Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5742 FIBER OPTIC INSTALLATION AT TRANSFORT (2)BID #5742 FIBER OPTIC INSTALLATION AT TRANSFORT ADDENDUM #1 Bid Schedule Contractor will provide all labor, equipment, materials and traffic control to install 24 strand single mode fiber optic feed to Transfort per specification: 2800 linear feet X $ /3 3 per foot = $ 3 % 3 ed TOTAL BASE BID Firm Name Corporation, DBAPartnership, or LLC Signatur Print Name I ,; t�ooc� s Address 1301 1U L"'n ': A, , Gt) 760 2 "7 Phone/Fax# 303-66Y-5�7uo 1303-b6v-0zy6 References City of Fort Collins Trafic Division $500,000 Ward Stanford (970)221-8820 Eric Bracke (970) 2244788 Metrowest Communications was awarded the contract for the City of Ft. Collins Traffic Division fiber optic backbone throughout the entire city.The project was successfully delivered on time despite an extremely Aggressive schedule. The project involved some 25,000 feet of underground boring and trenching, over 100 hand holes being placed throughout the city streets, 300 utility potholes, 80,000 feet of fiber optic cable placement and all necessary splicing and testing. Otyef Soft# 1.l►Ulm The city officials were very pleased on the professional and timely installation. Brown (970) 356-4000 wcL4875 Metrowest installed a total campus backbone build out for the Weld a County Government. This project involved the installation of a 48- strand single mode fiber optic cable from their county headquarters in Greeley to the new North Jail Facility. From the North Jail location Metrowest installed a redundant fiber optic ring to connect the Human Resources Building, the new health facility Building, Public Works, ambulance facility, and Social Services Building. (970) 350-988 Metrowest Communications installed the Island Grove Fiber Optic Network for the City of Greeley. This project involved both single mode and murdmode fiber optic backbone, which connected the City of Greeley's data center with the Facilities Building, Community Center, Exhibition Center, and multiple outlying buildings. US Cable $1.2 Million Rick Montoya (970) 587-2243 Metrowest Communications currently is working with US Cable as a Primary Contractor. Metrowest currently has a 4.3 mile fiber build in 1 1\ the town of Johnstown Colorado, and a 11.2 mile fiber build in Wellington Colorado. US Cable in the towns of Miliken, and Ft. 1 1■ 1 Collins Colorado has awarded two other new build construction _V V projects to Metrowest Communications. These projects also require attentive Project Management and coordination, Boring, Trenching, splicing and activation. Rick Shannon (720) 490-3927 Metrowest Communications holds a Master Construction Agreement with AT&T Broadband as a primary contractor. Metrowest has been contracted to manage 38 existing new build projects in the Denver MUM_ Metro area. These projects require project management, MUcoordination with Developers, and builders', directional boring, backhoe trenching, splicing active and passive devices, and activation of new plant. Metrowest has also secured two fiber Optic build projects from AT&T Broadband. These projects combined total over 19 miles of aerial and underground fiber construction.