HomeMy WebLinkAboutRESPONSE - BID - 5728 SPRING PARK IMPROVEMENTSSECTION 00300
BID FORM
PROJECT: SPRING PARK IMPROVEMENTS; Bid No. 5728
Place Fort Collins
Date September 3, 2002
1. In compliance with your Invitation to Bid dated August 8, 2002
and subject to all conditions thereof, the undersigned
G.L. Hoff Company a **(Corporation, -13-iffti-"el---- In-ra)st-13t-y
authorized to do
business in the State of Colorado hereby proposes to furnish and do
everything required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid bond
in the sum of 5% of Bid Amount ($
in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows: EMployers Mutual Casualty Company PO Box 441098 Aurora Co 80044
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No. 1
through
7/96 Section 00300 Page 1
G.L. Hoff Company
2001 Projects
Elkhorn Retail Shops
Construction of a new, two story, 16,000 square foot retail building in Estes
Park. The scope of work included contaminated soil remediation,
foundation, utility lines, building construction, rough in for twelve retail
units, exterior finishes, elevator, mechanical and electrical.
Owner: Ed Grueff, 970-586-5421
3225 Devils Gulch Road
Estes Park, CO 80517
Contact: owner
Contract: $1,363,217 .00
Completion: November, 2001
Edora Skate Park
Construction of a new concrete, in ground, skate board park with flat and
vertical curved concrete work. Scope of work included excavation,
structural steel, and shotcrete work.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Jason Stutzman, 970-221-6366
Park Planning and Development
Contract: $347,846.00
Completion: August, 2001
East Drive to Center Street Steam Loop
Construction of concrete trench and installation of steam piping for
Colorado State University. Scope of work included excavation, structural
concrete, and mechanical work.
Owner: Colorado State University
365 Aylesworth Hall Southeast
Fort Collins, CO 80523
Contact: Cass Beitler, Project Manager, 970-491-0158
Contract: $702,443.00
Completion: August, 2001
Pella Crossing Irrigation System Improvements
Installation of a new submersible pump and guide rail system and
construction of a new set well and piping. Scope of work included removal
of existing lake pump, wet well, catwalk and discharge piping, and
installation of meter pit, discharge line, suction line, intake screen, slide gate,
and sitework.
Owner: Boulder County
2040 14th Street
Boulder, CO 80302
Contact: Kenneth V. Sjodin, 720-622-0109
Boulder County Parks and Open Space
Contract: $92,305.85
Completion: May, 2001
George Rist Dam Rehabilitation Project
Construction of new outlet structure, repair of damaged section of dam and
replacement of riprap. Scope of work included excavation, sitework,
structural concrete and pipeline installation.
Owner: City of Loveland
500 East Third Street
Loveland, CO 80537
Contact: Rod Chapman, Project Manager, 970-962-2454
Contract: $157,918.00
Completion: July, 2001
Geist Reservoir Dam Rehabilitation Project
Repair of dam and outlet. Scope of work included construction of coffer
dam and excavation for new outlet, installation of outlet, upstream and
downstream headwalls, sluice gate, staff gage and trash rack, removal and
replacement of existing spillway culvert, raise top of dam, and set riprap.
Owner: Frank Walsh
PO Box 30
Sterling, CO 80751
Contact: David Marsh, Project Engineer, 970-490-2620
Smith Geotechnical Engineering Consultants
Contract: $37,895.25
Completion: February, 2001
Sheldon Lake North Shore
Construction of concrete and crusher fines pavement and access ramp.
Install a stone cap on the existing wall, and provide furnishings and
related site work for the north shore of Sheldon Lake.
Owner: City of Fort Collins
215 North Mason Street
Fort Collins, CO 80521
Contact: Hetty Bixby, Project Manager, 970-416-2192
Contract: $84,180.00
Completion: December 2001
Loveland Financial Center
Subcontractor to Big T Construction for construction of the site grading,
site concrete and parking lot at the new commercial building.
