HomeMy WebLinkAboutRESPONSE - BID - 5699 TRAFFIC CONTROL SERVICESBid Schedule " A "
Contractor to provide all service, manpower and equipment
Traffic Control Supervisor (at job site)
$_ -A05o per hour
Traffic Control Supervisor (at job site)
$95 0 per day
Flag Person with paddle
$ ho.00 per hour
Flag Person with paddle
$ per day
36" Reflectorized Tube
$ .51 per day per unit
Vertical Panel without light
$ 59 per day per unit
Type I Barricade without light
$_c5E[ per day per unit
Type 11 Barricade without light
$ 55 per day per unit
Type III Barricade without lights
$ '5,CO per day per unit
Light - Steady Burn
$ 3D per day per each
Light - Flashing
$ per day per each
Barrels
$ per day per unit
Size A Sign with stand
$ per day per set
Size A Sign without stand
$ I CC7 per day per set
Size B Sign with stand
$__�_,L{ q per day per set
Size B Sign without stand
$ 1 per day per set
No Parking Sign with stand
$ per day per unit
Specialty Sign Size A -Cost of Manufacturing
$_ per sign
Specialty Sign Size B-Cost of Manufacturing
$ per sign
28" Cone with reflective strip
$ 55 per day per cone
36" Cone with reflective strip
$.{, per day per cone
l
Safety Fence
$ 50 per day per roll
Light - Steady Burn
$ , 3fD per day per unit
Light - Flashing
$ per day per unit
Arrow Board
$ per day per unit
Message Board
$ 1,�5,per day per unit
Type IV Barrier -Jersey Barrier
$1�)XQ per day per unit
Size A Signs - 0.01 to 9.00 Square Feet
Size B Signs - 9.01 to 16.00 Square Feet
Specialty Signs - The initial manufacturing will be paid for per the unit cost for specialty signs and the rental
rate paid per the appropriate rental rate.
Ilmn Name: A - -
5
BID PROPOSAL #5699:
E.CONTRACTORS:
2. LAFARGE:
A. CITY OF FORT COLLINS STREET OVERSIZING-TIMBERLINE RD. AND
DRAKE RD.
B. TIMBERLINE EXTENSION PROJECT
C. WATERGLEN PROJECT @ VINE ST.
REFERENCES:
A. KELLY STEELE: OCTOBER 1997-TIMBERLINE EXTENSION
DECEMBER 1999-WATERGLEN PROJECT @ VINE ST
B. GARY MARTINSON: APRIL 2001- OCTOBER 2001-STREET OVERSIZING@
TIMBERLINE RD. AND DRAKE RD
MIKE OBESTER
PRESIDENT
BID PROPOSAL #5699:
E. CONTRACTORS:
3. BURLINGTON NORTHERN SANTE FE:
A. MASON ST @ MAPLE ST
B. DRAKE RD. @ REDWING RD.
C. ANY MISCELLANOUS PROJECTS
REFERENCES:
A. TONY BALZONO: OCTOBER 1999-MASON ST. @ MAPLE ST
OCTOBER 2000-DRAKE RD @ REDWING RD.
1996-PRESENT-MISCELLANOUS PROJECTS
MIKE OBESTER
PRESIDENT
Bid Schedule " B "
Rental including Delivery and Pickup Only
Flag Person with paddle
Flag Person with paddle
36" Reflectorized Tube
Vertical Panel without light
Type I Barricade without light
Type II Barricade without light
Type III Barricade without lights
Light - Steady Burn
Light - Flashing
Barrels
Size A Sign with stand
Size A Sign without stand
Size B Sign with stand
Size B Sign without stand
No Parking Sign with stand
Specialty Sign Size A -Cost of Manufacturing
Specialty Sign Size B-Cost of Manufacturing
28" Cone with reflective strip
36" Cone with reflective strip
Hand Paddle with 5' Handle
Safety Fence
Light - Steady Burn
Light - Flashing
Arrow Board
Message Board
per hour
per day
per day per unit
per day per unit
per day per unit
per day per unit
per day per unit
per day per each
per day per each
per day per unit
per day per set
per day per set
per day per set
per day per set
per day per unit
per sign
per sign
per day per cone
per day per cone
per day per unit
per day per roll
per day per unit
per day per unit
per day per unit
per day per unit
Bid Schedule "C"
Rental Only - Picked up and returned by City Personal
Flag Person with paddle
Flag Person with paddle
36" Reflectorized Tube
Vertical Panel without light
Type I Barricade without light
Type II Barricade without light
Type III Barricade without lights
Light - Steady Burn
Light - Flashing
Barrels
Size A Sign with stand
Size A Sign without stand
Size B Sign with stand
Size B Sign without stand
No Parking Sign with stand
Specialty Sign Size A -Cost of Manufacturing
Specialty Sign Size B-Cost of Manufacturing
28" Cone with reflective strip
36" Cone with reflective strip
Hand Paddle with 5' Handle
Safety Fence
Light - Steady Burn
Light - Flashing
Arrow Board
Message Board
per hour
per day
per day per unit
per day per unit
per day per unit
per day per unit
per day per unit
per day per each
per day per each
per day per unit
per day per set
per day per set
per day per set
per day per set
per day per unit
per sign
$__(g2S.CD per sign
$ 55 per day per cone
$ (,o5 per day per cone
$ a .00 per day per unit
$ 5. tip per day per roll
$�_ per day per unit
$ per day per unit
$_ 0 Ob per day per unit
$ Ia5 per day per unit
Firm Name: LtADJ_L{
1 - - - . -
FAV1 ..� -
Bid Schedule " A " (Contractor to provide all service ,manpower and equipment.)
