HomeMy WebLinkAboutCHANGE ORDER - BID - 5681 FOSSIL CREEKCHANGE ORDER NO. #9
PROJECT TITLE:
FOSSIL CREEK COMMUNITY PARK PHASE 1 B
CONTRACTOR:
Clark Construction Company, Inc.
PROJECT NUMBER:
5681
PURCHASE ORDER NO.:
2202988
DESCRIPTION: @lar*64*22 - Add Power to Irrigation Controllers
1. Reason for change: Omission from drawings and bid schedule.
2. Description of Change: Irrigation power, trenching, backfill per Clark subcontractor.
3. Change in Contract Cost: $7,488.00
4. Change in Contract Time:
TOTAL APPROVED CHANGE ORDERS No. 1 through 5 $117,325.00
TOTAL PENDING CHANGE ORDERS 6 through 8 $43,212.00
TOTAL THIS CHANGE ORDER $7,488.00
TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0.12%
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 2.76%
ADJUSTED CONTRACT COST $6,260,965.56
(Assuming all change orders approved)
ACCEPTED BY: Uw(z(�� DATE: D jJ,Z
Contractor's Representative T
ACCEPTED r ��,.c%u It DATE: IQ,!SDZ
Project Manager
REVIEWED BY: Cic ��� DATE: Title:
APPROVED
Title
APPROVED BY: DATE
Purchasing Agent over $30,000
coCity Clerk Architect
Contractor Engineer
Project File Purchasing
Denver Electrical Contractors Inc.
SINS. Gory SL lillbbn,CobM Wln VOI (30.1)M7�
COVER SHEET
PROJECT NAME: FOSSIL CREEK PARK
GENERAL CONTRACTOR: CLARK CONSTRUCTION CO., INC.
DATE: 9/10/2002
LABOR COST
POSITION COUNT
SUPERINTENDENT
FOREMAN
JOURNEYMAN 1
TOTAL LABOR
LABOR BURDEN 45%
TOTAL LABOR COST
MAN DAYS 2
MAN WEEKS 0
DIRECT JOB EXPENSE IDJE1
TEMPORARY POWER
EQUIPMENT
STORAGE
FUEL
PHONE
ENGINEERING
CLEANUP
SMALL TOOLS
VEHICLE EXPENSE
PROJECT MANAGER
TESTING
CRANE
TRENCHING
SUB CONTRACTOR
TOTAL DJE
0% LABOR
0% LABOR
HOURS RATE
LABOR COST
41
$ -
1.56 36
$ 56.16
15.6 32
$ 499.20
17.16 $ 655.36
$ 249.91
$ 805.27
TAKE • OFF AND PRICING SHEET
�c SSII. GlZEi6,.
JOB NAME:
DIVISION#
SHEET
ESTIMATE #: Gam_ DATE: IQ� Iti /OZ
ESTIMATOR: 14-%
OF -
ITEM LISTING
ITEM TOTALS
vl w
STMOL
PACO
NO.
O.P.
NO.
ou Nf
'
MATERIAL
LABOR
STAVDVIO
u"T
.i
o.ru
Too
V T
EXTENSION
srm
6ND
I T
co-c'
11N11DN
P.CTOII
—w
IEo
I T
EXTENSION
3 I.L 3W 2`io
�d�
Z,Zv
2
O
eo
, L
l
2-
oU
a
o0
1 i0
00
.006
Sep 23 02 02:51p
.:f. 3.2002 11'14AW!
BHH DESIGN
E S C ill;
t 8 1 U 1223-1tjcl
No.q+4 P 1
p.[
eieCrri,:al Systema Conaultantc, he.
212 west Muberry
F )rt Collins, colei 80521
V0.224-9100
V0224.et31
e :cf�T2eleGsya.wm
H'Kw.electsys.cwn
ep'ernber 23, 2002
RE: 200-132
Mr. Roger S. Shvrnrian
F,HA Design, Inc.
4003 Innevalion Drive
Fort Collins, CO 80525
$'UBJECT: Fossil Creek Park
Irrigation control Change Order
tear Roger:
('lease issue fine following e:elrcal change erder for the above -mentioned project.