Owner: Loveland Financial Center
West 37th Street, Loveland, CO 80538
Contact: Jasper Johnson, Bid T Construction, 970-635-0503
Contract: $68,272.00
Completion: December2001
G.L. Hoff Company
2000 Completed Projects
Arkins Pump Station
Construction of cast in place buried pump building including interior
piping, pump equipment, installation of manual hoist and sectionalizing
valve, earthwork, and reclamation of construction site.
Owner:
Contact:
Contract:
Completion:
Centennial Village Pump Station
Little Thompson Water District
Mike Cook PE, (970) 532-2096
835 East Highway 56
Berthoud, CO 80513
The Engineering Company
Warren Mesloh, (970) 484-7477
$86,538.00
February, 2000
Construction of non -potable water pump station including well drilling,
pump system, building construction, electrical, and landscaping.
Owner: City of Greeley
Phil Carter, (970) 350-9826
1000 10th Street
Greeley, CO 80631
Contact: Amy Johnson, Aqua Engineering, (970)229-9668
Contract: $119,511.00
Completion: February, 2000
Associated Thermoforming, Inc
Pre-engineered metal building addition and remodel of manufacturing
facility. Scope of work included sitework, landscaping, structural and site
concrete, metal building construction, mechanical, electrical.
Owner: Associated Thermoforming, Inc.
765 Second Street
Berthoud, CO 80513
Contact: John Nix, President (970) 532-2000
Contract: $806,679.00
Completion: August, 2000
Colorado State University Condensate Replacement Phase 16 G/H
Remove existing underground condensate lines from campus main lines to
building entrances for CSU heating system. Scope of work included
excavation, landscaping, concrete tunnels, piping and insulation.
Owner: Colorado State University
Facilities Services
Fort Collins, CO 80523
Contact: Jim Stoddard, Project Manager, 491-0138
Contract: $319,552.00
Completion: October, 2000
Colorado State University Steam and Condensate Insulation Repair
Insulation repair to existing underground steam and condensate lines at
CSU. The scope of work included excavation, landscaping, concrete,
mechanical and piping insulation, and tunnel lid replacement.
Owner: Colorado State University
Facilities Services
Fort Collins, CO 80523
Contact: Jim Stoddard, Project Manager, 491-0138
Contract: $263,306.00
Completion: October, 2000
Colorado State University: University Avenue Plaza
Three projects combined for the removal of an road through campus and
constriction of a landscaped plaza. The scope of work included demolition,
structural and flatwork concrete, paving stones, masonry, landscaping,
asphalt, drain line, fencing and bike parking.
Owner: Colorado State University
Facilities Services
Fort Collins, CO 80523
Contact: Bill Conn, Project Manager, 491-0145
Contract: $302,796.00
Completion: October, 2000
Colorado State University Master Storm Drainage Phase H
Construction of a storm water drain system including excavation, installation
of storm sewer and manifold pipe, precast vaults, manholes, asphalt paving,
cast in place concrete, masonry and landscaping.
Owner: Colorado State University
Facilities Services
Fort Collins, CO 80523
Contact: Jim Stoddard, Project Manager, 491-0138
Contract: $219,773.00
Completion: December 2000
Harmony Substation
Construction of containment facility for the City of Fort Collins substation.
The scope of work included excavation, concrete catch basin, drainage
channel, and concrete box, sand interceptor/imbiber bead vault, installation
of precast containment tank, and concrete flow fill.
Owner: City of Fort Collins
700 Wood Street
Fort Collins, CO 80521
Contact: Anthony Barsoom, Project Manager, 482-5922
Sear -Brown Group, Engineering
Contract: $85,739.68
Completion: August, 2000
Emerald Glen Pump Station
Installation of a new non -potable water pump station and transfer pump
station for neighborhood irrigation system. Scope of work included
sitework, irrigation, and abandonment of potable water sprinkler taps.
