SECTION 00300
BID FORM
PROJECT: CITY PARK POOL, RENOVATION; Bid No. 5731
Place Fort Collins, Colorado
Date September 27, 2002
1. In compliance with your Invitation to Bid dated August 28, 2002
and subject to all conditions thereof, the undersigned
Sun Construction & Design Services, Irk ** (Corporation/I�i/c��¢p1/�1�(�C�t�/¢per'
1�a'�d i TT Z7 d77� /�6d�/�✓tldp�{i'E{6�(�* authorized to do business
in the State of. Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashiers check or standard Bid
bond in the stun of 5% of base bid ($
in accordance with the Invitation. To Bid and
Tnstructi.ons to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Pavment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award. of the contract, is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and pa.yrnent bonds is as
follows:
Travelers Casualty & Surety Company of America
Zinden arse s oe, T6T770Tri� rive, ort ol1ins, CO 80525
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed .in the Bid Schedule, irrespective
of whether it is named in said list.
o. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No. 1
through
7/96 Section 00300 Page 1
Sun Construction & Design Services, Inc.
General Co ftvctor
Maier Job Completions - 1995 — 2001
2001
Valley Ford
Dealership
$2,748,406.00
F&PS
Bldg. 9 Chiller Addition
$1,612,528.00
Wall Tech
New Bldg. /Installation
$1,514,929.24
CSU
Wagar Controlled
$1,166,796.00
STA Labs
New Office / Lab
$1,045,817.21
Signal Soft
Renovation
$693,453.21
Aramark
Coors Lunchroom
$667,924.00
Gilead
2970 Phase I Office Ren
$662,635.93
GSA
CDC Lab Remodel
$573,674.89
AT&T
HVAC Build out
$547,852.00
AT&T
HVAC Build out
$547,852.00
Avaya
Celestra Demising
$529,600.76
Sun Const.
2001 New Bldg. Addition
$518,356.00
Sturgeon
Metro Waste Water
$513,248.00
Jacobs
Coors U3 Upgrades
$384,249.00
MarketWise
3rd Interior Finish
$355,000.00
Jacobs
Coors US Exit Upg.
$296,511.00
Raytheon
Trench Fibro Duet
$257,552.52
F&PS
Bldg. 9 Steel Erect
$246,197.00
F&PS
Bldg. 2 NCFC
$245,629.00
Gilead
2nd Fl. Office Renov.
$228,413.73
F&PS
Bldg. 6 Command Center
$221,991.00
Valley Subaru
Remodel
$221,520.97
CSU
Old Ft. Collins ffiigh -Elev
$184,921.00
CU-Fac
Exterior Light Upgrade
$180,544.00
BW System
Denver Mint
$175,729.00
Avaya
Q&RLabs
$175,361.00
Weld Cnty
West Annex
$159,059.00
CU-Fac
Standing Order T&M
$153,259.16
UNC
Signage Project
$151,062.00
Central Fire
CU Ketchum Fire
$148,237.00
CU-Fac
Farrand Hall Arch Work
$144,516.14
CU-Fac
Cires Catwalk
$135,873.00
Amgen
Lgmt Standing Order
$127,309.50
Pratt
Hawthorn Ste Remodel
$126,749.00
F&PS
Bldg. 25-1 Alter Cubes
$122,529.00
Adams 12
Auto Shop
$122,372.00
Raytheon
Ski£3rd Floor
$121,328.50
Celestica
Gate 3 Entry
$117,387.00
UNC
Tennis Court Replc.
$115,727.00
Pratt Maxtor
$106,522.94
TOTAL GROSS VOLUME 2001
Sun Construction & Design Services, Inc.
General Contmctor
Major Job Comoletions - 1995 - 2000
2000
Job Name
Contract Amount
AMGEN AC22 BUILDOUT
$1,296,974.00
CSU LAUREL HALL
$1,250,203.00
IBM BLDG 6 CUBICLE SPACE
$676,291.00
GILEAD NEXSTAR PHARM. (2860)
$591,843.00
GILEAD NEXSTAR PHARM.
$449,405.00
IBM BLDG 25-2 BUILDOUT
$430,394.00
UNC BUTLER HANCOCK
$422,683.00
AT&T ADMINISTRATION RELOCATE
$276,856.00
CSU HUGHES STADIUM
$263,048.00
YMCA BOULDER LOCKER ROOM
$262,536.00
FRCC PENTHOUSE MODIFICATIONS
$222,193.00
LEXMARK BLDG 31 PACKAGING
$200,000.00
HP BLDG 6 LOBBY REMODEL
$197,000.00
LUCENT BLDG 30 CONFERENCE ROOM
$195,884.00
IBM BLDG 6 FIBER OPTICS
$192,791.00
CSU CDC REMODEL
$170,940.00
IBM BLDG 6
$170,057.00
UNC RESIDENCE HALL LANDSCAPE
$160,625.00
CITY OF LONGMONT WASTE WATER
$146,778.00
CICSCO WASTE WATER —FRITO LAY
$121,347.00
AT&T PROSPECT VALLEY VANDALISM
$115,491.00
PIC MH3BCH COORS BREWING
$107,333.00
