HomeMy WebLinkAboutRESPONSE - BID - 5699 TRAFFIC CONTROL SERVICES (2)Bid Schedule " A "
Contractor to provide all service, manpower and equipment.
Traffic Control Supervisor (at job site)
$ 3y.So per hour
Traffic Control Supervisor (at job site)
$ S. o per day
Flag Person with paddle
Flag Person with paddle
$ al.00 per hour
$ al0•oo per day
36" Reflectorized Tube
Vertical Panel without light
$ _SS per day per unit
$ __ per day per unit
Type I Barricade without light
Type It Barricade without light
$ .SS per day per unit
per day per unit
Type III Barricade without lights
$ 2. oo per day per unit
Light - Steady Burn
Light - Flashing
$ . IS per day per each
Barrels
$ per day per each
Size A Sign with stand
$ per day per unit
$ �• y per day per set
Size A Sign without stand
Size B Sign with stand
$ /.oD per day per set
Size B Sign without stand
$ /.SS per day per set
$ LSO per day per set
No Parking Sign with stand
$ �- y� per day per unit
Specialty Sign Size A -Cost of Manufacturing
$ 51 -Oo per sign
Specialty Sign Size B-Cost of Manufacturing
$ y3 dp per sign
28" Cone with reflective strip
Cone with reflective strip
$ . 50 per day per cone
$ SO per day per cone
Safety
Safety Fence
Light - Steady Burn
a..
$ oo per day per roll
$ /S per day per unit
Light -Flashing
Arrow Board
$ i5 per day per unit
Message Board
$ 35.0o per day per unit
per day per unit
Type IV Barrier -Jersey Barrier
$ I .00 per day per unit
Size A Signs - 0.01 to 9.00 Square Feet
Size B Signs - 9.01 to 16.00 Square Feet
Specialty Signs - The initial manufacturing will be paid for per the unit cost for specialty signs and the rental
rate paid per the appropriate rental rate.
UR/Z7,64 RE.J7 41 S
Firm Name: Aay,&&rgY T£�Y/R.F�40anE fe
UNITED RENTALS HIGHWAY TECHNOLOGIES INC.
2456 EAST 9TH STREET
LOVELAND, CO. 80537
PHONE: (970) 667-3620
FAX: (970) 669-3930
JOSEPH R.BRANDT
DATE: APRIL 21, 2002
PROJECT: CITY OF FORT COLLINS
TRAFFIC CONTROL SERVICES - ANNUAL
BID NO: 5699
( NAME OF COMPANY REPRESENTATIVES TO RESOLVE PROBLEMS )
" JOSEPH R BRANDT
ESTIMATOR / CONTRACT ADMINISTRATOR
OFFICE NUMBER: (970) 667-3620
HOME NUMBER: ( 970 ) 593-9117
CELL PHONE: (970) 227-3573
"SHAWN SEVERN
FIELD OPERATIONS SUPERVISOR
OFFICE NUMBER: (970) 667-3620
HOME NUMBER: (970) 593-1504
CELL PHONE: (970) 227-8116
IF YOU NEED ANY MORE INFORMATION ON THE PEOPLE ABOVE, PLEASE
GIVE ME A CALL SO I CAN PROVIDE YOU WITH IT.
THANK YOU FOR THE OPPORTUNITY TO HAVE QUOTED YOU ON THIS PROJECT.
WE LOOK FOREWORD TO HEARING FROM YOU.
SINCERELY,
JOSEPH. R. BRANDT
U.R.I. /ESTIMATOR
UNITED RENTALS HIGHWAY TECHNOLOGIES, INC.
