HomeMy WebLinkAboutBID - 5743 LP CONDUIT PVC 4 INCHES (2)Citv of Fort Collins
Administiative Services
Purchasing Division
CITY OF FORT COLLINS
INVITATION TO BID
BID #5743
Sealed bids will be received and publicly opened at the office of the Director Of Purchasing and Risk
Management, PO Box 580, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80521, at the
time and date noted on the bid proposal and/or contract documents. If delivered, they are to be
delivered to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80521. If mailed, the
address is P.O. Box 580, Fort Collins, 80522-0580.
Bids must be received at the Purchasing Office prior to 2:00 p.m. (our clock), October 23, 2002.
Special Instructions
All bids must be properly signed by an authorized representative of the company with the legal
capacity to bind the company to the agreement. Bids may be withdrawn up to the date and hour
set for closing. Once bids have been accepted by the City and closing has occurred, failure to enter
into contract or honor the purchase order will be cause for removal of supplier's name from the City
of Fort Collins' bidders list for a period of twelve months from the date of the opening. The City
may also pursue any remedies available at law or in equity. Bid prices must be held firm for a
period of forty-five (45) days after bid openings.
Submission of a bid is deemed as acceptance of all terms, conditions and specifications contained
in the City's specifications initially provided to the bidder. Any proposed modification must be
accepted in writing by the City prior to award of the bid.
Only bids properly received by the Purchasing Office will be accepted. All bids should be clearly
identified by the bid number and bid name contained in the bid proposal.
No proposal will be accepted from, or any purchase order awarded, to any person, firm or
corporation in default on any obligation to the City.
Bids must be furnished exclusive of any federal excise tax, wherever applicable.
Bidders must be properly licensed and secure necessary permits wherever applicable.
Bidders not responding to this bid will be removed from our automated vendor listing for the subject
commodities.
The City may elect where applicable, to award bids on an individual item/group basis or on a total
bid basis, whichever is most beneficial to the City. The City reserves the right to accept or reject
any and all bids, and to waive any irregularities or informalities.
Sales prohibited/conflict of interest: no officer, employee, or member of City Council, shall have a
financial interest in the sale to the City of any real or personal property, equipment, material,
supplies or services where such officer or employee exercises directly or indirectly any decision -
making authority concerning such sale or any supervisory authority over the services to be
rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift,
gratuity, favor, entertainment, kickback or any items of monetary value from any person who has or
is seeking to do business with the City of Fort Collins is prohibited.
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
REV. SYM: C
SPECIFICATION FOR PLASTIC CONDUIT
SPEC. 9366-200
1.0 SCOPE
This Specification establishes the minimum requirements for 2", 4",
and 5" plastic conduit to be used with electric power conductors and cables for aboveground use
indoors or outdoors exposed to weather and sunlight at 5,000 feet altitude, and for underground use
by direct burial or encasement in concrete.
2.0 APPLICABLE DOCUMENTS
This Specification is in accordance with the requirements of ASTM F512, titled "Standard
Specification for Smoothwall Poly(vinyl Chloride) (PVC) Conduit and Fittings for Underground
Installation', with exceptions as noted in the following paragraphs.
3.0 REQUIREMENTS
3.1 GENERAL REQUIREMENTS FOR DESIGN
All conduit furnished under this Specification shall, unless otherwise specified, comply with ASTM
F512. In case of conflict, the requirements of the following documents shall apply in the priority
shown:
I. This Specification.
2. ASTM F512.
3. Other referenced standards.
3.L1 MATERIAL
Conduit furnished under this Specification shall be made of virgin Polyvinyl -chloride (PVC)
compound conforming to ASTM D1784 with the minimum cell classification shown in Table I of
this Specification. Chemical resistance shall be in accordance with ASTM D 1784, suffix A or B.
5
366-200 `
REV. SYM: C
TABLE
ASTM D1784
Designation
Order No.
Property and.
Unit
Value
ASTM
Test
Method
Minimum ASTM D
1784 Cell
Classification
Cell Limit No.
Base resin
Poly (vinyl
I
Homo of mer
Chloride
NA
1
Impact strength
(Izod)min ft-Ih/in. of notch
2
065
D256
2
Tensile strength,
3
Min psi.
5,000
D638
2
Modulus of elasticity
4
in tension, min psi
500,000
D638
>6
Deflection Tempera-
ture under load, min
5
264 psi de . F
158
D648
4
Flexural strength min
-
is
13,000
D790
3.1.2 Virgin compound is defined as compound which has not previously been used to make another
product. Reworked material is defined as clean reground or repelletized material generated from a
manufacturer's own conduit extrusion, and used by the same manufacturer who generates it.