Misc. Standing Order Jobs up to $look
$14,421,575.00
TOTAL GROSS VOLUME 2000 ae azo0
COLORADO VOLUME $22,342,247.00
OUTSIDE COLORADO VOLUME $0.00
1999
Job Name
Contract Amount
LUCENT TOILET RENOVATIONS
$2,218,099.00
HILLESHOG MONO-HY
$1,416,800.00
ADA, PHASE II MODIFICATIONS
$1,189,700.00
SUPERIOR TOWN HALL REMODEL
$607,562.00
AT&T ZUNI MMOC6
$517,873.00
COORS NBl SOUTH EXTERIOR STAIR
$509,425.00
RAYTHEON REMODEL 3RD FLOOR
$403,868.00
AT&T CHEYENNE MAIN REROOF
$383,843.00
AT&T BATTERY RM PROJECT -MEAD
$351,628.00
LSI HARMONY BUILDING KITCHEN
$351,576.00
AT&T ZUNI BATTERY ROOM
$330,919.00
AT&T ZUNI IAQ PROJECT
$296,000.00
CU ENGINEER CTR CHILLED H2O
$288,366.00
CSU EDDY FLOOD WALLS
$270,258.00
HELM CONST-MOORE MIDDLE SCHOOL
$249,682,00
SOUTH AGGIE VILLAGE
$233,879.00
AT&T WYOMING REGEN HVAC
$219,795.00
UNC BIKE TRAIL PHASE II
$215,899.00
COORS CELLAR 8 SOUTH STR UPGRADE
$208,185.00
COORS SE STAIR ENCLOSURE
$200,201.00
UNC ADA PHASE U SITE IMPROVE
$189,151.00
AT&T 4TH FLOOR VESDA
$180,581.00
ADAMS 12 WESTLAKE MIDDLE SCHOOL
$174,301.00
F&PS - IBM BLDG 25 DEMO
$170,245.00
F&PS - IBM BLDG 22 CALL CENTER
$168,982.00
ELEVATOR UPGRADE
$167,500.00
DENTAL HEALTH - NEW CLINIC
$161,759.00
CICSCO UNLOAD BLDG FRITO LAY
$157,259.00
DR. MCCARTY DENTIST OFFICE
$155,320.00
CASE- LOGIC S.RESTROOM ADDITION
$133,065.00
CENTER DISEASE CONTROL BSL3-LB
$133,014.00
CSU CLARK HALL
$123,517.00
CU HOUSE HARD; LIBBY HALL DOOR
$116,839.00
Misc. Standing Order Jobs up to $100k
$6,128,907.00
TOTAL GROSS VOLUME 1999
$18.62d_Olill_011
COLORADO VOLUME
$18,236,257.00
OUTSIDE COLORADO VOLUME
$387,743.00
1998
Oyu i.amc
Contract Amount
NCC WEST EXPANSION
$6,326,237.00
AT&T NGLN PHASE 2
$1,416,800.00
RHBU AREA FITUP
$1,188,521.00
MOUNTAIN VIEW COMPONENTS
$685,033.00
GIBBONS BUILDING
$805,779.00
CELLAR 9 STAIRS & CATWALK
$667,365.00
SINDELIR REMODEL
$650,461.00
AT&T NCC WEST SYSTEM 85 HVAC
$602,306.00
BLDG 8 RHTC RELOCATE
$441,733.00
STK BLDG 8 MPBG OFFICE FITUP
$415,344.00
AT&T NGLN PHASE 1
$399,958,00
EXEC. LOBBY & CONE ROOM
$356,232.00
IBM BRS REMODEL
$235,967.00
SINDELIR WAREHOUSE
$222,241.00
REMODEL SECOND FLOOR
$208,576.00
CIGNA 4TH GENERATOR
$205,087.00
IBM BLDG 26 REMODEL OFFICES
$169,647.00
UCAR ATRIUM TENENT FINISH
$148,151.00
RESTRM UPGRADE PHASE 6 FITUP
$145,693.00
UNIVERSITY VILLAGE PHASE 3
$145,426.00
BATHROOM RENO PHASE V FITUP
$140,738.00
RESTRM UPGRADE PHASE VII FITUP
$137,791.00
BLDG 2 CLASSROOM FITUP
$111,013.00
Misc. Standing Order Jobs up to $100k
$6,165,531.00
TOTAL GROSS VOLUME 1998
COLORADO VOLUME
$19,916,383.00
OUTSIDE COLORADO VOLUME
$2,075,248.00
1997
Job Name
Contract Amount
AT&T PROSPECT VALLEY
$714,000.00
FITZMORRIS ELEMENTARY
$234,021.00
CU DENVER, INFECTIOUS DISEASE LAB
$396,832.00
NYPRO CLEAN ROOM
$427 242 00
AT&T CHEYENNE NGLN, PHASE I
$390,545.00
HUGHES INFO.CENTER INVERNESS INTERIOR
$840,803.00
STK BLDG. 8 C.S. RELOCATE
$396,000.00
LUCENT BLDG, 30 FLOOR REPAIR
$233,914.00
UNC CRABBE HALL
$244,225.00
HP OUTDOOR TEST AREA
$254,889.00
Misc. Standing Order Jobs up to $100k
$10,915,529.00
TOTAL GROSS SALES 1997:
st 5.11a4_oon_oo
COLORADO VOLUME
$14,657,455.00
OUTSIDE COLORADO VOLUME
$390,545.00
1996
Job Name
Contract Amount
IBM BUILDING 23 INSTALL
$1,500,000.00
LUCENT HAZARDOUS STORAGE FACILITY
$1,216,000.00
CU CENTER STORES
$755,000.00
AT&T ELEVATOR
$512,577.00
CSU MOBY ARENA
$477 000 00
CU LAB SAFETY UPGRADE
$407 000 00
AT&T TAZ
$295,000.00
CSU CONTROLLED MAINTENANCE
$286,000.00
WESTVIEW PRESBYTERIAN CHURCH
$257,000.00
AT&T EXECUTIVE BRIEF
$250,000.00
AT&T FEEDWATER
$162,000.00
GOLDEN HIGH SCHOOL
$117,875.00
Misc. Standing Order Jobs up to $100k
$7,464,548.00
TOTAL GROSS VOLUME 1996: $t3.7110_nlln_MI
1995
Job Name
Contract Amount
CSU VET HOSPITAL
$723,407.00
LARDAER COUNTY ADMIN BLDG.