Description
Traffic Control Supervisor (at job site)
Traffic Control Supervisor (at job site)
Flag Person with paddle
Flag Person with paddle
Vertical Panel without light
Type I Barricade without light
Type III Barricade without lights
Light - Steady Burn
Light - Flashing
Barrels
Size A Sign with stand
Size A Sign without stand
Size B Sign with stand
No Parking Sign with stand
Specialty Sign Size A -Cost of Manufac.
28" Cone with reflective strip
36" Cone with reflective strip
Safety Fence
Arrow Board
Message Board
Type IV Barrier -Jersey Barrier
Bid Schedule " B "
Rental including Delivery and Pickup Only
Flag Person with paddle
Flag Person with paddle
36" Reflectorized Tube
Vertical Panel without light
Type I Barricade without light
Type II Barricade without light
Type III Barricade without lights
Light - Steady Burn
Light - Flashing
Barrels
Size A Sign with stand
Size B Sign with stand
Size B Sign without stand
No Parking Sign with stand
Specialty Sign Size A -Cost of Manufacturing
28" Cone with reflective strip
36" Cone with reflective strip
Hand Paddle with 5' Handle
Safety Fence
Arrow Board
Message Board
Price/Unit
Price/Unit
per hour
per day
per hour
per day
per day per unit
per day per unit
per day per unit
per day per each
per day per each
per day per unit
per day per set
per day per set
per day per set
per day per unit
per sign
per day per cone
per day per cone
per day per roll
per day per unit
per day per unit
per day per unit
Quantity Total
270
3
220
3
191
181
25
50
150
75
90
10
10
200
5
285
100
10
3
1
50
SUB -TOTAL SCHEDULE "A
Quantity Total
perhour
100
perday
3
per day
per unit
100
per day
per unit
160
per day
per unit
95
per day
per unit
40
per day
per unit
10
per day
per each
50
per day
per each
150
per day
per unit
75
per day
per set
80
per day
per set
10
per day
per set
5
per day
per unit
100
per sign
5
per day
per cone
100
per day
per cone
50
per day
per unit
3
per day
per roll
18
per day
per unit
2
per day
per unit
1
SUB -TOTAL SCHEDULE "B"
Bid Schedule "C"
Rental Only - Picked up and returned by City Personal
Flag Person with paddle
Flag Person with paddle
Vertical Panel without light
Type I Barricade without light
Type III Barricade without lights
Light - Steady Burn
Light - Flashing
Size A Sign with stand
Size B Sign with stand
Size B Sign without stand
No Parking Sign with stand
Specialty Sign Size A -Cost of Manufacturing
Specialty Sign Size B-Cost of Manufacturing
28" Cone with reflective strip
Hand Paddle with 5' Handle
Safety Fence
Arrow Board
Message Board
Price/Unit
per hour
per day
per day per unit
per day per unit
per day per unit
per day per each
per day per each
per day per set
per day per set
per day per set
per day per unit
per sign
per sign
per day per cone
per day per unit
per day per roll
per day per unit
per day per unit
Quantity Total
30
2
135
70
10
30
180
35
12
4
75
5
5
75
3
18
5
1
SUB -TOTAL SCHEDULE "C" $z RAW
SUB -TOTAL SCHEDULE "A" $ 4. o2cZlo�.o 3
SUB -TOTAL SCHEDULE "B" $ 3 ,
PROJECT TOTAL
Sr
Est t� \ tM.� c�
Signature and Title Typed or Printed Name of Signatory
m-prlc-. () ya'J-(-'�%LaS
Company Name Telephone Number (Area Code)
4vsa �(
oil i 4 nq q ha /Oa
ress (Street, PO Box, City, State, Zip) Date
BID PROPOSAL #5699:
