HomeMy WebLinkAboutRESPONSE - BID - 5742 FIBER OPTIC INSTALLATION AT TRANSFORT (3)BID #5742 FIBER OPTIC INSTALLATION AT TRANSFORT
ADDENDUM #1
Bid Schedule
Contractor will provide all labor, equipment, materials and traffic control to install 24 strand single
mode fiber optic feed to Transfort per specification:
2800 linear feet X $22.25per foot = $ 62, 300.00 TOTAL BASE BID
Firm Name Sturgeon Electric Cajpmy, Inc.
Cor rati%o r, DDB P rtn ship,
Signature 1p
Print Name Richard S. Swartz, vice President
Address 12150 East 112th Avenue
Henderson, CO 80640
Phone/Fax # 303-286-8000 (phone)
303-286-1811 (fax)
ZrApAr4e""
Scope Letter
INCLUSIONS, QUALIFICATIONS AND EXCLUSIONS
Thank you for the opportunity to present you a proposal for work on the above referenced project.
Our proposal includes the electrical work itemized above, with the following inclusions, qualifications and
exclusions. If the scope of work you would like us to quote on differs from the work described above, please
let us know so that our proposal can be modified accordingly.
Inclusions:
1. Performance and payment bond.
2. Plans and specifications dated 4 18-02.
3. Addendum's/revisions number- ONE.
Qualifications:
1. This is a UNIT PRICE PROPOSAL. You agree to make payment to us for the actual quantities of work installed
multiplied by the unit prices shown above. The above quantities are those quantities shown in the
bidding documents and we make no representations as to their accuracy.
2. The Unit Prices quoted include material, equipment, reasonably anticipated labor and applicable taxes.
3. The Unit Prices include the cost of the premiums for performance and payment bonds ONLY if expressly
stated above.
4. Delivery of electrical equipment is typically 12 -14 weeks after return of approved submittals.
5. Delivery of Material equipment is typically 10 .12 weeks after return of approved submittals.
6. Delivery of signal poles is typically 20 weeks after return of approved submittals.
7. The schedule for our work shall take into account the above identified delivery times, or the actual
delivery times for specified materials and equipment, and shall include a reasonable amount of
time for us to complete our work after receipt of the required materials and equipment.
8. Our proposal is conditioned on entering into a subcontract with terms and conditions similar to and
consistent with t
9. Prior to our commencement of our Work, you will notify us in writing of any existing hazardous materials
known or suspected by you or the Owner, on or about the Project. We will not be required to perform
work that involves exposure to hazardous materials or substances. If we encounter hazardous
materials or substances not placed on the Project by our operations, they will be abated or otherwise
remedied before we will proceed with the balance of our Work.
Exclusions:
1. Unit Prices include no overtime and/or shift work.
2. All cutting, patching and removal of concrete and/or asphalt are excluded.
If Sturgeon Electric is the only contractor working at a location where cutting and patching
is required, Sturgeon will provide quantities for pricing.
3. Unless expressly stated above as being included in the Unit Prices all: (1) landscape restoration;
(2) surveying; (3) pavement markings; (4) temporary wiring for construction trailers and/or yards; (5) traffic control,
devices and flagging.
Acceptance:
1. This proposal price is valid for 60 calendar days from the date of this proposal.
Page 2 of 2
Project History
Job Number 1348 Contract Number
Project Title
Project City
Percent Complete
Completion Date
Contract Value to Date
DENVER WASTEWATER
Denver, CO
100%
1/7/1999
$185,427.25
Owner
Work Type Fiber Optics
Facility Type Government
Project Mgr Gary Eckley
Department Traffic
City and County of Denver
5440 Roslyn Street, Building E
Denver, CO 80216
Robert Kochevar
303-289-5499
Description Installation of fiber optic cable and connections between Alameda and Tejon and the
Wastewater Management building at 2000 W. 3rd Avenue.
MYR Subsidiary Sturgeon Electric Company, Inc.
Subsidiary Location CO Denver,
Sturgeon Electric Company, Inc
Fall 2002 6
Project History
ect
Job Number
Project Title
Project City
Percent Complete
Completion Date
Contract Value to Date
1330 Contract Number
COORS FIELD INTERCONNECT
Denver, CO Work Type Fiber Optics
100% Facility Type Govemment,Traffic
11/30/1998 Project Mgr Gary Eckley
$144,345.61 Department Traffic
Owner City & County of Denver
5440 Roslyn Street, Building E
Denver, CO 80216
Robert Kochevar
303-289-5499
Description Installation of fiber optic cable.
MYR Subsidiary Sturgeon Electric Company, Inc.
Subsidiary Location CO Denver,
Sturgeon Electric Company Inc
Fall 2002 8 Project History
Project History
Job Number 84843 Contract Number
Project Title LEVEL 3 D.C. BUILDOUT
Project City Broomfield, CO Work Type Fire Alarm
Percent Complete 100% Facility Type Telecommunications
Completion Date 4/30/2001 Project Mgr Paddy Moore
Contract Value to Date $2,440,000.00 Department Construction
Owner Level 3 Communications
1025 Eldorado Blvd.
Broomfield, CO 80021
Scott Wilson
720-888-7214
Contractor Kiewit Western Construction
11802 Ridge Parkway
Broomfield, CO 80021
Ken Gibson
303-369-5300
Architect Name
Holland Basham Architects
Architect Address
119 South 49th Avenue
Omaha, NE 68132
Architect Phone
402-551-0800
Engineer Name
Morrissey Engineering
Engineer Address
4327 North 142nd Street
Omaha, NE 68164
Engineer Phone
402-491-4144
Description Electrical contracting services for the ultimate buildout of the data center in building
1000.
MYR Subsidiary Sturgeon Electric Company, Inc.
Subsidiary Location CO Denver,
Sturgeon Electric Company Inc
Project History
Job Number
1321
Contract Number
Project Title
CDOT 6TH AVENUE ATR'S
Project City
Denver, CO
Work Type
Fiber Optics
Percent Complete
100%
Facility Type
Government
Completion Date
1/6/1999
Project Mgr
Brian Harem
Contract Value to Date
$822,000.00
Department
Traffic
Owner
Colorado Department of Transportation
2000 South Holly Street
Denver, CO 80222
Bill Kascek
303-757-9511
Description Installation of fiber and automatic traffic recorders.
MYR Subsidiary Sturgeon Electric Company, Inc.
Subsidiary Location AZ Denver,
Sturgeon Electric Company, Inc
Fall 2002 7
Project History