$656,000.00
AT&T AREA 37
$525,000.00
AT&T BLDG. 30
$243,648.00
HUGHES AIRCRAFT
$222,118.00
CSU MEAT PACKING
$145,029.00
RAM MECHANICAL CHILLER ROOM
$138,000.00
CSU REMODEL GREEN HALL
$139,134.00
CSU NECROPSY LAB
$128,494.00
AT&T ETOP
$120,191.00
Misc. Standing Order Jobs up to $look
$5,266,561.00
TOTAL GROSS VOLUME 1995: 4 smss _nn
Gross volumeh_istory since incorporation:
2001
$29,000,000.00
2000
$22,342,247.00
1999
$18,951,455.00
1998
$21,991,631.00
1997
$15,048,000.00
1996
$13,700,000.00
1995
$8,307,582.00
1994
$7,546,882,00
1993
$5,698,960.00
1992
$6,154,753.00
1991
$12,060,773.00
1990
$4,881,054.00
1989
$5,815,509.00
1988
$3,446,116.00
1987
$2,979,653.00
Sun Construction & Design Services, Inc.
General Contractor
Company Owned Equipment - Rental Rates
Description gty Days Used Daily Rate Weekly Rate Monthly Expendables Extension
Telescopic Manlik - 24' 9100.00 5250 n0 IAnn nn
Scissor Lift - 24'
$110.00
$270.00
$850.00
Scissor Lit - 20'
$85.00
$240.00
$750.00
Scissor Lrft - 18'
$85.00
$240.00
$650.00
12' 1 Ton Trucks
$180.00
$350.00
$550.00
Fuel
16 2 Ton Trucks
$180.00
$350.00
$550.00
Fuel
69 Extension Ladder
$35.00
$100.00
$350.00
Laser & Tripod
$45.00
$135.00
$450.00
TP 800 Chipping Hammer
1
1 $30.00
$100.00
$300.00
Electric Jack Hammer 40#
1
1 $50.00
$150.00
$450.00
Gas Welder
$40.00
$120.00
$400.00
Gas
Wire Welder
$55.00
$150.00
$200.00
Wire
Torch & Gas Tanks
$30.00
$90.00
$300.00
Gas
Large Hammer Drill
$25.00
$80.00
$290.00
6000 # Fork Lift
$275.00
$900.00
$3,000.00
Fuel
Walk behind Saw
$60.00
$180.00
$425.00
Blades
Compressor & Jack Hammer
$100.00
$300.00
$800.00
Gas
45' Snorkel Lift
$375.00
$800.00
$1,800.00
Gas
Scaffolding r section
$10.00
$30.00
$50.00
Texture Machine
$30.00
$90.00
$300.00
Large Generator
$35.00
$140.00
$425.00
Gas
Demo Saw with Blades
$50.00
$150.00
$275,00
Blades
2.5 Cubic Feet Concrete Mixer
$25.00
$75.00
$300.00
4 Cubic Feet Concrete Mixer
$50.00
$150.00
$450.00
62 Snorkel Lifts
$400.00
$1,200.00
$3,500.00
Gas
10,000# all terrain Forklift
$400.00
$1,200.00
$3,500.00
Gas
Equipment Rental Rates
Updated 2119/02
SAMPLE OF PROJECTS COMPLETED
CU-Boulder MCDB Laboratory $ 445,306.00
Description of Work: This work involved interior laboratory and office tenant finish at
the department of Molecular, Cellular and Developmental Biology at the Colorado
University -Boulder Campus. Sun Construction started with a large open area and created
individual research laboratories including all stages of finish, mechanical, electrical and
fire alarm systems.
Owner: University of Colorado Boulder
Facilities Management
Boulder, Colorado
Architect: P.E.H. Architects
Contact: Peter E. Heinz
CSU Weber Building— Phase H $ 1,101,927.00
Description of Work: This 19,750 s.f project included historic renovations and the
replacement of mechanical systems; remodel of interior spaces, and various maintenance
items as specified. No asbestos abatement required.
Owner: Colorado State University - Facilities Management
Facilities Services Center North
Fort Collins, Colorado 80523-6030
Architect: Architectural Resources Group
1828 Wallenberg
Fort Collins, Colorado 80526
Contact: Larry Trampe (970) 484-0126
UNC ADA, Phase H Modifications $ 1,189,700.00
Description of Work: This project contained work in 22 buildings around the UNC
campus including 2 new elevators, 6 new handicap ramps, a building addition, restroom
modifications and door alterations.
Owner: University of Northern Colorado
Facilities Management
Greeley, Colorado
Architect: Randell E. Larson
215 Nottingham Dr.
Huntersville, NC. 28078
Contact: Randell Larson (704) 947-6150
CSU Gibbons Building $ 805,779.00
Description of Work: Gibbons Building was a full 3-floor renovation covering all
divisions, from Landscaping to Electrical.
Owner: Colorado State University
Facilities Management
Fort Collins, Colorado 80523-6030
Architect: Architecture 2000
5031 S. Ulster
Greenwood Village, CO. 80111
Contact: Kathy Lingo (303) 290-9930
Sun Construction $ Design Services, Inc.
Germml Ca dracWr
Personnel Profiles
Personnel Profile
Stephen B. Strong
Owner/President
Years of Experience: 25
Steve has been in construction most of his life. He started work as a laborer and moved through
the ranks until starting Sun Construction & Design Services, Inc. in February 1985. As the Chief
Executive Officer of the Company, he provides long range planning and maintains key
relationships with clients. Steve's community and charitable organization involvement have
provided him the opportunity to utilize the resources of Sun Construction to aid numerous
worthy causes.
Bill Prout
Vice President/General Manager
Years of Experience: 35
Bill has been involved with project management and controls for his entire career since receiving
a degree in Construction Management from Colorado State University. His project experience
ranges from small jobs for standing order clients to very large projects valued to $250 million.
Bill is responsible for the day-to-day operation of all aspects of Sun Construction, and is heavily
involved with the strategic long-range direction of the Company. Additionally, Bill adds
strength and experience to our pre -construction services where he provides guidance in budget
estimating, preliminary scheduling, constructability reviews, value engineering and guaranteed
maximum price development for design -build projects.
