HomeMy WebLinkAboutRESPONSE - BID - 5723 HOMESTEAD PARKSECTION 00300
BID FORM
PROJECT: HOMESTEAD PARK; BID NO. 5723
Place cbktylS 1�
Date j_ 21_n
1. In compliance with your Invitation to Bid dated '%�?j-Q a
and subSD'ect.to all conditions thereof, the undersigned
< a **(Corporation, L' -
** authorized to do
business in the State of Colorado hereby proposes to furnish and do
everything required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certifiedor cashier's check or standard Bid bond
in the sum of S�y-� /a ($
in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows: pyl �}ty �5 �i-mr�Mo n LdLp
a31-7J-VU��IVai0V- U tBiuS. 1 L1 IP< ..
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through _�-
7/96 Section 00300 Page 1
r
11075 Maple Road
Lafayette, CO 80026
Phone: 303-666-5002
Fax: 303-666-7300
W. J. Shirley, Inc.
O"ec"" List public works projects completed by contractor.
Rocky Rklgs Park Renovation
■ 16200 E. Mississippi, Aurora, CO 80017
■ City of Aurora, Parks Planning and Design, John Sawatzke (303)739-
7160
• City of Aurora, Architect
■ $481,660.08, project is 100% complete, 50%by WJS, Inc.
al O&WAray Park Nie ter and Kkieks
■ 5520 Poudre Canyon Hwy, Bellevue, CO 80512
■ City of Ft. Collins Parks Dept., Jeff Lakey (970)416.2260
■ City of Ft. Collins, Architect
■ $47,772.00, project is 100% complete 11-16-01, 100% by WJS, Inc.
CDOT YYlg h Rest Area BWMft
■ 5113 Hwy 6, Wiggins, CO 80664
■ QAorado Department of Transportation, Brad Pierce (970) 522-0481,
subcontractor to Concrete Works of Colorado, Aaron (303) &%.8075
■ Barker, Rinker, Seacat Architect, Keith Hayes (303)41 1366
■ $770,349.60, project is 100% complete 10-1-01, 50% by WJS, Inc.
Ookkm Bate Canyon Btate Park, Employee housing Buiknng,
ResUoom 8updki% Adnilidshation RemodN, Cabins and Traft
■ 3873 Hwy 46, Golden, CO 80403
■ Colorado State Parks, Maio Sandoval (303)582-5998
■ Robert Shreve Architect (970)346-0151
■ $1,233,289.77 project is 100% complete, 50% by WJS, Inc.
BJAA Park Restroan Building
■ 1220 Longs Peak, Brighton, CO 80601
■ City of Brighton Parks Dept., Mark Heidt (303)665-2170
■ Architecture Unlimited (303)654-1751
■ $104,283.20, project is 100% complete 9-11-00, 75% by WJS, Inc.
Case De la Esperanra Co mmurdty Center Add doNRemodel
■ 1520 S. Emery, Longmont, CO 80501
■ Boulder Courdy Housing Auttrortty, Soott Simkus (303)441-1707
■ Dale Shreve, Architect (303)494-7567
■ $247,697.66, project is 100% complete 831-00, 50Dk by WJS, Inc.
Thondon PmdYmrs and Berrclws
■ Cherry Park, Yorkbororgh Park and North Star Park, Thornton, CO
■ City of Thornton, Jack Mulha ll (303)255-7842
■ Land Architects (303)734-1777
■ Approx. $210,000, project is 100% complete 7-31-00, 60% by WJS, Inc.
Stonegate Pool Deck and Sheiter Addition
■ 10326 Stonegate Parkway, Parker, CO
■ Stonegate Metropolitan District, Wayne Monson (303)779-4525
■ James E. Moorhead, Architect (303)790-8065
• $53,500 project is 100% complete 430-00, 90% by WJS, Inc.
Apache Mesa Park Renovation
■ 710 Laredo St., Aurora, CO 80012
■ City of Aurora, Dept. of Parks and Planning,Tracy Young (303)739-7166
■ $166,132.85 project is 100% complete 1031-99, 40% by WJS, Inc.
