ADDENDUM No. 5
BID #5683
CABLE 27 STUDIO AT CITY HALL — PHASE 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5683 Cable 27 Studio at City Hall — Phase 1
OPENING DATE: APRIL 4, 2002, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
A. General:
All work is to be bid as shown on the addenda and the drawings.
Weekend work shall be bid at 128 hours of weekend work to be included in the base bid.
B. Drawings:
Sheet X1,
Contractor to remove perimeter of concrete floor slab as required for clearance to drill
holes in stem wall and install drain and dowels.
Sheet A1.1,
Revision: Remove exterior perimeter drain and with interior perimeter drain and
waterproofing. See attached sketch.
Sheet A1.2,
Revision: Remove exterior perimeter drain and replace with interior perimeter drain and
waterproofing. See attached sketch.
ATTACHMENTS
Floor Plan Sketch
Section Sketch
If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
CONTROL
B12
CORE DRILL AS HIGH AS
POSSIBLE FOR SUM
PUMP DISCHARGE
NEW CONCRETE SLAB EL TO
EXISTING W -3 BARS m e cc -
ROCK LANDSCAPING
AROUND PERIMETER TO
MATCH LANDSCAPING
NEAR RAMP
EXIST. PLAZA
WALL TO REMAIN
RELOCATE EXISTING
SPRINKLER HEADS 5MIN
AWAY FROM BUILDING
WALL CONTRACTOR TO
VERIFY LOCATION Ary
NUMBER IRI21G4T"
LAYOUT TO BED IGN
BUILD BY CON TOR
4'e PERFORATED PJC DRAIN PI'
UNDER SLAB 1N 6' PEA GRAVEL
ALL ARCLND TO PUMP WRAP W/
.tCREEN
EXISTING TREE TO
BE PROTECTED
AND REMAIN
B; BWLDING ^
AIU OPENING FOR FUTURE MOUNTING
FRAME AND DUCT - COVER
OPENING W/ 12 GA. GAL V. METAL
B W/ (4) 3/8'0 EXP. BOLTS CENTER
B ON WALL SET IN BED OF CAULK
FUTURE MECHANICAL CURB
8'T CONC. SLAB W/ EP
RELOCATE EXISTING SPRINKLER
J
COATED 9 BARS m E
OC. EACH WAY
-
HEADS 5' MIN AWAY FROM
BUILDING WALL CONTRACTOR TO
VERIFY LOCATION AND NUMBER
IRRIGATION LAYOUT TO BE DESIC
METAL DECK OR
BUILD By CONTRACTOR
PLYWOODFORM TO
SUPPORT PEPRE CONC.
4'0 PVC DRAIN
IL
LOAD UNTIL CURED
UNDER
PIPE UNDER SLAB IN 6' PEA
FLAB
GRAVEL ALL AROUND TO PUMP
N,LRAP W/ SCREEN
NEW CONCRETE SLAB DOWEL j
APPROXIMATE LOCATION OF
EXISTING W/ 9 BARS m qB E
EXISTI J ITY AREA - DO
NOT D TU
I
TWO COATS AOUAFIN IC
T PORART ]X4 ILL W/
INTERIOR LATE CHINA/B'
EXTERIOR GRA PL
ON FLOOR AND S -
LL
SHEATHING , 3'-0" . l'- H.
INSTALL PERM R
DOOR VERIFY LOCKING
IR' EXPANSION JT
RECOMENDA ONE
RECUIREMENTS W/ OWNER P.
W/ SEALANT
STUDIO
BLOCK
ry
B14
INFILL OPENING AT REM
6' THICK CONC. SLAB W/
FAN W/ 8- SOLID CONCRETE
LL BROOM FIN.
l
BLOCK AND BRICK VENEER
CORE DRILL THROUG
III\
EXISTING FOUNDATION WALL
FOR PVC W/ EXP JT. I
CAULK
O f
I2.0 STEEL HANDRAIL -
IN LL 24.0 SUM W/
GRATE . PUMP
PAINT
n�
DAYLIGHT IN GRA55 1
AWAY IRON ILDI
U
XD
RE_ MEC ANIBCUAL
0%HMF IN WOODTED
ED WALL W/ 5/8'
FL<0ol®I LAN
6' THICK COMO. SLAB W/
LT. BROOM FIN.
CAST -IN -PLACE CONCRETE
STEPS W/ LT BROOM FIN.
CA5T-IN-PLACE CONCRETE
RETAINING WALL W/
INTERGRAL COLOR TO
MATCH EXISTING BRICK
APPROX. LOCATION OF 2'
PVC DISCHARGE PIPE 15'
FROM STEPS
EXISTING GAS TANKS TO
REMAIN AND BE
PROTECTED VERIFY
LOCATION
OALV. METAL FL/SNN'
N.L 4RO.Np o
RGX EMT.CA , t
MATOH )66T. (M. _
EEYOND)
P LY ADHERED EPdt
OVER col BLAE ExiBO
I)P AND DO)N WALL6 4'
6'T OO SLAE BV EP
COATED A EARS . IT 04.