Sheet E-L
a. Extend clrcu:t P2-9 from irrigation controller junction box indicated by flag note 2 (sheet E-5) at
Lake Pavilion to exterior Irrigation controller location as indicated by $K-1. The Sectrica'
Contractor 5UU coordinate with the Irrigation Supplier for the exact location for the powe., IWC
stub into the equipment template. Refer to Irrigation submittals for reference to the equipment
footprint and conduit entry template.
b. Provde new 120 volt connection from the water feature control panel (2111 TH1NN CU 6 1 #12
CU GRO) WPVC to the irrigation controller location at the water feature. Coordination will be
required with the pump submittal shop dra"nps for branch Circuit requirements. Refer to SK-1 for
the approximate controller location Coordinate the exact location of the equipment footprint with
the Imgation Supplier prior to final rough -in.
Sheet E-2t
a. Locate circuit BF2.4 as iodinated on attached SK-2 at irrigation controller location, Coordinate the
exact locations otthe equipment footprint with the Irrigation Supplier prior 10 final rough -in.
b. Locale circuit 104.18 at irrigation Controller location as indicated on attached SK-3. Circuit P4.18
shalt be extended from its original location rear the tennis Courts, reference sheet F-3.
Coordinate the exact locations of the equipment footprint with the Irrigation Supplier prior to final
rough -in.
Sheet F-3:
a. Extend circuit P4-9 from the irrigation controller junWon box indicated by flag note 2 (sheet E-5)
at Oval Pavilion to the extenar irrigation Controller location as indicated by SK-4. The Electrical
Contractor shall coordinate with the Irrigation Supplier for the exact location for the pourer WC
stub into the equipment template. Refer to Irrigation submitals for fefe'l'.nce to the equipment
footprint.
Sheet E-5:
a. Concession Alea Eleexricni Pfeil. Delete jmhction boa indicated by nag note 2 as irrigation
controller. Make circuit CS-8 spare.
b- Lake Pavilion Electrical Plan: Extend circuit atilag note 2 as :ndicated in note 1 above.
c. Oval Pavilion Electrical Plan Fatend rirauit at tag note 2 as indicated in note 3 above.
P,espeelfully,
ffLECTRICAL SYSTEMS CONSULTANTS, INC-
Kate liod0s
Enclosed. SK-1, SK-2. SK-3. SK-4
Sep 23 02 02:51P BHA DESIGN :y eu I eeo-Iuci p.o
IF.:'3. 2DO ;i, "WV [Sc. wkj � , V
. 2
"�..434 F7-9
Pl—
AA
I S CONTROLLER-;y:-'•
.(
,�
1 — 11u ,
,-
IRRIGATION
�\
\ 11 \
?piv2_4
CONTROLLER, E.C.
MAKE 120 VOLT
CONNECTION TO
\ ,0
S i
WATER FEATURE
PUMA CONTROL
�4. K
\ OOTT�HERS PROVIDED BY
WATER
FEATURE
Area 1 of 4 £-1
Electrical Plan
Fossi Creek fork
ELECTRICAL
1" = 50'-0"
f
Phase lb
SYSTFJdS
`!
city artGO~s
CONSULTANTS
97G1 224-910G
SK—t
Sep 23 02 02:51p OHS DESIGN 1S701223-1827 p,4
Scf i?. 20i? 11 ?;AN ES I#1( No, 454�P. 3"—"'�
! \ \ PROVIDE CONNECTION TO SCOREBOARD.
�R S. �\ VERIFY POWER REQUIREMENTS OF
BOARD PROVIDED PRIOR TO
CONNECTION. PROVIDE LOCAL MEANS OF
DISCONNECT AT BOARD LOCA110N.
BF2-7 i
(2 /8 THWN CU &
G 1 # 10 CU GRD)
� `♦ 1 �� \� 3/4-PVC VD=37.
EMPTY 1/2` PVC WITH PULL
i CORD TO SCORE BOOTH FOR
\ 41Po ER50R SCORECONTROL —5BOOTH.
QABL� BY VENOFR.
ELECTRICAL CONTRACTOR ALL PRnVInE
120V. CONNECTION TOR IR TION
CONTROLLLR BY IRRIGAnON
CONTRACTOR_ REFER TO IF
RIGATOOt
�SUBMITTALS FOR CONDUIT ENTRY
N TEMPLATE. VERIFY EXACT LOCATIONS)
WITH IRRIGATION CONTRACTOR.