Tom Smith
Vice President/Project Manager
Years of Experience: 38
Having more than 14 years with Sun Construction, Tom has developed and maintained client
relationships with some of the largest companies in Colorado (AT&T, Lucent Technologies and
Raytheon to just name a few). Tom has completed such projects as restaurants, executive
briefing centers, auditoriums, manufacturing facilities, shopping facilities, high security areas for
the Department of Defense, hospitals, pharmaceutical plants, and schools. Tom enjoys
challenging and different types of projects such as the relocation of a 75' two-story shielded
anechoic chamber.
SEF-18-U2 WED U2,b8 HM UM/FT UULLIN6, YUKCHAS hAX NU. 91U 221 M H.U(122
-aAIL_GMaLr- C ion & Design Services, Inc.
CONTRACTOR -
F:Y:
William B. Prout
ice Presi ent General Manager
ADDRESS: _ 1232 Boston Avenue
Longmont, CO 80501
8. BID SCHEDULE (Base Bid)
Base Bid
Lump Sum
- fixed price with bid a.l.ternates.
Fixed Price -
$ I LlLio (DOC)
1
Alternate
Alternate
#1 (add)
Play Feature SCS 107 -
$-�-Li .GG_
��� �(70
#2 (add)
Play Structure SCS 115 -
Alternate
#3 (add)
Building awnin includ'
g, �.ng roo ,
structure & attachments -
Alternate #4 (add) Concrete masonry screen wall.,
shower and awing -
Alternate #5 (add) Concrete Stain Color 02 -
Alternate #6 (add or deduct) Demo existing pool floor
in place.
�nc� m';dcan ,s wA ,d V-i. r cnw� i
4. PRICES
$ -St-a00 , Oi
Dollars
The foregoing prices shall include all labor., materials, transportation,
shoring, removal, dewatering, Overhead, profit, insurance, etc., to cover
the Complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty -.five percent (25) of the total Agreement: Price.
RESPF. FULLY S M;CT D:
/y.,, 9/27 /02
SignaT.urn William B. Prout Date
Vice President/General Manager
Title -
7/96 Section 00300 Page 2
Personnel Profile
(Continued)
John Sargent
Vice President of Design and Development/Project Manager
Years of Experience: 35
John brings an extensive estimation and project management background to Sun Construction.
Starting at the trades level, John has experience ranging from crane operation to the completion
of a carpenter apprenticeship program. He has also worked as a general field superintendent for
a large commercial general contractor. A promotion to estimator brought John into the
management sector and eventually to the position of chief estimator. While in that capacity he
worked closely with many design teams, as the company was primarily a design -build firm.
John spent the next 11 years working on a wide variety of projects from large industrial plants,
school remodels, retail, medical and a daycare facility at the Pentagon. In May 1991, he joined
the team at Sun Construction. John has established many new clients and managed many
diverse projects from high tech to high profile and is now our prime contact for Butler sales.
John's projects range from small to over $20 million.
Tim Strong
Operations Manager / Project Manager
Years of Experience: 18
Tim's responsibilities with the Company have steadily grown from craftsman, to superintendent,
project manager, and now Operations Manager. His ability to handle labor and personnel issues
is ideally suited for his current position which includes employee relations, office management,
and field labor distribution. Tim is also the company Safety Director that involves visiting job
sites to insure safety compliance.
Chuck Youngren
Project Manager
Years of Experience: 27
Chuck has approximately 12 years of industrial/commercial mechanical design and management
with specialization in HVAC, piping and plant layout. Past responsibilities range from
mechanical drafting, design and project engineering. Subsequent to this, Chuck has 15 years of
construction management and general contracting experience. Most projects being turnkey
industrial and commercial projects, Chuck has worked from the owners conceptual plan,
coordinated the design team, bid the construction and oversaw the building process.
Personnel Profile
(Continued)
Mark McMahon
Project Manager - Cabinet Shop
Years of Experience: 21
Before taking the position as the Project Manager for the Cabinet Shop, Mark worked eleven
years at Sun Construction. After six years as a project superintendent, Mark took on the duties
of managing Sun Construction's Cabinet Shop. The Cabinet Shop has serviced Sun
Construction for 16 years, and specializes in standard wood and plastic laminate casework
fabrication and millwork. Projects have varied from restaurants and kitchens to labs and
classrooms. The Cabinet Shop has completed projects for CU Boulder, CSU, University of
Colorado Health Sciences Center, IBM, Amgen, Hewlett Packard, Lucent Technologies, just to
name a few.
John Chavez
Project Manager
Years of Experience: 21
After approximately 17 years in the nuclear weapons industry, as both a foreman and
coordinator, John brings to us a strong background of government knowledge, which proves very
helpful in his coordination and management of the AT&T Communications projects for
Colorado, Wyoming and Nebraska. John is also OSHA 510 certified. John works with
Primavera software including "Expedition" and "SureTrak" to track projects from start to finish
and is also experienced in Microsoft Word, Excel, and Corel WordPerfect.
Anthony M. Landi, Jr.
Project Manager
Years of Experience: 21
Tony has a B.A. in Architecture from Kent State University. After receiving his architect's
license, he worked for an interior contractor in Cleveland, whose projects included new tenant
finish, shopping centers, hotels and hospitals. In 1987, he opened his own interior contracting
company, which he owned and operated until his move to Colorado in 1997. He is currently
project manager for a variety of projects including tenant improvement jobs and ground -up new
construction. He is the Company's principal contact for Amgen Pharmaceuticals.
Personnel Prorde
(Continued)
George Warner
Project Manager
Years Experience: 37
With an extensive background and 36 years of experience in architecture and construction,
George has coordinated and managed the construction of a variety of projects. These projects
have ranged from relatively small tenant finish projects to large and complex retail, industrial,
institutional and public works projects. Thoroughly versed in all aspects of construction project
management, he is proficient in maintaining cost and the established construction schedule.
George is experienced in effectively interfacing with the client to produce a high quality finished
product.
