Purchasing Division
CITY OF FORT COLLINS
City of Fort Collins INVITATION TO BID
BID #5738
LEMAY AVENUE POTHOLING
BID OPENING: OCTOBER 14, 2002, 2:30P.M. (our clock)
Sealed bids will be received and publicly opened at the office of the Director Of Purchasing and
Risk Management, PO Box 580, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80522,
at the time and date noted on the bid proposal and/or contract documents. If delivered, they are
to be sent to 215 North Mason Street, 2"d Floor, Fort Collins, Colorado 80524. If mailed, the
address is P.O. Box 580, Fort Collins, 80522-0580.
Bids must be received at the Purchasing Office prior to 2:30p.m. (our clock), October 14,
2002.
A copy of the Bid may be obtained as follows:
Call the Purchasing Fax -line, 970-416-2033 and follow the verbal instruction to
request document #25738. (The bid number must be preceded by a 2 when
using the Fax -line.)
2. Download the Bid from the Purchasing Webpage, Current Bids page, at:
www.fcgov.com/purchasing.
3. Come by Purchasing at 215 North Mason St., 2nd floor., Fort Collins, and
request a copy of the Bid.
Special Instructions
All bids must be properly signed by an authorized representative of the company with the legal
capacity to bind the company to the agreement. Bids may be withdrawn up to the date and hour
set for closing. Once bids have been accepted by the City and closing has occurred, failure to
enter into contract or honor the purchase order will be cause for removal of supplier's name
from the City of Fort Collins' bidders list for a period of twelve months from the date of the
opening. The City may also pursue any remedies available at law or in equity. Bid prices must
be held firm for a period of forty-five (45) days after bid openings.
Submission of a bid is deemed as acceptance of all terms, conditions and specifications
contained in the City's specifications initially provided to the bidder. Any proposed modification
must be accepted in writing by the City prior to award of the bid.
Only bids properly received by the Purchasing Office will be accepted. All bids should be clearly
identified by the bid number and bid name contained in the bid proposal.
No proposal will be accepted from, or any purchase order awarded, to any person, firm or
corporation in default on any obligation to the City.
215 North Mason Street - 2nd Floor - P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 - FAX (970) 221-6707
Traffic Control Devices shall be measured and paid for under this section based upon a lump
sum pay item.
In the event of a conflict between the MUTCD criteria and the City's criteria, the City's criteria
shall govern.
Traffic control devices shall be placed and/or stored in the City right-of-way in such a manner
that minimizes the hazards to pedestrians, bicyclists and vehicles. Proper placement and
storage of traffic control devices will be subject to the Engineer's discretion.
Traffic control devices shall be removed from the site immediately upon completion of the Work,
but not before the concrete has cured sufficiently to allow vehicular traffic to use it.
Subsection 630.02 shall include the following:
All traffic control devices placed for this project must meet or exceed the minimum standards set
forth in the MUTCD. All traffic control devices shall be clean and in good operating condition
when delivered and shall be maintained in that manner on a daily basis. All traffic control
devices shall be clearly marked and free of crossed out information or any other form of
defacement that detracts from the purpose for which they are intended (i.e. crossed out
information, information written in long -hand style, etc.)
Additionally, any sign blank with sign faces on both sides must have the back sign face covered
when in use to avoid confusion to motorists traveling in the opposite direction and other
potentially affected parties, such as residents affected by any information the sign may present.
Subsection 630.05, the second paragraph shall include the following:
The reflective material shall be AP1000 Polyester (Reflexite Corporation), 3M Type III or
Transparent (Reflexite Corporation). Vinyl material is not acceptable unless its brightness is
equivalent to or greater than the types named as approved by the Engineer.
Subsection 630.08 shall be revised as follows:
Traffic control on this project is the responsibility of the Contractor and included in the
lump sum potholing cost.
For this project, a Traffic Control Plan shall be prepared. The Traffic Control Plan shall be
submitted for approval to the Traffic Division by 12:00 noon, two working days prior to
the commencement of work.
