HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - 9929915- NOV-27-2002 WED 02:00 PM CFO ENG. FAX NO. 9702216378 P. 01 ,'4 Change Order Form PROJECT TITLE: South Taft Hill Roadway Projects (a.k.a. Taft Hill, Drake to Derby) PROJECT NUMBER: 30521800.6 CONTRACTOR: Zak Dirt (PO *9929916) CHANGE NUMBER: 17 In proparing change orders show in order as separate numbered paragraphs the following: 1. Roa$on for change. 2. Description of change. 3. Change in contract cost. 4. Change in contracttimo. 142. See atlachad invoice for details 3. The contract cost will increase by $29,613.85 4. There will be 8vo (5) calendar days added to the contracttime. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUST13D CONTRACT COST (Assuming oil change orders approved) ACCEPTED BY: antra—c—r& s preSenir SUBMITTEDBY: _ 4Eg Project Me APPROVED BY; _'�— Utility Project Manager APPROVED BY:E�' Park Planning Project I APPROVED Sr. .... W .�---- APPROVED BY: Ft Copi.s Lovelad APPROVED BY: CC, Citycicrll Purdm%ng Awoun6ng ConW=Of Protect Flli (Purchasi�r $30,000) 0.61 % 4.30% $4.840,496.60 $178,336.84 $0,00 $29,613,85 $5,046,446.29 DATE: ili%A i 0 P - DATE:.- I (I LO 10 a DATE: DATE: DATE: DATE: Z Z% DATE: Enginoaring- Roadway 517.691,60 Ponce . Troll $11,922.35 Ut9lty, - Pond $0.00 Uboty • vvZodms 50.00 Enainoormg - FCLWD S0.00 �— nJlnnn v..n..... rl .• �f..-��\ NOV-27-2002 WED 02:01 PH CFO ENG, FAX NO, 9702216378 P, 02 Change Order Form Gh of Fort Collins PROJECT TITLE: South Taft Hill Roadway Projects (a.k.a. Taft Hill, Drake to Derby) PROJECT NUMBER: 30621800.E CONTRACTOR: Zak Dirt (PO #9929915) CHANGE ORDER NUMBER: 17 In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change, 2- Doscripdon of change. 3. Change in contract cost. 4. Change In contract time. 1,&2. See oltachcd Invoice for details 3. The contract coat will Increase by $29,613.85 4. Thore wbI be five (5) calendar days added to the contract tims- ORIGINAL CONTRACT COST $4.640,495.60 TOTAL APPROVED CHANGE ORDERS $178,336.34 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $29,613.85 TOTAL 0,5 OF THIS CHANGE ORDER 0.61% TOTAL CO. % OF ORIGINAL CONTRACT 4.30% $5,048,446.29 ADJUSTHD CONTRACT COST r (Assuming all Change orders approved) ACCEPTED BY: _ DATE: Contractor's Representative SUBMITTED BY: DATE' Engineering Project Manager APPROVED BY: APPROVED BY: DATE: DATE; APPROVED BY: V DATE: Ft. Collins Loveland Water District Project Manager APPROVED BY: DATE' Overall Project Manager APPROVED BY: (Purchasing Agent over $30,000) x City CILFK En9inoerin9 - Roodwey Purchoaina parks -1ou1 Accounhng utility - PoM Contractor uullty - Waterline PnVxt Re En9rneenn9 - PCLWD GATE: S17.691.50 571,922.55 $0.00 50.00 S0.00 Zak Dirt, L-rc Change Order Ho.17 SOUTH TAFf MLLROADWAY PROJECTS 1111S02 Date 1 Reason for Change' a This Change order adds Ole is) WkWar days to Die Suhslanb'a[ Comp ron Contract Time for additonal irigaDon work as ou8iled in October 18fi, 20 mamo- b This Ghm!)e Order adds additional wodt to the contract as outlined below. 2 Descrglon of Charge. a Sze Cekm 3 Item l Quar ruty Sanmary and Change In ConlractAmuant Overall Contract Summary RoaQ TraR Rem No Newt Description Unit Unit Cost Quantity Amount(S) Quantity( Quantity Costls) Original katedal cost far ptaain9 mia in median rases Addilimn mi irarlmVay TTee ti@aleriig Zones Rebu:tl Drake 8 Tait Pet RUOges CY LS EACH 515.OD 350 $11.151 OD 1 S1,I102.75 4 5735.00 1 55,259.00 Ei1,151.00 S4.01100 5735.00 350 1 4 1 OD 1.00 .00 .aD 0 O 0 0 50.00 SO-00 SO OO254 251 252 253 Repair edtig Type R Well (111480 RT) 5315-00 1 3315 00 1 A0 0 SO. DO255 SO DD265 S920- Addhionai Irish work on Peck's DdYe"y LS $1.75 278 SC85.5D 278 .0 0 (51,520-00)1S Addlion of Hgh Earh C83 to Ty 11-R LF 55200 -35 IS7,620 DO' O 0 E6?8.80109 51 Rmwve Add Carcrele lraMY. in) (Ffi Eatly) SY S6D6 6D 0 0 367 387 SZ.3377�414 7JF Rem Fence LF LF287 31.8 33i57 00 -387 7 0D) 674 52,337-75113 3-Rai Wood P. wl Wire Mesh 5225 103g $2,337.75 0 0 1039 S294-00t15 Was Fence q2 5294OD 0 0 42 6 53,000;0 Horx Fence118 fi SS000.00 0 D Fle1d Gaze r Totab 8 613.85 $17 691,5o