HomeMy WebLinkAboutCHANGE ORDER - BID - 5681 FOSSIL CREEKCHANGE ORDER NO. #9 PROJECT TITLE: FOSSIL CREEK COMMUNITY PARK PHASE 1 B CONTRACTOR: Clark Construction Company, Inc. PROJECT NUMBER: 5681 PURCHASE ORDER NO.: 2202988 DESCRIPTION: @lar*64*22 - Add Power to Irrigation Controllers 1. Reason for change: Omission from drawings and bid schedule. 2. Description of Change: Irrigation power, trenching, backfill per Clark subcontractor. 3. Change in Contract Cost: $7,488.00 4. Change in Contract Time: TOTAL APPROVED CHANGE ORDERS No. 1 through 5 $117,325.00 TOTAL PENDING CHANGE ORDERS 6 through 8 $43,212.00 TOTAL THIS CHANGE ORDER $7,488.00 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0.12% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 2.76% ADJUSTED CONTRACT COST $6,260,965.56 (Assuming all change orders approved) ACCEPTED BY: Uw(z(�� DATE: D jJ,Z Contractor's Representative T ACCEPTED r ��,.c%u It DATE: IQ,!SDZ Project Manager REVIEWED BY: Cic ��� DATE: Title: APPROVED Title APPROVED BY: DATE Purchasing Agent over $30,000 coCity Clerk Architect Contractor Engineer Project File Purchasing Denver Electrical Contractors Inc. SINS. Gory SL lillbbn,CobM Wln VOI (30.1)M7� COVER SHEET PROJECT NAME: FOSSIL CREEK PARK GENERAL CONTRACTOR: CLARK CONSTRUCTION CO., INC. DATE: 9/10/2002 LABOR COST POSITION COUNT SUPERINTENDENT FOREMAN JOURNEYMAN 1 TOTAL LABOR LABOR BURDEN 45% TOTAL LABOR COST MAN DAYS 2 MAN WEEKS 0 DIRECT JOB EXPENSE IDJE1 TEMPORARY POWER EQUIPMENT STORAGE FUEL PHONE ENGINEERING CLEANUP SMALL TOOLS VEHICLE EXPENSE PROJECT MANAGER TESTING CRANE TRENCHING SUB CONTRACTOR TOTAL DJE 0% LABOR 0% LABOR HOURS RATE LABOR COST 41 $ - 1.56 36 $ 56.16 15.6 32 $ 499.20 17.16 $ 655.36 $ 249.91 $ 805.27 TAKE • OFF AND PRICING SHEET �c SSII. GlZEi6,. JOB NAME: DIVISION# SHEET ESTIMATE #: Gam_ DATE: IQ� Iti /OZ ESTIMATOR: 14-% OF - ITEM LISTING ITEM TOTALS vl w STMOL PACO NO. O.P. NO. ou Nf ' MATERIAL LABOR STAVDVIO u"T .i o.ru Too V T EXTENSION srm 6ND I T co-c' 11N11DN P.CTOII —w IEo I T EXTENSION 3 I.L 3W 2`io �d� Z,Zv 2 O eo , L l 2- oU a o0 1 i0 00 .006 Sep 23 02 02:51p .:f. 3.2002 11'14AW! BHH DESIGN E S C ill; t 8 1 U 1223-1tjcl No.q+4 P 1 p.[ eieCrri,:al Systema Conaultantc, he. 212 west Muberry F )rt Collins, colei 80521 V0.224-9100 V0224.et31 e :cf�T2eleGsya.wm H'Kw.electsys.cwn ep'ernber 23, 2002 RE: 200-132 Mr. Roger S. Shvrnrian F,HA Design, Inc. 4003 Innevalion Drive Fort Collins, CO 80525 $'UBJECT: Fossil Creek Park Irrigation control Change Order tear Roger: ('lease issue fine following e:elrcal change erder for the above -mentioned project. Sheet E-L a. Extend clrcu:t P2-9 from irrigation controller junction box indicated