y" Change Order Form
City Of F..r..,�rt C.W °t.�+
PROJECT TITLE: 2002 Street Maintenance Program
PROJECT NUMBER: 30522121.6 (Concrete Project Phase I - Bid #5717)
CONTRACTOR: Vogel Concrete (PO #2206109)
CHANGE CRDEI'2 NUMBER: 1
1 Rooson for change. 2. Description of change.
3. Change in contr21lt cost. 4. Change in contract time.
1.&2. See allached invoice for details
3. The cenfiact cost will Increase by $8,378.46
4. There will he throe (3) days added to the contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL. PENDING CHANGE ORDERS
TOTAL TM IS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. c/o OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
ACCEPTED BY: _
ACCEPTED BY:
REVIEWED BY
APPROVED BY:
APPROVED BY:
cc Aaounlin0
FIIfC��ina
conlr"Arklr
Prolocl Fill!
(Engineer)
1.38
1.38
$607,726.10
$0,00
$0.00
$8,378,46
$616,106.56
DATE: %/
_ DATE:
DATE: 1 l-7-09
DATE:
(Purchasing Agent over $30,000)
stfQet Maiot $1,00216
Pnd Amess $7,376.21
flw ,An . Fnrr Collins. CO 80522.0580 • (303) 221-6605
NOV-07-2002 THU 11:51 AM CFC ENG, FAX NO, 9702216378 P. 02
City of Fort Collins 2002 Concrete Project - Phase I
Vogel Concrete - Bid No. 5717
Change Cedar No: 1
Data: 10/29/02
1. Reason For Change:
a. Inednshian Access contributed funds to incrooso the width of the sidewalk on West Elizabeth Street.
b. 24 Hour concrete Is needed to mpedite work in front of businesuas on West Elizaboth Strout.
c. Additional removal and haul was raquirod for shrubs & ctumpa In Falrbrooke and on W. Elizaboth Stroot.
2. Description Or change:
A. Add lho costa For construction of additional sidewalk width to the contract.
b. Add fine costs for 24 hour corlwato to the c haat, per attached Time & Materials sheet.
c. Add the cmtr, for shrub and ahlmp removal to the contract per attached Time & Materials ohoots.
3. Change In Contract Amount: aty Unit unit cost Total Cost
A, Removal -Concrete Driveways
420
Sr
$
2.07
$
889.40
EXcowrSon • Additional sidewalk width
16.67
CY
i
62,04
$
1,034.00
4" Flatwork
864
SF
$
3.10
$
2,679.40
G• Drive Approach
636
SF
$
5.62
$
2,302.32
Aggregate Vase Gout"
17
TON
$
28.05
$
492.15
$
7,370.27
b. 24 Hour Concmto
18
YO
$
20.00
$
360.00
c. Dump Fres
1
LS
$
205,00
$
205.00
Truck
3.6
Hm
$
55.00
$
198.00
Tmok
1
firs
$
43,o0
$
43.00
Bobcat
3.65
Hre
$
53.75
_$
196.19
$
642.19
TOTAI, CFIANOE IN CONTRACT AMOUNT
$
8,378.46
Change In Contract Time
4.
a. Add three (3) days to lho contract time.
b. There Is no change in contract time.
c. Thera is no change In contract time,