Owner: Glen Properties
2707 West Eisenhower Blvd.
Loveland, CO 80538
Contact: Richard Aust, Engineer, 970,229-9668
Aqua Engineering, Inc.
Contract: $321,668.50
Completion: August, 2000
Home State Bank Interior Remodel
Interior remodel of the first and second floor of the main bank building.
Scope of work included construction of new walls, interior finishes, and
electrical.
Owner: Home State Bank
935 North Cleveland
Loveland, CO 80537
Contact: Mary McCambridge, Bank Officer, 669-4040
Contract: $97,824.00
Completion: October, 2000
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM
Farquhar Masonry
7/96 Section 00430 Page 1
SECTION 00410
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned G. L. Hoff Company
as Principal, and Employers Mutual Casualty Company as
Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado,
as OWNER, in the sum of $ 57 of total bid for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction
of Fort Collins Project, SPRING PARK IMPROVEMENTS; Bid No. 5728.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver
a Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
7/96 Section 00410 Page 2
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this 3rd day of September , 2002, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
above.
PRINCIPAL
Name: G. L. Hoff Company
Address: 1815 W. 12th St.
Loveland CO 80537
By:
Title:
ATTEST:
By
(SEAL)
7/96
SURETY
Employers Mutual Casualty Company
P.O. Box 441098
Aurora, CO 80044
By:
Title: Attorney -in -Fact
(SEAL)
Section 00410 Page 3
1S
P.O. Box 712 • Des Moines, Iowa 50303 ' '"^ ` v v v r r u
CERTIFICATE OF AUTHORITY INDIVIDUAL ATTORNEY -IN -FACT
KNOW ALL MEN BY THESE PRESENTS, that:
1. Employers Mutual Casualty Company, an Iowa corporation 5. Dakota Fire Insurance Company, a North Dakota Corporation
2. EMCASCO Insurance Company, an Iowa Corporation 6. EMC Property & Casualty Company, an Iowa corporation
3. Union Insurance Company of Providence, an Iowa Corporation ' 7. The Hamilton Mutual Insurance Company, an Ohio Corporation
4.1 Illinois EMCASCO Insurance Company, an Illinois Corporation
hereinafter refereed to severally as "Company" and collectively as "Companies' each does by these presents, make, constitute and appoint
CHRIS RICHMOND, RUSSELL MICHELS, DARLENE KRINGS, INDIVIDUALLY, FORT COLLINS, COLORADO .........
its true and lawful attorney -in -fact, with full power and authority conferred to sign, seal, and execute its lawful bonds, undertakings, and other obligatory instruments of a
similar nature as follows:
IN AN AMOUNT NOT EXCEEDINGTEN MILLION DOLLARS ......... ......... .......... ($10,000,000.00)
and to bind each Company thereby as fully and to the same extent as if such instruments were signed by the duly authorized officers of each such Company, and all of
the acts of said attorney pursuant to the authority hereby given are hereby ratified and confirmed.
The authority hereby granted shall expire April 1. 2003 unless sooner revoked.
AUTHORITY FOR POWER OF ATTORNEY
This Power -of -Attorney Is made and executed pursuant to and by the authority of the following resolution of the Boards of Directors of each of the Companies at a
regularly scheduled meeting of each company duly called and held in 1999
RESOLVED; The President and Chief Executive Officer, any Vice President, the Treasurer and the Secretary of Employers Mutual Casualty Company shall have power
and authority to (1) appoint attorneys4n-fact and authorize them to execute on behalf of each Company and attach the seal of the Company thereto, :bonds and
undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof, and (2) to remove any such attorney -in -fact at any time and revoke
the power and authority given to him or her. Attorneys -in -fact shall have power and authority, subject to the terms and limitations of the power-ofattorney issued to them,
to execute and deliver on behalf of the Company, and to attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and
other writings obligatory in the nature thereof, and any such instrument executed by any such attomey-in-fact shall be fully and in all respects binding upon the Company.