by flag note 2 (sheet E-5) at Lake Pavilion to exterior Irrigation controller location as indicated by $K-1. The Sectrica' Contractor 5UU coordinate with the Irrigation Supplier for the exact location for the powe., IWC stub into the equipment template. Refer to Irrigation submittals for reference to the equipment footprint and conduit entry template. b. Provde new 120 volt connection from the water feature control panel (2111 TH1NN CU 6 1 #12 CU GRO) WPVC to the irrigation controller location at the water feature. Coordination will be required with the pump submittal shop dra"nps for branch Circuit requirements. Refer to SK-1 for the approximate controller location Coordinate the exact location of the equipment footprint with the Imgation Supplier prior to final rough -in. Sheet E-2t a. Locate circuit BF2.4 as iodinated on attached SK-2 at irrigation controller location, Coordinate the exact locations otthe equipment footprint with the Irrigation Supplier prior 10 final rough -in. b. Locale circuit 104.18 at irrigation Controller location as indicated on attached SK-3. Circuit P4.18 shalt be extended from its original location rear the tennis Courts, reference sheet F-3. Coordinate the exact locations of the equipment footprint with the Irrigation Supplier prior to final rough -in. Sheet F-3: a. Extend circuit P4-9 from the irrigation controller junWon box indicated by flag note 2 (sheet E-5) at Oval Pavilion to the extenar irrigation Controller location as indicated by SK-4. The Electrical Contractor shall coordinate with the Irrigation Supplier for the exact location for the pourer WC stub into the equipment template. Refer to Irrigation submitals for fefe'l'.nce to the equipment footprint. Sheet E-5: a. Concession Alea Eleexricni Pfeil. Delete jmhction boa indicated by nag note 2 as irrigation controller. Make circuit CS-8 spare. b- Lake Pavilion Electrical Plan: Extend circuit atilag note 2 as :ndicated in note 1 above. c. Oval Pavilion Electrical Plan Fatend rirauit at tag note 2 as indicated in note 3 above. P,espeelfully, ffLECTRICAL SYSTEMS CONSULTANTS, INC- Kate liod0s Enclosed. SK-1, SK-2. SK-3. SK-4 Sep 23 02 02:51P BHA DESIGN :y eu I eeo-Iuci p.o IF.:'3. 2DO ;i, "WV [Sc. wkj � , V . 2 "�..434 F7-9 Pl— AA I S CONTROLLER-;y:-'• .