HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 2203020 BID 5700 CFC CSU TRANSIT11/05/2002 08:44 9706696411 ECI PAGE 02 Inr. November 4, 2002 City of Fort Collins Attn: Steve White 117 N. Mason Street Fort Collins, CO 80522 RE: CSU Transit Center Dear Steve: Construction Athletic Complexes - Parks • Trails 2526 E. Hwy. 402 P.O. Box 2135 Loveland, Colorado 80539 Phone (970) 669-6291 Fox (970) 669-6411 Metro (303) 530-7660 Per your request I have sent along additional information regarding the questions that you had on RFC's 15 and 16. RFC #15: 1. We have revised RFC 15 to show Ray's hours as site superintendent time. 2. The Pickups charged on RFC 15 item #2 are for the dates of 1017/02 to 10/25/02 per our letter dated 10115/02. The Mast day of work on the T & M landscaping walls was on 10/7/02, per our letter dated 10/9/02,.and we did not charge you for pickups on that day. 3. We have revised the change for the: pickups to $30.00 a day, which makes the new total $450.00 plus 15% E.CI markup. RFC #16: 1. RFC # 16, item #1 — paint lights. I :spoke with Ted and the cost is correct. We charged $160.00 for us to deliver the lights (labor and pickups), $1,300.00 for Alta Mille's work and $640.00 for CDI We applied a 5% markup to these costs. Backup is attached. 2. We have included a credit of $54.80 for tax that was charged for material and rental equipment on the T & M wall work that should have been exempt. Revised RFC's 15 and 16 are attached for your review. Please let me know if you have any questions or comments. Si cerely VIA-. ma Connett, Project tJlanager ECI Attachments 11/05/2002 08:44 9706696411 ECI PAGE 03 REQUEST for CHANGE CSU TRANSIT CENTER PROJECT: TO: CITY OF FT. COLLINS FACILITIES 117 N. MASON STREET FT. COLLINS, CO 80522 ATTN: STEVE WHITE ENVIRONMENTAL CONCERNS, INC. 2526 E. Highway 402 P.O. Box 2135 Loveland, CO 80539 Phone: (970) 669.6291 Fax: (970) 669-6411 DATE: November 5, 2002 SUBJECT: RFC #15 ADDITIONAL ECI COORDINATION, FENCING AND SUBCONTRACTOR REMOBILIZATION DUE TO SHELTER DELA)'S (FINAL REVISION 11/5102) ITEM # 1-GENERAL CONDITIONS Project Management/Coordination — Rick DELETED Site Superintendent — Ray 85 Hours $ 2,000-90 - ECI MARKUP —15% $ 300.14 The above project managemenU coordination includes the following tasks to be performed beyond the contract time allotted by the Cltydue to shelter revision delays. -Remobilization of Construction Trailer -Unloading, storage, delivery of pennanent bus signs -Rerouting of buses -Coordination of shelters / rooferr: -Coordination Meetings with CD] in Denver for shelter install -Meetings with City bus coordinator for relocation of buses -Moving signage for buses as ne,Wed —including weekend relocations -Coordination / layout / core drilling of revised info panels. ITEM # 2- PICKUPS (15 DAYS) 1017/02-10/25r02 - ECI MARKUP —15% $ 450.D0 $ 67.50 ITEM # 3-500' OF TEMPORARY CHAINLINK FENO:E RENTAL AROUND BUS ISLANDS INCLUDING REMOVAL AND REPLACEMENT AS SHELTERS ARE BEING SET (2 WEEKS) NO LABOR INCLUDED $ 1,208.00 - ECI MARKUP —15% $ 181.20 ITEM #4-ECI TEMP FENCE AROUND INOIVIDUA� SHELTERS- DAILY REMOVAL AND REPLACMENT AS SHELTER ROOFING AND PAINTING IS BEING PERFORMED 68 HOURS $ 1,600.72 - FENCE RENTAL $ 300 000.01 - ECI MARKUP —15% ITEM # 5-ADD CRUSHER FINES PATH BY WEATHER CENTER INSTALL 15.5 TONS CRUSHER FINES 8 LABOR HOURS $ 53570 - ECI MARKUP —15% . 36 ITEM # 6- SUBCONTRACTOR RE-MOBILIZATIO14 ALTA MILLA ELECTRIC RE-MOBILIZATOt4 00 $ $ 1,22323. - ECI MARKUP -5% .15 00 $8 293.78 TOTAL THIS RE VEST SCHEDULE IMPACT _DAYS TO DATE Contractor: Rick Coulter, Project Superintendent Date Environmental Concerns, Inc. Accepted: City of Ft. Collins Facilities Date 11/05/2002 08:44 9706696411 REQUEST for CHANGE PROJECT: CSU TRANSIT CENTER TO: CITY OF FT. COLLINS FACILITIES 117 N. MASON STREET FT. COLLINS, CO 80522 ATTN: STEVE WHITE ECI ENVIRONMENTAL CONCERNS, INC. 2526 E. Highway 402 P.O. Box 2135 Loveland, CO 80639 Phone: (970)669-6291 Fax: (970) 669-6411 DATE: November 5, 2002 SUBJECT: RFC #16 RE -PAINT LIGHTS AND LANDSCAPE REVISIONS/ TIME & MATERIALS FOR MASONRY WALLS (REVISED 1115102) ITEM #1- PAINT LIGHTS REMOVAL, DELIVERY AND REINSTALLATION OF LIGHT FIXTURES INCLUDING D''SCONNECTING POWER $1,630.00 CDI TO PAINT LIGHTS S 672.00 SUB-1rorrAL ITEM #1 $2,302.00 ITEM tit- ELECTRICAL REVISIONS INSTALL GROUND LUGS FOR LIGHTNI14G PROTECTION AT EACH SHELTER $4r 88.25 SUB= ro m ITEM #2 $488.25 ITEM #3- LANDSCAPING CHANGES ALPINE GARDENS FOR LANDSCAPE ADDITIONS $3.864.63 DEDUCT SOD AND IRRIGATION, ADD ANNUAL RYE (7 087 0 SUB;TOTAL ITEM #3 ($3,222.87) ITEM #4-TIME AND MATERIALS FOR MASONRY WALLS WEEK 912102 per letter dated 9/1710i: $ 180.00 WEEK 919102 per letter dated 9/17102 $6,628.92 WEEK 9/16/02 per letter dated 9124/02 $3,783.80 WEEK 9/22/02 per letter dated 9130/02 $4,053.18 WEEK 9/29/02 per letter dated 1019/02 $1,485.69 Credit for tax exempt materials and rental ($ 54.89) $ 42. 11.51_ 15% ECI MARK-UP suo-TOTAL ITEM #4 $18,488.21 TOTAL THIS REQUEST $18.055.59 SCHEDULE IMPACT DAYS Contractor Accepted: PAGE 04 Rick Coulter, Project Superintendent Date City of Ft. Collins Facilities Date Environmental Concerns, Inc.