2456 EAST 9TH STREET
LOVELAND, CO. 80537
BRANCH NO: 233
PHONE: ( 970 ) 667-3620
FAX: ( 970 ) 667-3930
JOSEPH R. BRANDT
DATE: APRIL 21, 2002
PROJECT: CITY OF FORT COLLINS
TRAFFIC CONTROL SERVICES - ANNUAL
BID NO: 5699
( LIST OF EQUIPMENT AND TRUCKS)
ITEM/DESCRIPTION AGE QTY CONDITION
(VEHICLES)
GMC 1 TON FLAT BED TRUCK 1999 17 EXCELLENT
GMC 1/2 TON PICK UP TRUCK
1999
4 EXCELLENT
GMC SUBURBAN
1996
1 EXCELLENT
(EQUIPMENT)
PORTABLE SOLAR POWERED
2000
6 EXCELLENT
MESSAGE BOARDS
SOLAR POWERED ARROW
2000
8 EXCELLENT
BOARDS
PORTABLE SOLAR POWERED 2001 1 EXCELLENT
TEMPORARY SIGNAL LIGHTS
( ONE SET / TWO UNITS)
* WE AT UNITED RENTALS HIGHWAY TECHNOLOGIES, INC, HAVE A LARGE
QUANTITY OF INVENTORY IN OUR LOVELAND OFFICE AND OUR DENVER
OPERATIONS. IF YOU REQUIRE ANY MORE INFORMATION ON OUR
INVENTORIES OR WISH TO VISIT OUR OFFICE, PLEASE GIVE US A CALL
THANK YOU FOR THE OPPORTUNITY TO HAVE QUOTED YOU ON THIS
PROJECT. YOUR TIME AND CONSIDERATION IN REVIEWING OUR QUOTE
IS GREATLY APPRECIATED. WE LOOK FOREWORD TO HEARING FROM YOU.
SINCERELY,
/i X'
JOSEPH R.BRANDT
U.R.I./ ESTIMATOR
Bid Schedule '' A "
:7ntractor to provide all service, manpower and equipment.
-'a"�c Control Supervisor (at job site)
$ 34.69per hour
_raffic Control Supervisor (at job site)
$ 346. 90per day
�Iag Person with paddle
$ 19.95perhour
=lag Person with paddle
$ 199.95perday
Rellectorized Tube
$ • 69per day per unit
e I cai Panel without light
$ .95per day per unit
De l Barricade without light
$ .64per day per unit
.roe II Barricade without light
-=oe
$ 64per day per unit
III Barricade without lights
$ 1 .99per day per unit
Steady Burn
$ .29per day per each
"lash,ng
$ - 79per day per each
Ba-re s
$ . 99per day per unit
Sze A Sign with stand
$ .99per day per set
Size A Sign without stand
$ .9gper day per set
S ze B Sign with stand
$ 1 .49per day per set
S ze B Sign without stand
$ 1 .49per day per set
`Jo Parking Sign with stand
$ .95per day per unit
Sceaalry Sign Size A -Cost of Manufacturing
$ 59.49per sign
Soeaalty Sign Size B-Cost of Manufacturing
$ 69.49per sign
tc" Cone with reflective strip
$ . 69per day perconeCone
with reflective strip
$ 69per day per cone
Sa(ey Fence
$ i _ 99per day per roll
_rah, - Steady Burn
$ 9gper day per unit
_ -, - F'ashing
$ 29per day per unit
� r:rw Board
$ 59 - 0 per day per unit
_'essage Board
$ 25 0 per day per unit
,re IbBarrier-Jersey Barrier
$ a _RRper day per unit
Sze A Sans - 0.01 to 9,00 Square Feet
Size B Signs - 9.01 to 16.00 Square Feet
Specially Signs - The initial manufacturing will be paid for per the unit cost for specially signs and the enia
'aie paid aer the appropriate rental rate.
7i-m Name CARNES SERVICE
5
Bid Schedule " B "
Rental including Delivery and Pickup Only
Flag Person with paddle
Flag Person with paddle
36" Reflectorized Tube
Vertical Panel without light
Type I Barricade without light
Type II Barricade without light
Type III Barricade without lights
Light - Steady Burn
Light - Flashing
Barrels
Size A Sign with stand
Size A Sign without stand
Size B Sign with stand
Size B Sign without stand
No Parking Sign with stand
Specialty Sign Size A -Cost of Manufacturing
Specialty Sign Size B-Cost of Manufacturing
28" Cone with reflective strip
36" Cone with reflective strip
Hand Paddle with T Handle
Safety Fence
Light - Steady Burn
Light - Flashing
Arrow Board
Message Board
6W27V/0 fEwTx11_S
Firm Name: &&ny TFi 1A&YQ6„ &S r.,.