( ,� 1 — 11u , ,- IRRIGATION �\ \ 11 \ ?piv2_4 CONTROLLER, E.C. MAKE 120 VOLT CONNECTION TO \ ,0 S i WATER FEATURE PUMA CONTROL �4. K \ OOTT�HERS PROVIDED BY WATER FEATURE Area 1 of 4 £-1 Electrical Plan Fossi Creek fork ELECTRICAL 1" = 50'-0" f Phase lb SYSTFJdS `! city artGO~s CONSULTANTS 97G1 224-910G SK—t Sep 23 02 02:51p OHS DESIGN 1S701223-1827 p,4 Scf i?. 20i? 11 ?;AN ES I#1( No, 454�P. 3"—"'� ! \ \ PROVIDE CONNECTION TO SCOREBOARD. �R S. �\ VERIFY POWER REQUIREMENTS OF BOARD PROVIDED PRIOR TO CONNECTION. PROVIDE LOCAL MEANS OF DISCONNECT AT BOARD LOCA110N. BF2-7 i (2 /8 THWN CU & G 1 # 10 CU GRD) � `♦ 1 �� \� 3/4-PVC VD=37. EMPTY 1/2` PVC WITH PULL i CORD TO SCORE BOOTH FOR \ 41Po ER50R SCORECONTROL —5BOOTH. QABL� BY VENOFR. ELECTRICAL CONTRACTOR ALL PRnVInE 120V. CONNECTION TOR IR TION CONTROLLLR BY IRRIGAnON CONTRACTOR_ REFER TO IF RIGATOOt �SUBMITTALS FOR CONDUIT ENTRY N TEMPLATE. VERIFY EXACT LOCATIONS) WITH IRRIGATION CONTRACTOR. % BF2-4 `*+► j (2\jF12 THWN CU if & T\ S12 CU GRD) ,.� / ^I CC3 � 1/2"PWC4k•• Area 2 Of 4 E-2 Fossil Creek Pork Ew Electrical Plan ELECTRICAL 1" aCztyofrcv Phase lb SYSTEMS CONSULTANTS (970} 224-91C0 Sep 23 C2 02:51p SHP DESIGN 3 2" • 41 I _r (970)223-1527 J9 A;A -F I .5 Area 2 of 4 E-2 ^ossi! Creek Pork Et.EC-Rr -AL 1' = 50•-0• .,- rha58 1b SY5CE�1S Crry o Fort c, 6 1 C(N15Cn 7ANT5 (270) 224-PICO 3h_3 Sep 23 02 02:51p UHA ULbiGn j_J'., \ j Ej r !� ' EE r 4 � J iCOUR�'S� ' 13, A I JOl-[2;i-1812 P.e 1_ 2.14 P3- 3 P3-t7,t9 �t . % ti t, 1I' \U P3-21 BBI BBt 2 BBI <-ter.,, eel 5 \ B61 - '\ ^N-19.21 EE r EI \ ' KNEE �COU4? 7 ` \ 3-20 _-ZL �1V_ iL Pa-20,2alt� i (2 #s '•� & #10 .... -.- I- .. _.. raps w �\~� L—, City of Fog collias COSSiI Creek Pork Phase 1b ELECTRICAL SYSTEMS CONSAA.TANTC (970) 20-9100 Area 3 of 4 E-3 Electrical Plan 1` = 50'-0" jK-4 Clark construction C0.1 Inc. PROFESSIONAL ENGINEER GENERAL CONTRACTING BONDED -LICENSED 1530 Boise Avenue, Suite 204 Loveland, Colorado 80538 FAX 663-7384 (970) 667-0674 DATE:_c"A'fi0f '. o2DDa FAX TRANSMITTAL COVER SHEET Original will will not Vbe mailed. O. O. ..• SENT TO: FAWO ii FAX 41 NUMBER OF PAGES (INCLUDING THIS COVER LETTER): SPECIAL INSTRUCTIONS: �UA� aLk aft #: 970/663-7384 . Sep 23 02 02:51p BHR DESIGN (870)223-1827 p.1 0 SHA Design m.0-purvea 4803 111,10VAL106 Drive For, CoW,16. CO 60625 ,.k4 470 773,7377 fsx 970. 223.!!37 FOSSIL CREEK COMMUNITY PARK - PHASE 10 �S TRANSMITTA C) \J OATS! 91z310Z-- FROM'. ROGER EHERMAN — YO. CITY OF FORT COLLINS CLARK CONSTRUCTION .IFFF LAKEY MIKE SIMS FAX' S70.221.6556 FAX: el0.663.7304 ❑ DESIGN CONCEPTS U RB413 ARCHITECTS ROB LAYFTON COPAL SHREOTIIA FAX: 3C3.6e4.5313 FAX: 970.454.0264 ❑ JR ENGINEERING ❑ ESC CONSULTANTS DAN MATTSON KATE HODGSON FAX: 970.491.9984 FAX: 970.224.913' ❑ ABRAHAMSON ENGINEERING ❑ JVA BILL FARYNA DAN'IEL FOLMAR FAX. 970.221.2671� FAX: 970.225-6923 ❑ AQUA -ENGINEERING O ROCKY MOUNTAIN RAIN SCOTT ADDINGTON CHUCK AINSWORTI-. FAX: :/0.226.3565 FAX: 1170 RF1.3659 U ALLTEC SKATEPAUKS TIM ALTIO FAX: ❑'ARTSCAPES ANDY DUFFORD FAX: 303.4r7.C737 " CF}RISTIAN MULLER FAX: 303,720,0616 We are sending you--L pages including this cover sheet Description I Comments n• _ L . n_ _ - _-4 .