Certification as to the validity of any power -of -attorney authorized herein made by an officer of Employers Mutual Casualty: Company shallbe fully and In all respects
binding upon this Company. The facsimile or mechanically reproduced <signature ;of such officer, whether made heretofore or hereafter, wherever appearing upon
certified copy of any power-of-attomey of the Company, shall be valid and binding upon the Company with the same force and affect as though manually affixed.
IN WITNEss WHEREOF, the Companies have caused these presents to be signed for each by their officers as shown, and the Corporate seals to be hereto affixed this
27th day of January , 2000.._. n
Seals
Sip IINSUgq .•`�yGE c0 0
2 P 0
PPr OPq 4F, yJ gPPOflq P : 4 pNGOPq
:75 SEAL a, .o f1663r.m_ ..-.-1953
°i�tie0�5
� I
iowP
NSUPAryCp
: Al,
,�,UitIAI •,•
��H4 ;.
y�. `OPPOP9 CO Q EO
PQ PPOP4lp''p %:
pPPOfl4 :.
SEAL ='
Y: SEAL s
W=; SEAL
o:
/OwA
%�OPr......
ualSUAr,
3, 4, 5 & 6;'Presic
ce Chairman and
AD 2000 :before me a
ly appeared Bruce G. Kelley and Jeffrey S.
t they are, and are known tome to be the
nd/or Assistant Secretary, respectively, of
ad to this instrument are the seals of said
,ealed on behalf of each of the Companies
'a; and that the said Bruce G. Kelley and
the execution of said instrument to be the
my vunumaaiuii capnub oepwinuar 30, zuuo.
m I�r ROTA KRUMINS
Commission Number 176255 \��-•-�•°s•
My Comm Exp. sgpt_3o.2003 Notary Public in and for the State of Iowa
CERTIFICATE
1, David L. Hixenbaugh, Vice. President of the Companies, do hereby certify that the foregoing resolution of the Boards of Directors by each of the
Companies and this Power of Attorney issued pursuant thereto on January 97 2000
on behalf of Chris Richmond, Russell Michels, Darlene Krings
are true and correct and are still in full force and effect.'
1n TeshnortyWhereof l have subscribed my name and affixed the facsimile seal of each Company this3rd day of September 2002
Vic -President
CEO of Company 7
On thjQ7th day of
Birdsley, who, being by me duly swom, did sa
Chairman, President, Vice Chairman and CE
each of The Companies above; that the seals
corporations; that said instrument was signed ,
by authority of their respective Boards of Dir
the C
G.L. Hoff Company
CONTRACTOR
BY:
Grego y L. Hoff, President
ADDRESS: 1815 West 12th Street
Loveland, CO 80537
8. BID SCHEDULE (Base Bid)
Please use the attached Bid Schedule when submitting your bid.
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (250) of the total Agreement Price.
RESPECTFULLY SUBMITD:
r
q 3-07
Signature Date
President
Title
B-6
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest:*��T7
Address 1815 West 12th Street
Loveland, CO 80537
Telephone 970-669-3255
7/96 Section 00300 Page 2
G.L. Hoff Company
Construction Experience
Gregory L. Hoff, President and Construction Manager
For the past twenty seven years, Greg has been involved with all aspects of construction
from architectural drafting, surveying and carpentry to supervision and construction
management.
Graduating from Northeastern Junior College in 1972 with a degree in Civil Engineering
Technology, his early work included surveying and architectural design and drafting. He
has held a commercial contractor's license with the City of Fort Collins since 1976.
Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, Longmont,
Boulder, and Thornton.
Prior to 1984, Greg worked with A] Hockett, Inc. initially as an architectural draftsman and
progressing to project superintendent. He was also a partner in H&M Builders from 1976
to 1980. This company specialized in custom homes, tenant finish and custom millwork.