$ at.00 per hour
$ ata-oo per day
$6,SF per day per unit
$ . SS per day per unit
$ Sr per day per unit
$__. SS per day per unit
$ .2.00 per day per unit
$ . /S per day per each
$ . /S per day per each
$ 75- per day per unit - --
$ /. 96 per day per set
$ /.00 per day per set
per day per set
per day per set
$ /. S/S per day per unit
$ gQ.on per sign
$ yS.00 per sign
$ -So per day per cone
$So per day per cone
$ /.as per day per unit
$ .2.00 per day per roll
$ . /6 per day per unit
$---. /_s per day per unit
$ 3S.00 per day per unit
per day per unit
Bid Schedule "C"
Rental Only - Picked up and returned by City Personal
Flag Person with paddle
Flag Person with paddle
36" Reflectorized Tube
Vertical Panel without light
Type I Barricade without light
Type II Barricade without light
Type III Barricade without lights
Light - Steady Burn
Light - Flashing
Barrels
Size A Sign with stand
Size A Sign without stand
Size B Sign with stand
Size B Sign without stand
No Parking Sign with stand
Specialty Sign Size A -Cost of Manufacturing
Specialty Sign Size B-Cost of Manufacturing
28" Cone with reflective strip
36" Cone with reflective strip
Hand Paddle with 5' Handle
Safety Fence
Light - Steady Burn
Light - Flashing
Arrow Board
Message Board
elWX7W REu7A<5
Firm Name: 2r W6eQG ZS Z-AI
$ .2l.00 per hour
$,210.ejn perday
$ �O per day per unit
$ . So per day per unit
$- slo per day per unit
$_ . so per day per unit
$ 1.77.5 per day per unit
$ .10 per day per each
$ .10 per day per each
$_ .,7o per day per unit
$ /.25- per day per set
$ Loo per day per set
$ /.'/$- per day per set
$ I. yo per day per set
$ /.3S per day per unit
$ - no per sign
$ ya.00 per sign
$YS'_ per day per cone
$Y.<-_ per day per cone
$ / . oo per day per unit
$ /. 7 per day per roll
$ - M per day per unit
$/o_ per day per unit
$ 357:00 per day per unit
$ /a soe per day per unit
AWARD BID TAB
Bid Schedule " A " (Contractor to provide all service ,manpower and equipment.)
Description
Traffic Control Supervisor (at job site)
Traffic Control Supervisor (at job site)
Flag Person with paddle
Flag Person with paddle
Vertical Panel without light
Type I Barricade without light
Type III Barricade without lights
Light - Steady Burn
Light - Flashing
Barrels
Size A Sign with stand
Size A Sign without stand
Size B Sign with stand
No Parking Sign with stand
Specialty Sign Size A -Cost of Manufac.
28" Cone with reflective strip
36" Cone with reflective strip
Safety Fence
Arrow Board
Message Board
Type IV Barrier -Jersey Barrier
Bid Schedule " B "
Rental including Delivery and Pickup Only,
Flag Person with paddle
Flag Person with paddle
36" Reflectorized Tube
Vertical Panel without light
Type I Barricade without light
Type II Barricade without light
Type III Barricade without lights
Light - Steady Burn
Light - Flashing
Barrels
Size A Sign with stand
Size B Sign with stand
Size B Sign without stand
No Parking Sign with stand
Specialty Sign Size A -Cost of Manufacturing
28" Cone with reflective strip
36" Cone with reflective strip
Hand Paddle with 5' Handle
Safety Fence
Arrow Board
Message Board
Price/Unit Quantity Total
$moo per hour
270
$3N6'.00 perday
3
$ el1.00 per hour
220
$a/o.00 perday
3
$ . SS per day per unit
191
$ .,JE5_ per day per unit
181
$ 2. oo per day per unit