SerkNe Rock Shade Shelters
• 22251 E. Ridge Trail Drive, Aurora, CO 80016
■ Lost Shoe Metropolitan District
■ Bob Welton, Architect, Knudson Gloss Architects, (303)4425882
■ $92,232.85 project is 100% complete, 8-1-99, 500/6 by WJS, Inc.
Saddle Rods Coneraarity Center
■ 22251 E. Ridge Trail Drive, Aurora, CO 80016
■ Lost Shoe Metropolitan District
■ Bob Welton, Architect, Knudson Gloss Architects, (303)4425882
■ $648,181.01 project is 100% complete, 8-1-99, 50% by WJS, Inc.
Pkeroer Park Pavllim BuNdng
■ 12020 W. &A Avenue, Arvada, CO 80004
■ North Jeffco Park and Recreation District, Marshall Masek (303)403-2528
■ Jane Douglas/Jim Johnson, Architect, JG Johnson (303)892-7062
■ $218,895.50 project was completed April 1999, 50% by WJS, Inc.
Parist Park Restroorn Replacement
■ 719 le Avenue, Golden, CO 80401
■ 8 Hof Golden, Parks and Recreation Dept., Charlie Fagan (303)384-
■ Dave Anderson, Architect, Andrews & Anderson (303)278.4378
■ $149,790.18 project was completed Sept. 1998, 80% by WJS, Inc.
Cornerstone Park Shelter with Reabooms
■ 5150 Windemere, Englewood, CO 80M
■ City of Littleton, South Suburban Park and Recreation District
■ David L. Slips, Architect, City of Littleton (303)798-5131
■ $113,228.70 project was completed June 1998, 80% by WJS, Inc.
Radium 97- Permanent Toilets
■ Radium Recreation Area, Grand County, CO
■ Bureau of Land Management,2850 Youngfield St., Lakewood, CO 80215
■ Paul Paterson, BLM (970)244-3173
■ $55,000, project was completed March 1998, 100% by WJS, Inc.
Mountain View Ballfield Renovation
■ South Roosevelt Street, Loveland, CO 80537
■ City of Loveland, Park and Recreation Department
■ Jerry Adamson, Architect, City of Loveland (970)962-2451
■ $181,569.48 Completed on 7-28-97, 30% by WJS Inc.
Harlow Pool Sun Shelter
■ 5151 S. Lowell, Littleton, CO 80121
■ South Suburban Parks and Recreation District, Littleton, CO
■ Peggy Golden -Administrator, (303) 7985131, Jim Moorehead -Architect
■ $18,555 Completed on 7397, 70% by WJS, Inc.
11075 Maple Road
Lafayette, CO 80026
Phone: 303-666-5002
Fax: 303-666-7300
W. J. Shirley, Inc.
0"eco" List of projects in progress by contractor.
Summit County Bike Path and Pedestrian Bridge, Breckenridge, CO,
Summit County Government Parks and Recreation Dept., P.O. Box 5660,
Frisco, CO 80443, Tetra Tech, Inc., Steve Tice 970453-6394 $288,000
completion 630.02
e Tanglewood Sports Park and Restroom Building, Golden, CO, Prospect
Park and Recreation District, 4198 Xenon St., Wheat Ridge, CO 80033,
Hwdey. Saftury & Associates, Broke Huxley, 303643-0204, $315,250
completion 531-02
, ,9 The Ridge at West Meadows Conte Building and Park
Improvemerrts, Foothills Park and Recreation District, 6612 S. Ward SL,
Littleton, CO 80127, Colin Insley 303409-2304, McLaughlin Water
Engineers, Mike Gakazi 303 458.6550, $900,320.45 completion 7-31-02
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned W.J. SHIRLEY, INC.