EACH WAY
RRURE MEGH.
POGF LW®
1. GA-V. METAL COVER S,
PLATE WI (4) 3AY4 EMS.
ELLT6 GENTM N WAL1-6
n) 4 EARS CONT.3
PLACE6(MJ
Lv'-bt . b OG (MJ
POLYliW1® WAtERPROOPN6
METClI6ANE W( OWERDOAI® OR
APPpOVED EOIAL (MJ
ST CAST-IN-RLACE GONG.
GLAD W - 3 EARS A b'
OO. EACH WAY
ECNTONNE WATE.STOP AT ALL
JONTB fMJ
C Act EA3ORADE TO 66x
DVDrcY N PIEB®L'E OF6oIL6
ENGPE216
PEA SR (MJ
VY DIA HOLE R 24' OG ALL AROIND
(2) 4 EARS
VA'"W STEEL ANOLE —
/4't4X4' STEEL ANOL!
LEDD6)R W/ 1/4' EW. EOLT
n,0'p= WLLGgd�V.$MErrAL
O ,Emto��
V V�
iW0 COA.i6 dGLAP�' N`K���NtERIOR�
BIATpgR'�LFIING N6TALL PER MANE.
RECGNBDdtNSM OI ALL 0.0CI01 (
WALLS E�OB®�TO GpgpE�
1 \\
SHOO 6ECTIO!
C�BUILDING SECTION
NOTE
RELOCATE EMTNO
SPRWLER HEADS S'�' MIN
R EWE -ONO (MJ
LAYOUT TO ER DEN(N
WILD EY CORRl.CTOR
i
OUTDOOR PLAZA TO
REMAN
PL NE
ufl
LOGO WI
GtlNER
&A=T N
•b• Vr4 (4d )
DOIIEL n
\ EMT.
WALL
FOO(rtl i0
_—� REMNN
4Y PEI
RNC LdNOBC�PINS TO \
MATCH EXMT. (M.
EEYGTO)
APAW%. LOCATION
W RELOG ED
6)'IP1(LER HEADAll
WALL P
RECOTEN
ROL')I® (
SLOPE
BEE ORPOSITE WALL TO!
City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 3
BID #5683
CABLE 27 STUDIO AT CITY HALL - PHASE 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5683 Cable 27 Studio at City Hall — Phase 1
OPENING DATE: March 15, 2002, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
The March 15, 2002, opening date has been changed to March 26, 2002, 3:00p.m. (Our
Clock).
If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
CABLE 27 STUDIO AT CITY HALL — PHASE 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5683 Cable 27 Studio At City Hall — Phase 1
OPENING DATE: March 15, 2002, 3:00p.m. (Our Clock)
To all proposed Bidders for the above -referenced project, the following changes are hereby made and
will become a part of the Contract Documents:
A. General:
1. There is no known Geotechnical report for this site.
2. Contractor shall include in the base bid four (4) eight (8) hour days of weekend construction
for the entire anticipated crew.
3. All demolition of existing equipment shall be by contractor. The owner shall remove
miscellaneous furnishings in the construction area.
Contractor shall coordinate mechanical and electrical disconnect with the owner. Owner shall
disconnect or shut down existing before contractor removal.
5. In section 13.12.1 and 13.12.3 Correction Period, of the General Conditions, change two (2) years
to one (1)year. There may, however, be specific warranty requirements in various specification
sections of this document.
B. Specifications
1. Section 01024, MULTIPLE BID PACKAGES, Paragraph 1.02 B work of bid Package 2
Clarification: A release date for Bid package #2 has not been defined.
2. Sections 01590, FIELD OFFICES AND SHEDS, Paragraph 2.01 TEMPORARY FIELD
OFFICE.
Delete Paragraph 2.01. No field office is required
3. Section 07130, 07150 Waterproofing, Dampproofing paragraph 1.01 WORK INCLUDED:
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970 221-6707
Addendum 1
Clarification Waterproofing shall occur at occupied spaces and concrete vault. Dampproofing
shall occur at retaining walls.
C. Drawings:
1. SheetX1,
Delete General note #2
Delete 1 the southernmost 3'-4"X7'-0" saw cut door opening in northeast wall.
The concrete pad (approximately 4'-0"X4'-0") in approximately the center of room B12 is
to be removed.
2. SheetA1.1,
Delete temporary infill at deleted opening.
Add concrete leveling compound @ all removed concrete pads.
If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
Addendum #1