Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 2204769 (3)NOV-06-02 11:28 PROM:ADVANCE PLANNING DEPT ID•9702246111 PAGE 3/4 EDAW INC 24 October 2002 240 EAST MOUNTAIN AVENUE TORT COLLINS COLORA00 Ivlr. Greg Byrne °°��` City of Fort Collins Advance Planning Department 281 North College Avenue TEl 970 sea e013 Fort Collins, CO 80S22 VAX 070 A84 SS, E Re: Fort Collins City Plan Update —Request for Survey Wrr.eea W.com Dm Greg: An accurate gauge of community attitudes on potential expansion of the urban growth area and other key issues is essential to the success of the City Plan update. For this reason, we propose to conduct a community -wide survey that will be integrated with input from the CAC, public meetings and other forums to provide a coherent sense of, the community's desired future direction key aspects of the survey approach are Doted below: • The survey will be conducted using a ma0out/mail-back format. Although a phone survey offers certain advantages, the need to include maps and other graphics to illustrate key issues strongly favors use of a mail -out approach: As we envision the survey, it will be limited in scope. Rather than a comprehensive look at multiple issues, many of which have been addressed in prior surveys, we envision the survey focusing on a few key issues such as UGA expansion, i.e. the scenarios, and other selected issues such as the importance of encouraging infiwredevelopo=t, regional commercial center, community separators and others that will bejoinfly identified • We will work with a survey fmtu to design and implement a statistically valid study. For purposes of initial cost estimation, we anticipate mailing out approximately 2,000 surveys with a goat of receiving a minimum of 4o0 responses. • Survey results will be fully documented and presented in summary and detailed report formats. if authorized to initiate this effort immediately, survey results will be available by early to mid -December. This schedule assumes mail -out by November 9, a return date of November 27 and results compilation by December 11, UNITED STATES The preliminary cost estimate for the survey is $15,000, This is based on prior experience and does not reflect a specific estimate from a survey firm_ We will obtain EUROPE a specific cost from a survey firm and refine this estimate once we know the City is AUSTRALIA ASIA DESIGN, PLANNING AND ENVIRONNENTe WORLDWIDE NOV-OS-02 11:28 FROM -ADVANCE PLANNING DEPT ID:9702246111 PAGE 24 October 2002 Page 2 ready to move ahead. As noted, a survey firm will assist in developing the survey instrument and take a lead role in implementing the survey, including sample design and results compilation. EDAW Will take a lead role in developing survey content and reporting results. Best Regards, '^'1'K' Tom Keith Principal/Vice President ce_ Ken W'aido, Joe Frank DMON. PLANNINQ AND ENWRONNENT8 WOALOWIOE BrucemeiOtf- Senior Associate 4/4