HomeMy WebLinkAboutCHANGE ORDER - RFP - P812 SECOND SHEET OF ICE CHANGE ORDER (3)SECTION 00950 CHANGE ORDER NO. 9 PROJECT TITLE: Second Sheet of Ice at EPIC CONTRACTOR: The Neenan Company BID NUMBER: P-812 DESCRIPTION: The design and construction of an addition to the Edora Pool Ice Center (EPIC) to house a full size ice arena and associated facilities and equipment. In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: To upgrade the designed fire alarm system for the addition by adding the voice evacuation required by the Code, per direction from Poudre Fire Authority. 2. Description of change: Provide all materials, labor and equipment necessary to upgrade the fire alarm system to include: adding fifteen (15) 75cd candela strobes; adding four (4) 75cd, seventeen (17) 30cd and nine (9) 110cd speaker/strobes (one (1) will be replacing an existing strobe); adding three (3) intelligent photoelectric smoke detectors for duct detectors, along with three (3) LED remote alarms and three (3) air samplers; adding one (1) EST3 Control Panel, one (1) Base Remote Ampler and two (2) Base Power Boosters; also adding miscellaneous equipment such as drivers, amplifiers, dialers, graphic map, boxes, modules and controllers. 3. Change in Contract Cost: $29,797.92 4. Change in Contract Time: 0 Days (Attach additional sheets as required) ORIGINAL CONTRACT COST $3,360,896.00 TOTAL APPROVED CHANGE ORDERS 173.256.00 TOTAL PENDING CHANGE ORDERS 43,604.40 TOTAL THIS CHANGE ORDER 29,797.92 ADJUSTED CONTRACT COST $3,607,554.32 (Assuming all change orders approved) ACCEPTED BY: 'G�+ 1y�� ZYZjloL Contractor's Representative Date REVIEWED BY Facilities Project Manager cc: City Clerk Project File D/B Contractor Purchasing 10 2