Clean is considered to exclude anything foreign to the specific compound designated by the
manufacturer for use under this Specification. Rework material may be used provided that the
conduit or fittings produced meet all of the requirements of this Specification.
3.1.3 CONDUIT TYPE
Conduit type shall be as specified in Specific Requirements for Design.
3.1.4 WORKMANSHIP
The conduit shall be homogeneous throughout and free from visible cracks, holes. foreign
inclusions, or other injurious defects. The conduit bore shall be smooth and free from blisters,
nicks or other imperfections which could mar conductors or cables.
3.L5 SUNLIGHT RESISTANCE/COLOR
The conduit shall contain titanium dioxide pigment to produce a white color with a reflective
factor of greater than eighty percent to allow outdoor storage and,or installation at 5.000 feet
altitude for an indefinite period without deterioration.
6
366-200
REV. SYM: G
3.1.6 LENGTH
Conduit shall be in lengths of twenty feet overall including integral bell. Tolerance of length
shall be + one inch (+ 25 mm).
3.2 SPECIFIC REQUIREMENTS FOR DESIGN
3.2.1 CONDUIT DIMENSIONS AND TOLERANCES
Dimensions, tolerances and pipe stiffness shall be in accordance with Table II of this
Specification. Wall thicknesses shown in Table Ii are based on a minimum modulus of 500,000
psi.
TABLE II
Serial
Number
Nominal
Size (in.)
ASTM
Type
Wall
Thickness
Min. In.
Average
Outside Dia.
Inches
Out -of -
Round
366-200-02
2
DB 120
0.077
2.375+.006
366-200-04
4
DB 120
0.154
4.497 +•006
0:082
366-200-05
5
EB 35
0.126
5.563 + .010
1 0.082
'snaoeo items oevtate trom ASTM F512
3.2.2 BELLED ENDS
Each length of conduit shall have an integral belled end. Glued couplings are specifically
prohibited. Belled end dimensions shall be based on the clearance fit system defined in Table 2
of ASTM F512 except socket depth and out -of -round requirements shall be in accordance with
Table III of this Specification. Belled ends shall be centered on the longitudinal axis to provide a
visible shoulder around the entire circumference of the conduit. Both ends of each length of the
conduit shall be perpendicular to the longitudinal axis of the conduit, i.e., both ends shall be
square cut.
TABLE Ill
Nominal
Size
Inches
Socket Entrance
Inside Dia,
Inches
Socket Bottom
Inside Dia.
Inches
Socket Depth
Inches
Min. Max.
Out -of -Round
2
2.400+0.006
2.381+0.006
2.250 2.500
0.038
4
4,544 + 0,009
4.509 + 0.009
4.000 4.250
0.082
5
5.614 + 0.010
5.573 + 0.010
5.000 5.250
0.082
oicnucu LCII i] UCVIUIC Iinm A 1 IVI rD 12
366-200
REV. SYM: C
4.0 QUALITY ASSURANCE
4.1 RESPONSIBILITY FOR INSPECTION
Unless otherwise specified, the vendor is responsible for the performance of all tests and
inspection requirements specified herein. Except as otherwise specified, the vendor may utilize
his own facilities or any commercial laboratory acceptable to the City of Fort Collins. The City.
reserves the right to perform or witness any of the tests and inspections set forth in this
Specification, where such inspections are deemed necessary. If the City, upon receipt of the
conduit, deems it necessary to have an independent laboratory perform tests and inspections set
forth in this Specification, the manufacturer shall be responsible for all fees incurred in testing if
any requirement of the specifications is not met and/or test results for that lot or shipment are
not consistent with the manufacturer's certified test results.
4.2 REQUIREMENTS AND TEST METHODS
4.2. t COMPOUND TESTS
All the tests required by ASTM D 1784, except the chemical resistance test, shall be made on a
compound sample from each new lot or batch. The average value for all the tests made on each
batch or lot shall comply with the requirements of paragraph 3.1.1 of this Specification and
shall be reported in the certified test report. The chemical resistance test shall be performed
annually or when compound suppliers are changed and test results shall be included in the
certified test report.
42.2 SUNLIGHT RESISTANCE TESTS
Evidence that the compound being used has been qualified in accordance with all tests required
by Paragraph 17 of UL 651 shall be included in the certified test report.
4.2.3 PERFORMANCE TESTS
Conduit furnished under. this Specification shall pass all tests required by and performed in
accordance with ASTM F512 except 2-inch conduit shall have a minimum impact resistance of
40-foot-pounds at 32°F (O°C).
4.2.4 EXTRUSION QUALITY TEST
The extrusion quality shall be determined by immersion in anhydrous acetone in accordance
with ASTM D2152. Finished duct shall not flake or disintegrate when subjected to this test.