% BF2-4 `*+►
j (2\jF12 THWN CU
if & T\ S12 CU GRD) ,.� / ^I CC3
� 1/2"PWC4k••
Area 2 Of 4 E-2
Fossil Creek Pork Ew Electrical Plan
ELECTRICAL 1"
aCztyofrcv
Phase lb SYSTEMS
CONSULTANTS
(970} 224-91C0
Sep 23 C2 02:51p SHP DESIGN
3 2" • 41
I
_r
(970)223-1527
J9 A;A -F
I
.5
Area 2 of 4 E-2
^ossi! Creek Pork
Et.EC-Rr -AL
1' = 50•-0•
.,-
rha58 1b
SY5CE�1S
Crry o Fort c, 6 1
C(N15Cn 7ANT5
(270) 224-PICO
3h_3
Sep 23 02 02:51p UHA ULbiGn
j_J'.,
\ j Ej
r
!�
' EE r 4
� J iCOUR�'S� '
13,
A
I JOl-[2;i-1812 P.e
1_ 2.14
P3-
3 P3-t7,t9 �t . % ti t, 1I'
\U P3-21
BBI BBt 2 BBI
<-ter.,, eel
5 \ B61
-
'\
^N-19.21 EE r EI
\ '
KNEE �COU4? 7 ` \
3-20
_-ZL
�1V_ iL Pa-20,2alt� i
(2 #s '•� & #10 .... -.- I- .. _.. raps w
�\~�
L—,
City of Fog collias
COSSiI Creek Pork
Phase 1b
ELECTRICAL
SYSTEMS
CONSAA.TANTC
(970) 20-9100
Area 3 of 4 E-3
Electrical Plan
1` = 50'-0"
jK-4
Clark
construction
C0.1 Inc.
PROFESSIONAL ENGINEER
GENERAL CONTRACTING
BONDED -LICENSED
1530 Boise Avenue, Suite 204 Loveland, Colorado 80538 FAX 663-7384 (970) 667-0674
DATE:_c"A'fi0f '. o2DDa
FAX TRANSMITTAL COVER SHEET
Original will will not Vbe mailed.
O. O. ..•
SENT TO:
FAWO ii
FAX 41
NUMBER OF PAGES (INCLUDING THIS COVER LETTER):
SPECIAL INSTRUCTIONS: �UA� aLk aft
#: 970/663-7384
. Sep 23 02 02:51p BHR DESIGN (870)223-1827 p.1
0
SHA Design m.0-purvea
4803 111,10VAL106 Drive
For, CoW,16. CO 60625
,.k4 470 773,7377
fsx 970. 223.!!37
FOSSIL CREEK COMMUNITY PARK - PHASE 10
�S
TRANSMITTA
C)
\J
OATS! 91z310Z--
FROM'. ROGER EHERMAN —
YO.
CITY OF FORT COLLINS
CLARK CONSTRUCTION
.IFFF LAKEY
MIKE SIMS
FAX' S70.221.6556
FAX: el0.663.7304
❑ DESIGN CONCEPTS
U RB413 ARCHITECTS
ROB LAYFTON
COPAL SHREOTIIA
FAX: 3C3.6e4.5313
FAX: 970.454.0264
❑ JR ENGINEERING
❑ ESC CONSULTANTS
DAN MATTSON
KATE HODGSON
FAX: 970.491.9984
FAX: 970.224.913'
❑ ABRAHAMSON ENGINEERING
❑ JVA
BILL FARYNA
DAN'IEL FOLMAR
FAX. 970.221.2671�
FAX: 970.225-6923
❑ AQUA -ENGINEERING
O ROCKY MOUNTAIN RAIN
SCOTT ADDINGTON
CHUCK AINSWORTI-.
FAX: :/0.226.3565
FAX: 1170 RF1.3659
U ALLTEC SKATEPAUKS
TIM ALTIO
FAX:
❑'ARTSCAPES
ANDY DUFFORD
FAX: 303.4r7.C737
" CF}RISTIAN MULLER
FAX: 303,720,0616
We are sending you--L pages including this cover sheet
Description I Comments
n• _ L . n_ _ - _-4 .- ___4._u_ _ __, Ao'
P'.ease <ontacl ma if you have any hue 52io.^.s or comments z oul this I ansmittel.