- ___4._u_ _ __, Ao' P'.ease <ontacl ma if you have any hue 52io.^.s or comments z oul this I ansmittel. CLARK CONSTRUCTION CO., INC. Job Fossil Creek Community Park Change Order No. 22 Description Add Power to Irrigation Controllers Date 10/9/02 Contr Contr Bid Unit Cost Fee Fee Total Item Description Clty Units Price Amount % Amount Amount PART 1 - WORK PERFORMED BY CONTRACTOR 2 General Conditions 7.488 7,488 Site Supervision 7,488 2.5% $ 188 15% $ 29 $ 217 Project Manager 7,488 1.5% $ 113 15% $ 17 $ 130 Safety 7,488 0.1 % $ 8 15% $ 2 $ 10 Travel 7,488 0.1% $ 8 15% $ 2 $ 10 Job Cleanup 7,488 0.5% $ 38 15% $ 6 $ 44 Trailers & Supplies o days $ 25.00 $ - 15% $ - $ Temp Util, Phone, Toilet, etc o days $ 70.00 $ - 15% $ - $ - PART 1 TOTAL $ 355 $ 56 $ 411 PART 2 - WORK PERFORMED BY SUBCONTRACTOR 177 Electrical $ 6,620 5% $ 331 $ 6,951 PART 2 TOTAL $ 6,620 $ 331 $ 6,951 Change Order SubTotal $ 7,362 1 Contractor's Bond & Insurance Fee 1.7% $ 126 Change Order Total $ 7,488 The Contract Time will be Unchanged by 0 Days October 7, 2002 Clark Construction Co., Inc. 1530 Boise Ave. Loveland, CO 80538 Attn: Mike Sims Re: FOSSIL CREEK COMMUNITY PARK Subject: Denver Electrical Contractors Change Request No. 7 Dear Mike, Phone: 970-667-0674 Fax: 970-663-7384 We hereby submit for your consideration our Change Request No. 7 in the amount of Six Thousand Six Hundred Twenty Dollars ($6,620.00), as an add to our subcontract agreement for the above referenced project. This Change Request covers providing the power required for the irrigation system per the ESC correspondence dated 9/23/02. Price breakout is as follows: Irrigation power $ 4,045.00 Trench and backfill 2,575.0 TOTAL $ 6,620.00 Our itemized breakdown for this change request is attached for your review. A formal change order to our contract for the above amount must be issued prior to us proceeding with this work. This proposal is based solely on the usual cost elements such as labor, material, and normal markups. If you have any questions or if we can be of further service to you in this matter, please do not hesitate to contact the undersigned. Sincerely, D�ENV E RICAL CONTRACTORS, INC. 'Ke y om Pres dent CONSTRUCTIONBUILD955 E. 58th Ave., Unit D • Denver, CD 80216 • Phone 303.432.8879 • Fax 303.431.1724 Denver Electrical Contractors Inc. 955E.S A"-,UMD Da ,CbMO E021E Vab (=)4l2-0BM Fu(!D3"-1T24 COVER SHEET PROJECT NAME: FOSSIL CREEK PARK GENERAL CONTRACTOR: CLARK CONSTRUCTION CO., INC. DATE: 9/10/2002 IRRIGATION POWER SUMMARY MATERIAL COST $ 562.08 QUOTES $ TAX $ TOTAL MATERIALS $ 562.08 LABOR COST $ 