(Note: Traffic Control Plans for work done on Monday and Tuesday shall be submitted
the previous Friday by 9:00 a.m.). Facsimiles of plans shall not be allowed. No phase of the
construction shall start until the Traffic Control Plan has been approved.
The Traffic Control Plan shall include, as a minimum, the following:
(1) A detailed diagram which shows the location of all sign placements, including advance
construction signs (if not previously approved), fines doubled for speeding signs and
mil]
speed limit signs; method, length and time duration for lane closures, and location of flag
persons.
(2) A tabulation of all traffic control devices shown on the detailed diagram including, but not
limited to: construction signs; vertical panel; vertical panel with light; Type I, Type ll, and
Type III barricades; cones; drum channeling devices; advance warning flashing or
sequencing arrow panel. Certain traffic control devices may be used for more than one
operation or phase. However, all devices required for any particular phase must be
detailed and tabulated for each phase.
(3) Number of flaggers to be used.
(4) Parking Restrictions to be in affect
Approval of the proposed method of handling traffic is intended to indicate minimum devices
needed to control traffic. Such approval does not relieve the Contractor of liability specifically
assigned to him under this contract.
Failure to have an approved Traffic Control Plan, including the Parking Restriction information
listed above shall constitute cause for the City to stop work, as well as the Contractor's forfeiture
of payment for all work and materials at that location, with no adjustment in the contract time.
Subsection 630.09 shall be revised as follows:
Traffic Control Management shall be performed by a Traffic Control Supervisor (TCS). The
TCS(s) shall possess a valid Driver's License, a current American Traffic Safety Services
Association (ATSSA) certification as a Worksite Traffic Control Supervisor or Colorado
Contractor's Association (CCA) certification as a Traffic Control Supervisor. (Proof of
certification shall be presented to the City Traffic Control Manager, and when requested by a
City representative, for each TCS utilized on this project.)
One TCS shall be designated as the Lead TCS. The Lead TCS shall have a minimum of
one-year experience as a certified TCS. The Lead TCS shall be on site at all times during
the construction. Qualifications shall be submitted to the Engineer for approval a
minimum of one week prior to commencement of the work.
The Lead TCS shall be equipped with a cellular phone. The cost of this phone shall be
incidental to the work. The Lead TCS cellular phone number will be made available to the
Engineer, Inspector, and the General Contractor
It is the intent of the specifications that the Lead TCS be the same person throughout the
project. If the Lead TCS is to be replaced during the project, the Engineer shall be given
a minimum of one (1) weeks notice and qualifications shall be submitted for approval of
the Lead TCS replacement.
Payment for the TCS shall be included in the lump sum pay item.
The TCS's duties shall include, but not be limited to:
11
(1) Preparing, revising and submitting Traffic Control Plans as required.
(2) Direct supervision of project flaggers.
(3) Coordinating all traffic control related operations, including those of the Subcontractors,
City Streets Department, and suppliers.
(4) Coordinating project activities with appropriate police and fire control agencies,
Transfort, school districts and other affected agencies and parties prior to construction.
(5) Maintaining a project traffic control diary which shall become part of the City's project
records.
(6) Inspecting traffic control devices on every calendar day for the duration of the project.
(7) Insuring that traffic control devices are functioning as required.
(8) Overseeing all requirements covered by the plans and specifications, which contribute to
the convenience, safety and orderly movement of traffic.
(9) Flagging.
(10) Setting up and maintaining traffic control devices.
(11) Attending weekly progress meetings as requested by the Engineer and/or Contractor.
All traffic control devices shall be placed under the supervision of a Traffic Control Supervisor.
The Traffic Control Supervisor shall have up to date copies of the City of Fort Collins' "Work
Area Traffic Control Handbook", and Part VI of the MUTCD, pertaining to traffic controls for
street and highway construction, available at all times.
Subsection 630.13 shall be revised as follows:
Traffic control on this project is the responsibility of the Contractor and included in the
lump sum potholing cost.
