Loading...
HomeMy WebLinkAboutPrebid - BID - 5663 DOWNTOWN STREETSCAPES PHASE IIIATTENDANCE RECORD PREBID CONFERENCE Project: Downtown Streetscapes Phase III Time: 10:30a.m. Date: January 18, 2002 Location: 281 N. College, Conference Room 2 /.0 nU i7?, k . - 2-7/-/-3i < 22 )-1-58G v�k `rp c ov leot NAME FIRM NAME ADDRESS TELEPHONE FAX # E-MAIL ADDRESS -_ a y (' s Peale, o ZU2 IrC3i /'moo �vx 9Ssj 970 r{OADA2m�L CorZPv2A-T7unr^� a>rZ5— -5�82-6zyy '/J32-�33c- �clr oha LPj r Cl �y e foallou.-s i;gl �. Coc �cti r' C 7r1' ZLI- (0(p�- ZzJ-63Jg -'YLP 4e Fe Gav, Co-1 L�v/e r G p I3 / 1V791 S,6pe e-;o3);?9/ /fe/ 2 4 �eId ZZt - co3Yn r L.. �Kc L tcgoJ. \ /' 1 alrk Y �y y 7� �e .�5t. vil(l- 11414 M kK®��N.Cow ,1 ak(0 - t26r-*rJ .te65 IHp cuA•naNAu 7577 2z5 -1 Bz3 i!« 6-'bllxJ'ebrJ• 1122g3- Gig 6'a101;41du2-r6rz 'F4� zs L(,r mi%P go-P. /3&5- 4ib atv .u:—, -1'75 7 �oh ti 1 Y f.tc✓ c..� (: 91.0 FT I� _76Yf V57 RA/err c;�/SAl, aa/-(o?7� �21-6767 Pre -Bid Meeting Agenda City of Fort Collins Downtown Streetscapes — Phase III - Bid No. 5663 Engineering Conference Room A 281 N. College Ave. Friday, January 18, 2002 10:30 a.m. 1) INTRODUCTIONS Virgil Taylor— Project Manager 221-6365 Mark Taylor — Project Manager 416-2494 Rick Richter - Project Manager 221-6605 Kyle Lambrecht — Project Engineer 221-6605 Lance Newlin — Inspection Representative 221-6605 John Stephen - Purchasing 221-6777 2) PARTICIPANT INTRODUCTIONS 3) BID OPENING January 28, 2002, 3:00 p.m. (our clock) Purchasing Division - 215 North Mason Street, 2ntl Floor, Fort Collins 4) GENERAL CONDITIONS AND GENERAL REQUIREMENTS 1) Bonds — Bid, Payment and Performance 2) $300.00 per calendar day liquidated damages 5) SCHEDULE — Substantial Completion, June 21, 2002 Austin's —April 1, 2002 City Drug — April 29, 2002 Final Completion — June 28, 2002 Austin's — April 8, 2002 City Drug — May 6, 2002 6) PROJECT DESCRIPTION Schedule Substantial Completion Dates for Austin's and City Drug Final Completion Dates for Austin's and City Drug No demolition work shall be allowed at the Austin's comer between 11:30 am and 1:30 pm City will perform all the stormwater work (including demolition work) This includes the adjusting of manhole (line item 22) and the adjusting of water valves (line item 21) Stormwater will place the catch basins approximately 6" below grade. Contractor is responsible for locating grade and placing the inlets. �ntitis ..lti�' /U/O. (010,t - V5 (041Y i�iC. Pre -Bid Meeting Agenda City of Fort Collins Downtown Streetscapes — Phase III - Bid No. 5663 Engineering Conference Room A 281 N. College Ave. Friday, January 18, 2002 10:30 a.m. 6) PROJECT DESCRIPTION (cont) Contractor is responsible for all other aspects of the job, including demolition, establishing grade, placement of colored and gray concrete, and the placement of brick and concrete pavers. City Streets Department will complete the asphalt overlay portion required for the street cuts involved with the project. 7) SURVEYING — Provided by City of Fort Collins if necessary 8) TRAFFIC CONTROL — Stormwater will provide traffic control for their portion of the project. It is the responsibility of the Contractor to provide traffic control for all other aspects of the project. 9) QUESTIONS 10) SITE VISIT Ii ,k"�+ W ti��ti5.