CLARK CONSTRUCTION CO., INC.
Job Fossil Creek Community Park
Change Order No. 22
Description Add Power to Irrigation Controllers
Date 10/9/02
Contr
Contr
Bid
Unit
Cost
Fee
Fee
Total
Item Description Clty Units
Price
Amount
%
Amount
Amount
PART 1 - WORK PERFORMED BY CONTRACTOR
2 General Conditions 7.488 7,488
Site Supervision 7,488
2.5%
$
188
15%
$
29
$
217
Project Manager 7,488
1.5%
$
113
15%
$
17
$
130
Safety 7,488
0.1 %
$
8
15%
$
2
$
10
Travel 7,488
0.1%
$
8
15%
$
2
$
10
Job Cleanup 7,488
0.5%
$
38
15%
$
6
$
44
Trailers & Supplies o days $
25.00
$
-
15%
$
-
$
Temp Util, Phone, Toilet, etc o days $
70.00
$
-
15%
$
-
$
-
PART 1 TOTAL
$
355
$
56
$
411
PART 2 - WORK PERFORMED BY SUBCONTRACTOR
177 Electrical $ 6,620 5% $ 331 $ 6,951
PART 2 TOTAL $ 6,620 $ 331 $ 6,951
Change Order SubTotal $ 7,362
1 Contractor's Bond & Insurance Fee 1.7% $ 126
Change Order Total $ 7,488
The Contract Time will be Unchanged by 0 Days
October 7, 2002
Clark Construction Co., Inc.
1530 Boise Ave.
Loveland, CO 80538
Attn: Mike Sims
Re: FOSSIL CREEK COMMUNITY PARK
Subject: Denver Electrical Contractors
Change Request No. 7
Dear Mike,
Phone: 970-667-0674
Fax: 970-663-7384
We hereby submit for your consideration our Change Request No. 7 in the amount of Six
Thousand Six Hundred Twenty Dollars ($6,620.00), as an add to our subcontract
agreement for the above referenced project.
This Change Request covers providing the power required for the irrigation system per
the ESC correspondence dated 9/23/02.
Price breakout is as follows:
Irrigation power $ 4,045.00
Trench and backfill 2,575.0
TOTAL $ 6,620.00
Our itemized breakdown for this change request is attached for your review. A formal
change order to our contract for the above amount must be issued prior to us proceeding
with this work. This proposal is based solely on the usual cost elements such as labor,
material, and normal markups.
If you have any questions or if we can be of further service to you in this matter, please
do not hesitate to contact the undersigned.
Sincerely,
D�ENV E RICAL CONTRACTORS, INC.
'Ke y om
Pres dent
CONSTRUCTIONBUILD955
E. 58th Ave., Unit D •
Denver,
CD 80216 •
Phone 303.432.8879 •
Fax 303.431.1724
Denver Electrical Contractors Inc.
955E.S A"-,UMD Da ,CbMO E021E Vab (=)4l2-0BM Fu(!D3"-1T24
COVER SHEET
PROJECT NAME: FOSSIL CREEK PARK
GENERAL CONTRACTOR: CLARK CONSTRUCTION CO., INC.
DATE: 9/10/2002
IRRIGATION POWER
SUMMARY
MATERIAL COST $ 562.08
QUOTES $
TAX $
TOTAL MATERIALS $ 562.08
LABOR COST
$
2,028.13
LABOR BURDEN
$
912.66
TOTAL LABOR COST
$
2,940.79
DJE
$
JOB COST
3,602.87
PERMIT 0%
$
_
PRIME COST
$
3,602.87
OVERHEAD 10%
$
350.29
NET COST
3,853.16
PROFIT 5%
$
192.66
SELL PRICE
$
4,045.82
Denver Electrical Contractors Inc.
5IN&D-,fta Uml N9 b,M =29 void M9317�
COVER SHEET
PROJECT NAME: FOSSIL CREEK PARK
GENERAL CONTRACTOR: CLARK CONSTRUCTION CO., INC.