Sbb-2UU
REV. SYM: C
4.2.5 CERTIFICATION
The manufacturer shall furnish to the purchaser certified copies of the results of the tests on
each lot or shipment and size of conduit ordered, prior to payment. The certified test report
shall state the lot or control number and manufacturer of compound used and shall give
specific test values for compound tests, stiffness test, and tests having other than a simple
Pass/Fail result. Any conduit tested by the City that does not yield results consistent with the
certified test reports for that lot or shipment will be sufficient reason for rejection of the entire
lot or shipment. City of Fort Collins purchase order number shall be noted on the first page of
each report. Copies shall be sent to the Design section of Fort Collins Light & Power.
Unsigned copies are not acceptable even if accompanied by a signed cover letter.
5.0 PREPARATION FOR DELIVERY
Conduit shall be bundled by individual size into units suitable for shipping and stacked
storage.
To protect the bells from deformation caused by pressure from adjacent conduits, each bundle
shall be assembled such that bells are all at the same end of the bundle with the bell ends of
alternating layers recessed at least the full length of the bells in adjacent layers. The bundles
shall be secured using two steel bands with 2" x 4" minimum wooden boards under the bands,
sets of bands and boards to be spaced appropriately along the length of the bundle forming
adequate crate frames to provide the vertical stacking, frame to frame, to minimize stacked
storage deformation with the stack height up to ten feet. Direct contact between the steel
bands and the conduit anywhere on the perimeter of the bundle is expressly prohibited.
Bundles shall be shipped on an open bed truck.
Jbb-NU
REV. SYM: F
/:\JOR197A�1
Conduit purchased under this Specification shall be of the manufacturer shown below. Manufacturers not listed
below may submit written proposals demonstrating compliance with these Specifications for consideration of
addition to the accepted manufacturers list prior to the next request for bids. In addition to inclusion on the list
below, manufacturer's conduit must also satisfy all requirements of this Specification to be acceptable.
MANUFACTURER
Can -Tex
Certainteed
North American Pipe Corporation (NAPCO)
10
366-200
NOV 06 2002 3:48PM 970-"2-5807 P.1
NOV-05-02 03:01P
P.01
NORTH AMERICAN PIPE CORPORATION
3348 INDUSTRIAL DRIVE
WICHITA FALIS, TEXAS 76306-3135
946- W 4100
November 6, 2002
i
Fort Collins WfimkcWc
P. O. Box 271005
Fort Collins, Colo. 90327-1005
RoQes:
RE: City of Fort Collins
Did No. 5743
Quote M 177%
Order By 11/15/02
Ship BY 4130103
Anything shipped alter 4/30/03 will have an mculator depeodio6 on Cost of resin up or
down.
329,320' 4" Spec. 366-200, Serial 04, Rev.G, .l54 Wall ddckm3
The above price is based on cost of resin u .Nlb., which is approximately 75% of our
few malarial cost. We will advise you on 4/30/03 of any increase or decrease in cost of
resin.
If you have any further questions, pleme let me !slow.
Sino"Y'
Joyce Korukh
PO4W Fax Note 7671 Di1' t 1
TOTPL P.01
n
Freight terms: unless otherwise noted, all freight is F.O.B. Destination, Freight Prepaid. All freight
charges must be included in prices submitted on proposal.
Discounts: any discounts allowed for prompt payment, etc., must be reflected in bid figures and
not entered as separate pricing on the proposal form.
Purchasing restrictions: your authorized signature of this bid assures your firm's compliance with
the City's purchasing restrictions. A copy of the resolutions are available for review in the
Purchasing Office or the City Clerk's Office. Request Resolution 91-121 for cement restrictions.
Collusive or sham bids: any bid deemed to be collusive or a sham bid will be rejected and reported
to authorities as such. Your authorized signature of this bid assures that such bid is genuine and is
not a collusive or sham bid.
Bid results: for information regarding results for individual bids send a self-addressed, self -stamped
envelope and a bid tally will be mailed to you. Bid results will be posted in our office 7 days after
the d openi
Naha
P
l James B. O'Neill 11, CPPO, FNIGP
Director of Purchasing and Risk Management
10/02/02 2
FIRM
CITY OF FORT COLLINS
BID PROPOSAL
BID NO. 5743
BID DATE: October 23, 2002
WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS' REQUIREMENTS FOR Conduit,
PVC 4" PER THE BID INVITATION AND ANY REFERENCED SPECIFICATIONS.
QUANTITY: DESCRIPTION:
328,320 Ea. Conduit, PVC, 4" x 20' overall length, 4.0" min.
depth belled end, .154" wall thickness, per Spec. 366-
200, Serial 04, Rev. G. As per eleven (1 1) pages of
specifications attached.