The Contractor shall supply and pay all costs associated with the traffic control for this project.
Flaggers and all incidental equipment will not be measured and paid for separately, but shall
be included in the Work.
The flaggers shall be provided with electronic communication devices when required. These
devices will not be measured and paid for separately, but shall be included in the Work.
The cost of batteries, electricity and/or fuel for all lighting or warning devices shall not be paid
for separately but shall be considered subsidiary to the item and shall be included in the Work.
Sandbags will not be measured and paid for separately, but shall be included in the Work.
IPA
The Contractor may provide larger construction traffic signs than those typically used in
accordance with the MUTCD, if approved; however, no additional payment will be made for the
larger signs.
The City shall not be responsible for any losses or damage due to theft or vandalism.
SPECIAL CONDITIONS FOR WORK ON ARTERIALS AND COLLECTORS
NOTE: Cross street traffic shall be maintained at all times unless authorized by the Engineer in
writing.
NOTE: Full closures on arterials and collectors, including those listed above, will be allowed
under extreme circumstances and only upon approval by the Engineer and City Traffic Division.
Plans shall be approved a minimum of one week prior to the commencement of work and/or the
time required to adequately notify the public through the media.
SPECIAL CONDITIONS FOR WORK ON RESIDENTIAL STREETS
NOTE: Full closures on all residential streets shall be allowed as shown on the traffic control
plans oniv if approved by the City Traffic Division.
NOTE: Full closures on arterials and collectors, including those listed above, will be allowed
under extreme circumstances and only upon approval by the Engineer and City Traffic Division.
Plans shall be approved a minimum of one week prior to the commencement of work and/or the
time required to adequately notify the public through the media.
SPECIAL CONDITIONS FOR WORK ON RESIDENTIAL STREETS
NOTE: Full closures on all residential streets shall be allowed as shown on the traffic control
plans only if approved by the City Traffic Division.
`s]
Bids must be furnished exclusive of any federal excise tax, wherever applicable.
Bidders must be properly licensed and secure necessary permits wherever applicable.
Bidders not responding to this bid will be removed from our automated vendor listing for the
subject commodities.
The City may elect where applicable, to award bids on an individual item/group basis or on a
total bid basis, whichever is most beneficial to the City. The City reserves the right to accept or
reject any and all bids, and to waive any irregularities or informalities.
Sales prohibited/conflict of interest: no officer, employee, or member of City Council, shall have
a financial interest in the sale to the City of any real or personal property, equipment, material,
supplies or services where such officer or employee exercises directly or indirectly any decision -
making authority concerning such sale or any supervisory authority over the services to be
rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift,
gratuity, favor, entertainment, kickback or any items of monetary value from any person who
has or is seeking to do business with the City of Fort Collins is prohibited.
Freight terms: unless otherwise noted, all freight is F.O.B. Destination, Freight Prepaid. All
freight charges must be included in prices submitted on proposal.
Discounts: any discounts allowed for prompt payment, etc., must be reflected in bid figures and
not entered as separate pricing on the proposal form.
Purchasing restrictions: your authorized signature of this bid assures your firm's compliance
with the City's purchasing restrictions. A copy of the resolutions are available for review in the
Purchasing Office or the City Clerk's Office. Request Resolution 91-121 for cement restrictions.
Collusive or sham bids: any bid deemed to be collusive or a sham bid will be rejected and
reported to authorities as such. Your authorized signature of this bid assures that such bid is
genuine and is not a collusive or sham bid.
