Loading...
HomeMy WebLinkAbout124025 WORK A HAULICS - CONTRACT - BID - 5683 2203303 CABLE 27 WORK A HAULICSCABLE 27 STUDIO AT CITY HALL - PHASE I BID NO. 5683 BID OPENING: PURCHASING DIVISION 215 NORTH MASON STREET, FORT COLLINS MARCH 15, 2002, 3:OOP.M. (Our Clock) Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 5 BID #5683 CABLE 27 STUDIO AT CITY HALL — PHASE 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5683 Cable 27 Studio at City Hall — Phase 1 OPENING DATE: APRIL 4, 2002, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. A. General: All work is to be bid as shown on the addenda and the drawings. Weekend work shall be bid at 128 hours of weekend work to be included in the base bid. B. Drawings: Sheet X1, Contractor to remove perimeter of concrete floor slab as required for clearance to drill holes in stem wall and install drain and dowels. Sheet A1.1, Revision: Remove exterior perimeter drain and with interior perimeter drain and waterproofing. See attached sketch. Sheet A1.2, Revision: Remove exterior perimeter drain and replace with interior perimeter drain and waterproofing. See attached sketch. ATTACHMENTS Floor Plan Sketch Section Sketch If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 CONTROL B12 CORE DRILL AS HIGH AS POSSIBLE FOR SUM PUMP DISCHARGE NEW CONCRETE SLAB EL TO EXISTING W -3 BARS m e cc - ROCK LANDSCAPING AROUND PERIMETER TO MATCH LANDSCAPING NEAR RAMP EXIST. PLAZA WALL TO REMAIN RELOCATE EXISTING SPRINKLER HEADS 5MIN AWAY FROM BUILDING WALL CONTRACTOR TO VERIFY LOCATION Ary NUMBER IRI21G4T" LAYOUT TO BED IGN BUILD BY CON TOR 4'e PERFORATED PJC DRAIN PI' UNDER SLAB 1N 6' PEA GRAVEL ALL ARCLND TO PUMP WRAP W/ .tCREEN EXISTING TREE TO BE PROTECTED AND REMAIN B; BWLDING ^ AIU OPENING FOR FUTURE MOUNTING FRAME AND DUCT - COVER OPENING W/ 12 GA. GAL V. METAL B W/ (4) 3/8'0 EXP. BOLTS CENTER B ON WALL SET IN BED OF CAULK FUTURE MECHANICAL CURB 8'T CONC. SLAB W/ EP RELOCATE EXISTING SPRINKLER J COATED 9 BARS m E OC. EACH WAY - HEADS 5' MIN AWAY FROM BUILDING WALL CONTRACTOR TO VERIFY LOCATION AND NUMBER IRRIGATION LAYOUT TO BE DESIC METAL DECK OR BUILD By CONTRACTOR PLYWOODFORM TO SUPPORT PEPRE CONC. 4'0 PVC DRAIN IL LOAD UNTIL CURED UNDER PIPE UNDER SLAB IN 6' PEA FLAB GRAVEL ALL AROUND TO PUMP N,LRAP W/ SCREEN NEW CONCRETE SLAB DOWEL j APPROXIMATE LOCATION OF EXISTING W/ 9 BARS m qB E EXISTI J ITY AREA - DO NOT D TU I TWO COATS AOUAFIN IC T PORART ]X4 ILL W/ INTERIOR LATE CHINA/B' EXTERIOR GRA PL ON FLOOR AND S - LL SHEATHING , 3'-0" . l'- H. INSTALL PERM R DOOR VERIFY LOCKING IR' EXPANSION JT RECOMENDA ONE RECUIREMENTS W/ OWNER P. W/ SEALANT STUDIO BLOCK ry B14 INFILL OPENING AT REM 6' THICK CONC. SLAB W/ FAN W/ 8- SOLID CONCRETE LL BROOM FIN. l BLOCK AND BRICK VENEER CORE DRILL THROUG III\ EXISTING FOUNDATION WALL FOR PVC W/ EXP JT. I CAULK O f I2.0 STEEL HANDRAIL - IN LL 24.0 SUM W/ GRATE . PUMP PAINT n� DAYLIGHT IN GRA55 1 AWAY IRON ILDI U XD RE_ MEC ANIBCUAL 0%HMF IN WOODTED ED WALL W/ 5/8' FL<0ol®I LAN 6' THICK COMO. SLAB W/ LT. BROOM FIN. CAST -IN -PLACE CONCRETE STEPS W/ LT BROOM FIN. CA5T-IN-PLACE CONCRETE RETAINING WALL W/ INTERGRAL COLOR TO MATCH EXISTING BRICK APPROX. LOCATION OF 2' PVC DISCHARGE PIPE 15' FROM STEPS EXISTING GAS TANKS TO REMAIN AND BE PROTECTED VERIFY LOCATION OALV. METAL FL/SNN' N.L 4RO.Np o RGX EMT.CA , t MATOH )66T. (M. _ EEYOND) P LY ADHERED EPdt OVER col BLAE ExiBO I)P AND DO)N WALL6 4' 6'T OO SLAE BV EP COATED A EARS . IT 04. EACH WAY RRURE MEGH. POGF LW® 1. GA-V. METAL COVER S, PLATE WI (4) 3AY4 EMS. ELLT6 GENTM N WAL1-6 n) 4 EARS CONT.3 PLACE6(MJ Lv'-bt . b OG (MJ POLYliW1® WAtERPROOPN6 METClI6ANE W( OWERDOAI® OR APPpOVED EOIAL (MJ ST CAST-IN-RLACE GONG. GLAD W - 3 EARS A b' OO. EACH WAY ECNTONNE WATE.STOP AT ALL JONTB fMJ C Act EA3ORADE TO 66x DVDrcY N PIEB®L'E OF6oIL6 ENGPE216 PEA SR (MJ VY DIA HOLE R 24' OG ALL AROIND (2) 4 EARS VA'"W STEEL ANOLE — /4't4X4' STEEL ANOL! LEDD6)R W/ 1/4' EW. EOLT n,0'p= WLLGgd�V.