--�`� as Principal, and CONTRACTORS BONDING AND INSU
Surety, are hereby held and firmly boTRAund unto the Cit SCE COMPANY sa as OWNER, :in the sum of $ ** Y of Fort Collins Colorado
Truly to be made, we hereb for the payment of which, well and
assigns. **FIVE PERCENT jointly and severally bind ourselves, successors,
i ) OF THE TOTAL AMOUNT OF THE BID and
THE CONDITION of this obligation submitted to the Cit g is such that whereas the Principal made a — '�of Fort Collins Colorado pal has
Part hereof to enter into a the accompanying Bid and hereby
of Fort Collins Project, E Construction Agreement for 7 HOMESTEAD PARK; BID NO. 5723 the construction
NOW THEREFORE,
(a) if said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver
a Contract in the form of Contract attached hereto (properly completed accordance with said Bid) and shall. furnish a BOND
performance of plated in
said Contract, and for a for his faithful
labor or furnishing materials in connection ntherewith, persons performing
other respects perform the Agreement created b and shall in then this obligation shall y the acceptance of said Bid, force and Pffect, be void; otherwise the same shall re
liability of the Surat being expressly understood and agreed
main in
event, Y for any and all claims that the
exceed the penal amount of this hereunder shall, in no
obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
ex said Surety and its BOND shall be in no way impaired oz affected
extension of the time within which the OWNER may accept such Bi
does hereby waive notice of by any
any such extension. d% and said Surety
Surety Companies executing bonds must be State of Colorado and be accepted by the OWNER.
authorized to transact business
in the
7/96
Section 00410 Page 2
IN WITNESS WHEREOF, the Principal and the Surety have hereunto
and seals this 25THday of JULY set their hands
corporations have caused their corporate seals to be heretoch Of affixed ndatheare
se
presents to be signed by their proper officers, the day and year first set forth
above.
1. PRINCIPAL
Name: W.J. SHIRLEY, INC
Address: 11075 MAPLE ROAD
LA FAYETTE, CO 80026
By
.�Ifir�►
A
S
1..MLf
7/96
SURETY
CONTRACTORS BONDING AND INSURANCE COMPANY
23172 PLAZA POINTE DRIVE NO. 185
LAGUNA HILLS, CA 92653
By. ---
Title: LINDA D. COATS, ATTORNEY IN FACT
(SEAL)
Section 00410 Page 3
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
State of California
County of
ORANGE
I ss.
On JUL 2 5 2002 before me, CHRISTINE M. RAPP, NOTARY PUBLIC
Date Name and Tille of officer (e.g., •Jane Doe, Notary Public') '
personally appeared LINDA D. COATS
Name(a) of Signere) '
IN personally known to me
❑ proved to me on the basis of satisfactory
evidence
to be the person(s) whose name(s) is/are
subscribed to the within instrument and
acknowledged to me that he/she/they executed
CHRISTINE M. RAPP the same in his/her/their authorized
ac COMM. #1267189 capacity(ies), and that by his/her/their
NOTARV %1BLIC-CALIFIX2NIA �_
oRaNcecouNrr signature(s) on the instrument the person(s), or
My Comm. Exp. July 9. 2004 the entity upon behalf of which the person(s)
acted, executed the instrument.
WITNESS my hand and official se
�l� I Ni(livl D J
Place Notary Seal Above $ignaNre of Notal Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title or Type of Document:
Document Date:
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer
Signer's Name:
❑ Individual
❑ Corporate Officer — Title(s):
❑ Partner —❑ Limited ❑ General
❑ Attorney in Fact
❑ Trustee
❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
Number of Pages:
RIGHT THUMBPRINT
OF SIGNERLl
0 1999 National Notery Aeeow9on • 9050 De SotoAre.. P.O. M. 2 0 • CNhwonh, CA 91013200E • avrx.ne9delmbryory Prod No. S90) eemder. Cell Toil -Free 1.90De)64B2r
III:.I1) l1 KLFI'IJ.1 lu lot' med only 10111 lift, hunt/ %pt,cificd lu-rt,in
Certificate of Appointment and Resolutions of the Board of Directors
The undersigned President and Secretary of Contractors Bonding and Insurance Company hereby certify that the
President has appointed the Atlomi,m)-in fact identified on the front side of this power of attorney, under and by
the authority ill the foltow!Wg ,<,iuNoru adopted by Lite Board of Dnectors of Contractors Bonding and Insurance
Company at a meeting duly hell! on !)cccmbcr 15, 1993:
RlSOP,'i(I>, that I htrc idcrll, I, M, any Vice President, Sc( it of any Assistant
Secretary, and any other cu plover :u Inay he specifically authorized a by parlicular board re;olUdOII
(hereafter "At thorized (Mit t I err t,mpIoy, c") may appoint attorneys -in -fact or agents with authority
as delined or limited III thr imanunent evidencing the appointment in each cdsc, !or and on behalf of
the C'otnpaM, to e.vuruk .:nd (H ices .u),i I lo, the seal of [Ile Company to hond,, undertakings,
I Ii/annu ccs, ari sret)ship oollgatIoI "of all kinds ana d ny Authorized Otfko cr r m Il:IpIoyce ay
remove any such attorney -in -fact or agent and revoke any power of attorney previously granted to
such pe(son.