Beginning in 1984, Greg started his own general contracting business, G.L. Hoff Company,
which specializes in all types of commercial construction including sitework, excavation
and concrete construction. As president and construction manager for G.L. Hoff Company,
Greg works with a wide variety of projects including, schools, churches, city and
government projects, city park developments, as well as many light industrial and concrete
construction jobs. Greg oversees all project scheduling, review of construction procedures,
quality control and safety enforcement.
Project: SPRING PARK IMPROVEMENTS
BID SCHEDULE
Bid Item #
Description
JUnit
I Unit Price I Estimated of
. Total
General
1
Bond
LS
722. Cc)
1
mmm nnn
np
2
Mobilization
LS
$ 3,050.00
1
$3,050.00
3
Surveying
LS
$ 2,350.00
1
$2,350.00
4
Demolition
LS
$ 1,163.00
1
$1,163.00
5
Tree Protection
LS
$ 357.00
1
$ 357.00
6
Remove and Salvage Existing Drinking
Fountain
LS
$ 357.00
1
$ 357.00
Earthwork
7A
Topsoil -Removal
CY
$ 7.00
129
$ 903.00
7B
Topsoil- Furnish and Place
Cy
$ 20.00
98
$1, 960.00
8
Earthwork- Fill
Cy
$ 15.00
13
$ 195.00
9
Gravel Sump
LS
$ 454.00
1
$ 454.00
Utilities
10
Sanitary Sewer Service and Drinking
Fountain Drain
LS
$ 5,803.00
1
$5,803.00
11
Domestic Water Service Conncetion
LS
$ 450.00
1
$ 450.00
12
Domestic Water Service Distribution
LF
$ 18.70
500
$9,350.00
13
Electrical Service and Distribution
LS
$ 00
1
$7
Paths
14
Concrete Sidewalks and slabs, 5" thick
SF
$ 3.05
8,510
$25,955.50
15
Concrete Bike Trail, 10' wide, 5" thick with
fiber mesh, Yosemite Brown
SF
$ 3.80
1,936
$ 7, 356.80
Architectural
Features
16
Restroom
LS
$ 0
1
pp
$ 10, QD7 0 0
Irrigation
17
Adjust irrigation system
LS
$2,257.00
1
$2,257.00
Fine Grading
18
Fine Grading
SF
$ 0.22
8,026
$1, 765.72
Sod
19
Sod
SF
$ 0.63
9,513
$5,993.19
I Bid Item # l Description jUnit I Unit Price I Estimated Qty. I Total I
Miscellaneous Site Features
20 Bike Rack
21 Picnic Tables
22 BBQ Grill
TOTAL
EA
$ 573.00
1
$
573.00
EA
$ 685.00
2
$
1,370.00
EA
$ 257.00
1
$
257.00
1(9.5..237.�21
lars
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may
be answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: G.L. Hoff
2. Permanent main office address: 1815 Vast 12th Street
3. When organized: January 1984
4. If a corporation, where incorporated: Colorado
5. How many years have you been engaged in the contracting business under your
present firm or trade name? 18 years
14
Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
Johnstown Ready Mix Batch Plant: $323,152. October 2002
CSU Trial Garden Structure: $118,973. Nov. 2002
7. General character of Work performed by your company:
8. Have you ever failed to complete any Work awarded to you? no
If so, where and why?
9. Have your ever defaulted on a contract?
If so, where and why?
10. Are you debarred by any government agency?
If yes list agency name.
7/96
no
Section 00420 Page 1
11. List the more important projects recently completed by your company, stating
the approximate cost of each, and the month and year completed, location
and type of construction.
