Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 9929915OCT-31-2002 THU 11118 AN CFO ENG, FAX NO, 9702216378 P. 01 Change Order Forra W� or rort Colltin i+r PROJECT i'ITLF; South Taft I lill Roadway Projects (a.k.a. Taft Hill, Drake to Derby) PROJFCT NUMI3ER: 30521800.0 CONTRAOrok: Znk DIIt (P0 #0929g15) CHANGE ORDER NUMBER: 18 In Prcpadrtg change orders show in order as separate numbered paragraphs the following 1. Reason for change, 2. Descilption of change. 3 Cllnngo qi contract uosl. 4. Change In contract lime. 1.d2. See attachod invoice for details 3. Thn control cost will increase by $21,651 95 4 There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORD(3RS TOTAL PCiNDING CHANGE ORDERS TOTAL THIS CI IANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all ell -Inge orders approved) ACCEPTED BY: S1.113MITTE9D BY: APPROVED BY; APPROVED BY: APPROVED BY; APPROVED BY. APPROVNO BY: 9C CIN I);vrk 1'vannnln0 Aorgl nuaq •.JflVpotor holCrt Na Enbm rl g Project Manager Utility Project Manager Park Planning Project Manager 1A _ Ft. Collins Lr)yy(aacl W. Di Overall Protect Manager ill "VL 7u %CirS c;Av*• ea [1 $4,840,495.60 $156, 784.89 50.00 $21.551.95 0.45% 3.68% $5,018,832.44 DATE. _1QpAID% DATE: DATE. DATE. _ OATC. A Project Manager DATE..- rJ7f 0 L - A11 DATE - - ram-- _-- (Purchasinq.\gentover$30,000) E01 "rdnnq - Roagwmy 11115 Parke - Z'l 51, 3da 0a 'JtdilY • Pam 52; r6i •i0 Ulildy - Watefllnc j0 0e EngmCenn<7 - i'CLWd a0 00 CnGt,+eanai '•r_ar;:nunt .at rnr,a „� , .,,,��� , ,,,..:,., - • _-- ..'_ -- OCT-31-2002 THU 11:18 AM CFO ENG, FAX N0, 9702216378 P. 02 Change Order Form CJIY of FOIL COUIN PROJCCT Trit I_: south'raft HIII Roadway Projects (a.k.a. Taft Hill, Drake to Derby) PROJECT NUMBER: 30521800.6 CONTRACTOR: Zak Dirt (PO #9929915) CHANGE ORDER NUMBER: 16 In propanng change orders show in ordor as separate numbered paragraphs the following: 1. Reason for change, 2. Description of change. 3. Ghana in contract cost. 4. Change in contract lime. IA2. Sccattarhedmvolccfor detalls 3, The contract cost will Increase by $21,551.95 4. There will be no change in contract time. ORIGINAL CONTRACT COST $4,840,495.60 TOTAL APPROVED CHANGE ORDERS $156,784.89 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL 1 HIS CHANGE ORDER $21,651.95 TOTAL % OF Ti IIS 01-IANGE ORDER 0,454/ TOTAL C.O. % ORIGINAL CONTRACT 3.68% ADJUSTED CONTRACT COST $5.018,832.44 (Assurning all change orders approved) ACCEPTED BY, DATE: Contractor's Representative SUBMITTED BY: DATE: Enginooring Project Manager APPROVED BY: APPROVFC BY: APPROVED BY: APPROVED BY: APPROVED BY: m• Cily Clink Pumhnsing rcrounung CnnmrMr P1 glrvrta t ou DATE: X181I Project agar bA1 E: 2 � Pa Planning Pro d Manager Ft. Collins Loveland Watcr Dlstnct Project Manager Overall Project Manager (Purchnsing Agentover $30.000) Engmncnng- Roadway P,rO • Trod Uhldy - Pond Utility Wntedine Engirunong - FCI-Wa DATE: DATE: DATE: $7,69545 Q,1e7 50 50 u0 $0 00 Zak D:n, Inc 4Dbange Order him 16 SOUTH TAFT HILL POADWAY PROJECTS Data r^fTt.'02 1 Renton �br Ctane. a File Cheooe Order irkrJes edd3or+a; xr�rele 4van'.t(:'or R�Iq+s Onws»ay 6. This Omige, OWW imAkles the adddon oi'1.1aer Fenix:' § the Jaergar PronMy t Th%olanga ekudes Dle ac2f`.^. of rn:sn Piopd:IiRRu�ch�rces d This a P$' ad "d on Im jell. 2 Dmeriplion o! Crslrgm a swse*cw 3 Item I Ci.-ar*J Summer)• and Charge in Co+keztAmment Hum Na- Od n9T al Cascripaim Omeall Contract Summary Roadway Tra)l Ptkrd Unit Unit (S)osl Quw94 Amount 16) Quantity Cost Qrrxmity Cast(S) Quantity Cost($) 51 Canaele Psmt(9in)114gh Early) SY 55200 51 52,652.0 0 SQOD 51 SZ,f=1200 O S300 247 'Ana Procery:11tig."m Chw.ges LS 52,5$245 i 52.592.55 1 52592-45 0 SC 03 0 M{XI 249 Spxral Jaa9s Fence EACH 54.50 1134 55.103.00 1134 SS.103.00 0 $a03 0 SO DO 250 SP't'9Creek RB,lAdd Posts LS $2.4675 1 52,467.50 0 50.03 C Saco I 52.467-5D 232 AdcRionaltuck Ex [or Tail GY 537.00 197 $6,91900 0 50.00 187 $6.91900 0 SO -OD 233 Mciiiional GeWgC for Trau SY 5505 Mu 5:,8'.B tit 0 $0.00 3-50 S1111803 9 $O OD Tota6 1 1.95 $7,E9SA5 $11,359.00 $2 67-50