2,028.13 LABOR BURDEN $ 912.66 TOTAL LABOR COST $ 2,940.79 DJE $ JOB COST 3,602.87 PERMIT 0% $ _ PRIME COST $ 3,602.87 OVERHEAD 10% $ 350.29 NET COST 3,853.16 PROFIT 5% $ 192.66 SELL PRICE $ 4,045.82 Denver Electrical Contractors Inc. 5IN&D-,fta Uml N9 b,M =29 void M9317� COVER SHEET PROJECT NAME: FOSSIL CREEK PARK GENERAL CONTRACTOR: CLARK CONSTRUCTION CO., INC. DATE: 9/10/2002 PHASE BREAKDOWN PHASE DESCRIPTION 100 IRRIGATION POWER 200 300 400 500 700 1000 1100 1200 2000 2100 2200 PHASE TOTAL TOTAL MAT AND LABOR QUOTES 100 LIGHTING 300 GEAR 1100 FIRE ALARM 2000 SITE LIGHTING 0 0 0 0 0 TOTAL QUOTES TOTAL MAT & QUOTES TAX % TOTAL MATERIAL LABOR $ 562.08 56.97 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 562.08 $ 662.08 $ 562.08 0.00% $ - $ 562.08 56.97 56.97 Denver Electrical Contractors Inc. COVER SHEET PROJECT NAME: FOSSIL CREEK PARK GENERAL CONTRACTOR: CLARK CONSTRUCTION CO., INC. DATE: 9/10/2002 LABOR COST POSITION COUNT SUPERINTENDENT FOREMAN JOURNEYMAN 1 TOTALLABOR LABOR BURDEN 45% TOTAL LABOR COST MAN DAYS 8 MAN WEEKS 2 DIRECT JOB EXPENSE IDJEI TEMPORARY POWER EQUIPMENT STORAGE FUEL PHONE CLEANUP SMALL TOOLS VEHICLE EXPENSE PROJECT MANAGER TESTING CRANE TRENCHING SUB CONTRACTOR TOTAL DJE 0% LABOR 0% LABOR HOURS RATE LABOR COST 41 $ - 5.697 36 $ 205.09 56.97 32 $ 1,823.04 62.66 $$ 2,028.13 $ 912.66 $ 2,940.79 T TAKE • OFF AND PRICING SHEET ~ „ JOB NAME: ylZIZd et M`1 Ate! ocic�s U7�lL .• DIVISION#: SHEET: ESTIMATE #: GLk-J DATE: ltd-t loz- ESTIMATOR: KGT- OF: mm omm in ME EWE in WE I Elm mom IN mm mom ME I Denver Electrical Contractors Inc. ME.6 Aga.,U 0 Demo, CobraEo lOZ18 V.i (903)4M2 70 F.003MMM COVER SHEET PROJECT NAME: FOSSIL CREEK PARK GENERAL CONTRACTOR: CLARK CONSTRUCTION CO., INC. DATE: 9/10/2002 IRRIGATION TRENCHING SUMMARY MATERIAL COST $ 1,425.00 QUOTES $ TAX $ TOTAL MATERIALS $ 1,425.00 LABOR COST $ 555.36 LABOR BURDEN $ 249.91 TOTAL LABOR COST $ 806.27 DJE $ JOB COST $ 2,230.27 PERMIT 0% $ _ PRIME COST $ 2,230.27 OVERHEAD 10% $ 223.03 NET COST $ 2,453.30 PROFIT 5% $ 122.66 SELL PRICE $ 2,575.96 Denver Electrical Contractors Inc. 8149S. Wft St UMtlela,CobM Wln VOIM CM3)03 74% COVER SHEET PROJECT NAME: FOSSIL CREEK PARK GENERAL CONTRACTOR: CLARK CONSTRUCTION CO., INC. DATE: 9/10/2002 PHASE BREAKDOWN PHASE DESCRIPTION 100 IRRIGATION TRENCHING 200 300 400 500 700 1000 1100 1200 2000 2100 2200 PHASE TOTAL TOTAL MAT AND LABOR QUOTES MATERIAL LABOR $ 1,425.00 15.6 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0- $ 0 $ 0 $ 1,425.00 $ 1,426.00 100 LIGHTING $ 300 GEAR $ 1100 FIRE ALARM $ 2000 SITE LIGHTING $ 0 $ 0 $ 0 $ 0 $ 0 $ TOTAL QUOTES $ TOTAL MAT & QUOTES $ 1,425.00 TAX % 0.00% $ - TOTAL $ 1,425.00 15.6 15.6