Dennis L. Haney
Project Manager
Years of Experience: 26
Dennis has served as a senior landscape architect and project manager at the University of
Colorado - Boulder campus for 20 years. He has prior work experience including three (3) years
in private practice and two (2) years in the Peace Corps. Dennis has gained a wide variety of
experience in building construction; renovation; planning; budgeting; specification writing; cost
estimating; project management as well as landscape and irrigation design and construction. His
experience, proven organizational skills and effectiveness contribute significantly to his projects'
success.
Tom Gilliland
Project Manager
Years of Experience: 28
Tom comes from the Project Control Group of Coors Brewing Company where he served as a
project estimator for 15 years. He has estimated projects valued up to $20 million with an
expertise in structural and mechanical construction. Tom is currently responsible for work
throughout the northern metropolitan Denver area with projects ranging from renovations and
additions to new facilities.
Personnel Profile
(Continued)
R I (Bob) Ferenc
Staff Architect
Years of Experience: 28
Bob comes to Sun with a diverse background in the full service design -build arena. His career in
building began early with immersion in general construction trade work for his father, a
Colorado custom -builder. This grounding in the practical side of design -build relationship was
broadened by advanced academic training on the design side of the equation, culminating in
licensing as an Architect. His career has encompassed industrial design, facilities planning,
design & management, and construction project management on projects up to $25 million. His
past clients include Colorado Memory Systems; Hewlett-Packard; Storage Technology
Corporation; ARAMCO (Saudi Arabia); U.S. Dept. of Energy, Sandia Labs; The University of
Colorado; Rocky Mountain Solar Glass; and numerous private commercial, ecclesiastic, and
residential clients.
David Bode
Project Manager
Years of Experience: 10
David employs practical working knowledge of the construction industry with over 10 years of
field and management experience in design / build and bid construction projects. David is
currently engaged in project management at Colorado State University and the University of
Northern Colorado.
Dean Peck
Project Manager
Years of Experience: 29
Before taking a Project Manager position, Dean held a Project Superintendent position with Sun
Construction for 3-1/2 years and was regularly involved in projects at the Colorado State
University. He was involved with tenant finish and large-scale demolition & reconstruction of
buildings on campus. Dean started out as a Laborer and worked his way to Master Carpenter.
He has held the positions of Customer Service and Warranty Manager for commercial and high -
end residential custom homes. Dean is currently engaged in projects at Weld County and the
University of Northern Colorado campus.
Personnel Profile
(Continued)
Joel Johnson
Project Manager
Years of Experience: 26
Before taking a Project Manager position, Joel held a Project Superintendent position with Sun
Construction. He has been regularly involved in projects at the IBM Facility in Boulder for the
past 24 years. Joel has been involved with tenant finish, interior and exterior demolition, all
phases of concrete and additions to various buildings on the IBM campus, including recently
completing a $2 million chiller building addition. Joel started out working as a laborer/carpenter
for his father in residential construction, was employed by a painting contractor for 2 years and
then returned to commercial general contracting as a laborer, worked into carpenter, foreman
and then superintendent.
Mark Lepro
Assistant Project Manager
Years of Experience: 7
Mark has an associate's degree in architectural and mechanical drafting, and a two-year
certificate of completion in drafting, Mark has extensive training in the computer aided drafting
field. He has experience on the following systems: AutoCAD, versions 12-14, AutoCAD 2000,
Pro -Engineer, and Draft Choice. Along with the CAD training Mark also has a good deal of
knowledge in Microsoft windows 98-2000, Microsoft Excel, Microsoft Project, and
programming and HTML experience. Mark has experience working in the field with residential
homebuilders, electricians, and painting contractors as well. His responsibilities include:
Drafting plans, shops, elevations, etc., estimating, project coordination, bid administration, client
relations, budget spreadsheets and the many other tasks that project management includes.
Ginni Ayres
Assistant Project Manager
Years of Experience: 7
Ginni has work with residential homebuilders as well as commercial general contractors. She
has been involved with renovation, design -build and ground up projects. Ginni has worked with
a variety of Owners including State and Government Projects. She acts as the principal
coordinator for project manager assistants for the Company.
Personnel Profile
(Continued)
Andy Welch
Operations Coordinator
Years of Experience: 7
Andy has worked his way through the ranks, starting as a laborer and working his way through
superintendent, on to assistant project manager and Operations Coordinator. While starting as an interior
finish apprentice in residential construction, Andy made the move to commercial construction where he
has been responsible for all carpentry and supervisory levels of construction. In his current capacity
Andy handles labor distribution and assists in various other aspects of human resources and safety. Andy
is also responsible for estimating, quality control, field management, and is involved in most every
aspect of project management and estimating processes.
Sun Construction & Design Services, Inc.
General Contractor
License Numbers
Sun Construction & Design Services, Inc.
G"rw cortracw
CONTRACTOR'S LICENSE NUMBERS
CITY LICENSE #
City of Aurora
101119871 00 CL Class B
1/1/03
Errol Unverzagt Supervisor Certification E011598
11/30/03
City of Boulder
LIC-0001670-08
5115103
City of Boulder -Right -of -Way LIC-0980025-28
03/20/03
City of Broomfield
Class A — A2001-529
12/31/02
City of Commerce City
Class B 102270
12/31/02
City of Denver
BLDG. B 18209
8/31/02
City of Erie
2001-267 Class A
12/31/02
City of Federal Heights
94-0129
12/31/02
City of Fort Collins
C-1 #84
4/18/04
John Sargent Certificate Holder #872
4/18/04
Town of Frederick
02-115
12/31/02
City of Louisville
Class A — 00273
12/31/02
City of Loveland
Class H 2220
11/03/02
City of Thornton
A1088
9/05/02
Updated 4/19/02
Sun Construction & Design Services, Inc.