Please refer to the attached lists
12. List your major equipment available for this contract.
dump truck, ACT 928 loader, CAT 320 track excavator, backhoe, bobcat,
motor grader, grading tractor, concrete pump
13. Experience in construction Work similar in importance to this
project:
Please refer to the attached lists
14. Background and experience of the principal members of your organization,
including officers:
Please refer to the attached information
15. Credit available: $ $250,000.
16. Bank reference: Loran Emmonds, Bank One Loveland CO
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
18. Are you licensed as a General CONTRACTOR? yes
If yes; in what city, county and state? Fort Collins, others What
class, license and numbers? #B-6
19. Do you anticipate subcontracting Work under this Contract? yes
If yes, what percent of total contract?
and to whom? Please refer to section 430 of the Bid Documents
20. Are any lawsuits pending against you or your firm at this time? no
If
yes,
DETAIL
7/96 Section 00420 Page 2
21. What are the limits of your public liability? DETAIL
2 million liability plus 2 million umbrella
t company?
rerson
22. What are your company's bonding limitations?5 million
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at Loveland this 3rd day of September 2002
Title: Miriam T. Hoff, Secretary Treasurer
State of Colorado
County of Larimer
Miriam T. Hoff being duly sworn deposes and says that he is
Secretary Treasurer of G.L. Hoff Company and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Su scribed and sworn to before me this 5A.c day of
20va.
SLd2 ublic ' s�,�o-ic.�i
Noty P
MV commission expires /A o'4
7/96 Section 00420 Page 3
Joel S. Reger, Estimator and Project Manager
Joel has a Bachelor of Science Degree in Construction Management from Colorado State
University and fourteen years experience in the construction field. He has continued his
education with estimating seminars including training with American Building Company's
estimating .Access workshop. He is also an active member of the Sigma Lambda Chi
honorary national construction fraternity.
During the past ten years, as the chief estimator with G.L. Hoff Company, Joel has
compiled bids and development estimates for projects valued at up to five million dollars.
As estimator, he directs project bidding process as well as the review of specifications. He
is also involved with project management, coordinating proposal requests and change
orders with the architect or owner, overseeing material orders to insure that the project is
completed in a timely manner and according to specifications.
William L. Vance, Project Superintendent
Bill brings over twenty three years of experience in construction related fields to his position
as project superintendent. His background includes heavy equipment operating, truss
construction, carpentry, and cost estimating. He also has experience in both commercial
and residential property development from site work and utility lines through finish
carpentry. Bill has built over five hundred new homes as well as several light commercial
properties. His commanding knowledge of construction methods enables Bill to be an
especially effective project superintendent.
G.L. Hoff Company
2002 Projects
Estes Park Sanitation District Centrifuge Building
Construction of a new concrete block building with precast tee
constriction for a centrifuge. The work included piping, valves, electrical
and instrumentation.
Owner:
Estes Park Sanitation District
1201 Graves Avenue
Estes Park, CO 880517
Contact:
Jim Duell, District Manager 970-586-2866
John Burgeson, 970-223-9600
Shepherd Miller Inc., Project Engineer
Contract:
$264,053.00
Completion:
January, 2002
Rehabilitation of Owl Creek Ditch Hydraulic Structures
Removal and replacement of ten concrete hydraulic structures, providing
and installing 25 meter gates, 21 precast concrete flumes, and construction
of 4 cast -in -place flumes and other miscellaneous headwalls and structures
along the Owl Creek Ditch.
Owner: Owl Creek Supply and Irrigation Company
PO Box 206
Eaton, CO 80615
Contact: Duane Smith, 970-490-2620
Smith Geotechnical
Contract: $383,000.00
Completion: April, 2002
Sitework and Utilities for New Kuck Mechanical Building
Subcontracted the sitework and utilities for the new Kuck Mechanical
building to Delehoy Construction. Scope of work included overlot
grading, structural fill, building excavation, foundation insulation, underslab
gravel, fine grading, installation of sewer line, storm drainage, waterline,
fireline and asphalt patch.
Owner: Kuck Mechanical, Inc.
General Contractor: Delehoy Construction
3109 South Taft Hill Road
Fort Collins, CO 80526
Contact: Mark Delehoy, 970-226-0836
Contract: $125,840.00
Completion: March, 2002