Rh5 )I,VIi1) P1, 1I:I111 R, That 111v hoed nndertaking, recognizance,('I "mtyshtpohligahonshall
be valid and binding upon the ('onipan)
(i) when •'ignckl by [lie (utthor zed 011icer or Employee and mil i,'d and sealed (it a seal
he rrrluirr�?); of
(d) when sighed by the Authorized officer or Employee, and countersigned and sealed
(if it seal be re(Juired) by a duly authorized attorney -in -fact or agent; or
(iii) when duly c'xeruted and sealed (if a seal be required) by one or more attorneys-in-
ftict or agents pursuant to and within the limits of the authority evidenced by the
power of attol lick issued by the Company to such person or persons.
ItESOI V!,l) I (JP It 11,R, Iha[ I her signahne of any Authorized Otficer or Employee and the seat of
the Company ncty be alfi s.ed by lacsinllic to any power of attorney or certification thcreaf authorizing
the execution and deli` elv of sop bond, undertaking, recognizance, or other suretyship obligations of
the COMINIny (unless olhctwisespecilied in the power of attorney itself); and such signature and seat
When so used shall hav I. Irre same force and effect m though manually affixed.
RP.SOI.VI'.I) I UP I I II.R, that all previous resolutions ofthe Board of Directors concerning powers
of attorney and allonx v s-In-tact remain io hull force and effect; that all forms of powers of attorney
previously or ill the luture approved by the Board of Directors, including, but not invited to, so called
"fax or tacs!milc powers Ol attorney", where the entice power of attorney is a tacsimile, remain in full
force and effect; and that one form of it power of attorney may be attached to one bond (for example,
the form for which 111i1: re SOiLlliun is a part may be attached to a bid bond), and another form of power
of attorney may be attached to another bond (tot example, a fax power of attorney may be attached to
the final bond for a proje(! Iol which the different form of power was attached to the hid bond)
without affcI.i t;� till .. 11.I,t pr„crofattorney or hand.
IN WI I NI.SS V, f 11(R1 OI ,rants❑+ ton I;on(ling a1)(I Insurance (:on)pany has Qlll9ed these presents to Ile signed
by its piesiclent and xr .I,,. ,t post" r;c;tl to he hcrcunto affixed this kst day of lanuary, 1994.
9'" `Iv�wi 1 ones, IRrt� Altetil
State of Washington --
County of Kine,
Nevin I.. IyIxclt, Secretary
On January Ist, 1994 holoIc nu, ft!oIIy !A. I ludspe[h Notary Public, personally appeared Steven A. Gaines and Kevin L.
Lybeck, personally known to me to he the peiSons whose names are subscribed to the within instrument, and acknowl-
edged to me till that they executed the salve in their authorised capacities and that by their signatures the entity upon
behalf of which they ❑elect executed the inslnr.ttcllt. p,. HUOV
,... r
WITNESS my hand and official 0�\sStON*O��SrI)I
:Q typPUBLIG
TARY mr.
