Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 2206109 BID 5717 CHANGE ORDER PEDESTRIAN ACCESSNOV-07-2002 THU 11:51 AM CFO ENG, FAX NO. 9702216378 P. 01 y" Change Order Form City Of F..r..,�rt C.W °t.�+ PROJECT TITLE: 2002 Street Maintenance Program PROJECT NUMBER: 30522121.6 (Concrete Project Phase I - Bid #5717) CONTRACTOR: Vogel Concrete (PO #2206109) CHANGE CRDEI'2 NUMBER: 1 1 Rooson for change. 2. Description of change. 3. Change in contr21lt cost. 4. Change in contract time. 1.&2. See allached invoice for details 3. The cenfiact cost will Increase by $8,378.46 4. There will he throe (3) days added to the contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL. PENDING CHANGE ORDERS TOTAL TM IS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. c/o OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST ACCEPTED BY: _ ACCEPTED BY: REVIEWED BY APPROVED BY: APPROVED BY: cc Aaounlin0 FIIfC��ina conlr"Arklr Prolocl Fill! (Engineer) 1.38 1.38 $607,726.10 $0,00 $0.00 $8,378,46 $616,106.56 DATE: %/ _ DATE: DATE: 1 l-7-09 DATE: (Purchasing Agent over $30,000) stfQet Maiot $1,00216 Pnd Amess $7,376.21 flw ,An . Fnrr Collins. CO 80522.0580 • (303) 221-6605 NOV-07-2002 THU 11:51 AM CFC ENG, FAX NO, 9702216378 P. 02 City of Fort Collins 2002 Concrete Project - Phase I Vogel Concrete - Bid No. 5717 Change Cedar No: 1 Data: 10/29/02 1. Reason For Change: a. Inednshian Access contributed funds to incrooso the width of the sidewalk on West Elizabeth Street. b. 24 Hour concrete Is needed to mpedite work in front of businesuas on West Elizaboth Strout. c. Additional removal and haul was raquirod for shrubs & ctumpa In Falrbrooke and on W. Elizaboth Stroot. 2. Description Or change: A. Add lho costa For construction of additional sidewalk width to the contract. b. Add fine costs for 24 hour corlwato to the c haat, per attached Time & Materials sheet. c. Add the cmtr, for shrub and ahlmp removal to the contract per attached Time & Materials ohoots. 3. Change In Contract Amount: aty Unit unit cost Total Cost A, Removal -Concrete Driveways 420 Sr $ 2.07 $ 889.40 EXcowrSon • Additional sidewalk width 16.67 CY i 62,04 $ 1,034.00 4" Flatwork 864 SF $ 3.10 $ 2,679.40 G• Drive Approach 636 SF $ 5.62 $ 2,302.32 Aggregate Vase Gout" 17 TON $ 28.05 $ 492.15 $ 7,370.27 b. 24 Hour Concmto 18 YO $ 20.00 $ 360.00 c. Dump Fres 1 LS $ 205,00 $ 205.00 Truck 3.6 Hm $ 55.00 $ 198.00 Tmok 1 firs $ 43,o0 $ 43.00 Bobcat 3.65 Hre $ 53.75 _$ 196.19 $ 642.19 TOTAI, CFIANOE IN CONTRACT AMOUNT $ 8,378.46 Change In Contract Time 4. a. Add three (3) days to lho contract time. b. There Is no change in contract time. c. Thera is no change In contract time, TOTAL CHANGE IN CONTRACT TIME 3 Days