Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CHANGE ORDER - BID - 5700 CITY OF FORT COLLINS AND CSU TRANSIT CENTER
Fnn September 18, 2002 City of Fort Collins Attn: Steve White 117 N. Mason Street Fort Collins, CO 80522 RE: CSU Transit Center Dear Steve: Construction Athletic Complexes - Parks - Trails 2526 E. Hwy, 402 P.O. Box 2135 Loveland, Colorado 80539 Phone (970) 669-6291 Fax (970) 669-6411 Metro (303) 530-7660 Listed below are the outstanding work directives and RFC 1.2 that we have not received a change order for. We have attached copies of the work directives and RFC 12 for your review. Please let me know when we will receive a change order for this work. Outstanding approved work directives: 1. Work Change Directive 05-2002: Electrical and bus signage revisions 2. Work Change Directive 07-2002: Electrical work, concrete work, and parking meter posts 3. Work Change Directive 08-2002: Parking meter posts — revised to reflect installation of 14 posts instead of 25 4. Work Change Directive 09-2002: Landscaping retaining walls T & M 5. RFC #12: Steam tunnel revisions at sidewalk Total: nnSincerely, ` 1�•(�IL lJ�+�x �W Rick Coulter, General Superintendent Environmental Concerns, Inc. RC t© Enclosures $6,826.00 $20,335.78 $4,175.00 Cost to be determined 7 134.28 $38,471.06