Bid results: for information regarding results for individual bids send a self-addressed,
self -stamped envelope and a bid tally will be mailed to you. Bid results will be posted in our
,;.office 7 days after the bid
�op^ening..� .
a s B. O'Neill II, CPPO, FNIGP
it ctor of Purchasing and Risk Management
2
CITY OF FORT COLLINS
BID PROPOSAL
BID #5738
BID OPENING: OCTOBER 14. 2002 2:30 p.m. (our clock)
WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS' REQUIREMENTS
FOR LEMAY AVENUE POTHOLING PER THE BID INVITATION AND ANY REFERENCED
SPECIFICATIONS:
The City of Fort Collins is requesting bids for a Contractor to provide all equipment, labor,
materials and traffic control deemed necessary to perform utility locating for the City
Engineering Department. The limits of the Lemay Avenue utility survey are Trilby Road to the
south and Muirfield Way to the North. The construction elevations of all located lines will be
potholed every 100-ft for bidding purpose only. Water and sewer will be excluded. The
attached plan sheets show the locations of the following needs: Nineteen (19) holes will be
required in existing asphalt roadway; these potholes will need to be flow filled, patched and
traffic control will be necessary. Sixty Two (62) holes will be needed in a temporary 4-inch
asphalt sidewalk; these potholes will need to be flow filled and asphalt patched. The contractor
will be responsible for maintaining pedestrian access and safety in regard to the City of Fort
Collins specifications. Eighty (80) holes will be required in the existing ground and flow filled
back to existing elevation. There will be no required traffic control for this operation. In addition
to the above mentioned we need a unit price for any additional potholes in the roadway,
sidewalk or in the open dirt, and the flow fill and asphalt patch as stated above.
Work must be substantially complete by November 8, 2002. Awarded contractor must name the
City of Fort Collins as an additional insured as required in Exhibit "B" and sign the attached
Service Agreement.
A pre -bid meeting is scheduled for October 2, 2002 at 1:00 p.m. on site (golf course access
road, 6090 South Lemay Avenue), if bad weather meeting will be at 215 North Mason, 2Id Floor,
Conference Room 2A.
For technical questions, call Scott Woodruff, Project Manager or Quentin Egan, Project
Manager at 970-221-6605.
For purchasing questions, call John Stephen, Senior Buyer, CPPB, at 970-221-6775.
3
BID SCHEDULE
Spec/Item
Number
Description
Contract
Quantity
Unit
Lemay Avenue Utility
Survey Pro'ect
203-01
Utility Survey
1
LUMP
SUM
Additional unit prices for potential extra work
203-01a
Pothole in asphalt roadway
(including traffic control, flow fill and
asphaltpatch)
1
EA
203-01 b
Pothole in asphalt sidewalk
(including pedestrian control, flow
fill and asphaltpatch)
1
EA
203-01 c(including
Open ground pothole
flow fill
1
EA
Lump Sum In Words
Firm Name
(Are you a corporation, DBA, Partnership, LLC, PC)
Signature PRINTED
Title
Address
Phone/Fax
SECTION 01010
SUMMARY OF WORK
1.1 DESCRIPTION OF WORK
A. The Work shall consist of the construction of the outlined improvements:
Potholing utilities for the widening of South Lemay from the Fossil Creek Bridge to Trilby
Road. This will be a Lump Sum contract based on the following improvements.
Lemav Improvements:
The construction elevations of all located lines will be potholed every 100-ft for bidding ur ose
only. Water and sewer will be excluded. The attached plan sheets show the locations of the
following needs: Nineteen (19) holes will be required in existing asphalt roadway; these
potholes will need to be flow filled, patched and traffic control will be necessary. Sixty Two (62)
holes will be needed in a temporary 4-inch asphalt sidewalk; these potholes will need to be flow
filled and asphalt patched. The contractor will be responsible for maintaining pedestrian access
and safety in regard to the City of Fort Collins specifications. Eighty (80) holes will be required
in the existing ground and flow filled back to existing elevation. There will be no required traffic
control for this operation. In addition to the above mentioned we need a unit price for any
additional potholes in the roadway, sidewalk or in the open dirt, and the flow fill and asphalt
patch as stated above.
B. Protection and Restoration.
1. Replace to equal or better conditions all items removed and replaced or damaged during
construction. Restore all areas disturbed to match surrounding surface conditions. The
Owners Field Representative must approve the condition of all replaced and/or restored
areas prior to final payment.
