Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5742 FIBER OPTIC INSTALLATION AT TRANSFORT (3)BID #5742 FIBER OPTIC INSTALLATION AT TRANSFORT ADDENDUM #1 Bid Schedule Contractor will provide all labor, equipment, materials and traffic control to install 24 strand single mode fiber optic feed to Transfort per specification: 2800 linear feet X $22.25per foot = $ 62, 300.00 TOTAL BASE BID Firm Name Sturgeon Electric Cajpmy, Inc. Cor rati%o r, DDB P rtn ship, Signature 1p Print Name Richard S. Swartz, vice President Address 12150 East 112th Avenue Henderson, CO 80640 Phone/Fax # 303-286-8000 (phone) 303-286-1811 (fax) ZrApAr4e"" Scope Letter INCLUSIONS, QUALIFICATIONS AND EXCLUSIONS Thank you for the opportunity to present you a proposal for work on the above referenced project. Our proposal includes the electrical work itemized above, with the following inclusions, qualifications and exclusions. If the scope of work you would like us to quote on differs from the work described above, please let us know so that our proposal can be modified accordingly. Inclusions: 1. Performance and payment bond. 2. Plans and specifications dated 4 18-02. 3. Addendum's/revisions number- ONE. Qualifications: 1. This is a UNIT PRICE PROPOSAL. You agree to make payment to us for the actual quantities of work installed multiplied by the unit prices shown above. The above quantities are those quantities shown in the bidding documents and we make no representations as to their accuracy. 2. The Unit Prices quoted include material, equipment, reasonably anticipated labor and applicable taxes. 3. The Unit Prices include the cost of the premiums for performance and payment bonds ONLY if expressly stated above. 4. Delivery of electrical equipment is typically 12 -14 weeks after return of approved submittals. 5. Delivery of Material equipment is typically 10 .12 weeks after return of approved submittals. 6. Delivery of signal poles is typically 20 weeks after return of approved submittals. 7. The schedule for our work shall take into account the above identified delivery times, or the actual delivery times for specified materials and equipment, and shall include a reasonable amount of time for us to complete our work after receipt of the required materials and equipment. 8. Our proposal is conditioned on entering into a subcontract with terms and conditions similar to and consistent with t 9. Prior to our commencement of our Work, you will notify us in writing of any existing hazardous materials known or suspected by you or the Owner, on or about the Project. We will not be required to perform work that involves exposure to hazardous materials or substances. If we encounter hazardous materials or substances not placed on the Project by our operations, they will be abated or otherwise remedied before we will proceed with the balance of our Work. Exclusions: 1. Unit Prices include no overtime and/or shift work. 2. All cutting, patching and removal of concrete and/or asphalt are excluded. If Sturgeon Electric is the only contractor working at a location where cutting and patching is required, Sturgeon will provide quantities for pricing. 3. Unless expressly stated above as being included in the Unit Prices all: (1) landscape restoration; (2) surveying; (3) pavement markings; (4) temporary wiring for construction trailers and/or yards; (5) traffic control, devices and flagging. Acceptance: 1. This proposal price is valid for 60 calendar days from the date of this proposal. Page 2 of 2 Project History Job Number 1348 Contract Number Project Title Project City Percent Complete Completion Date Contract Value to Date DENVER WASTEWATER Denver, CO 100% 1/7/1999 $185,427.25 Owner Work Type Fiber Optics Facility Type Government Project Mgr Gary Eckley Department Traffic City and County of Denver 5440 Roslyn Street, Building E Denver, CO 80216 Robert Kochevar 303-289-5499 Description Installation of fiber optic cable and connections between Alameda and Tejon and the Wastewater Management building at 2000 W. 3rd Avenue. MYR Subsidiary Sturgeon Electric Company, Inc. Subsidiary Location CO Denver, Sturgeon Electric Company, Inc Fall 2002 6 Project History ect Job Number Project Title Project City Percent Complete Completion Date Contract Value to Date 1330 Contract Number COORS FIELD INTERCONNECT Denver, CO Work Type Fiber Optics 100% Facility Type Govemment,Traffic 11/30/1998 Project Mgr Gary Eckley $144,345.61 Department Traffic Owner City & County of Denver 5440 Roslyn Street, Building E Denver, CO 80216 Robert Kochevar 303-289-5499 Description Installation of fiber optic cable. MYR Subsidiary Sturgeon Electric Company, Inc. Subsidiary Location CO Denver, Sturgeon Electric Company Inc Fall 2002 8 Project History Project History Job Number 84843 Contract Number Project Title LEVEL 3 D.C. BUILDOUT Project City Broomfield, CO Work Type Fire Alarm Percent Complete 100% Facility Type Telecommunications Completion Date 4/30/2001 Project Mgr Paddy Moore Contract Value to Date $2,440,000.00 Department Construction Owner Level 3 Communications 1025 Eldorado Blvd. Broomfield, CO 80021 Scott Wilson 720-888-7214 Contractor Kiewit Western Construction 11802 Ridge Parkway Broomfield, CO 80021 Ken Gibson 303-369-5300 Architect Name Holland Basham Architects Architect Address 119 South 49th Avenue Omaha, NE 68132 Architect Phone 402-551-0800 Engineer Name Morrissey Engineering Engineer Address 4327 North 142nd Street Omaha, NE 68164 Engineer Phone 402-491-4144 Description Electrical contracting services for the ultimate buildout of the data center in building 1000. MYR Subsidiary Sturgeon Electric Company, Inc. Subsidiary Location CO Denver, Sturgeon Electric Company Inc Project History Job Number 1321 Contract Number Project Title CDOT 6TH AVENUE ATR'S Project City Denver, CO Work Type Fiber Optics Percent Complete 100% Facility Type Government Completion Date 1/6/1999 Project Mgr Brian Harem Contract Value to Date $822,000.00 Department Traffic Owner Colorado Department of Transportation 2000 South Holly Street Denver, CO 80222 Bill Kascek 303-757-9511 Description Installation of fiber and automatic traffic recorders. MYR Subsidiary Sturgeon Electric Company, Inc. Subsidiary Location AZ Denver, Sturgeon Electric Company, Inc Fall 2002 7 Project History