25
$ .!�_ per day per each
50
$ _ 1 S per day per each
150
$ • 7S per day per unit
75
$ /.45' per day per set
90
$ J. O o per day per set
10
$ /.SS per day per set
10
$ f.y.q- per day per unit
200
$ yO.00 per sign
5
per day per cone
285
$ _ So per day per cone
100
$ a.00 per day per roll
10
$ 3S.00 per day per unit
3
$ td5. oo per day per unit
1
$ Woo per day par unit
50
SUB -TOTAL SCHEDULE "A"
Price/Unit
al_oo perhour
$ a/o.00 perday
per day per unit
$ _ SS per day per unit
$ per day per unit
$ .SS per day per unit
$ Go per day per unit
$ <' per day per each
$ . IS per day per each
$—_7!5'— per day per unit
$ f. q6 per day per set
$ /.65' per day per set
$ /. Yo per day per set
$ /. qS per day per unit
$ V0.0o per sign
$ .SO per day per cone
$ . 60 per day per cone
$ l.aS per day per unit
$ 2.0n per day per roll
$ 3ir 00 per day per unit
$ taLS.00 per day per unit
0
Quantity Total
100
3
100
160
95
40
10
50
150
75
80
10
5
100
5
100
50
3
18
2
1
SUB -TOTAL SCHEDULE "B"
$
$ 630.00
$ .SS.oO
$ 89.00
$ sa.as
$ ao.00
$�.SO
$ L5-1
$ 7-00
$ Oo
$ a0o.00
$ SO. DO
$ 3L.00
$ 70.00
$ fa6.0o
30IMFINfl
Bid Schedule "C"
Rental Only - Picked up and returned by City Personal
Flag Person with paddle
Flag Person with paddle
Vertical Panel without light
Type I Barricade without light
Type III Barricade without lights
Light - Steady Burn
Light - Flashing
Size A Sign with stand
Size B Sign with stand
Size B Sign without stand
No Parking Sign with stand
Specialty Sign Size A -Cost of Manufacturing
Specialty Sign Size B-Cost of Manufacturing
28" Cone with reflective strip
Hand Paddle with 5' Handle
Safety Fence
Arrow Board
Message Board
Price/Unit
per hour
per day
per day per unit
per day per unit
per day per unit
per day per each
per day per each
per day per set
per day per set
per day per set
per day per unit
per sign
per sign
per day per cone
per day per unit
per day per roll
per day per unit
per day per unit
Quantity Total
30
2
135
70
10
30
180
35
12
4
75
5
5
75
3
18
5
1
$ bao.0o
$ g.20.00
$ b7. SO
$ 3b-.Oo
$ 17.So
$ Oo
$
$ io/.aS
$ 176-00
$ 200.00
$ 33.7S
$ 3/.SO
$ 175.0a
$1 2S 00
SUB -TOTAL SCHEDULE "C" $ a+j0 .Zs
SUB -TOTAL SCHEDULE "A" $17177?j_$-
SUB-TOTAL SCHEDULE "B" $,3.A�S
PROJECT TOTAL $23, %31.85
ig ature and Title Typed or Printed Name of Signatory
&,VZ72 o REnvnnGS
&ri AL4Y ZZCWy0 06r< T ( 70 )- i467-36 n
Company Name Telephone Number (Area Code)
I7
UNITED RENTALS HIGHWAY TECHNOLOGIES INC.
2456 EAST 9TH STREET
LOVELAND, CO. 80537
PHONE: (970) 667-3620
FAX: (970) 669-3930
JOSEPH R.BRANDT
DATE: APRIL 21, 2002
PROJECT: CITY OF FORT COLLINS
TRAFFIC CONTROL SERVICES - ANNUAL
BID NO: 5699
( LIST OF REFERENCES)
CONNELL RESOUCES, INC.
4305 EAST HARMONY ROAD
FORT COLLINS, CO.
PHONE: ( 970 ) 223-3151
FAX: ( 970 ) 223-3191
ATTN: WILL WELCH / PRESIDENT
PROJECT: 1 ST STREET AND TAFT AVE
RECONSTRUCTION
LOVELAND, CO.
2001 / ONE YEAR PROJECT
PROJECT: SOUTH SHIELDS STREET
RECONSTRUCTION
FORT COLLINS, CO.
2001 / SIX MONTH PROJECT
PROJECT: LARIMER COUNTY ASPHALT
PATCHING PROGRAM / 2001
* VARIOUS LOCATIONS
ONE YEAR CONTRACT
PROJECT: TIMBERLINE AVE NORTH OF TRILBY RD.
RECONSTRUCTION
FORT COLLINS, CO.
2001 / FOUR MONTH PROJECT.
NOTE: WE DO A VARIETY OF CONSTRUCTION PROJECTS FOR CONNEL RESOURCES
ALONG THE FRONT RANGE.