NOTICES TO PRIVATE OWNERS AND AUTHORITIES
The following items shall be coordinated between the Contractor and the Owners Field
Representative.
A. Notify private owners of adjacent properties, utilities, irrigation canals, and affected
governmental agencies when prosecution of the Work may affect them.
B. Give notification 48 hours in advance to enable affected persons to provide for their
needs when it is necessary to temporarily deny access or services.
C. Contact utilities at least 48 hours prior to excavating near underground utilities.
D. Contact all agencies at least 72 hours prior to start of construction. Notify all agencies of
the proposed scope of work schedule and any items, which would affect their daily
operation.
E. Names and telephone numbers of affected agencies and utilities in the area are listed
below for Contractor's convenience.
UTILITIES
One Call 1-800-922-1987
Traffic Control Syl Mireles 970-221-6815
SECTION 01310
CONSTRUCTION SCHEDULES
1.1 GENERAL
A. The contractor shall prepare a detailed schedule of all construction operations and
procurement after review of tentative schedule by parties attending the pre -construction
conference. This schedule will show how the contractor intends to meet the milestones
set forth.
1. No work is to begin at the site until Owner's acceptance of the Construction Progress
Schedule and Report of delivery of equipment and materials.
1.2 FORMAT AND SUBMISSIONS
Prepare construction and procure schedules in a graphic format suitable for displaying
scheduled and actual progress.
B. Submit two copies of each schedule to Owner for review.
Owner will return one copy to Contractor with revisions suggested or necessary for coordination
of the Work with the needs of Owner or others.
1.3 CONTENT
A. Construction Progress Schedule.
1. Show the complete work sequence of construction by activity and location.
2. Show changes to traffic control.
B. Equipment, Materials and Submittals schedule.
Show delivery status of critical and major items of equipment and materials
1.5 OWNER'S RESPONSIBILITY
Owner's review is only for the purpose of checking conformity with the Contract Documents and
assisting the Contractor in coordinating the Work with the needs of the Project.
B. It is not to be construed as relieving Contractor from any responsibility to determine the
means, methods, techniques, sequences and procedures of construction as provided in
the General Conditions.
SECTION 01510
TEMPORARY UTILITIES
C
1.1 UTILITIES
A. Furnish all utilities necessary for construction.
B. Owner will furnish water in reasonable amounts for execution of the work at existing fire
hydrants without charge to Contractor. The Contractor shall coordinate and schedule
with the Owners' Field Representative for the Water Department to select the
appropriate fire hydrant and set the hydrant meter.
C. Make arrangements with Owner as to the amount of water required and time when water
will be needed.
1. Owner will fix the place, time, rate and duration of each withdrawal from the distribution
system.
2. Unnecessary waste of water will not be tolerated.
D. Furnish necessary water trucks, pipes, hoses, nozzles, and tools and perform all
necessary labor.
1. Only Owner shall operate existing valves and hydrants.
1.2 SANITARY FACILITIES
A. Contractor shall furnish temporary sanitary facilities at each site for the needs of
construction workers and others performing work or furnishing services on the Project.
B. Contractor shall properly maintain sanitary facilities of reasonable capacity throughout
construction periods.
C. Contractor to enforce the use of such sanitary facilities by all personnel at the site.
D. Place facilities out of public view using the greatest practical extent.
SECTION 01580
TRAFFIC REGULATION
1.1 TRAFFIC CONTROL
A. The traffic control for this project shall be the responsibility of the Contractor.
Traffic control is defined as those devices necessary to channelize vehicular and
pedestrian traffic through the project.
B. The Contractor and/or Traffic Control Contractor must submit traffic control plans and
coordinate all traffic control with the City's Traffic Control Coordinator. The traffic control
plans must be submitted and approved 72 hours prior to starting construction and
before making each modification.
