and appoint *** BRIAN A. O'NEAL *** OF DENVER,COLORADO its true and lawful Attorney(s)-In-Fact, to make, execute, mal and deliver for and on Its behalf, as Surety: And any and all undertakings of suretyship And the exewtion of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Company, ea fully and amply, to all Intents and purposes, as If they had been duly executed and acknowledged by the regularly elected officers of the Company at Its offices in Denver, Colorado, In their own persons. The following Resolution was adopted at the Regular Meeting of the Board of Directors of the Pioneer General Insurance Company, held on June 1, 1990. 'RESOLVED. That the signatures of officers of the Company and the seal of the Company may be affixed by facsimile to any Power of Attorney executed In accordance with Ardde VI - "Section 2 of the Company By-laws; and that any such Power of Attorney bearing such facsimile signatures, Including the facsimile signature of a certifying Assistant Secretary and facsimile seal shall be valid and binding upon the Company with respect to any bond, undertaking or contract of suretyship to which it Is attached' All authority hereby conferred shall remain In full force and effect until terminated by the Company. IN WITNESS WHEREOF, PIONEER GENERAL INSURANCE COMPANY has caused these presents to be signed by its President and its wrporats seal to be hereunto anixedthis 18t day of MaY _ _.. _ 2001 PIONEER GENERAL INSURANCE COMPANY ��P�I INSUkgNC 41;or c Secretary yf4o's State of Colorado ) V-!SEA 1. County of Arapahoe j By PRESIDENT �gL9gkgg On this 1st day of May 2001,before mepersonallycame Bruce H. Lowdermilk to me known, who being by me duly sworn, did depose and say that (s)he resides in the County of Adams, State of Colorado; that (e)he la the President of the PIONEER GENERAL INSURANCE COMPANY, the corporation described in which executed the above Instrument; that (s)he knows the seal of the said corporation; that the seal affixed to the said Instrument is such corporate seal; that it was so affixed by order of the Board of Directors of said corporation; that (s)he signed (his) (her) name by like order; and that By -low, Adds VI - Section 2, adopted by the Board of Directors of said County, referred to In the preceding instrument, is now In force. My Commission Expires 1/18/2003 kl , P XpTA ��x N9rF OFB o`oPP�o Notary Public rh. 1, M.J. Frick Secretary of PIONEER GENERAL INSURANCE COMPANY, do hereby certify that the above and foregoing Is a true and correctcopy of a Power of Attorney executed by said PIONEER GENERAL INSURANCE COMPANY, which is still In full tome and effect. Signed and sealed at the City of Denver, Colorado this s Z9-' �L/Y da of / ` 1r,/1 , aG1�. P133 Secretary `mQ ?iu,� PIO 2144 003 Certified Copy POWER OF ATTORNEY From GENERAL REINSURANCE CORPORATION FINANCIAL CENTRE, STAMFORD, CONNECTICUT 06904 Know All Men By These Presents: That the GENERAL REINSURANCE CORPORATION, a corporation organized and existing under the laws of the State of Delaware, with Executive Offices at Financial Centre, Stamford, Connecticut, does hereby nominate, constitute and appoint Diane M. Bailey, Bruce H. Lowdermilk, Stefan Tauger and Brian A. O'Neal, individually, all of Denver Colorado ------------------------------ its true and lawful Attomey(s)-in-fact with full power and authority to make, execute and deliver, for and on its behalf as surety, and as its act and deed; any and all bonds or undertakings - including consents in connection therewith -which are written on a co -surety basis and duly executed by Pioneer General Insurance Comgagv -- as a co -surety; provided the co -surety share of General Reinsurance Corporation on any single bond shall not exceed One Million ($1,00O,0O0) dollars -------------------------- ------------------------- and the execution of such bond(s), undertaking(s), or writing(s) obligatory, in pursuance of these presents, shall be as binding upon said Corporation, to all intents and purposes, as if duly executed by the President or Vice President of the Corporation, sealed with its corporate seal, and attested by its Secretary or Assistant Secretary; and said Corporation hereby ratifiesand confimts the acts of said Attomey(s)-in-fact done pursuant to the power and authority herein given. This Power of Attorney is made and executed by authority of the By-laws of said Corporation of which the following excerpt is a true and exact copy. "ARTICLE VI, SECTION 6.01 Execution of Instruments