A. NAME OF COMPANY REPRESENATIVE TO RESOLVE DISPUTES AND ANSWER
QUESTIONS. 1. JEAN LEHMAN
2. MIKE OBESTER
B. 1. MIKE OBESTER-PRESIDENT AND OWNER
TRAFFIC CONTROL SUPERVISOR FOR 14 YRS. BEEN WITH COMPANY FOR
10 YRS.
2. JEAN LEHMAN-VICE PRESIDENT
BEEN WITH THE COMPANY FOR 1 YR. PREVIOUSLY WORKED FOR THE CITY
OF FORT COLLINS-ENG. DEPT. FOR 7 YRS. ON THE REHAB PROGRAM AND
OTHER MISC. PROJECTS. WORKED FOR TMI FOR 5 YRS. AS TRAF-FiC 0&-SlRCt, `mac O(%R ,
3. RUDY NISSELY-TRAFFIC CONTROL SUPERVISOR
HAS BEEN WITH THE COMPANY FOR 6 YRS. AS FLAGGER AND TCS ON
THE CITY OF FORT COLLINS REHAB. PROGRAM, PED. ACCESS PROGRAM
AND MISCELLANOUS CONCRETE PROGRAM FOR THE CITY OF FORT COLLINS-
ENG. DEPT.
4. DAN TYREE-TRAFF►C CONTROL SUPERVISOR
HAS BEEN WITH THE COMPANY FOR 2 YRS. AS FLAGGER AND TCS. WORKED
ON THE CITY OF FORT COLLINS PED. ACCESS PROGRAM, MISCELLANOUS
CONCRETE PROGRAM AND REHAB. PROGRAM FOR THE CITY OF FORT COLLINS
ENG. DEPT.
BID PROPOSAL #5699:
C. LIST OF EQUIPMENT:
PANEL A:
ROAD WORK AHEADA9
RIGHT LANE CLOSED28
LEFT LANE CLOSED:31
LEFT TRANS:28
RIGHT TRANS:31
FLAGGER AHEAD SYMBOLS:49
ROAD CLOSED AHEAD:20
NO RIGHT TURN:34
NO LEFT TURN:31
KEEP RIGHT:30
DETOUR LEFT:52
DETOUR RIGHT:52
SIDEWALK CLOSED:10
BIKE LANE ENDS MERGE WITH TRAFFIC:18
SPEED LIMIT SIGNS:18
LOCAL BUSINESS:15
SHOULDER WORK AHEADA 7
NO PARKING SIGNS:250
PANEL B:
ROAD WORK AHEAD:34
ROAD CLOSED AHEAD:28
FLAGGER AHEAD:8
RIGHT LANE CLOSED:30
LEFT LANE CLOSED:26
LEFT TRANS:28
RIGHT TRANS26
ROAD CLOSED TO THRU TRAFFIC:18
ROAD CLOSED FOR TYPE III BARRICADE:33
DETOUR AHEAD:18
BARRICADES:
TYPE I:437
TYPE 11:16
TYPE 111:68
VERTICAL PANELS (SIDELINE AND CENTERLINE):230
BARRELS:275
CONES-500
'RC.i�e-SSTp 'MriSSw(rE �Uow<Y.-�S
BID PROPOSAL #5699:
C. LIST OF EQUIPMENT, TRUCKS, ECT. AVAILABLE TO SERVICE THE CITY.
1.2001 GMC SIERRA 1500/ 4W/EXCELLENT CONDITION
2. 2001 GMC SIERRA 1500/2W/ EXCELLENT CONDITION
3.1994 CHEVY/WT 1500/2WNERY GOOD CONDITION
4.1991 GMC SIERRA 1500/2WNERY GOOD CONDITION
5. 1989 IZUSU/LONG BED/2W/ GOOD CONDITION
6. 1996 CHEVY BLAZER/4W/ VERY GOOD CONDITION
7. 1991 16FT DUNLOP TRAILERNERY GOOD CONDITION
BID PROPOSAL #5699:
E. CONTRACTORS:
1. VOGEL CONCRETE:
A. CITY OF FORT COLLINS CONCRETE REHAB. PROGRAM
B. CITY OF FORT COLLINS PEDESTRIAN ACCESS PROGRAM
C. CITY OF FORT COLLINS MISCELLANOUS CONTRACT.
REFERENCES:
A. DAN VOGEL: MARCH 1999-OCTOBER 1999
MARCH 2O00-OCTOBER 2000
MARCH 2O01-OCTOBER 2001
ALL WORK INVOLVED SET-UPS FOR CONCRETE WORK.
B. CITY OF FORT COLLINS PED. ACCESS PROGRAM-VOGEL CONCRETE
FROM NOVEMBER 1999-NOVEMBER 2001
C. CITY OF FORT COLLINS MISCELLANOUS PROJECT-VOGEL CONCRETE
FROM NOVEMBER 1999-NOVEMBER 2001
THESE REFERENCES ARE FROM VOGEL CONCRETE.
Qom,
MIKE OBESTER
PRESIDENT