C. Conformance: City of Fort Collins Work Area Traffic Control Handbook, Manual of
Uniform Traffic Control Devices (U.S. Dept. of Transportation), or applicable statutory
requirements of authority having jurisdiction.
rA
D. The traffic access/control plan limitations for handling traffic for this project are described
below.
Work hours under traffic — (9:00 AM to 2:30 PM, Traffic opened by 3:00 PM)
Lemay Avenue: Minimum of one lane in the North and South bound direction.
Lemay Avenue and Trilby Road: Restricted turn movements from either road.
Local Business Access: Local Access must be maintaimed at all times — can be closed
for short periods of time
Local Street Access: Local street access must be maintained at all times - can be closed
for short periods of time.
E. Vehicle, bike and pedestrian access to all side streets and private drives shall be
maintained at all times. The Contractor will develop an access control plan in
coordination with adjacent property owners, and submit it in conjunction with the traffic
control plan to the Engineer for approval prior to the start of any Work. Pedestrian traffic
shall be maintained at all times, utilizing temporary sidewalks when necessary.
F. The Contractor must work with the adjacent residents to provide and maintain sufficient
access for them during the duration of the project. It will be the Contractors
responsibility to coordinate and communicate with the residents during construction.
G. The Contractor must maintain, at their cost, access to all businesses during their
business hours. It will be the Contractors responsibility to coordinate and communicate
with the businesses during construction.
H. The Contractor shall keep traffic areas free of excavated material, construction
equipment, pipe, and other materials and equipment.
The Contractor shall keep fire hydrants and utility control valves free from obstruction
and available for use at all times.
The Contractor shall provide and maintain, at their cost, temporary driveway approaches
on driveways open to traffic at all times to insure that the approaches are smooth,
compacted, and will not prohibit or inhibit the use of the driveway. The driveway
approaches must be maintained seven days a week. In the case of bad weather the
Contractor must repair the driveways immediately following the storm and must work to
maintain access during the storm.
1.2 WORK AREA SAFETY
A. The Contractor shall maintain a safe work area and protect area residents, motorists,
bicyclists, pedestrians, and children from work area hazards.
B. The Contractor shall provide all work area safety control devices, such as barricades
and safety fence around all excavations and drop-offs.
C.
equipment should be included in the lump sum cost
work area safety control devices.
SECTION 01720
PROJECT RECORD DOCUMENTS
1.1 GENERAL
A. Maintain at the site one record copy of:
Recorded field measurements.
for separately. Cost for this
the work items which will require
REVISION OF SECTION 403
HOT BITUMINOUS PAVEMENT
Section 403 of the Standard Specifications is hereby revised as follows:
Subsection 403.01 is revised to include the following:
Flow fill and temporary 4" asphalt patch — The holes used to locate the utilities within asphalt
sections shall be flow filled and then capped with a 4" temporary asphalt plug. All other holes
shall be flow filled to existing grade.
Subsection 403.05 is revised to include the following:
Payment will be made under:
Pavement Flow fill and 4" asphalt patch on this project is the responsibility of the
Contractor and included in the lump sum potholing cost.
REVISION OF SECTION 630
TRAFFIC CONTROL DEVICES
Section 630 of the Standard Specifications is hereby revised as follows:
Subsection 630.01 shall be revised as follows:
This work shall consist of furnishing, installing, moving, maintaining and removing temporary
traffic signs, advance warning arrows panels, barricades, channeling devices, and delineators
as required by the latest revision of the "Manual on Uniform Traffic Control Devices for Streets
and Highways" (MUTCD), the City of Fort Collins' "Work Area Traffic Control Handbook", June
1989 with Revisions dated May 29, 1991, and the City of Fort Collins' "Design Criteria and
Standards for Streets, Subsection 1.4, "Barricades, Warning Signs, Signal Lights", July, 1986.
This work includes use of the above devices to channelize or direct traffic away from the work
zone, but does not include work zone protection. It is the Contractor's responsibility to protect
his work zone and to protect Pedestrians and Bicyclists from potential hazards arising from his
work until such time as the work has been completed and can be opened to traffic.