Generally. The Chairman of the Board, the President, any Vice President, the Secretary or the Treasurer may enter into any contract or execute and deliver any instrument in the name and on behalf of the Corporation. The Board of Directors may audience any officer or omcent, or agent or agents, k enter into my contract or execute and deliver any instrument in the name and on behalf of the Corporation, and such authorization may be general or confined to specific instances." All power and authority hereby conferred shall hereby expire and terminate without notice at midnight of the 31st day of . duly- ,2002 as respects executions subsequent thereto. In Witness Whereof. The GENERAL REINSURANCE CORPORATION has caused these presents to be signed by its - Vice President and its corporate seal to be affixed this 21st day of lanuarv. 2002. Attest: si 1 W 1910 B j STATE OF CONNECTICUT) SS COUNTY OF FAIRFIELD ) REINSURANCE CORPORATION The foregoing inetmmmt was aclmowledge before me this 21at day of lmusrv. jrpg, by Robert L Post of the General Reinmrmce Corporation, a Delaware Coryoration, on behalf of mPoratioo. - ON L: PA 4'If 9 0-[At? A[/B LAG, LINDA L. PALMER NOTARY PUBLIC MY COMMISSION EXPIRES AUG, 91, 20m Notary Public 1, the undersigned Cherie A H MB A at. Secretary of the General Reiaeurance Corporation, do hereby certi y that the original Power of Attorney, of which the foregoing is a true and correct copy, remains in full force and effect; that the Attome s = mo er nominated and appnt the ecreins ofDy. duly eWied in s id execute for said not been a r k the extent, and for the force and recited in said Power of AUomey; and Out the Sections of By-laws, copied in said instrument, hive not Men amended and remain in full farce and effect. IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the General Reinsurance n Corporation this o7t3 day oFA.D., 1 Pk7.,' v a ` SECTION 00300 BID FORM PROJECT: CABLE 27 STUDIO AT CITY HALL -PHASE 1; Bid No. 5683 Place .215 N. )4ft*A/ Date #94(. 4. 200Z 1. In compliance with your Invitation to Bid dated ¢K6►4,y, AAA 17- 1 Zn Z and sub)ect to all conditions thereof, the undersigned 4W�vbulrZy 6Sh#A,&j ^4 f!/W % 7.lC . a **(Corporation, 3�#:sited=a .y C�, 4es;`��e, or Sole ___p__-___)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this B.d is'� certified cashier's check or standard Bid bond in the sum of � 3Z- ($/n ens ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: tea} Aa.o $1pu,n] /ZSgOk/�i� �j�.lw Ffjy� 641�deN5 Go 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through 7/96 Section 00300 Page 1 0 Pi �lc�tW 161p U6: Uu/05off � &4�/Q6�s,iu. CONTRACT R BY: ADDRESS: 3126 .4,0596759 -ell, 604Z C,&4(_.jS1 BID SCHEDULE (Base Bid) LUMP SUM TOTAL�'� ($ PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPF TFULLY �SUBBMITTED: }P ' u�—, zoo z- Siejnat re Date f �06N1 Title License Number (If Applicable) (Seal l/�f Bid is by cor ration) Attest : \ \ Address f ZV T ` CJ U ��- , Cub _ Telephone #lb 6q� 5 7/96 Section 00300 Page 2 SECTION 00410 BID BOND g4 KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned as Principal, and as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of $ for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, CABLE 27 STUDIO AT CITY HALL -PHASE l; Bid No. 5683. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 1 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this day of , 20 , and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL Name: Address• By: Title: ATTEST: By: (SEAL) SURETY M Title: (SEAL) 7/96 Section 00410 Page 2 Section 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: University designers and Builders, Inc. 2. Permanent main office address: 3120 Abbotsford Street Fort Collins, CO 80524 3. When organized: 1989 4. If a corporation, where incorporated: Colorado in 1998 5. How many years have you been engaged in the contracting business under your present firm or trade name? Part time from 1989 to 1996, full time 1996 to present 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) 1904 Baptist Church Rehabilitation Townley House Rehabilitation Asmus Building $301,325 03/O1/2002 to 04/01/2003 $112,000 08/15/2002 to 04/30/2003 $ 25,000 06/15/2002 to 07/30/2002 7. General character of work performed by your company: General contracting and historic preservation including, but not limited to the following: Structural stabilization, demolition (both light framing and finishes and heavy structural demo). • Tenant finish and new construction • Historic restoration (facade reconstruction, millwork and door/window repair and reproduction, masonry repair/re-pointing and cleaning, repair/ reproduction of historic interior finishes) 8. Have you ever failed to complete any work awarded to you? NO If so, where and why? Have you ever defaulted on a contract? NO If so, where and why? 10. Are you debarred by any government agency? NO If yes, list agency name. 