$ Ea. $ Total
Mfr. Mfr. #
"Delivery to be taken as follows:
54,720 FT the first of each of the following months:
December
2002
February
2003
April
2003
May
2003
June
2003
August
2003
"We retain the option of revising the above schedule one month
before the next scheduled shipment.
Deliveries will meet the above delivery dates. Yes No
Items being bid meet the above specifications without exception.
Yes_ No If no, please list exceptions, specifying
paragraph reference number, on a separate sheet and attach to
your bid.
For purposes of warranty and service ONLY approved
manufacturers or distributors authorized by an approved
manufacturer to serve the Fort Collins area may bid.
10/02/02 3
Bid #5743
SUPPLEMENTAL INSTRUCTIONS
Prices quoted must remain firm for a 30 day period after the opening date.
Freight terms: F.O.B. destination freight prepaid. All freight charges must be included in pricing
submitted on proposal and not entered as separate pricing.
Any discount allowed by Vendor for prompt payment, etc. must be reflected in quoted figure, and
not entered as separate pricing.
The City reserves the right to accept or reject any and all quotes.
Bidder not responding to the services requested in this bid shall be removed from our automated
listing for: Not Applicable
Any questions or inquiries regarding this bid should be directed to:
Opal F. Dick, CPPO, Senior Buyer (970) 221-6778
SIGNATURE AND TITLE TYPED OR PRINTED NAME AND TITLE
COMPANY NAME (AREA CODE) TELEPHONE NUMBER/FAX NUMBER
ADDRESS: STREET, CITY, STATE, ZIP DATE
10/02/02 4
SPECIFICATION FOR
PLASTIC CONDUIT FOR UNDERGROUND INSTALLATION
Specification No.: 366-200
Rev. G
May, 1999
REV. SYM: G
THE CITY OF FORT COLLINS
Light and Power Department
P.O. Box 580
Fort Collins, CO 80522
SPECIFICATION NO: 366-200
TITLE: PLASTIC CONDUIT FOR UNDERGROUND INSTALLATION
APPROVED BY: Gam/
T ii M. Sagen
Chief Design Engineer
Originated: 3/20/37
REVISED: 5/5/99
ITEMS COVERED BY THIS SPECIFICATION
DESCRIPTION
ASTM REFERENCE
SERIAL
STORE'S NO.
2" P.V.C. Conduit
DB 120
02
6535-1081
4" P.V.C. Conduit
DB 120
04
6541-1120
5" P.V.C. Conduit
EB 35
05
6543-1142
1
366-200
REV. SYM: G
PREVIOUS REVISION DESCRIPTIONS ON FILE
REVISION DESCRIPTION
CHANGE NOTICE
APPROVED
REVISION D:
ADD APPENDIX A, Approved
N/A
S. Coram
Manufacturers
Tim Sagen
3-12-92
REVISION E:
Update Appendix A, Remove
N/A
Tim M. Sagen
Condux
S.Coram
3-10-94
REVISION F:
Update Appendix A, Change Manufacturer
O. Dick
(Quail Plastics to NAPCO)
Tim Sagen
3/4/97
REVISION G:
Change 4" conduit to DB 120, wall thickness
.154
N/A
F
S_yG-99
i
2
366-200
REV. SYM: G
LIST OF ACTIVE PAGES
ORIGINAL PAGES
ADDED PAGES
SHEET NO.
REV. SYM:
SHEET NO,
REV. SYM:
SHEET NO.
REV. SYM:
1
G
2
G
G
4
D
5
C
6
C
7
G
8
C
9
C
10
F
3
366-200
TABLE OF CONTENTS
REV. SYM: D
PAGE
TitlePage...............................................................................................................................
I
RevisionRecord......................................................................................................................
2
Listof Active Pages................................................................................................................
3
Tableof Contents....................................................................................................................
4
1.0
Scope.......................................................................................................................................5
2.0
Applicable Documents............................................................................................................
5
3.0
Requirements .................. ..................................... .................................
........._...................... 5
3.1
General Requirements for Design...............................................................................
_......... 5
3.2
Specific Requirements for Design. .......... .........................._..............................._
.. .. ....... 7
4.0
Quality .Assurance.. ... .._..................... .......... ................... ........_..............................................
8
4.1
Responsibility for Inspection ._ ... ................................ ........ ......._................
........................_. 8
4.2
Requirements and Test Methods .......... .............................. ........
.......... ...._.......___ . 8
5.0
Preparation for Delivery... .... ,.... ._..... .,.................... ........:....................................__..............
9
AppendixA ....................... ............ ........ ..................... .... ..................................._
_... ...__. 10
4
366-200