Ce ral comwctor
Certificate of Insurance
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFE16 NO RIGHTS UPON YOU THE CERTIFICATE HOLDER. THIS CERTIFICATE IS NOT AN
INSURANCE POLICY AND DOES NOT AMEND, EXTEND, OR ALTER THE COVERAGE AFFORDED BY THE POLICIES LISTED BELOW.
SUN CONSTRUCTION & DESIGN SERVICES INC Name and Liberty
1232 BOSTON AVE 4— address of MutualT.
L-L—ONGMONT CO 80501 Insured.
Is, at the issue date of this certificate, insured by the Company under the policy(ies) listed below. The insurance afforded by the listed policy(ies) is subject
to all their terms, exclusions and conditions and is not altered by any requirement, term or Condition of any contract or other document with respect to which
this certificate may be issued.
EXP. DATE
❑ CONTINUOUS
TYPE OF POLICY
[]EXTENDED
POLICY NUMBER
LIMIT OF LIABILITY
POLICY TERM
WORKERS
COMPENSATION
COVERAGE AFFORDED UNDER WC
LAW OF THE FOLLOWING STATES:
EMPLOYERS LIABILITY
Bodily Injury By Accident
Each
Accident
Bodily Injury By Disease
Policy
Limit
Bodily Injury By Disease
Each
Person
GENERAL LIABILITY
1/1/2002 TO
YY2-191-097457-042
General Aggregate - Other than Products/Completed
1/1/2003
2,000,000
Ivi ® OCCURRENCE
Products/Completed Operations
'1,000,000
❑ CLAIMS MADE
Bodily Injury and Property Damage
I Per
1,000,000 Occurrence
Personal Injury
RETRO DATE
Per Person/
1,000,000 Organization
Other
Other
AUTOMOBILE LIABILITY
1/1/2002TO
1/1/2003
AS1-191-097457-032
1,000,000 Each Accident - Single Limit
B.I. and P.D. Combined
Each Person
® OWNED
® NON -OWNED
Each Accident or Occurrent
® HIRED
Each Accident or Occurrent
OTHER
ADDITIONAL COMMENTS
if.�.........:r.,._.__.._:_.:__ I_.____.:_.._..____..__.__._ .... __
•�:� cnPnauv„ �a,e a cvnnnuuua v, a aunuou rorm, you wm Do noaneci n Coverage Is terminated or reduced before the certificate expiration date.
SPECIAL NOTICE-OHIO: ANY PERSON WHO, WITH INTENT TO DEFRAUD OR KNOWING THAT HE IS FACILITATING A FRAUD AGAINST AN INSURER, SUBMITS AN
APPLICATION OR FILES A CLAIM CONTAINING A FALSE OR DECEPTIVE STATEMENT IS GUILTY OF INSURANCE FRAUD.
IMPORTANT NOTICE TO FLORIDA POLICYHOLDERS AND CERTIFICATE HOLDERS IN THE EVENT YOU HAVE ANY QUESTIONS OR NEED INFORMATION
ABOUT THIS CERTIFICATE FOR ANY REASON, PLEASE CONTACT YOUR LOCAL SALES PRODUCER, WHOSE NAME AND TELEPHONE NUMBER APPEARS IN THE LOWER RIGHT HAND
CORNER OF THIS CERTIFICATE. THE APPROPRIATE LOCAL SALES OFFICE MAILING ADDRESS MAY ALSO BE OBTAINED BY CALLING THIS NUMBER.
NOTICE OF CANCELLATION: (NOT APPLICABLE UNLESS A NUMBER OF DAYS IS ENTERED BELOW.) BEFORE Liberty Mutual Group
THE STATED EXPIRATION DATE THE COMPANY WILL NOT CANCEL OR REDUCE THE INSURANCE AFFORDED
UNDER THE ABOVE POLICIES UNTIL AT LEAST DAYS
NOTICE OF SUCH CANCELLATION HAS BEEN MAILED TO:
F- -I_
CERBRCATE
H CUDER
Sandra J. F
AUTHORIZED REPRESENTATIVE
Englewood, CO (303) 799-0818
OFFICE PHONE NUMBER DATE ISSUED
BS772A R12
This certificate is executed by LIBERTY MUTUAL GROUP as respects such insurance as is afforded by Those Companies BS 772L R2
AwRD+. nainT DATE(MCERTIFICATE OF LIABILITY INSURANCE MnnmDD YY)
---- _ --- ---_ ONLY AND CONFERS NO RIGHTS UPON THE C—ERTIFICATE FCN--- -
Herbert -Leavitt Insurance Agency, Inc.
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
275 South Main Street ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Suite 208
Longmont, CO 80501 INSURERS AFFORDING COVERAGE
gn :IervTces,
1232 Boston Ave
Longmont, CO 80501
INSURER A: Pinnacol Assurance
INSURER B:
INSURER C:
INSURER D:
INSURER E:
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
Ii LTR
TYPE OF INSURANCE
POLICY NUMBER
DATE (MMI/DDIYY)
DATE (MMIDD/YY)
LIMITS
GENERAL LIABILITY
COMMERCIAL GENERAL LIABILITY
CLAIMS MADE OCCUR
EACH OCCURRENCE
$
FIRE DAMAGE (Any one tire)
3
MED EXP(Any one person)
$
PERSONAL A ADV INJURY
$
GENERAL AGGREGATE
$
GEN'L AGGREGATE LIMIT APPLIES PER:
17 POLICY PRO- LOC
JECT
PRODUCTS -COMP/OPAGG
$
AUTOMOBILE
LIABILITY
ANY AUTO
ALL OWNED AUTOS
SCHEDULED AUTOS
HIRED AUTOS
NON -OWNED AUTOS
COMBINED SINGLE LIMIT
(Ea Zdent)
$
BODILY INJURY
(Par person)
$
BODILY INJURY
(Pereccidenp
$
PROPERTY DAMAGE
(Per accident)
$
GARAGE LIABILITY
ANY AUTO
AUTO ONLY -EA ACCIDENT
$
OTHERTHAN EA ACC
AUTO ONLY: AGG
$
$
EXCESS LIABILITY
OCCUR FICLAIMS MADE
DEDUCTIBLE
RETENTION $
EACH OCCURRENCE
$
AGGREGATE
$
$
$
A
WORKERS COMPENSATION AND
EMPLOYERS' LIABILITY
40S4777
FFICERS INCLUDED
04/01/2002
04/01/2003
X TORY LIMITS ER
E.L. EACH ACCIDENT
$ SOO OO
E.L. DISEASE - EA EMPLOYEE
a 500,00
E.L. DISEASE -POLICY LIMIT
5 500 00
OTHER
DESCRIPTION OF OPERATONSA=ATIONSNEHICLESIEXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS
11 Operations / All Locations
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL
30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,
BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY
OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES.