;U N:
+ i
Signature w'a. � (seat) Sr
Molly A- Ilrtdspeth, Nolary Public 11 •r ;9 p5•'��
)t1��W
USTA • USPTA
July 25, 2002 USTC & TBA
ARDA
Attn: James B. O'Neill
City of Fort Collins
PO Box 580
Fort Collins, CO 80522-0580
Dear James,
We appreciate the opportunity to bid on the Homestead Park — Bid No. 5723. However, after
reviewing the specifications and our schedule, we feel that we are unable to fulfill your
requirements at this time.
We hope that we may work together with your organization in the future. Also please note our
address change for future opportunities. Our national headquarters is now located in Sun City,
Florida.
Sincerely,
Deborah P. Carlson
Sales Administrator
P.O. Box 7770 • 4501 Old U.S. Hwy. 41 Sun City, FL 33586 • Phone (813) 641-7787 • Fax (813) 641-7795
Toll Free 1 (800) 282-4415 • Email: custsvc@welchtennis.com 0 www.welchtennis.com
CONTRACTOR
BY: ,,
V11I Tarn
ADDRESS: IM-IS_016La Vt�,
8. BID SCHEDULE (Base Bid)
Please use the attached Bid Schedule when submitting your bid.
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (25%) of the total Agreement Price.
RESPECTFULLY SUBMITTED:
Z-
Signature �— Date
Title
License Number (If Applicable)
by
Address
`{
s
f _ (o Z
Telephone
D
7/96 Section 00300 Page 2
complete the Site Improvement Survey per current City of Fort Collins
standards.
Bid Item # 4 — Safety Fencing: clarification - Per the contract documents, 65 I.f.
of safety fencing is required. This is a minimum contract requirement for
safety fencing and it is up to the contractor to determine appropriate methods
and materials to keep the site secure.
Bid Item #9 — Erosion Control: Add sentence- Bid item includes a 30'x 40'
aggregate tracking pad (1 '/2" round aggregate, 6" depth). Please note -
tracking pad to be removed prior to seeding operations. Tracking pad
location to be determined at the pre -construction meeting.
Bid Item # 13 — Domestic Water Service and Distribution: Delete backflow
device from bid item.
Bid Item #16 — 5" thick Concrete Paving : Clarification- Sidewalk within
R.O.W. along Avondale Road is 5" thick concrete with fiber mesh, per plans
and specifications.
Bid item # 24 —Restroom/Picnic Shelter: Clarification- Owner is responsible for
all special testing that is not covered by City of Fort Collins Building Code
Inspection. Please note that this bid item includes the finish floor concrete
within the limits of the walls. All other concrete paving under picnic shelter
roofing is part of Bid Item #16 — 5" Concrete Paving.
5. Section 03450 — Architectural Precast Concrete
Part 1 — general, 1.04 Quality Assurance, C. Design of Precast Units: delete
entire sentence
6. Section 04270 — Glass Unit Masonry
Add entire sections 04270 to Specifications (see attached)
7. Section 06200 — Finish Carpentry
Delete this entire section 06200 from the Specifications
DRAWINGS
1. Sheet D-1: Add note on Demolition Plan -City Stormwater rain gauge to be
protected.
2. Sheet D-1: Add note on demolition plan -Remove existing silt fence
(approximately 430 I.f.) along Avondale Road frontage
3. Sheet D-1: Add note- Existing stormwater outlet pipe at north end of existing
concrete trickle pan.
4. Sheet SD 2: Detail 5 - Type III Barricade: Please note that barrier is to be
located at the dead end of sidewalks, per plans. Barrier width needs to be at
least as wide as the sidewalk it is blocking. Signage is not required for
barricades.
Sheet A-8, Detail 4/a7: Delete Detail 4/a7 — Pipe Bollard
Sheet A-7, Detail 1/a7: Refer to revised drawing showing attachment of windows
to precast sill and sill to CMU wall. (see attached)
Sheet 1-1 — Irrigation Eguipement Table : Clarification — Guard Shack is the
manufacturer of the enclosure. Size enclosure to fit backflow preventer and
associated plumbing.
