PROJECT i'ITLF; South Taft I lill Roadway Projects (a.k.a. Taft Hill, Drake to Derby)
PROJFCT NUMI3ER: 30521800.0
CONTRAOrok: Znk DIIt (P0 #0929g15)
CHANGE ORDER NUMBER: 18
In Prcpadrtg change orders show in order as separate numbered paragraphs the following
1. Reason for change, 2. Descilption of change.
3 Cllnngo qi contract uosl. 4. Change In contract lime.
1.d2. See attachod invoice for details
3. Thn control cost will increase by $21,651 95
4 There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORD(3RS
TOTAL PCiNDING CHANGE ORDERS
TOTAL THIS CI IANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all ell -Inge orders approved)
ACCEPTED BY:
S1.113MITTE9D BY:
APPROVED BY;
APPROVED BY:
APPROVED BY;
APPROVED BY.
APPROVNO BY:
9C CIN I);vrk
1'vannnln0
Aorgl nuaq
•.JflVpotor
holCrt Na
Enbm rl g Project Manager
Utility Project Manager
Park Planning Project Manager
1A _
Ft. Collins Lr)yy(aacl W. Di
Overall Protect Manager
ill "VL 7u
%CirS c;Av*• ea
[1
$4,840,495.60
$156, 784.89
50.00
$21.551.95
0.45%
3.68%
$5,018,832.44
DATE. _1QpAID%
DATE:
DATE.
DATE.
_ OATC.
A Project Manager
DATE..- rJ7f 0 L
- A11 DATE -
- ram-- _--
(Purchasinq.\gentover$30,000)
E01 "rdnnq - Roagwmy 11115
Parke - Z'l 51, 3da 0a
'JtdilY • Pam 52; r6i •i0
Ulildy - Watefllnc j0 0e
EngmCenn<7 - i'CLWd a0 00
CnGt,+eanai '•r_ar;:nunt .at rnr,a „� , .,,,��� , ,,,..:,., - • _-- ..'_ --
OCT-31-2002 THU 11:18 AM CFO ENG, FAX N0, 9702216378 P. 02
Change Order Form
CJIY of FOIL COUIN
PROJCCT Trit I_: south'raft HIII Roadway Projects (a.k.a. Taft Hill, Drake to Derby)
PROJECT NUMBER: 30521800.6
CONTRACTOR: Zak Dirt (PO #9929915)
CHANGE ORDER NUMBER: 16
In propanng change orders show in ordor as separate numbered paragraphs the following:
1. Reason for change, 2. Description of change.
3. Ghana in contract cost. 4. Change in contract lime.
IA2. Sccattarhedmvolccfor detalls
3, The contract cost will Increase by $21,551.95
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
$4,840,495.60
TOTAL APPROVED CHANGE ORDERS
$156,784.89
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL 1 HIS CHANGE ORDER
$21,651.95
TOTAL % OF Ti IIS 01-IANGE ORDER 0,454/
TOTAL C.O. % ORIGINAL CONTRACT 3.68%
ADJUSTED CONTRACT COST
$5.018,832.44
(Assurning all change orders approved)
ACCEPTED BY, DATE:
Contractor's Representative
SUBMITTED BY: DATE:
Enginooring Project Manager
APPROVED BY:
APPROVFC BY:
APPROVED BY:
APPROVED BY:
APPROVED BY:
m• Cily Clink
Pumhnsing
rcrounung
CnnmrMr
P1 glrvrta t ou
DATE:
X181I Project agar
bA1 E: 2 �
Pa Planning Pro d Manager
Ft. Collins Loveland Watcr Dlstnct Project Manager
Overall Project Manager
(Purchnsing Agentover $30.000)
Engmncnng- Roadway
P,rO • Trod
Uhldy - Pond
Utility Wntedine
Engirunong - FCI-Wa
DATE:
DATE:
DATE:
$7,69545
Q,1e7 50
50 u0
$0 00
Zak D:n, Inc
4Dbange Order him 16
SOUTH TAFT HILL POADWAY PROJECTS
Data r^fTt.'02
1 Renton �br Ctane.
a File Cheooe Order irkrJes edd3or+a; xr�rele 4van'.t(:'or R�Iq+s Onws»ay
6. This Omige, OWW imAkles the adddon oi'1.1aer Fenix:' § the Jaergar PronMy
t Th%olanga ekudes Dle ac2f`.^. of rn:sn Piopd:IiRRu�ch�rces
d This a P$' ad "d on Im jell.
2 Dmeriplion o! Crslrgm
a swse*cw
3 Item I Ci.-ar*J Summer)• and Charge in Co+keztAmment
Hum Na-
Od n9T al
Cascripaim
Omeall Contract Summary
Roadway
Tra)l
Ptkrd
Unit
Unit (S)osl
Quw94
Amount 16)
Quantity
Cost
Qrrxmity
Cast(S)
Quantity
Cost($)
51
Canaele Psmt(9in)114gh Early)
SY
55200
51
52,652.0
0
SQOD
51
SZ,f=1200
O
S300
247
'Ana Procery:11tig."m Chw.ges
LS
52,5$245
i
52.592.55
1
52592-45
0
SC 03
0
M{XI
249
Spxral Jaa9s Fence
EACH
54.50
1134
55.103.00
1134
SS.103.00
0
$a03
0
SO DO
250
SP't'9Creek RB,lAdd Posts
LS
$2.4675
1
52,467.50
0
50.03
C
Saco
I
52.467-5D
232
AdcRionaltuck Ex [or Tail
GY
537.00
197
$6,91900
0
50.00
187
$6.91900
0
SO -OD
233
Mciiiional GeWgC for Trau
SY
5505
Mu
5:,8'.B tit
0
$0.00
3-50
S1111803
9
$O OD
Tota6 1 1.95 $7,E9SA5 $11,359.00 $2 67-50