DATE: 9/10/2002
PHASE BREAKDOWN
PHASE DESCRIPTION
100 IRRIGATION POWER
200
300
400
500
700
1000
1100
1200
2000
2100
2200
PHASE TOTAL
TOTAL MAT AND LABOR
QUOTES
100
LIGHTING
300
GEAR
1100
FIRE ALARM
2000
SITE LIGHTING
0
0
0
0
0
TOTAL QUOTES
TOTAL MAT & QUOTES
TAX %
TOTAL
MATERIAL LABOR
$ 562.08
56.97
$
0
$
0
$
0
$
0
$
0
$
0
$
0
$
0
$
0
$
0
$ 562.08
$ 662.08
$ 562.08
0.00% $ -
$ 562.08
56.97
56.97
Denver Electrical Contractors Inc.
COVER SHEET
PROJECT NAME: FOSSIL CREEK PARK
GENERAL CONTRACTOR: CLARK CONSTRUCTION CO., INC.
DATE: 9/10/2002
LABOR COST
POSITION COUNT
SUPERINTENDENT
FOREMAN
JOURNEYMAN 1
TOTALLABOR
LABOR BURDEN 45%
TOTAL LABOR COST
MAN DAYS 8
MAN WEEKS 2
DIRECT JOB EXPENSE IDJEI
TEMPORARY POWER
EQUIPMENT
STORAGE
FUEL
PHONE
CLEANUP
SMALL TOOLS
VEHICLE EXPENSE
PROJECT MANAGER
TESTING
CRANE
TRENCHING
SUB CONTRACTOR
TOTAL DJE
0% LABOR
0% LABOR
HOURS RATE LABOR COST
41 $ -
5.697 36 $ 205.09
56.97 32 $ 1,823.04
62.66 $$ 2,028.13
$ 912.66
$ 2,940.79
T TAKE • OFF AND
PRICING SHEET ~ „
JOB NAME: ylZIZd et M`1 Ate! ocic�s
U7�lL .•
DIVISION#:
SHEET:
ESTIMATE #: GLk-J DATE: ltd-t loz-
ESTIMATOR: KGT-
OF:
mm
omm
in
ME
EWE
in
WE
I
Elm
mom
IN
mm
mom
ME
I
Denver Electrical Contractors Inc.
ME.6 Aga.,U 0 Demo, CobraEo lOZ18 V.i (903)4M2 70 F.003MMM
COVER SHEET
PROJECT NAME: FOSSIL CREEK PARK
GENERAL CONTRACTOR: CLARK CONSTRUCTION CO., INC.
DATE: 9/10/2002
IRRIGATION TRENCHING
SUMMARY
MATERIAL COST $ 1,425.00
QUOTES $
TAX $
TOTAL MATERIALS $ 1,425.00
LABOR COST
$
555.36
LABOR BURDEN
$
249.91
TOTAL LABOR COST
$
806.27
DJE
$
JOB COST
$
2,230.27
PERMIT 0%
$
_
PRIME COST
$
2,230.27
OVERHEAD 10%
$
223.03
NET COST
$
2,453.30
PROFIT 5%
$
122.66
SELL PRICE
$
2,575.96
Denver Electrical Contractors Inc.
8149S. Wft St UMtlela,CobM Wln VOIM CM3)03 74%
COVER SHEET
PROJECT NAME: FOSSIL CREEK PARK
GENERAL CONTRACTOR: CLARK CONSTRUCTION CO., INC.
DATE: 9/10/2002
PHASE BREAKDOWN
PHASE DESCRIPTION
100 IRRIGATION TRENCHING
200
300
400
500
700
1000
1100
1200
2000
2100
2200
PHASE TOTAL
TOTAL MAT AND LABOR
QUOTES
MATERIAL LABOR
$ 1,425.00
15.6
$
0
$
0
$
0
$
0
$
0
$
0
$
0
$
0-
$
0
$
0
$ 1,425.00
$ 1,426.00
100
LIGHTING
$
300
GEAR
$
1100
FIRE ALARM
$
2000
SITE LIGHTING
$
0
$
0
$
0
$
0
$
0
$
TOTAL QUOTES
$
TOTAL MAT & QUOTES $ 1,425.00
TAX % 0.00% $ -
TOTAL $ 1,425.00
15.6
15.6