( PAGE TWO)
FEW
LAFARGE CORPORATION
1800 NORTH TAFT AVE
FORT COLLINS, CO.
PHONE: ( 970 ) 407- 3600
ATTN: GARY / ESTIMATOR
PROJECT: INTERSECTION OF HARMONY ROAD
AND TIMBERLINE AVE
FORT COLLINS, CO.
2001 / SEVEN MONTH PROJECT
GERRARD EXCAVATION
1739 SOUTH CTY RD 13C
LOVELAND,CO.
PHONE: (970) 669-1463
ATTN: BILL NICKEL / ESTIMATOR
PROJECT: SUPER- WAL-MART STORE
LEMAY AVE AND MULBERRY AVE
FORT COLLINS, CO.
2000 / 2001- ONE YEAR PROJECT.
EXCEL ENERGY
EAST HORSETOOTH ROAD
FORT COLLINS, CO.
ATTN:RANDY
PROJECT: TRAFFIC CONTROL AGREEMENT
2001 / ONE YEAR CONTRACT
NOTE: WE HAVE BEEN WORKING WITH EXCEL ENERGY FOR SEVENTEEN
YEARS
" IF YOU NEED ANY MORE REFERENCES, PLEASE GIVE ME A CALL AND I WILL
PROVIDE YOU WITH ADDITIONAL INFORMATION.
THANK YOU FOR THE OPPORTUNITY TO HAVE QUOTED YOU ON THIS PROJECT.
WE LOOK FOREWORD TO HEARING FROM YOU.
SINCERELY,
-I;aj
JOSEPH. R. BRANDT
U.R.I. /ESTIMATOR
UNITED RENTALS HIGHWAY TECHNOLOGIES INC.
2456 EAST 9TH STREET
LOVELAND, CO. 80537
PHONE: (970) 667-3620
FAX: ( 970 ) 669-3930
JOSEPH R.BRANDT
DATE: APRIL 21. 2002
PROJECT: CITY OF FORT COLLINS
TRAFFIC CONTROL SERVICES - ANNUAL
BID NO: 5699
(RESUMES OF MAJOR EMPLOYEES)
JOSEPH R BRANDT
ESTIMATOR / CONTRACT ADMINISTRATOR
TWENTY YEARS OF EXPERIENCE WORKING WITHIN THE TRAFFIC CONTROL
INDUSTRY.
WORK WITH ROCKY MOUNTAIN SAFETY SERVICE, INC FOR NINETEEN YEARS
AND THEN THEY WERE ACQUIRED BY UNITED RENTALS HIGHWAY TECHNOLOGIES
INC. WHERE HE WORKS TODAY.
TONY SUSKA
BRANCH MANAGER
TWENTY TWO YEARS OF EXPERIENCE WORKING WITHIN THE TRAFFIC CONTROL
INDUSTRY.
WORKED WITH COLORADO BARRICADE FOR TWENTY YEARS UNTIL THEY WERE
ACQUIRED BY UNITED RENTALS HIGHWAY TECHNOLOGIES, INC. WHERE HE
WORKS TODAY
SHAWN SEVERN
FIELD OPERATIONS SUPERVISOR
NINE YEARS OF EXPERIENCE WORKING WITHIN THE TRAFFIC CONTROL INDUSTRY.
WORKED WITH COLORADO BARRICADE FOR SEVEN YEARS UNTIL THEY WERE
ACQUIRED BY UNITED RENTALS HIGHWAY TECHNOLOGIES, INC. WHERE HE
WORKS TODAY.
NOTE: THE THREE PEOPLE ABOVE HAVE A COMBINATION OF FIFTY ONE YEARS
OF EXPERIENCE WORKING WITHIN THE TRAFFIC CONTROL INDUSTRY.
( PAGE TWO)
TWO
• IF YOU NEED ANY MORE INFORMATION ON THE PEOPLE ABOVE, PLEASE
GIVE ME A CALL SO I CAN PROVIDE YOU WITH IT.
THANK YOU FOR THE OPPORTUNITY TO HAVE QUOTED YOU ON THIS PROJECT.
WE LOOK FOREWORD TO HEARING FROM YOU.
SINCERELY,
//j
JOSEPH. R. BRANDT
U.R.I. /ESTIMATOR