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. • Pierce Elementary School Remodel, $100,000 completed Aug. 1989 • Ault Middle School Remodel, $50,000 completed Nov. 1990 • CSU — construction of ten computer labs for eight different departments, $750,000 from 1987 thru 1990 • CSU- Classroom remodels $250,000 summer of 1989 • CSU- Auto Emissions Lab, $100,000 summer of 1990 • Avery Carriage House Rehabilitation $50,000 completed Nov. 1992 • Eaton High School Classroom Remodel, $250,000 completed Aug. 1996 • Eaton School District Administrative Office Remodel, $100,000 completed in March 1998 • Hover Farmstead and barn reconstruction, $150,000 completed in 1997 • Trimble and Barkley Blocks Fagade Restoration, $ 400,000 completed 1998 • Eaton High School Window, Door Restoration and Masonry/Terracotta repairs, $425,000 completed In November 2000 • Walden Restoration Projects (Mayor's house and Jackson County Court House) $100,000 completed Aug. 1998 • City of Leadville Historic funded projects from 1997 thru 2001, include work on 21 projects from structural stabilizations, fagade reproductions, stone and masonry repair, roof reconstructions, window and door repair/reproductions, $1,100,000 • Salida First Methodist Church Bell Tower Reconstruction, $50,000 completed Nov. 2002 • Central City Historic Restoration Projects: $200,000 from 1999 -2001 • City of Fort Collins Trolley Barn Door Reconstruction, $45,000 completed in July 2001 12. List your major equipment available for this contract. Demolition equipment, staging, excavation and grading equipment, spray equipment, dust control and air handling equipment 13. Experience in construction work similar in importance to this project: Jackson County Court House, Leadville City Hall, Eaton High School, Ault Elementary School 14. Background and experience of the principle members of your organization, including officers: • Mark Thorbum, President and Project Manager: Under Graduate and Graduate degrees in Construction Management, faculty in Construction Management from 1989 thru 1996. Twenty-five years field experience in commercial and heavy/highway construction prior to 1996. bond # P51100 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned Work-A-Haulics, Inc. as Principal, and Pioneer General Insura as Surety, are hereby held and firmly bound unto the City of Fort Collins Colorado as OWNER, in the sum of $ 4525.00 for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation. issuch that whereas the Principal has submitted to the City of Fort Collins Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction Of Fort Collins Project, CABLE 27 STUDIO AT CITY HALL -PHASE 1; Bid No. 5683. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with .said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respacts perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its. BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 1 • John Price, Superintendent, Under Graduate degree in Construction Management, 20 years working in the building trades, five years estimating and construction management. 15. Credit available: (Assets, credit cards. Bank Credit)+/_ $1 million 16. Bank reference: Ed Wilkins_ First National Bank 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? YES 18. Are you licensed as a General CONTRACTOR? YES If yes, in what city, county and state? Fort Collins. Longmont Central City What class, license and number: Fort Collins. Class B. B-196 19. Do your anticipate subcontracting work under this contract? YES If yes, what percent of total contract? 