SEF-18-02 WED 02:5S PM C11'Y/F'1' CULLINS, PUKCHAS hAX NU. PU 2216 M
P. 08/22
C-1#84
License Number (IF Applicable)
!Seal. - if Bid is by corporation)
Attesz:5__
Cami S.'Bowker
Address 1232 Boston Avenue
F .; Telephone
:t5+
Longmont, CO 80501
303-444-4780
7/96 Sect:ien 00300 Page 3
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon.
21. What are the limits of your public liability? DETAIL
Please See Attached Certificates of Insurance
What company? Liberty Mutual and Pinnacol Assurance-HerbertOLeavitt Insurance
22. What are your company's bonding limitations? $4,000,000.00 Single Project
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at Longont, CO this 27th day of September 20 02.
Sun Cqh struction & Design Services, Inc.
r
In
Title: Vice President/General Manager
State of Colorado
County of Boulder
William B. Prout
LO
being duly sworn deposes and says that he is
Linn R Paci on Carviregndl hat
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this 27th day of
September 20 02
Notary Public Cami S. Bowker
My commission expires 02, aD 0(o
7/96 Section 00420 Page 3
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 20% of the contract.
1 ITEM
P l
7/96 Section 00430 Page 1
Sun Construction & Design Services, Inc.
qv,1'5�J General Contractors
Unit Pricing
Project: City Park Pool Renovation for
City of Fort Collins
Date: September 27, 2002
18" Caisson Drilling Overruns (Add)
$
—7,
aw
Ln.
�+.
18" Caisson Drilling Underruns (Deduct)
<$
1q,
C0=
Ln .
4>
Additional existing concrete pool floor removal beyond the extent indicated:
(Add) $ S9 , 9
1232 Boston Avenue . Longmont, CO 80501 . (303) 772-6776 . (303) 444-4780 , FAX: (303) 444-6774
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, th ugdersigned
.n Const. & Design SrvsainTrincipal, and Travelers Casualty & Surety Company oie America as
Surety, are hereby held and firmly bound unto the City of Foxt Collins Colorado
as OWNER, in the sum of $ 5%.amount bid for the. payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction of
Fort Collins Project, CITY PARK POOL RENOVATION; Bid No. 5731,
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a
Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
Performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which theOWNERmay accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
7/96 Section 00410 Page 2
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hand
and seals this 24th day of _ September , 2002, and such of them as ar
corporations have caused their corporate seals to be hereto affixed and theg
presents to be signed by their proper officers, the day and year first set fort
above.
PRINCIPAL SURETY
Name Sun Construction & Design Services Inc. Travelers Casualty & Surety Company of
1.232 Boston Avenue Americ
Address: 7600 E Orchard Rd �E330,
Longnont, o e wo i o 0TT --
ny t ��``{{,�
By: �.��i'lLk,e-C--7-7 Q—�1Z�
William B. Prout,
Title: _ p;,.oyres;lianr/ecnerol M r Title;,Eharoa Pond Attorney InFact
ATTEST -
By:
Cami S. Bowker
7/96
(SEAL)
Section 00410 Page 3
TOTAI
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
TRAVELERS CASUALTY AND SURETY COMPANY
FARMINGTON CASUALTY COMPANY
Hartford, Connecticut 06183-9062
POWER OF ATTORNEY AND CERTIFICATE OF AUTHORITY OF ATTORNEY(S)-IN-FACT
KNOW ALL PERSONS BY THESE PRESENTS, THAT TRAVELERS CASUALTY AND SURETY COMPANY OF
AMERICA, TRAVELERS CASUALTY AND SURETY COMPANY and FARMINGTON CASUALTY COMPANY,
corporations duly organized under the laws of the State of Connecticut, and having their principal offices in the City of Hartford,
County of Hartford, State of Connecticut, (hereinafter the "Companies") bath made, constituted and appointed, and do by these
presents make, constitute and appoint: Sharon K. Pond, Dean A. Meyer, Renee Stein, Michael D. Pierce, Lawrence E. Lutgen,
Rae L. Campbell, of Fort Collins, Colorado, their true and lawful Attorney(s)-in-Fact, with full power and authority hereby
conferred to sign, execute and acknowledge, at any place within the United States, the following instrument(s): by his/her sole
signature and act, any and all bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond,
recognizance, or conditional undertaking and any and all consents incident thereto and to bind the Companies, thereby as fully and
to the same extent as if the same were signed by the duly authorized officers of the Companies, and all the acts of said Attorney(s)-
in-Fact, pursuant to the authority herein given, are hereby ratified and confirmed
This appointment is made under and by authority of the following Standing Resolutions of said Companies, which Resolutions are
now in full force and effect:
VOTED: That the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any
Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attomeys-in-Fact
and Agents to act for and on behalf of the company and may give such appointee such authority as his or her certificate of authority may prescribe
to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in
the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such
appointee and revoke the power given him or her.
VOTED: That the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President
may delegate all or any pad of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is
in writing and a copy thereof is filed in the office of the Secretary.
VOTED: That any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional
undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any
Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any
Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary, or (b) duly executed (under seal, if
required) by one or more Attomeys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or
by one or more Company officers pursuant to a written delegation of authority.