ATTACHMENTS
1. Specification Section 04270 — Glass Unit Masonry
2. Detail 1/A7 Restroom Window Detail
If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
SECTION 04270
GLASS UNIT MASONRY
PARTI-GENERAL
1.01 SUMMARY
A. Section Includes:
1. Mortar for Glass Unit Masonry
2. Accessories for Glass Unit Masonry
3. Glass Unit Masonry
B. Products Installed but not Furnished Under This Section:
1. Items to be Built-in From Other Sections:
a. Bolts and Anchors
b. All Other Built-in Members
C. Related Requirements:
1. Testing: Section 01400 Quality Control
2. Quality Control: Section 01400
3. Mortar: Section 04100
4. Masonry General: Section 04200 Unit Masonry
1.02 REFERENCES
A. Reference Standards: Comply with Sections 04100 and 04200.
1.03 SUBMITTALS
A. Test Reports: Reports of tests shall be distributed in accordancewith Section 01400.
B. Samples: Submit full size samples of each type of glass block for acceptance in accordance with
Division 1,
1.04 QUALITY ASSURANCE
A. Testing Agency: Testing will be conducted by approved testing laboratory. See Section 01400.
1.05 DELIVERY, STORAGE, AND HANDLING
A. General: Comply with Section 01600. Inspect glass masonry units upon delivery and handle carefully to
avoid chipping.
1.06 PROJECT CONDITIONS
A. Environmental Requirements: Comply with Section 04200.
TAS 02136 Section 04270
Glass Unit Masonry - I
PART2-PRODUCTS
2.01 MORTAR
A. Mortar Materials: Comply with Section 04100.
I. Integral Metallic Stearate Additive: Sonneborn Contech, Master Builders Omicron
Mortarproofing or accepted substitute. Use at exterior glass block masonry.
B. Mortar Mix:
1. Mortar Materials and Proportions: Conform to requirements of property specifications of ASTM
C270 and Section 04100.
2. Glass Brick Setting Mortar: Type S as for masonry except add integral metallic stearate additive.
Add mortar color if required by Architect.
2.02 GLASS BRICK
A. Glass Brick: Pittsburgh Corning Vistabrik
1. Sizes: 8" x 8" x 3"
2. Stipple Finish.
PART 3 - EXECUTION
A. General: Comply with Section 04200.
3.03 GLASS BLOCK INSTALLATION
A. General: Install as indicated in accordance with manufacturer's recommendations.
1. Bond: Unless otherwise indicated, lay glass brick in stack bond.
B. Joints: Uniform approximately 1/4" wide.
C. Glass Brick:
1. Sills: Cover with heavy coat of water based emulsion and let dry. Place full bed of mortar, do
not furrow.
2. Joints: Strike joints smoothly while mortar is still plastic, remove mortar from glass faces as
block is laid.
3.04 ALLOWABLE TOLERANCE
A. General: Comply with Section 04200.
3.05 POINTING AND CLEANING
A. General: Comply with Section 04200.
B. Glass Brick: Clean as recommended by glass brick manufacturer as joints are tooled. Do not damage
glass surfaces. Replace all damaged or scratched block immediately.
3.06 FIELD QUALITY CONTROL
A. General: Comply with Section 04200.
END OF SECTION
TAS 02136 Section 04270
Glass Unit Masonry - 2
BENT STEEL PLATE —/
CHANNEL 12 x 10.6
SHIM UNDER
HSS 12 X 4
STEEL �FRAMEOTOTNNL
3"x 3"
STEEL TUBE
3/4" X 3/4"
BENT STEEL
PLATE WELDED
TO THE TUBE
GLAZING TAPE (TYP.
N
j x 4" ROUNa
FLATHEAD BOLT, EPDXY
11, SET ® 16" O.C.