40% And to whom? See attached list 20. Are any lawsuits pending against you or your firm at this time? NO 21. What are the limits of your public liability? DETAIL: Safeco: General aggregate $2 million, $1 million per occurrence, personal & injury $1 million, Products $2 million, State Farm: Automobile $1 million, Pinnacol Assurance: Workers Comp 22. What are your company's bonding limitations? Maximum single project $500,000 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. (� Dated at LKS M this �— day of 20 ®L University Designers and Builders, Inc. By: Mark S. Thorburn Title: President State of Colorado County of: Larimer is m answers to the foregoing questions and correct. signature uy sworn aeposes therein contained are true and W commission expires: SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 20% of the contract. ITEM HyiK- -- f W40 , AM16c,- �4"jj AfA#JeA1& &C*/A9fc," it z 0s epid SUBCONTRACTOR i 7/96 Section 00430 Page 1 r IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seal-- this 4th day of April , 20 O? and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL / SURETY Name:_ p/gL(-/' — 4 dL.Z,S -1-7G Pioneer General Insurance Co. Address:/ Cd �b _ �� 14�' 6780 E. Hampden Ave. to%� �J�`�Y Denver, CO 80224 Title: to Title: Title: Attorney -in -Fact ATTEST: (SEAL) (SEAL) 7/96 Section 00410 Page 2 PIONEER .aENERAL INSURANCE %OMPANY Denver, Colorado POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: P 51100 That the PIONEER GENERAL INSURANCE COMPANY, a corporation of the State of Colorado has Its principal office in the City of Denver. Colorado pursuant tD the following By-law, which was adopted by the Board of Directors of the said Company In 1990, to wit 'Article VI - Section 2 - RESIDENT OFFICERS AND ATTORNEYS -IN -FACT. The President or any Vice -President. acting with any Secretary or Assistant Secretary, shall have the authority to appoint Resident Vics-Presidents and Attorneys -In -Fact, with the power and authority to sign. Newts, acknowledge and deliver on its behalf, as Surety: Any and all undertakings of suretyship and to affix thereto the corporate seal of the corporation. The President or any Vice -President. acting with any Secretary or Assistant Secretary, shall also have the authority to remove and revoke the authority of any such appointee at any time, does hereby make, constitute and appoint * * * JOHN C. BECKETT, TIMOTHY D. BECKETT * * * OF FORT COLLINS, COLORADO its true and lawful Attorney(s)-In-Fact, to make, execute, seal and deliver for and on its behalf, as Surety. And any and all undertakings of suretyship And the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Company, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the Company at Its offices in Denver, Colorado, In their own persons. The following Resolution was adopted at the Regular Meeting of the Board of Directors of the Pioneer General Insurance Company, held on June 1, 1990. 'RESOLVED, That the signatures of officers of the Company and the seal of the Company may be affixed by facsimile to any Power of Attorney executed in accordance with Article VI -'Section 2 of the Company By-laws; and that any such Power of Attorney beating such facsimile signatures, including the facsimile signature of a wrdfying Assistant Secretary and facsimile seal shall be valid and binding upon the Company with respect to any bond, undertaking or contract of suretyship to which It is attached' All authority hereby conferred shall remain in full force and effect until terminated by the Company. IN WITNESS WHEREOF, PIONEER GENERAL INSURANCE COMPANY has mused these presents to be signed by its President and its corporate seal to be hereunto affixed this 1st day of February 2000 PIONEER GENERAL INSURANCE COMPANY tixsu 2.Ewp.......... qxN Secretary State of Colorado County of Arapahoe j By PRESIDENT Onthis 1st day of February 2000,before mepermnallymme Robert H. Warburton to me known, who being by me duly sworn, did depose and say that (s)he resides in the County of Adams, State of Colorado; that (s)he is the President of the PIONEER GENERAL INSURANCE COMPANY, the corporation described in which executed the above Instrument that (s)he knows the seal of the said corporation; that the seal affixed to the said Instrument is such corporate seal; that It was so affixed by order of the Board of Directors of said corporation; that (s)he signed (his) (her) name by like order; and that By-law, Article VI - Section 2, adopted by the Board of Directors of said County, referred to in the preceding instrument, is now in force. My Commission Expires 1/18/2003 � Tqe'.. ... 'qi-:� m9Te UBL;: Ppoo Notary Public m OF / g M.J. Frick f Secretary of PIONEER GENERAL INSURANCE COMPANY, do hereby certify that the above and foregoing Is a vie and correct copy of a Power of Attorney axewted�bysaid PIONEER GENERAL INSURANCE COMPANY, which is still in full force and effect. Signed and sealed at the City of Denver, Colorado this s-I day of �29" , a1G', P133 Secretary //V/�^-