This Power of Attorney and Certificate of Authority is signed and sealed by facsimile (mechanical or printed) under and by
authority of the following Standing Resolution voted by the Boards of Directors of TRAVELERS CASUALTY AND SURETY
COMPANY OF AMERICA, TRAVELERS CASUALTY AND SURETY COMPANY and FARMINGTON CASUALTY
COMPANY, which Resolution is now in full force and effect:
VOTED: That the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice
President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any
power of attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attomeys-in-Fact for
purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such power of attorney
or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and
certified by such facsimile signature and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or
undertaking to which it is attached.
(11-00 standard)
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410Bid Bond
00420Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
7/96 Section 00410 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder:
Sun Construction & Design Services, Inc.
2.
Permanent main office address: 1232 Boston Avenue, Longmont CO
80501
3.
When organized: 1985
4.
If a corporation, where incorporated: Colorado
5.
How many years have you been engaged in the contracting business
present firm or trade name? 17 Years
under your
6.
Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
Please See Attached Work ;n Pro cc
7.
General character of Work performed by your company:
Concrete, Rough Carpentry Drywall & Framing Acoustical & Specialty
Ceilings,
Doors. Frames & Hardware. Custome Cabinets & Casework Light Steel
Finish Carpenty,
Pre-engineered Builidng Erection.
6.
Have you ever failed to complete any Work awarded to you?
If so, where and why? No.
9.
Have your ever defaulted on a contract? No.
If so, where and why?
10.
Are you debarred by any government agency? No.
If yes list agency name.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
Please See List of Major Jobs Completed
12. List your major equipment available for this contract.
Please See Attached Equipment List
13. Experience in construction Work similar in importance to this
project:
Please See Attached Project Narratives
14. Background and experience of the principal members of your organization,
including officers:
Please See Attached Personnel Profiles
15. Credit available: $ Necessary Financial Information Available
16. Bank reference: Wells Fargo West NA
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
18. Are you licensed as a General CONTRACTOR? Yes
If yes, in what city, county and state? What
class, license and numbers? pTega Opp Att-nrhed Tirpnqe--Numbere
19. Do you anticipate subcontracting Work under this Contract? Yes
If yes, what percent of total contract?
and to whom? Please See Attached Subcontractor Sche u e- ectron
20. Are any lawsuits pending against you or your firm at this time? No.
If yes,
DETAIL
7/96 Section 00420 Page 2
Work Currently Under Contract
WORK IN PROGRESS
SUN CONSTRUCTION AND DESIGN SERVICES, INC.
AUGUST 2002
TOTAL
CONTRACT
JOBNAM
AMONT
Jerry Moon:Llving Room
$28.225.00
RK:CSU Cross Connection
$8,590.00
CSU: Foothills Fisheries
$423,447.00
CSU Aylesworth Elevator
$202,729.00
CSU:Rockwell Half Remdl
$60,033.00
CSU: CSFS Controlled Maim
$64,583.00
RKMech: CSU Cross Conne
$1,334.00
CSU:Wagar Classroom HVA
$168,880.00
CSU:Lory Judical Services
$63.856.00
VEECO:Training Rooms
$8,605.00
RK:Aggie Village
$1,276.00
Phipps: CU Porter 2nd fir
$121,912.00
Phipps: CU Porto 3rd floor
$141,964.00
CableLabs:Bulktin Board
$2,187.00
RK: Cob Convention Ctr
$22,436.00
Adams 12 Northglenn Dugou
$93,664.00
NorMstar.CU Arch Work
$91,049.00
CMECI:Fed Ctr Bldg 53
$41,250.00
ColoPipe:CU Warden Heat
$28,816.00
CUFAC: Muenzknger Remdl
$91,977.00
F&F Prop:HSC Suite Remod
$27,701.00
F&F Prop: Exercise Rm
$38,766.00
Adams 12:Legacy HS Dug
$169,658.00
CUFAC: Carbon Gym Pool
$6,248.00
CUFAC:Stadium 161 Rmdl
$135,726.00
CUFAC: Dalward Pool
$103,097.00
Encompass:CU HVAC Upgn
$125,804.00
CUFAC:Stowell Rm Rmd
$21,778.00
HP:Ft.Colfins, Concrete
$7,305.00
OSI: Phase 2 Design
$82,949.00
RK:Derwer Dist Cooling
$44,582.00
BestFoods: Canopy
$28,000.00
Enoompass:Coors Compute
$38,279.00
CUHSC, Dental Clinic
$194,703.00
Manio0:Court Yard Doors
$2,324.00
Jacobs:Coors Surge Bin
$197,323.00
RKMech: USPS Bulk Mail
$97,289.00
ProjMgt:Parking Garage
$2,602.00
From Range Hanger
$122,848.00
BlueMoon:High Gear Cycle
$94,311.00
F&PS Cisco Area Remodel
$68,359.00
Radar Comm: Office Wag
$2,255.00
Flextronics: VCT Intl
$3,426.00
WehFargo:DrymN Walls
$4,501.00
City of Longmont My Ctr
$1,145,350.00
Seedex:Concrete Pit
$3,242.00
Coyote Run
$1,158,854.00
Shxgeon:Westewater Redm
$556,472.00
Cebstica: Equip Ckorit
$133,458.00
Lucent.Fed Systems Exp
$758,500.00
AT&T:Cheyenne Core Rile
$3,275.00
AT&T:Casper Core Rifle
$2,060.00
OSI: Phase 2 Renovation
$1,266,882.00
Kemry:SunMicro Equip Rm
$60,762.00
OSI:LobbyElevator
$249,706.00
Ward:Flex Building
$765,085.00
DM:Flex Building
$711,615.00
Longmont Fd:Engine Rm
$58,900.00
Lngmt Foods:Bulk Oil tank $21,251.00
Ehvood:Tenarnt Improvement $58,403.00
Conagra:Compaction Grout $13,108.00
$10,253,539.00