n
0
n
PREDRILL HOLE FOR 4
3/8-ANCHOR BOLT
COUNTERSINK N ,
2 PER SILL PIECE
53" 21"
20. X 2" BENT
STEEL PLATE
DOUBLE -SKINNED
ACRYLIC SHEET
3/4" X 3/4"
BENT STEEL
PLATE SCREWED
TO THE TUBE
2"x 3"
STEEL TUBE
7 5/8"X 3 5/8"
PRECAST
CONC. CAP
RE: 1/A10
8"X 8"
MASONRY BLOCK
1 RESTROOM WINDOW DETAIL
A-7 3"=1'-0"
Project:
HOMESTEAD PARK
BID SCHEDULE
Bid Item #1 Description
Unit
I Unit Price I
Estimated Qty. I Total
General
1
Bid Bond
LS
$ i�T�
1
$ no
2
Mobilization
LS
$ }(JtjQ
1
$ `'a o0
3
Surveying
LS
$ �.0Do
1
4
Safety Fencing
LF
$ c:�,DQ
65
$
5
Demolition
LS
$ (I Dim
1
$ 1 , C)c)o
i
Earthwork
6
Topsoil
CY
$ ,y
3,294
$ $$ 2.
7
Earthwork -Cut
CY
$ %
6,092
8
Earthwork -Import Fill (loose)
CY
$ 2 rD
210
$ L
{
Drainage,
Erosion Control, and Utilities
9
Erosion Control
LS
1
$ (� �t�
1
$$$
10
Erosion Control Cover Crop
LS
$ �6 . DC>C>
1
$ �T Q C:)
11
Subdrains- perforated
LF
$ �r1, DO
161
$ ?-I
12
Subdrains- non -perforated
LF
$ /. C)o
125
$ Z!F�. '�7S
13
Domestic Water Service and Distribution
LS
$ ko , D00
i
$ LQ� o0c)
14
Sanitary Sewer Service and Drinking
Fountain Drain
LS
$ T4; DO
1
$ ':�5 Dc)
15
Electrical Service and Distribution
LS
$ J D 0Cb
'
1
$ � D"D Q
T
Paths, Plazas, Ramps, and Steps
16
5" Thick Standard Grey Concrete
SF
$ , Q 0
22,337
17
Entry Ramp at Playground
LS
$_�jT (7�
1
$To L)
18
Entry Stairs at Core Area
LS
$ DO
i
$ Cj
19
Playground Curb
LF
$ �, c>0
161
(
$ `Q, qo_
20
Playground Header
LF
)�
$ C
88
$ Q
Metal Railing
21
Plaza Step Handrails
LS
$ :5 4.b
1
$ S a
Multi -use Concrete Courts CC �����
22 Multi -use Court LS $$ J� 1 $ 5 0 DD-D'
Playground
23 Safety Surfacing Loose CY $ 30 , DQ 161 $
Architectural Structures
24
Restroom and Picnic Shelter
LS
$ 2--I w
1
$ 2Z 0o
25
SCurved Walls
EA
$ 1-i C)o C1
3
$ 000
26
S Curved Seat Walls
EA
$$ Z�Q
3
$ '7 .s O0
Landscaping
27
Fine Grading
AC
$ I�j ��(�
4.88
28
Landscape Trees
LS
$ Qb
1
q Lf j„, non
29
Fescue Seed
AC
$ 1 J,00
4.82
$ 1 Q) (20�
30
Fescue Sod
SF
$ D, S 2.
2,305
Irrigation
31
Irrigation System
LS
$ c�55
,
$ y S
32
Irrigation Pump
LS
$ 00
1
$ 2-00
Miscellaneous Site Features
33
Plow installation
LS
$ QQ
1
$ O
34
Barbecue Grills
EA
$ Q
2
$ lIT Q
35
Bike Racks
EA
$ I 0
2
$, S(Dc>
36
Picnic Tables
EA
$ ' )o
4
$ 3 QQ(]
37
Site Benches
EA
$ 1t+C)(D
4
$ Q�
38
Playground Equipment
LS
$ 3L o0o
1
$ 2 Ll
TOTAL $ r7)1I _�I V
Figure '
Dollars
(written)
Alternate Bid Item # 1- Restroom Block
1 Block Substitution - (deduct) LS $ - QD 1 $
Alternate Bid Item #2- Restroom Windows
2 Window Substitution - (deduct) LS $ - OND 1 $ 00
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
Ali
comprehensive.
be
information
questions must be answered and the data given must be clear and
This statement must be notarized. If necessary, questions may
answered on separate attached sheets. The Bidder may submit any additional
he desires.
