HomeMy WebLinkAboutCHANGE ORDER - RFP - P812 SECOND SHEET OF ICE CHANGE ORDERSECTION 00950 CHANGE ORDER NO. 8 PROJECT TITLE: Second Sheet of Ice at EPIC CONTRACTOR: The Neenan Company BID NUMBER: P-812 DESCRIPTION: The design and construction of an addition to the Edora Pool Ice Center (EPIC) to house a full size ice arena and associated facilities and equipment. In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: To upgrade the current fire alarm system by adding the voice evacuation required by the Code, per direction from Poudre Fire Authority. 2. Description of change: Provide all materials, labor and equipment necessary to upgrade the fire alarm system to include: adding one smoke detector above the Fire Alarm Control Panel; adding nineteen (19) 75cd candela strobes; adding six (6) 75cd, seventeen (17) 30cd and nine (9) 110cd speaker/strobes (fourteen (14) will be replacing existing strobes); adding one (1) 110cd temporal hom/strobe; adding sixteen (16) intelligent photoelectric smoke detectors for duct detectors, along with sixteen (16) LED remote alarms and sixteen (16) air samplers. 3. Change in Contract Cost: $43,604.40 4. Change in Contract Time: 0 Days (Attach additional sheets as required) ORIGINAL CONTRACT COST $3,360,896.00 TOTAL APPROVED CHANGE ORDERS 173.256.00 TOTAL PENDING CHANGE ORDERS 0.00 TOTAL THIS CHANGE ORDER 43,604.40 ADJUSTED CONTRACT COST $3,577,756.40 (Assuming all change orders approved) r ACCEPTED BY: REVIEWED BY APPROVED BY cc: City Clerk Project File D/B Contractor Purchasing Lv/z9 aZ_ Date Zof O 2— Date )( `{ 0 Date