$MErrAL O ,Emto�� V V� iW0 COA.i6 dGLAP�' N`K���NtERIOR� BIATpgR'�LFIING N6TALL PER MANE. RECGNBDdtNSM OI ALL 0.0CI01 ( WALLS E�OB®�TO GpgpE� 1 \\ SHOO 6ECTIO! C�BUILDING SECTION NOTE RELOCATE EMTNO SPRWLER HEADS S'�' MIN R EWE -ONO (MJ LAYOUT TO ER DEN(N WILD EY CORRl.CTOR i OUTDOOR PLAZA TO REMAN PL NE ufl LOGO WI GtlNER &A=T N •b• Vr4 (4d ) DOIIEL n \ EMT. WALL FOO(rtl i0 _—� REMNN 4Y PEI RNC LdNOBC�PINS TO \ MATCH EXMT. (M. EEYGTO) APAW%. LOCATION W RELOG ED 6)'IP1(LER HEADAll WALL P RECOTEN ROL')I® ( SLOPE BEE ORPOSITE WALL TO! City of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 3 BID #5683 CABLE 27 STUDIO AT CITY HALL - PHASE 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5683 Cable 27 Studio at City Hall — Phase 1 OPENING DATE: March 15, 2002, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. The March 15, 2002, opening date has been changed to March 26, 2002, 3:00p.m. (Our Clock). If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 City of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 2 CABLE 27 STUDIO AT CITY HALL — PHASE 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5683 Cable 27 Studio At City Hall — Phase 1 OPENING DATE: March 15, 2002, 3:00p.m. (Our Clock) To all proposed Bidders for the above -referenced project, the following changes are hereby made and will become a part of the Contract Documents: A. General: 1. There is no known Geotechnical report for this site. 2. Contractor shall include in the base bid four (4) eight (8) hour days of weekend construction for the entire anticipated crew. 3. All demolition of existing equipment shall be by contractor. The owner shall remove miscellaneous furnishings in the construction area. Contractor shall coordinate mechanical and electrical disconnect with the owner. Owner shall disconnect or shut down existing before contractor removal. 5. In section 13.12.1 and 13.12.3 Correction Period, of the General Conditions, change two (2) years to one (1)year. There may, however, be specific warranty requirements in various specification sections of this document. B. Specifications 1. Section 01024, MULTIPLE BID PACKAGES, Paragraph 1.02 B work of bid Package 2 Clarification: A release date for Bid package #2 has not been defined. 2. Sections 01590, FIELD OFFICES AND SHEDS, Paragraph 2.01 TEMPORARY FIELD OFFICE. Delete Paragraph 2.01. No field office is required 3. Section 07130, 07150 Waterproofing, Dampproofing paragraph 1.01 WORK INCLUDED: 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970 221-6707 Addendum 1 Clarification Waterproofing shall occur at occupied spaces and concrete vault. Dampproofing shall occur at retaining walls. C. Drawings: 1. SheetX1, Delete General note #2 Delete 1 the southernmost 3'-4"X7'-0" saw cut door opening in northeast wall. The concrete pad (approximately 4'-0"X4'-0") in approximately the center of room B12 is to be removed. 2. SheetA1.1, Delete temporary infill at deleted opening. Add concrete leveling compound @ all removed concrete pads. If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Addendum #1