1.
Name of Bidder:
2.
Permanent main office address: ((OAS ✓&Qj2Ce 12dg LQ
3.
When organized:
4.
If a corporation, where incorporated: 6)r-d-o
S.
How many years have you been engaged in the contracting business
present firm or trade name?
under your
6.
Contracts on hand: (Schedule these, showing the amount of each contract and
the ap�prit'cipated dates of completion.)
7.
General character of Work performed b} your com an
w rev Qe% p y
Y7w �
C.711 Owe At il h Q r
8.
Have you ever failed to complete any Work awarded to you? N a
If so, where and why?
9.
Have your ever defaulted on a contract? Py
If so, where and why?
10.
Are you debarred by any government agency? ND
If yes list agency name.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company, stating
the approximate cost of each, and the month and year completed, location
and type, of_ copstruction.
12. List your major equipment available for this contract.
13. Experience in construction Work similar in importance to this
proj@c.�: . .
19
15
16
17
18
19
20
Background and experience of the principal members of your organization,
including officers:
Credit available: $ `(X3'(y�
Bank reference: (7Vtn )4x %{1--2,--(0(nl—
Will you, upon request, Fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
, \ s,,. —
Are you licensed as a General CONTRACTOR?
If yes, in what city, county and state?
class, license and numbers? g35 3
Do you anticipate subcontracting Work under thi
If yes, what percent of total contract? 53 '(
and to whom? , n 1 A a
Are any lawsuits pending against you cr your firm at this time? ND
If yes,
DETAIL
7/96 Section 00420 Page 2
21
What are the limits of your public liability?
What company? Q1) rio ✓S
DETAIL
22. What are your company's bonding limitations? 3 rAAGJ-�,
23. The undersigned
corporation to
verification of
Qualifications.
hereby authorizes and requests any person, firm or
furnish any information requested by the OWNER in
the recital comprising this Statement of Bidder's
Dated at LbLt.n\)M—A this day of
,
State of L)6Pndo
County of 8(A,, FdQ Y
l' e1012 ►' ct.
2002,
eing duly sworn deposes and says that is
V I U WDS of and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this
`� 4�, 20Q�-
ui
JennBer Peree
500 South
My commission expiretwLWHtA
LIM
ARy
7/96 Section 00420 Page 3
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM
E �PC±n
7/96
SUBCONTRACTOR
Section 00430 Page 1
W.J. SHIRLEY, INC.
GENERAL CONTRACTOR
11075 MAPLE ROAD
LAFAYETTE, CO.80026
COMPANY SUMMARY
W.J. Shirley, Inc. was incorporated in Colorado in February 1997 as a General Contractor. The owner's are
William J. Shirley III and Victoria N. Shirley. William J. Shirley is the President and Treasurer and Victo-
ria N. Shirley is the Vice President and Secretary. WJS, Inc. is qualified with the State Buildings program
and holds licenses in many cities in the Denver Metropolitan area. Our work consists of mainly public
works projects for the federal, state and local governments.
William J. Shirley III has been involved in public works construction since 1975. He graduated form Colo-
rado State University with a degree in Construction Management in 1984. He gained much of his experi-
ence working for Shirley Brothers Construction in Pasadena, CA. While with Shirley Bros., he was a car-
penter, superintendent, estimator, project manager and project engineer for many projects ranging from
4,000,000 to 12,000,000. Since he started WJS, Inc. in Colorado in 1997, Bill has been involved in the day
to day operations of the business including project manager, project engineer, estimator.
Victoria N. Shirley has been involved in public works construction since the start of WJS, Inc. in 1997. She
attended Colorado State University for 4 years and obtained a degree in Sociology and minor in Business
Administration from California State University, Fullerton in 1987. Victoria is the office manager and pro-
ject administrator.
While WJS, Inc. is a young company, our philosophy is to provide quality, on -time projects that are within
budget. Currently, our work load consists of projects that amount to $1,500,000. Our work load for the
year 2002 is expected to be in the 4 million dollar range.
Phone: 303-666-5002 Fax: 303-666-7300 WJSVNSQAOL.COM